Qualification of tiller
Readiness of floor W.R.T other works
Material approval slip and sample
Submittal of tiling module
Colour of selected material
Size of plastic tile (Length, width, thickness)
Checking physical properties of sample with site deliveries;
a) Product data of sample with deliveries
b) Flexibility of tile
c) Nature of underneath fiber of tile
d) Smooth/plane nature of surface
e) Nature of adhesive (approved with new deliveries)
Signature:- Date:-
_________________________________________________________________________
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE
Cleaning state of finished surface
For the above items are fulfilled /not fulfilled ,the Contractor is hereby allowed
/refused to proceed Electrical works. The take-off sheet of this activity shall immediately
be signed upon completion.
For the Consultant For the Contractor
Name : Name:
Signature: Signature:
Signature:- Date:-