House Keeping Schedule

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 3

Form No.

HOUSEKEEPING SCHEDULE

Qualification BOOKKEPING NC III

Area/section

In-Charge Your name

Schedule for the Month of APRIL 2018


Responsible
ACTIVITIES Every Every
Person Wee Monthl
Daily other 15th Remarks
kly y
day Day

1.Clean and
check
equipment/acce
ssories from
dust and oil; dry
and properly
laid/secured/sta
ble

2.Clean and
check Weekly
laboratory and routine
computer 
checking
position from Trainees
dust/rust used
wires and gas
tube

3. Clean and Trainees  Before


arrange and after
working area work
done

4.Clean and Weekly


check floor, routine
window checking
ceilings
Dust/rust Trainees 
Cobwebs and
unnecessary
object/items
Any use
Date Developed: Document
July 2, 2018 Issued by:
August 23,2018:
BOOKKEEPING NC III
Developed by:
Revision # 00
materials/scra
ps spilled
liquid

5.Clean and Every


check 15day
workshop routine
ventilation by TRAINERTr 
checking
dusting lamps/ ainees
bulbs,
replace /non
function al
lamps and
keeping
exhaust clean

6.Clean and
check
Before
computer set and after
monitor ,CPU,
keyboard Work
TRAINER 
,mouse free, done
unnecessary
marking, dust
cable and plug
are in order,
well arrange,
all items
functions

7.Clean,
inspect air
conditioning
equipment:
Keep screen Every
and filter free other day
TRAINER/ 
from dust/rust. routine
Trainees
Check selector
knobs if in
normal
position and
function.
Check if
drainage is ok

8.Clean,check
Date Developed: Document
July 2, 2018 Issued by:
August 23,2018:
BOOKKEEPING NC III
Developed by:
Revision # 00
Trainees/
and maintain
equipment/sto trainer  Weekly
re room routine
Free from dust, checking
not damp
Equipment in
appropriate
position/locati
on
With visible
labels
Logbook and
forms are
complete in
order and
updated

9.Clean and Before


check restroom and after
TRAINEES 
work
Urinals bowls
done

10.Disposal of Before
waste materials TRAINEES and after

work
[follow waste
done
segregation
system]

To be included:
 Training equipment
 LCD projector
 Audio visual
 Computer set
 Air conditioning
 Water dispenser
 Support equipment
 Fax machine
 Photo copier

Date Developed: Document


July 2, 2018 Issued by:
August 23,2018:
BOOKKEEPING NC III
Developed by:
Revision # 00

You might also like