This document provides a material takeoff for site facilities at an existing laydown site, including quantities of transformers, panels, cables, generators, air conditioners, lights, and other equipment. Specifically, it lists 14 items needed for the transformer and distribution panel, 15 items under option 1 or 2 for cable tray and grounding installation, 11 items for the site office lighting and power, 11 items for another site office, and 10 items for the on-site mosque facilities. The material takeoff quantifies the electrical and mechanical equipment required for temporary power distribution and amenities at the construction laydown area.
Facilities Planning and Design An Introduction For Facility Planners, Facility Project Managers and Facility Managers, 2nd Ed (Jonathan Lian) (Z-Library)
This document provides a material takeoff for site facilities at an existing laydown site, including quantities of transformers, panels, cables, generators, air conditioners, lights, and other equipment. Specifically, it lists 14 items needed for the transformer and distribution panel, 15 items under option 1 or 2 for cable tray and grounding installation, 11 items for the site office lighting and power, 11 items for another site office, and 10 items for the on-site mosque facilities. The material takeoff quantifies the electrical and mechanical equipment required for temporary power distribution and amenities at the construction laydown area.
This document provides a material takeoff for site facilities at an existing laydown site, including quantities of transformers, panels, cables, generators, air conditioners, lights, and other equipment. Specifically, it lists 14 items needed for the transformer and distribution panel, 15 items under option 1 or 2 for cable tray and grounding installation, 11 items for the site office lighting and power, 11 items for another site office, and 10 items for the on-site mosque facilities. The material takeoff quantifies the electrical and mechanical equipment required for temporary power distribution and amenities at the construction laydown area.
This document provides a material takeoff for site facilities at an existing laydown site, including quantities of transformers, panels, cables, generators, air conditioners, lights, and other equipment. Specifically, it lists 14 items needed for the transformer and distribution panel, 15 items under option 1 or 2 for cable tray and grounding installation, 11 items for the site office lighting and power, 11 items for another site office, and 10 items for the on-site mosque facilities. The material takeoff quantifies the electrical and mechanical equipment required for temporary power distribution and amenities at the construction laydown area.
1 Install Transformer 20kV/400V, 150kVA 1 Ea 2 Install Panel MV Distribution Panel (MVP01) 1 Ea 3 Pulling Kabel 20kV, NA2XSEFGby 3c x 300 Sqmm 2000 Mtr Estimasi 4 Pulling Kabel NYY 4C x 70 Sqmm 50 Mtr 5 Termination Kit 20 kV untuk kabel 3c x 300 sqmm 4 Set 6 Install Genset 80 Kva 1 Ea 7 Install Change Over Switch (COS) 200A, 4 pole 1 Ea 8 Install Main Panel Genset 80 kVA (600x800x250) (1 Ea) 1 Ea Opsi 1 9 Cable Tray W200 c/w cover tray, clamp cover 670 Ea 10 Jointing Tray c/w Bolt and Nut 1340 Ea 11 UNP 100 200 Batang Support Tray 12 Hi-pot Test 1 Lot Opsi 2 13 Exavation dan back fill 2000 Mtr 14 Install Tile concrete 1 Lot 15 Hi-pot Test 1 Lot MATERIAL TAKE OFF
MTO SITE FACILITIES WIKA
MATERIAL TAKE OFF OF FACILITIES
NO. DESCRIPTION QTY UNIT Remarks
1 Install Panel Lighting (Terlampir Panel Schedule) 1 Ea 2 Lampu TL-2x36W 30 Titik 3 Lampu TL-1x36W 14 Titik 4 Downlight 36W 12 Titik 5 Exhaust Fan 8 Ea 6 AC Indoor 2 PK 10 Ea 7 AC Indoor 1 PK 5 Ea 8 Receptacle Inbow 16A 28 Ea 9 Kabel NYY 4C x 50 Sqmm 70 Mtr Panel LV to Site Office 1 10 Kabel Grounding, 1c x 50 sqmm 100 Mtr 11 Grounding Rod, Length 3 m, c/w clamp rod 10 Ea MATERIAL TAKE OFF
MTO SITE FACILITIES OFFICE KAN
MATERIAL TAKE OFF OF FACILITIES
NO. DESCRIPTION QTY UNIT Remarks
1 Install Panel Lighting (Terlampir Panel Schedule) 1 Ea Site Office Kecil 2 Lampu TL-2x36W 12 Titik 3 Lampu TL-1x36W 4 Titik 4 Downlight 36W 6 Titik 5 Exhaust Fan 5 Ea 6 AC Indoor 2 PK 5 Ea 7 AC Indoor 1 PK 2 Ea 8 Receptacle Inbow 16A 14 Ea 9 Kabel NYY 3C x 25 Sqmm 30 Mtr Panel LV to Site Office 2 10 Kabel Grounding, 1c x 50 sqmm 60 Mtr 11 Grounding Rod, Length 3 m, c/w clamp rod 2 Ea MATERIAL TAKE OFF
MTO SITE FACILITIES MUSHOLA
MATERIAL TAKE OFF OF FACILITIES
NO. DESCRIPTION QTY UNIT
1 Install Panel Lighting (Terlampir Panel Schedule) 1 Ea 2 Lampu TL-2x36W 6 Titik 3 Downlight 36W 5 Titik 4 Exhaust Fan 2 Ea 5 AC Indoor 2 PK 2 Ea 6 AC Indoor 1 PK 2 Ea 7 Receptacle Inbow 16A 1 Ea 8 Kabel NYY 3C x 10 Sqmm 30 Mtr 9 Kabel Grounding, 1c x 50 sqmm 40 Mtr 10 Grounding Rod, Length 3 m, c/w clamp rod 2 Ea Remarks Mesjid