MATERIAL TAKE OFF

MTO SITE FACILITIES EXISTING TO


LAY DOWN

MATERIAL TAKE OFF OF FACILITIES

NO. DESCRIPTION QTY UNIT Remarks


1 Install Transformer 20kV/400V, 150kVA 1 Ea
2 Install Panel MV Distribution Panel (MVP01) 1 Ea
3 Pulling Kabel 20kV, NA2XSEFGby 3c x 300 Sqmm 2000 Mtr Estimasi
4 Pulling Kabel NYY 4C x 70 Sqmm 50 Mtr
5 Termination Kit 20 kV untuk kabel 3c x 300 sqmm 4 Set
6 Install Genset 80 Kva 1 Ea
7 Install Change Over Switch (COS) 200A, 4 pole 1 Ea
8 Install Main Panel Genset 80 kVA (600x800x250) (1 Ea) 1 Ea
Opsi 1
9 Cable Tray W200 c/w cover tray, clamp cover 670 Ea
10 Jointing Tray c/w Bolt and Nut 1340 Ea
11 UNP 100 200 Batang Support Tray
12 Hi-pot Test 1 Lot
Opsi 2
13 Exavation dan back fill 2000 Mtr
14 Install Tile concrete 1 Lot
15 Hi-pot Test 1 Lot
MATERIAL TAKE OFF

MTO SITE FACILITIES WIKA

MATERIAL TAKE OFF OF FACILITIES

NO. DESCRIPTION QTY UNIT Remarks


1 Install Panel Lighting (Terlampir Panel Schedule) 1 Ea
2 Lampu TL-2x36W 30 Titik
3 Lampu TL-1x36W 14 Titik
4 Downlight 36W 12 Titik
5 Exhaust Fan 8 Ea
6 AC Indoor 2 PK 10 Ea
7 AC Indoor 1 PK 5 Ea
8 Receptacle Inbow 16A 28 Ea
9 Kabel NYY 4C x 50 Sqmm 70 Mtr Panel LV to Site Office 1
10 Kabel Grounding, 1c x 50 sqmm 100 Mtr
11 Grounding Rod, Length 3 m, c/w clamp rod 10 Ea
MATERIAL TAKE OFF

MTO SITE FACILITIES OFFICE KAN

MATERIAL TAKE OFF OF FACILITIES

NO. DESCRIPTION QTY UNIT Remarks


1 Install Panel Lighting (Terlampir Panel Schedule) 1 Ea Site Office Kecil
2 Lampu TL-2x36W 12 Titik
3 Lampu TL-1x36W 4 Titik
4 Downlight 36W 6 Titik
5 Exhaust Fan 5 Ea
6 AC Indoor 2 PK 5 Ea
7 AC Indoor 1 PK 2 Ea
8 Receptacle Inbow 16A 14 Ea
9 Kabel NYY 3C x 25 Sqmm 30 Mtr Panel LV to Site Office 2
10 Kabel Grounding, 1c x 50 sqmm 60 Mtr
11 Grounding Rod, Length 3 m, c/w clamp rod 2 Ea
MATERIAL TAKE OFF

MTO SITE FACILITIES MUSHOLA

MATERIAL TAKE OFF OF FACILITIES

NO. DESCRIPTION QTY UNIT


1 Install Panel Lighting (Terlampir Panel Schedule) 1 Ea
2 Lampu TL-2x36W 6 Titik
3 Downlight 36W 5 Titik
4 Exhaust Fan 2 Ea
5 AC Indoor 2 PK 2 Ea
6 AC Indoor 1 PK 2 Ea
7 Receptacle Inbow 16A 1 Ea
8 Kabel NYY 3C x 10 Sqmm 30 Mtr
9 Kabel Grounding, 1c x 50 sqmm 40 Mtr
10 Grounding Rod, Length 3 m, c/w clamp rod 2 Ea
Remarks
Mesjid

Panel LV to Mesjid