TABEL HASIL PENGUKURAN 115.

60
169.60
No. Patok Node Elevasi Jarak
(Mtr) (Mtr)
Ukuran Pipa Eksisiting Ukuran Pipa PMA 19.000
PMA-R 75 R 19.000 35.00
R-P0 90 P0 29.000 84.60
P0-P1 90 P1 12.000 50.00
P1-P2 75 P2 13.000 50.00
P2-P3 75 P3 13.250 50.00
P3-P4 75 P4 14.000 200.00
P4-P5 75 P5 13.000 150.00
P5-P6 75 P6 12.000 68.00
652.60

P0-M1 90 M1
M1-M2 90 M2
M2-M3 90 M3
M3-M4 75 M4
M4-M5 75 M5
M5-M6 75 M6
M6-M7 75 M7
M7-M8 75 M8
M8-M9 75 M9
M9-M10 75 M10
M10-M11 75 M11

- (253) 650
1,305.20 200 (200.00)
PIPA EKSISTING 3 54
PIPA EKSISTING 2.5 1,382 1,220.60
PIPA EKSISTING 2 1278 -
54.00
Jumlah Rumah Jmlh Layanan
(Unit) ( Jiwa) 1,340.20

pipa eksis pindah 2"' Ganti Pipa 3 0


0 5
- 4 20 5
6 30 5
1,830.00 11 55 5
3,660.00 15 75 5
4 20 5
2 10 5
210 5

bts 15 75 5
0 0 5
3 15 5
14 70 5
8 40 5
29 145 5
29 145 5
29 145 5
29 145 5
29 145 5
29 145 5

119,600,000.00
101 565
335.05

Pipa PVC SNI Dia. 3" (Panjang 6 M) #REF! #REF!


Pipa PVC SNI Dia. 2.5" (Panjang 6 M) #REF!
Pipa PVC SNI Dia. 2" (Panjang 6 M)

Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
Rencana
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
14,000,000
Perhitungan Hydrolis Desa Sumampeno
Kriteria Desain :
Formula Hazen William :
Kebut. Air = 90 lt / org / hari S (slope) = ( ^H/L)*100
Pertumbuhan Pddk = 2 % / thn D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Periode Desain = 15 thn Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
Faktor Jam Puncak, jp = 1.5 V = 4*Q/1000(3.14*(D/1000)^2)
Minor Loss = 10 %

DATA BEBAN NODE BEBAN PIPA PERHITUNGAN HEAD LOSS


No Jalur Node Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa
Pipa h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m)

PMA 29.50 29.50


1 R-P0 P0 29.00 0.50 84.6 0.59 210 0.22 283 0.29 0.44 210 283 0.29 0.44 130 39.78 90.00 0.01 0.01 29.49 0.49
2 P0-P1 P1 12.00 17.00 50 34.00 20 0.02 27 0.03 0.04 210 283 0.29 0.44 130 17.32 90.00 0.01 0.01 29.48 17.48
3 P1-P2 P2 13.00 -1.00 50 (2.00) 30 0.03 40 0.04 0.06 190 256 0.27 0.40 130 29.82 90.00 0.01 0.01 29.48 16.48
4 P2-P3 P3 13.25 -0.25 50 (0.50) 55 0.06 74 0.08 0.12 160 215 0.22 0.34 130 37.12 75.00 0.02 0.01 29.47 16.22
5 P3-P4 P4 14.00 -0.75 200 (0.38) 75 0.08 101 0.11 0.16 105 141 0.15 0.22 130 33.56 75.00 0.01 0.02 29.45 15.45
6 P4-P5 P5 13.00 1.00 150 0.67 20 0.02 27 0.03 0.04 30 40 0.04 0.06 130 18.52 75.00 0.00 0.00 29.45 16.45
7 P5-P6 P6 12.00 1.00 68 1.47 10 0.01 13 0.01 0.02 10 13 0.01 0.02 130 10.37 75.00 0.00 0.00 29.45 17.45

1 0 0 0.00 0.00 0 #DIV/0! 0 0.00 0 0.00 0.00 0 0 0.00 0.00 130 #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
2 P0-M1 M1 0.00 0.00 0 #DIV/0! 75 0.08 101 0.11 0.16 0 0 0.00 0.00 130 #DIV/0! 90.00 0.00 0.00 #DIV/0! #DIV/0!
3 M1-M2 M2 0.00 0.00 0 #DIV/0! 0 0.00 0 0.00 0.00 -75 -101 -0.11 -0.16 130 #DIV/0! 90.00 #NUM! #NUM! #DIV/0! #DIV/0!
4 M2-M3 M3 0.00 0.00 0 #DIV/0! 15 0.02 20 0.02 0.03 -75 -101 -0.11 -0.16 130 #DIV/0! 90.00 #NUM! #NUM! #DIV/0! #DIV/0!
5 M3-M4 M4 0.00 0.00 0 #DIV/0! 70 0.07 94 0.10 0.15 -90 -121 -0.13 -0.19 130 #DIV/0! 75.00 #NUM! #NUM! #DIV/0! #DIV/0!
6 M4-M5 M5 0.00 0.00 0 #DIV/0! 40 0.04 54 0.06 0.08 -160 -215 -0.22 -0.34 130 #DIV/0! 75.00 #NUM! #NUM! #DIV/0! #DIV/0!
7 M5-M6 M6 0.00 0.00 0 #DIV/0! 145 0.15 195 0.20 0.30 -200 -269 -0.28 -0.42 130 #DIV/0! 75.00 #NUM! #NUM! #DIV/0! #DIV/0!
555 0.58 747 0.78 1.17
653 555 0.578 747 0.778 1.167
Kcptan
V
(m/dtk)

0.07
0.07
0.06
0.08
0.05
0.01
0.00

#DIV/0!
0.00
-0.02
-0.02
-0.04
-0.08
-0.10
Perhitungan Hydrolis Desa Konde
Kriteria Desain :
Formula Hazen William :
Kebut. Air = 90 lt / org / hari S (slope) = ( ^H/L)*100
Pertumbuhan Pddk = 1.5 % / thn D (diam) teoritis = ((3.59*Q*10^6)/(S^0.54*C))^0.38
Periode Desain = 15 thn Hloss / 100 m = ((3.59*Q*10^6)/(D^2.63*C))^1.85
Faktor Jam Puncak, jp = 1.5 V = 4*Q/1000(3.14*(D/1000)^2)
Minor Loss = 10 %

DATA BEBAN NODE BEBAN PIPA PERHITUNGAN HEAD LOSS


Jalur Elevasi Beda Tinggi Pjg Pipa Slope Jmlh. Pddk Kebuth. Air Jmlh. Pddk Kebut. Air Kebut air Jmlh. Pddk Jmlh. Pddk Flow Flow Koeff HW Diam. Pipa Diam. Pipa Hloss Total Hloss HGL Sisa Kcptan
No Pipa Node h ^h L S yg dilayani Proy 15 thn Proy 15 thn jam puncak yg disuplai Proy 15 thn Jam Puncak C D teoritis D desain per 100 m (+10% minor) Tekan V
(+ m) (m) (m) (%) (jiwa) (lt/d) (jiwa) (lt/dt) (l/dt) (jiwa) (jiwa) (lt/dt) (lt/dt) (mm) (mm) (m) (m) (m) (m) (m/dtk)

#DIV/0!
R 19.00 19.00
1 PMA-R R 19.00 0.00 35.00 0.00 0 - 0 0.00 0.00 0 0 0.00 0.00 130 #DIV/0! 75.00 0.00 0.00 19.00 0.00 0.00
2 R-P0 P0 29.00 -10.00 84.60 (11.82) 0 - 0 0.00 0.00 0 0 0.00 0.00 130 0.00 90.00 0.00 0.00 19.00 -10.00 0.00
3 P0-P1 P1 12.00 17.00 50.00 34.00 20 0.021 25 0.03 0.04 0 0 0.00 0.00 130 0.00 90.00 0.00 0.00 19.00 7.00 0.00
4 P1-P2 P2 13.00 -1.00 50.00 (2.00) 30 0.031 38 0.04 0.06 0 0 0.00 0.00 130 0.00 75.00 0.00 0.00 19.00 6.00 0.00
5 P2-P3 P3 13.25 -0.25 50.00 (0.50) 55 0.057 69 0.07 0.11 0 0 0.00 0.00 130 0.00 75.00 0.00 0.00 19.00 5.75 0.00
6 P3-P4 P4 14.00 -0.75 200.00 (0.38) 75 0.078 94 0.10 0.15 0 0 0.00 0.00 130 0.00 75.00 0.00 0.00 19.00 5.00 0.00
7 P4-P5 P5 13.00 1.00 150.00 0.67 20 0.021 25 0.03 0.04 0 0 0.00 0.00 130 0.00 75.00 0.00 0.00 19.00 6.00 0.00
8 P5-P6 P6 12.00 1.00 68.00 1.47 10 0.010 13 0.01 0.02 0 0 0.00 0.00 130 0.00 75.00 0.00 0.00 19.00 7.00 0.00
9 0 0 - 12.00 652.60 1.84 210 0.219 263 0.27 0.41 0 0 0.00 0.00 130 0.00 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
10 0 0 - 0.00 - #DIV/0! 0 - 0 0.00 0.00 0 0 0.00 0.00 130 #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
11 0 0 - 0.00 - #DIV/0! 0 - 0 0.00 0.00 0 0 0.00 0.00 130 #DIV/0! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
12 P0-M1 M1 - 0.00 - #DIV/0! 75 0.078 94 0.10 0.15 0 0 0.00 0.00 130 #DIV/0! 90.00 0.00 0.00 #DIV/0! #DIV/0! 0.00
13 M1-M2 M2 - 0.00 - #DIV/0! 0 - 0 0.00 0.00 0 0 0.00 0.00 130 #DIV/0! 90.00 0.00 0.00 #DIV/0! #DIV/0! 0.00
14 M2-M3 M3 - 0.00 - #DIV/0! 15 0.016 19 0.02 0.03 Err:509 Err:509 Err:509 Err:509 130 Err:509 90.00 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
15 M3-M4 M4 - 0.00 - #DIV/0! 70 0.073 88 0.09 0.14 Err:509 Err:509 Err:509 Err:509 130 Err:509 75.00 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
16 M4-M5 M5 - 0.00 - #DIV/0! 40 0.042 50 0.05 0.08 Err:509 Err:509 Err:509 Err:509 130 Err:509 75.00 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
17 M5-M6 M6 - 0.00 - #DIV/0! 145 0.151 181 0.19 0.28 Err:509 Err:509 Err:509 Err:509 130 Err:509 75.00 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
18 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
19 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
21 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
22 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
10 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
11 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
12 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
13 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
14 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
15 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
16 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
17 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
18 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
19 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
20 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
21 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
22 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
23 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
24 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
25 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
26 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
27 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
28 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
29 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
30 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
31 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
32 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
33 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
34 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
35 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
36 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
37 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
38 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
39 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
40 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 #DIV/0! #DIV/0! Err:509
Err:509 Err:509 Err:509 Err:509 Err:509

PAMSIMAS 2011 RKM HID Desa Mattirowalie


Err:509 Err:509
1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 14 0.015 18 0.02 0.03 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 151 0.157 189 0.20 0.29 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 73 0.076 91 0.10 0.14 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 130 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

Err:509
1019 233 Rencana Pipa #REF!
Err:509 Err:509
#REF!
#REF!
#REF! Rencana Pipa 2

PAMSIMAS 2011 RKM HID Desa Mattirowalie


OWNEER ESTIMATE
(OE)
KABUPATEN : BUTON UTARA
INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa
Sumampeno Kec. Wakorumba Utara Kab. Buton Utara
LOKASI : Desa Sumampeno
TAHUN ANGGARAN : 2020

TARGET KONTRAK
NO URAIAN KEGIATAN
JUMLAH HARGA (Rp)
1 2 3

1 PEKERJAAN PERSIAPAN 6,000,000.00


2 PEKERJAAN TRUSH BLOCK 2,164,890.69
3 PEKERJAAN BOX VALVE 4Bh 11,309,491.00
4 PEKERJAAN SAMBUNGAN RUMAH (SR) 52,179,461.42
PEKERJAAN PENGADAAN PIPA/AKSESORIS + PEMSANGAN PIPA/AKSESORIS 176,011,908.58
5

I JUMLAH 247,665,751.68
II Pajak Pertambahan Nilai ( PPN ) = 10% x (I) 24,766,575.17
III TOTAL COST( I + II + ) 272,432,326.85
IV DI BULATKAN 272,400,000.00

Terbilang : Dua Ratus Tujuh Puluh Dua Juta Empat Ratus Ribu Ru

Buranga, Maret 2020


Mengetahui/Di Setujui Oleh : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Perencanaan Bid. Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang

( ZALMAN,
NIP. 19781016 ST., MT.1)006
200901 ( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
DAFTAR KUANTITAS DAN HARGA
KABUPATEN : BUTON UTARA
INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa Sumampeno Kec. Wakorumba
Utara Kab. Buton Utara
LOKASI : Desa Sumampeno
TAHUN ANGGARAN : 2020

DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 400,000.00 0.00
2 Pemasangan Bowplank / Pengukuran Jalur Pipa Ls 2,500,000.00 0.00
3 Air Kerja / P3K Ls 300,000.00 0.00
4 Papan Nama Proyek Ls 300,000.00 0.00
5 Administrasi Foto dan Dokumentasi Ls 2,500,000.00 0.00
4 PEKERJAAN BOX VALVE 4Bh
A PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m M3 0.70 85,100.00 59,570.00
2 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3 0.10 85,100.00 8,510.00
3 Pek. Urugan Pasir Alas Lantai M3 0.02 241,040.00 5,784.96
JUMLAH SUB.PEKERJAAN TANAH DAN PASIR 73,864.96
B PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP M2 2.04 308,550.75 629,443.53

2 Pek. Plesteran Tembok 1 : 3 M2 2.08 76,100.56 158,289.16


JUMLAH SUB.PEKERJAAN DINDING DAN PLESTERAN 787,732.69
C PEKERJAAN PONDASI DLL
1 Pek. Pemb. Plat Manhole 80 x 80 cm Ls 1.00 1,300,000.00 1,300,000.00
2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP M3 1.08 1,062,255.00 1,147,235.40
JUMLAH SUB.PEKERJAAN PONDASI DLL 2,447,235.40
JUMLAH Total. PEKERJAAN BOX VALVE 3,308,833.05
JUMLAH TOTAL PEKERJAAN BOX VALVE 3.00 BH 9,926,499.16

Buranga, Maret 2020


Mengetahui/Di Setujui Oleh : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Perencanaan Bid. Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang

NIP.( ZALMAN,
19781016 ST., MT.1 )006
200901 ( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
BACK UP DATA
Pekerjaan

Lokasi
Tahun Anggaran : 2019 Pek. : Box Valve UK. 1 m x 1 m
Volume Total
No. Jenis Pekerjaan Panjang Lebar ( Tebal ( TInggi ( M ) Jumlah (bh) V = ((L1 + L2)/2) x P
(M) M) M)
M3
Pekerjaan Tanah Dan Pasir
1 Galian Tanah Biasa Box Valve 0.70 M3
Box Valve I 1.00 1.00 0.70 0.70 M3

1 Galian Tanah Biasa Pondasi 0.10 M3


Box Valve I 1.00 1.00 0.10 0.10 M3

2 Urugan Pasir Alas Pondasi 0.02 M3


Box Valve I 4 0.2 0.03 0.02 M3

Pek. Pemasangan 1m2 dinding bata merah (5x11x22) cm


4 tebal 1 batu campuran 1SP : 3PP 2.04 M2
Box Valve I 1 0.70 0.60 2.04 M2

5 Pek. Plesteran Tembok 1 : 3 2.08 M2


Box Valve I Dalam 0.7 0.70 0.60 1.68 M2
Luar 1 1.00 0.10 0.40 M2

6 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


0.14 M3
1 0.70 0.20 0.20 0.14 M3

Mengetahui/Menyetujui Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang CV. ARTMA Consultant -
Kab. Buton Utara

SYAMSUDDIN USMAN, ST EMIL SIDIK, S.Ars -


NIP. 19840410 201001 1 035 Inspector Lapangan Pelaksana
Box Valve UK. 1 m x 1 m

KET.

Dibuat Oleh :
Kontraktor Pelaksana
-

-
Pelaksana
DAFTAR KUANTITAS DAN HARGA
KABUPATEN : BUTON UTARA
INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa Sumampeno Kec. Wakorumba
Utara Kab. Buton Utara
LOKASI : Desa Sumampeno
TAHUN ANGGARAN : 2020

DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 0.00 400,000.00 0.00
2 Pemasangan Bowplank / Pengukuran Jalur Pipa Ls 0.00 2,500,000.00 0.00
3 Air Kerja / P3K Ls 0.00 300,000.00 0.00
4 Papan Nama Proyek Ls 0.00 300,000.00 0.00
5 Administrasi Foto dan Dokumentasi Ls 0.00 2,500,000.00 0.00
JUMLAH SUB.PEKERJAAN PERSIAPAN 0.00
2 PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m/Peratan Lokasi M3 5.72 85,100.00 486,488.33
2 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3 3.20 85,100.00 272,320.00
3 Pek. Urugan Kembali Pondasi Batu Gunung M3 2.87 60,950.00 174,926.50
4 Pek. Urugan Pasir Alas Pondasi M3 0.24 241,040.00 57,849.60
5 Pek. Urugan Pasir Alas Lantai M3 0.17 241,040.00 39,934.30
JUMLAH SUB.PEKERJAAN TANAH DAN PASIR 1,031,518.74
3 PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Plesteran Tembok 1 : 3 M2 55.99 76,100.56 4,260,870.35
2 Pek. Pemasangan 1 m2 acian. M2 55.99 42,981.25 2,406,520.19
3 Pek. Membuat 1 m3 dinding beton bertulang + Bekisting M3 3.12 8,039,431.50 25,083,026.28
JUMLAH SUB.PEKERJAAN DINDING DAN PLESTERAN 31,750,416.82
4 PEKERJAAN BETON DAN PONDASI
1 Pek. Membuat 1 m3 lantai kerja M3 0.28 1,146,422.99 316,556.05
2
Pek. Membuat 1 m3 Beton Plat Lantai Bawah beton T = 0.15 cm M3 0.55 1,394,836.02 770,298.19
3 Pek. Pembesian 10 kg Plat Lantai Bawah dengan Besi Polos atau Besi Ulir (Reservoar) Kg 58.28 286,189.00 16,679,094.92
4
Pek. Membuat 1 m3 Plat Lantai Atas beton T = 0.15 cm M3
0.65 1,394,836.02 911,176.63

5 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas (Reservoar) M2


6.09 407,261.00 2,481,237.64
6 Pek. Pembesian 10 kg Plat Lantai Atas dengan Besi Polos atau Besi Ulir (Reservoar) Kg 73.66 286,189.00 21,079,536.98
7 Pek. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Uk. 20 x 25 cm M3 0.38 8,196,452.50 3,073,669.69
8 Pek. Pemb. Plat Manhole 80 x 80 cm Ls 1.00 1,300,000.00 1,300,000.00
9 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP M3 4.94 1,062,255.00 5,246,689.90
10 Pek. Pemasangan 1 m3 batu kosong/anstamping Bawah Pondasi M3 1.28 531,852.00 680,185.52
11 Pek. Pemasangan 1 m3 batu kosong/anstamping Bawah Lantai M3 0.76 531,852.00 403,875.11
JUMLAH SUB.PEKERJAAN BETON DAN PONDASI 52,942,320.64
5 PEKERJAAN PENGECETAN / FINISHING/DLL
1 Pek. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) M2 55.99 21,805.15 1,220,870.35
2 Pekerjaan Tangga Monyet Ls 1.00 3,500,000.00 3,500,000.00
JUMLAH SUB.PEKERJAAN PENGECETAN / FINISHING/DLL 4,720,870.35
JUMLAH TOTAL PEKERJAAN RESERVOAR ( UK. 3 M X 3 M ) 90,445,126.54

Buranga, Maret 2020


Mengetahui/Di Setujui Oleh : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Perencanaan Bid. Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang

NIP.( ZALMAN,
19781016 ST., MT.1 )006
200901 ( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
BACK UP DATA
Pekerjaan : Pengembangan Jaringan Perpipaan SPAM Desa Kadacua

Lokasi Pekerjaan :
Tahun Anggaran : 2019

No. Jenis Pekerjaan DIMENSI (M) Volume Total

1 Penggalian 1 m3 tanah biasa sedalam 1 m/Peratan Lebar ( M ) Tinggi (M) Panjang (M) 5.72 M3
Lokasi
3.50 0.47 3.50 5.72 M3

2 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Jumlah (Bh) Lebar ( M ) Tinggi (M) Panjang (M) 3.20 M3
Gunung
4 0.80 0.40 2.50 3.20 M3

3 Pek. Urugan Kembali Pondasi Batu Gunung Panjang (M) Lebar Bawah ( M ) Tinggi (M) Lebar Atas (M)
Dua Sisi 10.00 0.08 0.70 0.33 2.87 M3

4 Pek. Urugan Kembali Tanah Alas Lantai Panjang (M) Lebar Bawah ( M ) Tinggi (M)
Ganti Batu Kosong - M3

5 Urugan Pasir Alas Pondasi Jumlah (Bh) Lebar ( M ) Tinggi (M) 0.24 M3
10.00 0.80 0.03 0.24 M3

6 Urugan Pasir Alas Lantai Panjang (M) Lebar Bawah ( M ) Tinggi (M) 0.17 M3
2.35 2.35 0.03 0.17 M3

Pekerjaan Dinding dan Plesteran


5 Pek. Plesteran Tembok 1 : 3 Tembok Luar Jumlah (Bh) Lebar ( M ) Tinggi (M) 55.99 M3
4 2.65 2.70 28.62 M3

Tembok Dalam Jumlah (Bh) Lebar ( M ) Tinggi (M)


4 2.40 2.30 22.08 M3

Lantai Jumlah (Bh) Lebar ( M ) Tinggi (M) M3


1 2.30 2.30 5.29 M3

6 Pek. Pemasangan 1 m2 acian. Tembok Luar Jumlah (Bh) Lebar ( M ) Tinggi (M) 55.99 M3
4 2.65 2.70 28.62 M3

Tembok Dalam Jumlah (Bh) Lebar ( M ) Tinggi (M) M3


4 2.40 2.30 22.08 M3

Lantai Jumlah (Bh) Lebar ( M ) Tinggi (M) M3


1 2.30 2.30 5.29 M3

7 Pek. Membuat 1 m3 dinding beton bertulang + Bekisting Jumlah (Bh) Lebar ( M ) Tinggi (M) Tebal (M) 3.12 M3

1 10.00 2.40 0.13 3.12 M3

Pekerjaan Beton dan Pondasi


8 Pek. Membuat 1 m3 lantai kerja beton Jumlah (Bh) Lebar ( M ) Panjang (M) Tebal (M) 0.28 M3
1 2.35 2.35 0.05 0.28 M3

11 Pek. Membuat 1 m3 Plat Lantai Bawah beton Lebar ( M ) Panjang (M) Tinggi (M) 0.55 M3
2.35 2.35 0.10 0.55 M3

12 Pek. Pembesian 10 kg Plat Lantai Bawah dengan Besi Tul Pokok Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh) 58.28 Kg
Polos atau Besi Ulir (Reservoar)
10 2.35 0.620 2.00 29.14 Kg
Tul. Sengkang Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh)
10 2.35 0.620 2.00 29.14 Kg

13 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Bawah Panjang (M) Lebar (M) - M2
Bawah (Reservoar)
- - - M2
Samping Jumlah (Bh) Panjang (M) Lebar (M) M2
0 - - - M2

14 Pek. Membuat 1 m3 Plat Lantai Atas beton Bukaan Manhole Lebar ( M ) Lebar (M) Tebal (M) 0.65 M3
0.049 2.65 2.65 0.10 0.65 M3

Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas


15 Bawah Panjang (M) Lebar (M) Bukaan Manhole 6.09 M2
(Reservoar)
2.35 2.35 0.49 5.03 M2
Samping Jumlah (bh) Panjang (M) Lebar (M)
4 2.65 0.10 1.06 M2
No. Jenis Pekerjaan DIMENSI (M) Volume Total

16 Pek. Pembesian 10 kg Plat Lantai Atas dengan Besi Polos Tul Pokok Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh) 73.66 Kg
atau Besi Ulir (Reservoar)
12 2.65 0.62 2.00 39.43 Kg
Tul. Sengkang Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh)
12 2.65 0.62 2.00 39.43 Kg

Manhole Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh) 5.21 Kg

3 0.70 0.62 2.00 2.60 Kg

Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh)


3 0.70 0.62 2.00 2.60 Kg

17 Pek. Membuat 1 m3 sloof beton bertulang Jumlah (Bh) Panjang (M) Lebar (M) Tinggi (M) 0.38 M3
1 10.00 0.15 0.25 0.38 M3

20 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Panjang (M) Lebar Bawah ( M ) Tinggi (M) Lebar Atas (M) 4.94 M3
9.80 0.87 0.90 0.25 4.94 M3

21 Pek. Pemasangan 1 m3 batu kosong/anstamping Pondasi Panjang (M) Lebar Bawah ( M ) Tinggi (M) 1.28 M3
9.80 0.87 0.15 1.28 M3

21 Pek. Pemasangan 1 m3 batu kosong/anstamping Bawah Lantai Panjang (M) Lebar Bawah ( M ) Tinggi (M) 0.76 M3
2.25 2.25 0.15 0.76 M3

Pek. Pengecatan 1 m2 tembok baru (1lapis plamuur, 1


22 lapis cat dasar, 2 lapis cat penutup) Tembok Luar Jumlah (Bh) Lebar ( M ) Tinggi (M) 55.99 M2

4 2.65 2.70 28.62 M2

Tembok Dalam Jumlah (Bh) Lebar ( M ) Tinggi (M)


4 2.40 2.30 22.08 M2

Lantai Jumlah (Bh) Lebar ( M ) Tinggi (M)


1 2.30 2.30 5.29 M2

Mengetahui/Menyetujui Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang CV. ARTMA Consultant CV. RADITSYAH PRATAMA
Kab. Buton Utara

SYAMSUDDIN USMAN, ST EMIL SIDIK, S.Ars JAMALUDDIN ISI, A.Md


NIP. 19840410 201001 1 035 Inspector Lapangan Pelaksana
Reservoar Uk. 3 x 3 M

KET.
KET.

Kurang Bukaan
Manhole

Dibuat Oleh :
Kontraktor Pelaksana
CV. RADITSYAH PRATAMA

JAMALUDDIN ISI, A.Md


Pelaksana
DAFTAR KUANTITAS DAN HARGA
KABUPATEN : BUTON UTARA
INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa Sumampeno Kec. Wakorumba
Utara Kab. Buton Utara
LOKASI : Desa Sumampeno
TAHUN ANGGARAN : 2020 Pek. : Broncape

DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 0.00 400,000.00 0.00
2 Pemasangan Bowplank / Pengukuran Jalur Pipa Ls 0.00 2,500,000.00 0.00
3 Air Kerja / P3K Ls 0.00 300,000.00 0.00
4 Papan Nama Proyek Ls 0.00 300,000.00 0.00
5 Administrasi Foto dan Dokumentasi Ls 0.00 2,500,000.00 0.00
JUMLAH SUB.PEKERJAAN PERSIAPAN 0.00
2 PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m/Mata Air Ls 4.09 250,000.00 1,023,500.00
JUMLAH SUB.PEKERJAAN TANAH DAN PASIR 1,023,500.00
3 PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Plesteran Tembok 1 : 3 M2 76,100.56 0.00
2 Pek. Pemasangan 1 m2 acian. M2 42,981.25 0.00
3 Pek. Membuat 1 m3 dinding beton bertulang + Bekisting M3 8,039,431.50 0.00
JUMLAH SUB.PEKERJAAN DINDING DAN PLESTERAN 0.00
4 PEKERJAAN BETON DAN PONDASI
1 Pek. Membuat 1 m3 Plat Lantai Atas beton M3 2.00 1,394,836.02 2,785,208.56
2 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas (Reservoar) M2 23.06 407,261.00 9,393,067.70
3 Pek. Pembesian 10 kg Plat Lantai Atas dengan Besi Polos atau Besi Ulir (Reservoar) Kg 196.42 286,189.00 56,212,098.62
4 Pek. Membuat 1 m3 Balok Anak beton bertulang (200 kg besi + bekisting) Uk. 20 x 25 cm M3 0.57 9,623,430.00 5,523,848.82
5 Pek. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Uk. 20 x 25 cm M3 1.98 8,196,452.50 16,228,975.95
6 Pek. Pemb. Plat Manhole 80 x 80 cm Ls 1.00 1,300,000.00 1,300,000.00
7 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Talud M3 20.44 1,062,255.00 21,709,454.15
8 Pek. Pemasangan 1 m3 batu kosong/anstamping Bawah Pondasi M3 0.51 531,852.00 269,648.96
JUMLAH SUB.PEKERJAAN BETON DAN PONDASI 113,422,302.78
5 PEKERJAAN PENGECETAN / FINISHING/DLL
1 Pek. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) M2 21,805.15 0.00
2 Pekerjaan Pipa Screen Uk. 6 " M' 4.80
3 Pekerjaan Pipa Resapan Uk. 1.5"
JUMLAH SUB.PEKERJAAN PENGECETAN / FINISHING/DLL 0.00
JUMLAH TOTAL PEKERJAAN BRONDCAPE 114,445,802.78

Buranga, Maret 2020


Mengetahui/Di Setujui Oleh : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Perencanaan Bid. Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang

NIP.( ZALMAN,
19781016 ST., MT.1 )006
200901 ( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
BACK UP DATA
Pekerjaan : Pengembangan Jaringan Perpipaan SPAM Desa Kadacua

Lokasi Pekerjaan
Tahun Anggaran : 2019

No. Jenis Pekerjaan DIMENSI (M) Volume Total

1 Penggalian 1 m3 tanah biasa sedalam 1 m/Mata Air Lebar ( M ) Tinggi (M) Panjang (M) 4.09

1.78 2.30 1.00 4.09

Pekerjaan Dinding dan Plesteran


5 Pek. Plesteran Tembok 1 : 3 Tembok Luar Jumlah (Bh) Lebar ( M ) Tinggi (M) 67.10
4 3.15 2.60 32.76

Tembok Dalam Jumlah (Bh) Lebar ( M ) Tinggi (M)


4 2.85 2.30 26.22

Lantai Jumlah (Bh) Lebar ( M ) Tinggi (M)


1 2.85 2.85 8.12

6 Pek. Pemasangan 1 m2 acian. Tembok Luar Jumlah (Bh) Lebar ( M ) Tinggi (M) 67.10
4 3.15 2.60 32.76

Tembok Dalam Jumlah (Bh) Lebar ( M ) Tinggi (M)


4 2.85 2.30 26.22

Lantai Jumlah (Bh) Lebar ( M ) Tinggi (M)


1 2.85 2.85 8.12

14 Pek. Membuat 1 m3 Plat Lantai Atas beton Bukaan Manhole Lebar ( M ) Lebar (M) Tebal (M) 2.00
0.0768 4.80 3.60 0.12 2.00

15 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas Bawah Panjang (M) Lebar (M) Bukaan Manhole 23.06
(Reservoar)
4.60 3.40 0.64 15.00
Samping Jumlah (bh) Panjang (M) Lebar (M)
4 16.80 0.12 8.06
No. Jenis Pekerjaan DIMENSI (M) Volume Total

16 Pek. Pembesian 10 kg Plat Lantai Atas dengan Besi Polos Tul Pokok Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh) 196.42
atau Besi Ulir (Reservoar)
22 4.80 0.62 2.00 130.94
Tul. Sengkang Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh)
16 3.60 0.62 2.00 71.42

Manhole Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh) 5.95

3 0.80 0.62 2.00 2.98

Jumlah (Bh) Panjang (M) Besi Dia. 10 mm Jumlah Lapis (Bh)


3 0.80 0.62 2.00 2.98

17 Pek. Membuat 1 m3 Balok Anak beton bertulang Jumlah (Bh) Panjang (M) Lebar (M) Tinggi (M) 0.57
1 4.80 0.20 0.35 0.34
1 3.40 0.20 0.35 0.24

17 Pek. Membuat 1 m3 sloof beton bertulang Jumlah (Bh) Panjang (M) Lebar (M) Tinggi (M) 1.98
1 17.60 0.25 0.45 1.98

20 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Panjang (M) Lebar Bawah ( M ) Tinggi (M) Lebar Atas (M) Jumlah (Bh) 20.44

Dasar 5.20 0.65 0.50 1.00 1.69


Trap 1 5.20 0.65 1.30 0.30 1.00 3.21
Dasar 8.60 0.70 0.50 1.00 3.01
Trap 2 8.60 0.65 1.30 0.30 1.00 5.31
Dasar 11.80 0.50 0.50 1.00 2.95
Trap 3 12.60 0.46 0.53 0.30 1.00 2.54

Tebing 4.80 0.60 0.80 0.30 1.00 1.73

21 Pek. Pemasangan 1 m3 batu kosong/anstamping Pondasi Panjang (M) Lebar Bawah ( M ) Tinggi (M) 0.51
5.20 0.65 0.15 0.51

Mengetahui/Menyetujui Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang CV. ARTMA Consultant
Kab. Buton Utara

SYAMSUDDIN USMAN, ST EMIL SIDIK, S.Ars


NIP. 19840410 201001 1 035 Inspector Lapangan Pelaksana
: Reservoar Uk. 3 x 3 M

Volume Total KET.

M3

M3

M3
M3

M3

M3
M3

M3
M3

M3
M3

M3
M3

M3
M3

M2

M2

M2
Volume Total KET.

Kg

Kg

Kg

Kg Kurang Bukaan
Manhole
Kg

Kg

M3
M3
M3

M3
M3

M3
M3
M3
M3
M3
M3
M3
M3

M3

M3
M3

Dibuat Oleh :
Kontraktor Pelaksana
-

-
Pelaksana
RENCANA ANGGARAN BIAYA SAMBUNGAN RUMAH (SR)

KABUPATEN : BUTON UTARA


INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa Sumampeno Kec. Bonegunu
Kab. Buton Utara
LOKASI : Desa Sumampeno
TAHUN ANGGARAN : 2020

DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
II PEKERJAAN SAMBUNGAN RUMAH (SR)
I PEKERJAAN TANAH DAN PASIR JALUR PIPA
Penggalian 1 m3 tanah biasa sedalam 1 m Jalur Pipa M3 0.22 85,100.00 18,934.75
Pek. Urugan Kembali Jalur Pipa M3 0.19 60,950.00 11,830.96
Pek. Urugan Pasir Alas Pipa M3 0.03 241,040.00 6,435.77
JUMLAH 5. I 37,201.48
II PEKERJAAN BETON DAN PONDASI DUDUKAN PIPA SERVIS (PIPA SR)
1 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP M3 0.02 1,062,255.00 16,996.08
Pek. Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Dudukan Box
2 M3 0.01 1,250,533.68 15,006.40
Materan
Pek. Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Sandaran Pipa
3 M3 0.0040 1,250,533.68 5,002.13
SR
JUMLAH 5. II 37,004.62
III PEKERJAAN PENGADAAN PIPA DAN ASESORIES (SAMBUNGAN RUMAH)
Clamp Saddle GI 1.5" x 1/2 " Bh 1.00 135,000.00 135,000.00
Double Nipple GI 1/2" Bh 1.00 21,500.00 21,500.00
Faucet Elbow PVC 1/2" Bh 2.00 15,000.00 30,000.00
Elbow 90° PVC 1/2" Bh 4.00 12,500.00 50,000.00
Soket DL° PVC Dia.1/2" Bh 1.00 15,500.00 15,500.00
Water Meter 1/2" (Standar PDAM) + Box Meteran Bh 1.00 380,000.00 380,000.00
Valve 1/2" Bh 1.00 85,000.00 85,000.00
Socket Drat Dalam PVC Uk. 1/2" Bh 1.00 0.00
Kran Air GI 1/2" Bh 1.00 32,300.00 32,300.00
Tee PVC. Uk. 1/2" Bh 1.00 0.00 0.00
Dop PVC. Uk. 1/2" Bh 1.00 0.00
Pipa PVC SNI Dia. 1/2" M' 6.00 6,200.00 37,200.00
JUMLAH 5. II 786,500.00
IV PEKERJAAN PEMASANGAN PIPA PIPA SR

1 Pek. Pemasangan 1 m’ pipa PVC Dia 1/2” M1 6.00 11,845.00 71,070.00

JUMLAH 5. IV 71,070.00
JUMLAH TOTAL 931,776.10
JUMLAH TOTAL PEKERJAAN SAMBUNGAN RUMAH (SR) 56 bh 52,179,461.42

Buranga, September 2019


Mengetahui/Di Setujui Oleh : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Bid. Cipta Karya
Dinas Pkerjaan Umum dan Penataan Ruang Dinas Pkerjaan Umum dan Penataan Ruang

( ZALMAN, ST., MT. ) ( AHMAT HAAFI, ST )


NIP. 19781016 200901 1 006 Nip. 19900325 201903 1 015
BACK UP DATA
Pekerjaan : Pengembangan Jaringan Perpipaan SPAM Desa Karya Mulya
: Untuk Desa Karya Mulya Kec. Kulisusu Barat Kab. Buton Utara
Lokasi : Desa Karya Mulya Kec. Kulisusu Barat
Tahun Anggaran : 2019
Volume Total
No. Jenis Pekerjaan Panjang ( M ) Lebar ( M ) Tebal ( M ) TInggi ( M ) V = ((L1 + L2)/2) x P
M3
Pekerjaan Sambungan Rumah (SR) Jumlah SR
1 Plat Beton Dudukan Box Meteran 0.40 0.30 0.101.00 0.01 M3
2 Plat Beton Sandaran Pipa SR 0.10 0.10 0.401.00 0.00 M3
0 0.51 0.101.00 - M3
3 Pondasi Dudukan Pipa Sandaran 0.2 0.20 0.401.00 0.02 M3
Panjang Lebar Tinggi Jumlah SR
Penggalian 1 m3 tanah biasa sedalam 1 m Jalur Pipa 4.45 0.20 0.25 1.00 0.2225 M3
Vol. Pipa Pipa
Pek. Urugan Kembali Jalur Pipa 0.001691 1.00 0.1941 M3

Pek. Urugan Pasir Alas Pipa 4.45 0.20 0.03 1.00 0.0267 M3

Aksesoris SR Panjang Jumlah Sat SR Total


Pipa Servis Uk. 1/2' 6 1.00 6.00
Clamp Saddle GI 1.5" x 1/2 " 1 1.00 1.00
Socket Drat Luar PVC Uk. 1/2" 1 1.00 1.00
Foucet Elbouw PVC Uk. 1/2" 2 1.00 2.00
Ellbow PVC 90 Uk. 1/2" 4 1.00 4.00
Double Nipple GI 1/2" 1 1.00 1.00
Stop Karan GI/Valve 1/2" 1 1.00 1.00
Water Meter 1/2" (Standar PDAM) + Box Meteran 1 1.00 1.00
Socket Drat Dalam PVC Uk. 1/2" 1 1.00 1.00
Karan Air GI Uk. 1/2" 1 1.00 1.00
Tee PVC Uk. 1/2" 1 1.00 1.00
Dop PVC Uk. 1/2" 1 1.00 1.00

Mengetahui/Menyetujui Diperiksa Oleh : Dibuat Oleh :


Pejabat Pelaksana Teknis Kegiatan (PPTK) Konsultan Pengawas Kontraktor Pelaksana
Dinas Pekerjaan Umum Dan Penataan Ruang CV. ARTMA Consultant CV. RISMA
Kab. Buton Utara

SYAMSUDDIN USMAN, ST QOMARULLAH MADI, ST AZRIN ZABUR


NIP. 19840410 201001 1 035 Inspector Lapangan Direktur
KET.

22 mm
0.0220
0.0110

Dibuat Oleh :
Kontraktor Pelaksana
CV. RISMA

AZRIN ZABUR
Direktur
RENCANA ANGGARAN BIAYA

KABUPATEN : BUTON UTARA


INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa
LOKASI : Kopepisino
Desa Kec. Bonegunu Kab. Buton Utara
Sumampeno
TAHUN ANGGARAN : 2020

Harga Satuan
No URAIAN Satuan Volume Total
(Rp)
1 2 5 6 10
I SPESIFIKASI POMPA
1 Type : Centrifugal Pump Set 2.00 17,000,000.00 34,000,000.00
2 Daya Motor : 3500 Watt PLN
3 Voltage /Hz : 1x220-240 Vol, 50 Hz
4 Kapasitas : 1 - 1,5 LPS
5 Head : 25 - 30 Meter
6 Material : Stainless Steel
7 Brand : Pompa + Electro Motor sama brand
SUB TOTAL I 34,000,000.00
II JASA PEMASANGAN POMPA
1 Basic Control Panel Including Motor Protection Set 1.00 6,000,000.00 6,000,000.00
2 Stabilizer 5 KVA Unit 1.00 6,500,000.00 6,500,000.00
3 Drop Cable Power Rol 1.00 3,500,000.00 3,500,000.00
4 Drop Cable Water Level Control Rol 1.00 2,000,000.00 2,000,000.00
5 Solar Cell Set 1.00 45,000,000.00 45,000,000.00
SUB TOTAL II 63,000,000.00
III PEKERJAAN FINISING
2 Biaya Pemasangan Pompa Ls 1.00 5,000,000.00 5,000,000.00
3 Biaya Running Test dan Training Operator Ls 1.00 1,000,000.00 1,000,000.00
SUB TOTAL III 6,000,000.00
JUMLAH TOTAL 103,000,000.00
OVERHAED 15% 15,450,000.00
JUMLAH TOTAL + OVERHAED 15% 118,450,000.00
DIBULATKAN 118,450,000.00
Buranga, Maret 2020
Mengetahui/Di Setujui Oleh :
Kepala Bidang Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang

( ZALMAN, ST., MT. )


NIP. 19781016 200901 1 006

Di Buat Oleh :
Staf Perencanaan Bid. Cipta Karya
Dinas PUPR

( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015

Mengetaui :
Pejabat Pembuat Komitmen (PPK)

( ZALMAN, ST., MT. )


NIP. 19781016 200901 1 006
DAFTAR HARGA DAN UPAH KERJA
KABUPATEN : BUTON UTARA
INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa
Sumampeno Kec. Wakorumba Utara Kab. Buton Utara

LOKASI : Desa Sumampeno


TAHUN ANGGARAN : 2020

NO JENIS MATERIAL DAN TENAGA SAT UPAH/HARGA SPESIFIKASI TEKNIS KET.


1 2 3 4 5 6
A. UPAH KERJA
1 Mandor OH 110,000.00
2 Kepala tukang OH 110,000.00
3 Tukang Listrik OH 100,000.00
4 Tukang kayu OH 100,000.00
5 Tukang batu OH 100,000.00
6 Tukang besi OH 100,000.00
7 Tukang Cat OH 100,000.00
8 Tukang Gypsum OH 100,000.00
9 Tukang Pipa OH 100,000.00
9 Pekerja OH 95,000.00
B. BAHAN DASAR
1 Tanah urug M3 90,000.00
2 Pasir urug M3 150,000.00
3 Pasir pasangan M3 200,000.00
4 Pasir beton M3 220,000.00
5 Batu belah gunung M3 230,000.00
6 Batu bata Bh 750,000.00
7 Koral beton/Split M3 220,000.00
8 Kerikil sungai M3 250,000.00
9 Semen Portland Kg 1,900.00
10 Semen warna Kg 12,000.00
11 Air Ltr 200.00
C. BAHAN LANTAI
1 Tegel keramik putih Polos 60x60 cm Bh 16,666.67
2 Tegel keramik warna 40x40 cm Motif Bh 26,666.67
3 Tegel keramik polos 30 x 30 cm Bh 10,000.00
4 Tegel keramik warna 30x30 cm motif Bh 10,833.33
5 Tegel keramik putih 20x20 cm Bh 4,000.00
6 Tegel keramik Dinding 20x25 cm Bh 2,000.00
7 Tegel keramik warna 20x20 cm anti slip Bh 3,560.00
8 Tegel Plint 10x60 Bh 8,333.33
9 Tegel Kuku Bh 3,000.00
C. BAHAN KAYU
1 Dolken kayu dia 10 / 400 Cm Btg. 10,000.00
2 Papan kayu jati M3 4,000,000.00
3 Balok kayu jati M3 4,000,000.00
4 Papan kayu Borneo M3 3,000,000.00
5 Balok kayu Borneo M3 3,000,000.00
6 Papan kayu Kelas II(segeng, Mahoni,Laban) M3 2,800,000.00
7 Balok kayu Kelas II(segeng, Mahoni,Laban) M3 2,800,000.00
8 Papan/balok kayu kelas III M3 2,000,000.00
E BAHAN LANGIT-LANGIT
1 Gypsum Board 240x120x0.9 cm Lbr 120,000.00
2 Tripleks 1220 x 2440 x 0,3 mm Lbr 75,000.00
3 Multipleks 1220 x 244 0x 0,9 mm Lbr 170,000.00
4 List profil 4x4 M' 15,000.00
5 List Profil Gipsum lebar 15 cm M' 36,000.00
F. BAHAN ATAP
1 Seng gelombang BWG 34 " BJLS 0.20 mm Kk
2 Atap Sakura roof Lbr 45,000.00
NO JENIS MATERIAL DAN TENAGA SAT UPAH/HARGA SPESIFIKASI TEKNIS KET.
1 2 3 4 5 6
3 Nok Atap Sakura Roof Lbr 30,000.00
D BAHAN BESI
1 Kawat beton Kg 20,000.00
2 Besi Beton polos Kg 22,000.00
3 Besi Profil Kg 30,000.00
4 Besi Strip Kg 12,000.00
5 Paku biasa 2"-5" kg 20,000.00
6 Paku tripleks Kg 17,500.00
7 Paku sekrup Bh 360.00
E BAHAN CAT
1 Plamur tembok boyo 23 Kg. Kg. 16,380.00
2 Cat Metrolite Kg. 22,500.00
3 Plamir kayu Kg. 5,500.00
4 Cat dasar/kayu/tembok Kg. 22,500.00
5 Cat tembok Kg. 64,200.00
6 Cat tembok ria Kg 4,250.00
7 Cat kayu kilap standart Glotex Kg. 37,500.00
8 Cat besi Kg. 24,000.00
9 Cat batacote waterproof Kg 25,000.00
10 Cat Vernis Kayu Kg 21,300.00
11 Minyak cat Kg 70,000.00
12 Kalsium Kg. 5,000.00
13 Lem fox/ lem kayu Kg. 42,000.00
14 Kuas biasa 3 cm Bh. 8,400.00
15 Kuas Roll Bh. 17,500.00
16 Ampelas halus Lbr 9,000.00
17 Ampelas kasar Lbr 5,400.00
18 Meni besi Kg 24,000.00
19 Meni kayu Kg 24,000.00
20 Minyak bekisting Ltr 8,400.00
21 Residu Kg 20,100.00
I. BAHAN PENGGANTUNG
1 Kunci tanam 2x slag (Import) Bh. 425,000.00
2 Tarikan Pintu Utama (Import) Bh. 225,000.00
3 Kunci tanam kamar mandi Tanam (Standart) Bh. 70,000.00
4 Grendel biasa Bh. 7,500.00
5 Grendel Tanam Bh. 49,500.00
6 Engsel Pintu H Kuningan Bh. 10,000.00
7 Engsel jendela Standart Bh. 9,000.00
8 Engsel pintu kaca Aluminium Bh. 150,000.00
9 Hak angin Bh. 8,700.00
J. BAHAN KACA
1 Kaca bening 5 mm M2 125,000.00
2 Kaca Raybend 5 mm M2 195,000.00
3 Lem sealent Kg 80,000.00
4 Batu tempel Alam M2 150,000.00
NO JENIS MATERIAL DAN TENAGA SAT UPAH/HARGA SPESIFIKASI TEKNIS KET.
1 2 3 4 5 6
F. BAHAN INSTALASI LISTRIK
1 Lampu Downlight 40 Watt Bh. 140,000.00
2 Lampu Downlight 18 Watt Bh. 125,000.00
3 Instalasi titik lampu Titik 95,000.00
4 Pipa PVC 5/8" M' 2,500.00
5 Lampu Ref.Mirror TL 2x40 Watt Bh. 475,000.00
6 Saklar tunggal Ex.Clipsal Bh. 12,000.00
7 Stop Kontak Open Ex.Clipsal Bh. 15,000.00
8 Stop Kontak Close Ex.Broco Bh. 15,000.00
9 Saklar ganda broco Bh. 14,000.00
10 Sekring Box Bh. 20,000.00
11 MCB 20 A 3 o Merling Gering Bh. 240,000.00
12 Kabel NYY 2x2,5mm2 Eterna M1 5,000.00
13 Kabel NYM2x4 mm2 Eterna M1 10,200.00
14 Kabel NYM 2x2,5 mm2 Eterna M1 5,000.00
15 Kawat BC 50 mm2 M1 55,000.00
16 Kawat BC 25 mm2 M1 27,500.00
17 Arde Ex. Tembaga Asli m1 214,000.00
18 Stik Bh. 1,500.00
19 Behel Bh. 4,000.00
I. BAHAN SANITER
1 Kloset jongkok porselin Bh. 400,000.00
2 Kloset duduk monoblok KIA Bh. 2,000,000.00
3 Wastafel MEJa Bh. 250,000.00
4 Pintu Aluminium Kamar Mandi Bh. 275,000.00
5 Floor drain Bh. 36,000.00
Washer Bh. 50,000.00
6 Kran. Dia 1/2" Bh. 20,000.00
7 Kran. Dia 3/4" Bh. 24,000.00
8 Seal tape Bh. 6,000.00
9 Stop Kran Bh. 42,000.00
G PIPA DAN AKSESORIS
I. PIPA Besi Standar Medium A SNI,
SNI dia. 4" , Pj 6 meter M' 342,000.00
SNI dia. 3" , Pj 6 meter M' 270,000.00
SNI dia. 2 1/2" , Pj 6 meter M' 200,250.00
SNI dia. 2" , Pj 6 meter M' 146,250.00
SNI dia. 1 1/2" , Pj 6 meter M' 128,250.00
SNI dia. 1 1/4" , Pj 6 meter M' 97,875.00
SNI dia. 1" , Pj 6 meter M' 94,500.00
SNI dia. 3/4" , Pj 6 meter M' 83,250.00
SNI dia. 1/2" , Pj 6 meter M' 64,125.00
Assesories Pipa GIP
Bend 90°
Ukuran dia. 4"
Ukuran dia. 3"
Ukuran dia. 2 1/2"
Ukuran dia. 2
Ukuran dia. 1 1/2"
Ukuran dia. 1
Bend 45°
Ukuran dia. 4"
Ukuran dia. 3"
Ukuran dia. 2 1/2"
Ukuran dia. 2
Ukuran dia. 1 1/2"
Ukuran dia. 1
Socket
Ukuran dia. 3"
Ukuran dia. 2
Ukuran dia. 1
Tee
Ukuran dia. 2 x 2 x 2"
Ukuran dia. 2 x 2 x 1 1/2"
NO JENIS MATERIAL DAN TENAGA SAT UPAH/HARGA SPESIFIKASI TEKNIS KET.
1 2 3 4 5 6
Reducer
Ukuran dia. 3" x 2 "
Ukuran dia. 2 x 1"
V. L. Ring Ø 1/2" x Ø 1/4"
Manometer
Check Valve Ø 2"
Double Nipple Ø 3"
Double Nipple Ø 2"
Double
Flange Nipple GI dia. 1/2" Bh 21,500.00
Ukuran dia. 3"
Ukuran dia. 2 1/2"
Ukuran dia. 2
Ukuran dia. 1 1/2"
Waiter Mur
Ukuran dia. 3"
Ukuran dia. 2 1/2"
Ukuran dia. 2
Ukuran dia. 1 1/2"
A Gate Valve Onda Brass
Ukuran dia. 4"
Ukuran dia. 3" Bh 3,250,000.00
Ukuran dia. 2 1/2" Bh 2,650,000.00
Ukuran dia. 2 Bh 2,360,000.00
Ukuran dia. 1 1/2" Bh 1,532,000.00
Ukuran dia. 1 Bh -
Ukuran dia. 1/2" Bh 85,000.00
B Accesorries Lainnya
Clamp Saddle GI ø 2" x 1/2" Bh 135,000.00
Clamp Saddle GI ø 1 " x 1 " Bh 75,000.00
Water Meter 1/2" (Standar PDAM) Bh 380,000.00
Kran Air Dia. 1/2" Bh 32,300.00
Box Meteran Air (30 cm x 15 cm x 20 cm) Bh 73,000.00
Flange Shock Dia. 3" Bh 215,000.00
Flange Shock Dia. 2.5" Bh 205,000.00
Flange Shock Dia. 2" Bh 195,000.00
Flange Shock Dia. 1.5" Bh 175,000.00
Paking Dia. 3" Bh 30,000.00
Paking Dia. 2.5" Bh 30,000.00
Paking Dia. 2" Bh 30,000.00
Paking Dia. 1.5" Bh 30,000.00
Paking Dia. 3" Bh 30,000.00
Baut 5/8 x 10 cm Bh 10,000.00
Socket GI. DD Dia. 3 Bh 38,400.00
Socket GI. DD Dia. 2 Bh 32,500.00
Knee Gi Dia. 3" Bh 82,500.00
Knee Gi Dia. 2.5" Bh 77,500.00
Knee Gi Dia. 2" Bh 65,000.00
Knee Gi Dia. 1.5" Bh 42,500.00
Knee Gi Dia. 1" Bh 35,000.00
Knee Gi Dia. 3/4" Bh 20,000.00
Knee Gi Dia. 1/2" Bh 12,500.00

Sney Pipa dia. 1/2" - 2" Bh 85,000.00


Sney Pipa dia. 2 1/2" - 3"
Kunci Pipa dia. 1/2" - 2"
Kunci Pipa dia. 1/2" - 3"
NO JENIS MATERIAL DAN TENAGA SAT UPAH/HARGA SPESIFIKASI TEKNIS KET.
1 2 3 4 5 6
II Pipa PVC SNI
Pipa ND. 100 mm PVC ø 4'' SNI (Panjang 6 M) M' Rp 158,750.00
Pipa ND. 75 mm PVC ø 3'' SNI (Panjang 6 M) M' Rp 100,625.00
Pipa ND. 65 mm PVC ø 2 1/2'' SNI (Panjang 6 M) M' Rp 72,625.00 Tekanan Nominal pipa minimal 1,00 Mpa
atau 10 bar (SNI 06-0084- 2002) dengan
Pipa ND. 50 mm PVC ø 2'' SNI (Panjang 6 M) M' Rp 50,825.00
tebal dinding nominal S12,5. Bar
Pipa ND. 32 mm PVC ø 1 1/4'' SNI (Panjang 6 M) M' Rp 22,500.00
Pipa ND. 40 mm PVC ø 1 1/2'' SNI (Panjang 6 M) M' Rp 34,625.00
Pipa ND. 25 mm PVC ø 1'' SNI (Panjang 6 M) M' Rp 14,712.50 Sistim Penyambungan dengan gelang karet
Pipa ND. 20 mm PVC ø 3/4'' SNI (Panjang 6 M) M' Rp 9,300.00 (RRJ = Rubber Ring Joint) dan dapat
Pipa ND. 16 mm PVC ø 1/2'' SNI (Panjang 6 M) M' Rp 6,200.00 dengan lem (SCJ = Solven Cement Joint).
Assesories Pipa PVC
Bend 90°
Ukuran dia. 4" buah
3"1/2"
Ukuran dia. 2 buah
Ukuran dia. 2 buah
Ukuran dia. 1 1/2" buah
Ukuran dia. 1 buah
Bend 45°
Ukuran dia. 4" buah
Ukuran dia. 3" buah
Ukuran dia. 2 1/2" buah
Ukuran dia. 2 buah
A Socket Drat Luar
Ukuran dia. 4" Bh -
Ukuran dia. 3" Bh 140,000.00
Ukuran dia. 2 1/2" Bh 115,000.00
Ukuran dia. 2 Bh 125,500.00
Ukuran Dia. 1.5" Bh 85,000.00
Ukuran Dia. 3/4" Bh 15,000.00
B Tee
Ukuran dia. 3 x 3 x 3" Bh 183,000.00
Ukuran Dia. 2.5" x 2.5" x 2.5" Bh 125,700.00
Ukuran Dia. 2" x 2" x 2" Bh 115,600.00
Ukuran Dia. 3" x 3" x 2" Bh 185,000.00
Ukuran Dia. 3" x 3" x 3" Bh 187,000.00
Ukuran Dia. 2" x 2" x 2" Bh - Assesories Pipa harus dari bahan
Ukuran Dia. 1 1/2" x 1 1/2" x 1 1/2" Bh 85,000.00 dengan kualitas yang sama dengan pipa
Ukuran Dia. 1 " x 1 " x 1 " Bh 76,350.00 yang digunakan (SNI 06-0135- 1987) .
Ukuran Dia. 1 1/2" x 1 1/2" x 3/4 " Bh 57,600.00
Ukuran dia. 2 x 2 x 1 1/2" Bh -
Ukuran dia. 2 x 2 x 2" Bh -
Ukuran dia. 2 x 2 x 3/4" Bh 72,350.00
Ukuran dia. 3/4 x 3/4 x 3/4" Bh 35,000.00
Ukuran dia. 1/2 x 1/2 x 1/2" Bh
Reducer
dia. 3" x 2 1/2" buah
dia. 3" x 2" buah
dia. 2 1/2" x 2" buah
dia. 2" x 1 1/2" buah
C End Cap / Dop
Ukuran dia. 3" Bh 75,800.00
Ukuran dia. 2 1/2" Bh 84,300.00
Assesories Pipa harus dari bahan
Ukuran dia. 2 Bh 57,650.00
dengan kualitas yang sama dengan pipa
Ukuran dia. 1 " Bh 22,650.00 yang digunakan (SNI 06-0135- 1987) .
Ukuran dia. 3/4" Bh 28,450.00
Ukuran dia. 1 1/2" Bh 42,700.00
Ukuran dia. 1/2" Bh
D Aksesoris lainnya
Faucet Elbow PVC 1/2" Bh 15,000.00
Elbow 90° PVC 1/2" Bh 12,500.00
Elbow 90° PVC 2" Bh 60,000.00
Elbow 90° PVC 2.5" Bh 67,200.00
Elbow 90° PVC 3/4" Bh 45,000.00 Assesories Pipa harus dari bahan
Elbow 90° PVC 1" Bh 55,000.00 dengan kualitas yang sama dengan pipa
Bend 135° PVC 3/4" Bh 8,500.00 yang digunakan (SNI 06-0135- 1987) .
Assesories Pipa harus dari bahan
NO JENIS MATERIAL DAN TENAGA SAT UPAH/HARGA dengan kualitas yang sama
SPESIFIKASI dengan pipa
TEKNIS KET.
1 2 3 4 yang digunakan (SNI5 06-0135- 1987) . 6
Tanki Profil 1.200 Ltr Bh 2,100,000.00
Soket DD° PVC Dia.3/4" Bh 15,000.00
Soket DL° PVC Dia.3/4" Bh 15,000.00
Valve Dia. 3/4" Bh 25,000.00
E Reducer
Ukuran dia. 3 x 2.5" Bh 183,000.00
Ukuran Dia. 2.5" x 2 Bh 125,700.00
Ukuran Dia. 2.5" x 1" Bh 112,500.00
Ukuran Dia. 3" x 1.5 Bh 145,000.00
Ukuran Dia. 3" x 1" Bh 135,000.00
Ukuran Dia. 2" x 1.5 Bh 127,000.00
Ukuran Dia. 2" x 1" Bh 120,000.00
Ukuran Dia. 1.5" x 1" Bh 95,000.00
Ukuran Dia. 1.5" x 3/4" Bh 76,500.00
Bh -
Sealtape Bh 10,000.00
Lem Pipa @ 3 kg Klg 57,000.00

Buranga, Maret 2020


Di Buat Oleh :
Staf Perencanaan Bid. Cipta Karya
Dinas PUPR

( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
DAFTAR HARGA SATUAN PEKERJAAN

LEVEL JENIS PEKERJAAN SATUAN HARGA


SATUAN (Rp)
SITEWORK
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m M3 85,100.00
DIVISI II
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah M3 60,950.00
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug M3 241,040.00
Divis III
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP M3 1,062,255.00
DIVISI III
A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) M3 531,852.00
DIVIS IV
A.4.1.1.1 Membuat 1 m3 beton mutu f’= 7,4 MPa (K 100), slump (12 ± 2) cm, w/c
= 0,87 M3 1,146,422.99
A.4.1.1.3 Membuat 1 m3 beton mutu f’= 12,2 MPa (K 150), slump (12 ± 2) cm,
w/c = 0,72 M3 1,250,533.68
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm,
w/c = 0,58 M3 1,394,836.02
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (12 ± 2) cm,
w/c = 0,56 M3
A.4.1.1.9. Membuat 1 m3 beton mutu f’= 24,0 MPa (K 275), slump (12 ± 2) cm,
w/c = 0,53 M3
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2)
cm, w/c = 0,52 M3
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2)
cm, w/c = 0,49 M3
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2)
cm, w/c = 0,48 M3
A.4.1.1.15 Pemasangan 1 M PVC Waterstop Lebar 200 mm M'
A.4.1.1.14 Pemasangan 1 m’ PVC Waterstop lebar 150 mm M'
A.4.1.1.15 Pemasangan 1 m’ PVC Waterstop lebar 200 mm M'
A.4.1.1.16 Membuat 1 m’ PVC Waterstop lebar 230 mm – 320 mm M'
A.4.1.1.17 Pembesian 10 kg dengan Besi Polos atau Besi Ulir Kg 286,189.00
A.4.1.1.18 Pemasangan 10 kg kabel presstressed polos/strands Kg
A.4.1.1.19 Pemasangan 10 Kg Jaring Kawat Baja (wiremesh) Kg
A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi M2
A.4.1.1.21 Pemasangan 1 m2 bekisting untuk Sloof M2
A.4.1.1.22 Pemasangan 1 m2 bekisting untuk kolom M2
A.4.1.1.23 Pemasangan 1 m2 bekisting untuk balok M2
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai M2 407,261.00
A.4.1.1.24 Pemasangan 1 m2 bekisting untuk lantai M2
A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding M2
A.4.1.1.26 Pemasangan 1 m2 bekisting untuk tangga M2
A.4.1.1.27 Pemasangan 1 m2 jembatan untuk pengecoran beton M2
A.4.1.1.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
M3 6,558,139.50
A.4.1.1.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) M3 8,196,452.50
A.4.1.1.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) M3 12,906,001.50
A.4.1.1.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) M3 9,623,430.00
A.4.1.1.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) M3 8,187,011.00
A.4.1.1.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
M3 8,039,431.50
A.4.1.1.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
M3 9,167,098.50
A.4.1.1.35 Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm M'
A.4.1.1.36 Membuat 1 m’ ring balok beton bertulang (10 x 15) cm M'
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1. Pembuatan 1 m2 lahan produksi tebal 8cm beton f’c 14,5 Mpa (K
175) slump (12 ± 2) cm M2
A.4.1.2.2. Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K
175) slump (12 ± 2) cm M2
A.4.1.2.3. Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K
175) slump (12 ±2) cm M2
A.4.1.2.4. Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K
175) slump (12 ± 2) cm M2
A.4.1.2.5. Pembuatan 1 m2 bekisting untuk plat beton pracetak ( 5 kali pakai)
M2
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali
pakai) M2
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali
DIVISI IV pakai) M2
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton
pracetak Bh
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok
beton pracetak Bh
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom
beton pracetak Bh
A.4.1.2.11. Penuangan/menebar beton untuk 1 buah komponen plat pracetak
Bh
A.4.1.2.12. Penuangan/menebar beton untuk 1 buah komponen balok
pracetak Bh
A.4.1.2.13. Penuangan/menebar beton untuk 1 buah komponen kolom
pracetak Bh
A.4.1.2.14. Mendirikan 1 buah komponen plat pracetak Bh
A.4.1.2.15. Mendirikan 1 buah komponen balok pracetak Bh
A.4.1.2.16. Mendirikan 1 buah komponen kolom pracetak Bh
A.4.1.2.17. Melangsir 1 buah komponen plat pracetak ( ± 20 m) Bh
A.4.1.2.18. Melangsir 1 buah komponen balok pracetak ( ± 20 m) Bh
A.4.1.2.19. Melangsir 1 buah komponen kolom pracetak ( ± 20 m) Bh
A.4.1.2.20. Bahan 1 m3 grouting campuran M3
A.4.1.2.21. Bahan 1 m3 grouting tidak campuran M3
A.4.1.2.22. Upah melakukan 1 titik grouting pada join pracetak Titik
A.4.1.2.23. Pemasangan 1 titik Bekisting join pracetak Titik
A.4.1.2.24. Upah 1 titik Join dengan Sling Titik
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
A.4.2.1.1. Pemasangan 1 kg besi profil Kg
A.4.2.1.2. Pemasangan 1 kg rangka kuda-kuda baja IWF Kg
A.4.2.1.3. Pengerjaan 100 kg pekerjaan perakitan Kg
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka
baja siku M2
A.4.2.1.5. Pengerjaan 10 cm pengelasan dengan las listrik Cm
A.4.2.1.6. Pembuatan 1 m2 rangka jendela besi scuare tube (25 x 5) cm M2
A.4.2.1.7. Pemasangan 1 m2 pintu rolling door besi M2
A.4.2.1.8. Pemasangan 1 m2 pintu lipat (folding door) bahan plastik/PVC M2
A.4.2.1.9. Pemasangan 1 m2 sunscreen alluminium M2
A.4.2.1.10. Pemasangan 1 m2 rolling door alluminium M2
A.4.2.1.11. Pemasangan 1 m kusen pintu alluminium M2
A.4.2.1.12. Pemasangan 1 m2 pintu alluminium strip lebar 8 cm M2
A.4.2.1.13. Pemasangan 1 m2 pintu kaca rangka alluminium M2
A.4.2.1.14.Pemasangan 1 m2 venetions blinds dan Vertical blinds M2
A.4.2.1.15. Pemasangan 1 m2 terali besi strip (2 x 3) mm M2
A.4.2.1.16. Pemasangan 1 m2 kawat nyamuk M2
A.4.2.1.17. Pemasangan 1 m2 jendela nako & tralis M2
A.4.2.1.18. Pemasangan 1 m’ talang datar/ jurai seng bjls 28 lebar 90 cm M'
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30
lebar 45 cm M'
A.4.2.1.20.Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x
120 cm, dinding partisi M2
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60
cm, plafon M2
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu
campuran 1SP : 3PP M2 308,550.75
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm. M2 76,100.56
A.4.4.2.27. Pemasangan 1 m2 acian. M2 42,981.25
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat
dasar, 2 lapis cat penutup) M2 21,805.15
DIVISI V
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½” Bh 20,803.50
A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4” M' 20,803.50
A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm M' 61,772.25
A.5.1.1 23. Pemasangan 1 m’ pipa galvanis diameter 3” M' 71,760.00
A.5.1.1 25. Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” M' 11,845.00
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” M' 28,422.25
A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” M' 11,845.00
A.5.1.1 28. Pemasangan 1 m’ pipa PVC tipe AW diameter 1 1/2” M' 57,873.75
A.5.1.1 29. Pemasangan 1 m’ pipa PVC tipe AW diameter 2” M' 17,767.50
A.5.1.1 30. Pemasangan 1 m’ pipa PVC tipe AW diameter 2 1/2” M' 26,588.00
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3” M' 26,588.00
DIVISI VIII
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
DIVISI V A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm M' 14,576.25
A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm M' 16,813.00
RENCANA ANGGARAN BIAYA

KABUPATEN : KAB. BUTON UTARA


INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : PEK. PEMBANGUNAN SPAM KEL. BONE LIPU
LOKASI : DESA KEL. BONE LIPU
TAHUN ANGGARAN : 2019

DIV. URAIAN KEGIATAN SAT. VOL

1 PEKERJAAN PERSIAPAN T P L J Vol


1 Pembersihan Lokasi Ls 1.00

2 Pemasangan Bowplank / Pengukuran Kembali Ls 1.00

3 Air Kerja / P3K Ls 1.00

4 Papan Nama Proyek Ls 1.00

5 Administrasi Foto dan Dokumentasi Ls 1.00


JUMLAH I
2 PEKERJAAN RESERVOAR ( Uk. 3 M x 3 M x 2.5 M )
A PEKERJAAN TANAH DAN PASIR

1 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Poer Plat M3 1.200 1.00 1.00 4.00 4.80
2 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3 0.60 2.225 0.60 4 3.20
3 Pek. Urugan Kembali Pondasi Poer Plat + Pondasi Batu Gunung M 3
0.03 1 1 4 1.29024
4 Urugan Pasir Alas Pondasi M3 0.05 2.225 0.6 4 0.27
JUMLAH A
B PEKERJAAN DINDING DAN PLESTERAN

1 Pek. Plesteran Tembok 1 : 3 M2 2.50 1.85 2 4 37.00


2 Pek. Pemasangan 1 m2 acian. M3 37.00
Pek. Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 (Dinding
M3
3 Beton Menerus) 0.12 2.5 2.35 4 2.87
4 Pek. Pembesian 10 kg Diding Beton Menerus dengan Besi Polos Kg 150.908
5 Pek. Pemasangan 1 m2 bekisting untuk Dinding M 3
2.35 1.85 2 4 34.78
JUMLAH B
C PEKERJAAN BETON DAN PONDASI
Pek. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c =
1 0,87 M3 1.00 1 0.05 4 0.20
Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Pondasi
2 Poer Plat M3 0.20 1 1 4 1.00
3 Pemasangan 1 m2 bekisting untuk pondasi M2 0.30 0.6 2 4 2.64
4 Pek. Pembesian 10 kg Pondasi Poer Plat dengan Besi Polos Kg 106.62
Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Kolom
5 M 3
0.28 4.75 0.24 4 1.28
6 Pek. Pembesian 10 kg dengan Besi Polos Untuk Kolom Kg 107.22
7 Pek. Pemasangan 1 m2 bekisting untuk kolom M2 0.30 4.75 2 4 20.90
Pek. Membuat 1 m3 Plat Lantai Bawah beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm,
8 w/c = 0,58 T = 0.15 cm (Reservoar) M3 0.13 2.4 2.4 1 0.72
9 Pek. Pembesian 10 kg Pondasi Plat Lantai Bawah dengan Besi Polos atau Besi Ulir (Reservoar) 52.08
10 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Bawah (Reservoar) M2 2.50 2.5 7.81
Pek. Membuat 1 m3 Plat Lantai Atas beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm,
11 w/c = 0,58 T = 0.15 cm (Reservoar) M3 2.50 2.5 0.12 1 0.67
12 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas (Reservoar) M2
13 Pek. Pembesian 10 kg Pondasi Plat Lantai Atas dengan Besi Polos atau Besi Ulir (Reservoar) Kg 29.26
Pek. Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
14 M3 0.19 0.24 2.225 4 0.41

Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Balok
1 M3
2 Pek. Pembesian 10 kg Balok dengan Besi Polos Kg
3 Pek. Pemasangan 1 m2 bekisting untuk balok M2
Pek. Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61Balok
4 Anak M3
5 Pek. Pembesian 10 kg Balok dengan Besi Polos Kg
6 Pek. Pemasangan 1 m2 bekisting untuk balok M2
7 Pek. Pemb. Plat Manhole 80 x 80 cm Ls
Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
8 M3
9 Pek. Pemasangan 1 m3 batu kosong/anstamping M3
JUMLAH C

D PEKERJAAN PENGECETAN / FINISHING/DLL

1 Pek. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) M2

2 Pekerjaan Tangga Monyet Ls


3 Pembersihan Lokasi Ls
JUMLAH D

2 PEKERJAAN RUMAH POMPA + PENGADAAN POMPA


A PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3
2 Pek. Urugan Kembali Pondasi Batu Gunung M3

3 Pek. Urugan Pasir Alas Pondasi M3

4 Pek. Urugan Pasir Alas Lantai M3

5 Pek Urugan Kembali Alas Latai + Pemadatan M3


JUMLAH A
B PEKERJAAN LANTAI, DINDING DAN PLESTERAN
Pek. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c =
1 0,87 M3
Pek. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP M2
2

3 Pek. Plesteran Tembok 1 : 3 M2


4 Pek. Pemasangan 1 m2 acian. M3
JUMLAH B
C PEKERJAAN BETON DAN PONDASI
1 Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58(Kolom)
M3
2 Pek. Pembesian 10 kg dengan Besi Polos Untuk Kolom Kg
3 Pek. Pemasangan 1 m2 bekisting untuk kolom M2
Pek. Membuat 1 m3 Plat Lantai Atas beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm,
4
w/c = 0,58 T = 0.15 cm (Reservoar) M3
5 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas (Reservoar) M2
6 Pek. Pembesian 10 kg Pondasi Plat Lantai Atas dengan Besi Polos atau Besi Ulir (Reservoar) Kg

7 Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Sloof
M3
8 Pek. Pembesian 10 kg Sloof dengan Besi Polos atau Besi Ulir (Reservoar) Kg
9 Pek. Pemasangan 1 m2 bekisting untuk Sloof M2

10 Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Balok
M3
11 Pek. Pembesian 10 kg Balok dengan Besi Polos Kg
12 Pek. Pemasangan 1 m2 bekisting untuk balok M2
13 Pek. Pemb. Pintu Besi 80 x 80 cm Ls
14 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
M3
15 Pek. Pemasangan 1 m3 batu kosong/anstamping M3
JUMLAH C

D PEKERJAAN PENGECETAN / FINISHING/DLL

1 Pek. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) M2

2 Pekerjaan Pengadaan Pompa Ls


SPESIFIKASI POMPA
Type : Centrivugall Pump
Daya Motor : 2200 Watt PLN/7.5 kVA Genset
Voltage /Hz : 1x220-240 Vol, 50 Hz
Kapasitas : 1 - 1,5 LPS
Head : 30 - 60 Meter
DIV. URAIAN KEGIATAN SAT. VOL

JUMLAH D

3 PEKERJAAN BOX VALVE


A PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3
2 Pek. Urugan Kembali Pondasi Batu Gunung M3

3 Pek. Urugan Pasir Alas Pondasi M3

4 Pek. Urugan Pasir Alas Lantai M3

5 Pek Urugan Kembali Alas Latai + Pemadatan M3


JUMLAH A

B PEKERJAAN LANTAI, DINDING DAN PLESTERAN


Pek. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c =
1 0,87 M3
Pek. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP M2
2

3 Pek. Plesteran Tembok 1 : 3 M2


4 Pek. Pemasangan 1 m2 acian. M3
JUMLAH B
C PEKERJAAN BETON DAN PONDASI

1 Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58(Kolom)
M3
2 Pek. Pembesian 10 kg dengan Besi Polos Untuk Kolom Kg
3 Pek. Pemasangan 1 m2 bekisting untuk kolom M2
Pek. Membuat 1 m3 Plat Lantai Atas beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm,
4
w/c = 0,58 T = 0.15 cm (Reservoar) M3
5 Pek. Pemasangan 1 m2 bekisting untuk Plat lantai Atas (Reservoar) M2
6 Pek. Pembesian 10 kg Pondasi Plat Lantai Atas dengan Besi Polos atau Besi Ulir (Reservoar) Kg

7 Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Sloof
M3
8 Pek. Pembesian 10 kg Sloof dengan Besi Polos atau Besi Ulir (Reservoar) Kg
9 Pek. Pemasangan 1 m2 bekisting untuk Sloof M2

10 Pek. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Balok
M3
11 Pek. Pembesian 10 kg Balok dengan Besi Polos Kg
12 Pek. Pemasangan 1 m2 bekisting untuk balok M2
13 Pek. Pemb. Plat Manhole 80 x 80 cm Ls
14 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
M3
15 Pek. Pemasangan 1 m3 batu kosong/anstamping M3
JUMLAH C
D PEKERJAAN PENGECETAN / FINISHING/DLL

1 Pek. Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) M2

2 Pekerjaan Tangga Monyet Ls


3 Pembersihan Lokasi Ls
JUMLAH D

4 PEKERJAAN SUMBER ENERGI LISTRIK/PLN


A PEKERJAAN INSTALASI LISTRIK
Pek. 1 titik cahaya / instalasi listrik Titik 2.00
Pek. 1 Bh Stop Kontak Bh 1.00
Pek. 1 Bh BOX MCB Bh 1.00
Pek. Pengadaan Sumber Energi Listrik PLN (Daya Listrik 2.200 Watt) Ls 1.00
JUMLAH D

5 PEKERJAAN INSTALASI PIPA + PEMASANGAN SAMBUNGAN RUMAH ( SR )


A PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m Jalur Pipa M3
2 Pek. Urugan Kembali Jalur Pipa M3

3 Pek. Urugan Pasir Alas Pipa M3


JUMLAH A
DIV. URAIAN KEGIATAN SAT. VOL

F PEKERJAAN PIPA INSTALASI TRANSMISI + DISTRIBUSI + ACCESSORIES PVC Dan GIP


1 Pemasangan 1 m’ pipa PVC tipe AW diameter 2.5” (SNI S-12.5 Bar Panjang 6 M) M1 -
1 Pemasangan 1 m’ pipa PVC tipe AW diameter 2” (SNI S-12.5 Bar Panjang 6 M) M1
2 Pemasangan 1 m’ pipa PVC tipe AW diameter 2 1/2 ” (SNI S-12.5 Bar Panjang 6 M) M 1

2 Pemasangan 1 m’ pipa PVC tipe AW diameter 1 1/2 ” (SNI S-12.5 Bar Panjang 6 M) M1
3 Pemasangan 1 m’ pipa PVC tipe AW diameter 1/2” (SNI S-10 Bar Panjang 6 M) M1
4 Pek Pemasangan 1 m’ pipa galvanis diameter 3” (Panjang 6 M), Pipa Tansmisi M1
Pek Pemasangan 1 m’ pipa galvanis diameter 3/4” (Panjang 6 M), Pipa Tansmisi Dari Pompa
5 M1
Air Ke Reservoar
Pek. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” (Dari Pompa Ke Sumur Gali) M1
Pek. Pemasangan 1 m’ pipa PVC tipe AW diameter 1” (Dari Pompa Ke Sumur Gali) M1

Assesories Pipa PVC dan GI

Pek. Sambungan Rumah (SR) = 100 bh Sambungan Rumah

4 Pek. Pemasangan Clamp Saddle GI 1 1/2" x 1/2" Bh -


Pek. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4” M'

5 Pek. Pemasangan Double Nipple GI 1/2" Bh -

6 Pek. Pemasangan Faucet Elbow PVC 1/2" Bh -

7 Pek. Pemasangan Elbow 90° PVC 1/2" Bh -

8 Pek. Pemasangan Water Meter 1/2" (Standar PDAM) Bh -

9 Pek. Pemasangan Valve 1/2" Bh -

10 Pek. Pemasangan Kran Air GI 1/2" Bh -


11 Pek. Pemasangan Box Meteran Air (30 cm x 15 cm x 20 cm) Bh -

12 Pek. Gate Valve Dia. 2" Bh 4.00

13 Pek. Flange Shock Dia. 2" Bh 8.00


14
16 Pek. Paking Dia. Dia.
Gate Valve 2" 3" Bh 8.00
-
17 Pek. Flange Shock Dia. 3" Bh -
18 Pek. Paking Dia. 3" Bh -

15 Lem Pipa 3 Kg Klg 4.00


JUMLAH F
JUMLAH ( A + B +C+D+E+F+G+H+I+J)
DAFTAR KUANTITAS DAN HARGA

KABUPATEN : BUTON UTARA


INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : PEMABANGUNAN SARAN CUCI TANGAN PAKAI SABUN (CTPS)
LOKASI : KAB. BUTON UTARA
TAHUN ANGGARAN : 2020

DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
II PEKERJAAN SARANA CUCI TANGAN PAKAI SABUN (CTPS)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 200,000.00 200,000.00
2 Pemasangan Bowplank / Pengukuran Jalur Pipa Ls 0.00 0.00
3 Air Kerja / P3K Ls 0.00 0.00
4 Papan Nama Proyek Ls 1.00 300,000.00 300,000.00
5 Administrasi Foto dan Dokumentasi Ls 1.00 1,500,000.00 1,500,000.00
JUMLAH SUB.PEKERJAAN PERSIAPAN 2,000,000.00
II PEKERJAAN RANGKA BESI/BAJA DAN DUDUKAN TANDON AIR
1 Pemasangan 1 kg besi profil L Uk. 75 x 75 x 9 mm Kg 259.13 54,268.50 14,062,777.30
2 Pek. Pengerjaan 100 kg pekerjaan perakitan Kg 2.59 23,184.00 60,077.47
3 Pek. Papan Kayu Dudukan Tandon Air Lbr 5.00 27,500.00 137,500.00
4 Pek. Membuat Plat Tumpu/Tapak Uk. 15 x 15 x 9 mm Ls 4.0000 50,000.00 200,000.00
JUMLAH SUB.PEKERJAAN RANGKA BESI/BAJA DAN DUDUKAN TANDON AIR 14,460,354.77
III PEKERJAAN INSTALASI AIR DAN WASTAFEL CTPS
1 Wastafel Steensles Uk. 50 x 40 x 14 cm Bh 1.00 445,165.00 445,165.00
2 Elbow 90° PVC 3/4" Bh 16.00 45,000.00 720,000.00
3 Soket DD° PVC Dia.3/4" Bh 1.00 15,000.00 15,000.00
4 Valve 3/4" Bh 1.00 25,000.00 25,000.00
5 Socket DL PVC Uk. 3/4" Bh 2.00 15,000.00 30,000.00
6 Kran Air GI 3/4" Bh 1.00 34,672.50 34,672.50
7 Tee PVC. Uk. 3/4" Bh 18.00 35,000.00 630,000.00
8 Tangki Air PVC 1.200 Ltr" Bh 1.00 2,100,000.00 2,100,000.00
9 Pipa PVC SNI Dia. 1 1/4" M' 0.40 57,873.75 23,149.50
10 Pipa PVC SNI Dia. 3/4" M' 10.99 28,422.25 312,360.53
JUMLAH SUB.PEKERJAAN INSTALASI AIR DAN WASTAFEL CTPS 4,335,347.53
JUMLAH TOTAL 20,795,702.30
JUMLAH TOTAL PEKERJAAN SARANA CUCI TANGAN PAKAI SABUN (CTPS) 1 bh 20,795,702.30

Buranga, Maret 2020


Mengetaui : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Perencanaan Bid. Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang

NIP.( ZALMAN,
19781016 ST., MT.1 )006
200901 ( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
DAFTAR KUANTITAS DAN HARGA
KABUPATEN : BUTON UTARA
INSTANSI : DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
NAMA PEKERJAAN : Pengembangan Jaringan Perpipaan SPAM Desa Sumampeno Kec. Wakorumba
Utara Kab. Buton Utara
LOKASI : Desa Sumampeno
TAHUN ANGGARAN : 2020

DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
1 PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 400,000.00 400,000.00
2 Pemasangan Bowplank / Pengukuran Jalur Pipa Ls 1.00 2,500,000.00 2,500,000.00
3 Air Kerja / P3K Ls 1.00 300,000.00 300,000.00
4 Papan Nama Proyek Ls 1.00 300,000.00 300,000.00
5 Administrasi Foto dan Dokumentasi Ls 1.00 2,500,000.00 2,500,000.00
JUMLAH TOTAL PERERJAAN PERSIAPAN 6,000,000.00
3 PEKERJAAN TRUSH BLOCK
A PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3 2.30 85,100.00 196,070.40
2 Pek. Urugan Pasir Alas Pondasi m3 0.22 241,040.00 52,064.64
JUMLAH SUB. PEKERJAAN TANAH DAN PASIR TRUSH BLOCK 248,135.04
B PEKERJAAN PONDASI/DLL

1 Pek. Pipa Sipon Besi 0.5" (Pengunci Pipa Transmisi) Ls 4.80 20,000.00 96,000.00

2 Pek. Pemasangan 1 m3 batu kosong (anstamping) M3


1.54 531,852.00 816,924.67
3 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP M3 0.95 1,062,255.00 1,003,830.98
JUMLAH SUB. PEKERJAAN PONDASI DLL TRUSH BLOCK 1,916,755.65
JUMLAH TOTAL PERERJAAN TRUSBLOCK 2,164,890.69
4 PEKERJAAN BOX VALVE 4Bh
A PEKERJAAN TANAH DAN PASIR
1 Penggalian 1 m3 tanah biasa sedalam 1 m Pondasi Batu Gunung M3 3.96 85,100.00 336,996.00
2 Pek. Urugan Pasir Alas Pondasi M3 0.18 241,040.00 43,387.20
3 Pek. Urugan Pasir Alas Lantai M3 0.11 241,040.00 27,117.00
4 Pek Urugan Kembali Alas Latai + Pemadatan M3 1.32 60,950.00 80,454.00
JUMLAH SUB. PEKERJAAN TANAH DAN PASIR BOX VALVE 487,954.20
B PEKERJAAN LANTAI, DINDING DAN PLESTERAN

1 Pek. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP M2 12.67 308,550.75 3,909,955.10

2 Pek. Plesteran Tembok 1 : 3 M2 12.67 76,100.56 964,346.30


JUMLAH SUB. PEKERJAAN LANTAI, DINDING DAN PLESTERAN BOX VALVE 4,874,301.40
C PEKERJAAN BETON DAN PONDASI
1 Pek. Pemb. Plat Manhole 80 x 80 cm Ls 4.00 1,200,000.00 4,800,000.00
2 Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP M3 1.08 1,062,255.00 1,147,235.40
JUMLAH SUB. PEKERJAAN BETON DAN PONDASI BOX VALVE 5,947,235.40
JUMLAH SUB. PEKERJAAN BOX VALVE 7 Bh 11,309,491.00
5 PEKERJAAN PENGADAAN PIPA/AKSESORIS + PEMSANGAN PIPA/AKSESORIS
I PEKERJAAN TANAH DAN PASIR JALUR PIPA
1 Penggalian 1 m3 tanah biasa sedalam 1 m Jalur Pipa M3 318.46 85,100.00 27,100,946.00
2 Pek. Urugan Kembali Jalur Pipa M3 213.90 60,950.00 13,037,083.10
3 Pek. Urugan Pasir Alas Pipa M3 21.31 241,040.00 5,137,044.48
JUMLAH SUB. PEKERJAAN TANAH DAN PASIR JALUR PIPA 45,275,073.58
DIV. URAIAN KEGIATAN SAT. VOL HARGA SATUAN JUMLAH HARGA

1 2 3 4 5 6 = (4 x 5)
III1 PEKERJAAN
Pipa PVC SNI PENGADAAN
Dia. 3" PIPA M1 - 100,625.00 -
1 Pipa PVC SNI Dia. 2" M1 - 50,825.00 -
2 Pipa PVC SNI Dia. 1 1/2" M1 1,332.00 34,625.00 46,120,500.00
3 Aksesoris Pipa PVC dan Galvanis
Dop PVC Dia. 1.5 " Bh 4.00 42,700.00 170,800.00
Dop PVC Dia. 2" Bh 4.00 57,650.00 230,600.00
Tee PVC Dia. 1.5" x 1.5" x 1.5" Bh 5.00 85,000.00 425,000.00
Tee PVC Dia. 2" x 2" x 2" Bh 6.00 115,600.00 693,600.00
Reducer PVC Dia. 2" x 1.5" Bh 6.00 127,000.00 762,000.00
Gate Valve Dia. 2.5" Bh 1.00 2,650,000.00 2,650,000.00
Flange Shock Dia. 2.5" Bh 2.00 205,000.00 410,000.00
Karet Paking Dia. 2.5" Bh 2.00 30,000.00 60,000.00
Baut 5/8 x 10 cm Bh 16.00 10,000.00 160,000.00
Lem Pipa 3 Kg Klg 10.00 57,000.00 570,000.00
Socket DL Di.2" Bh 6.00 125,500.00 753,000.00
Stop Kran Uk.2" Bh 3.00 135,000.00 405,000.00
Socket DL Di.1.5" Bh 2.00 85,000.00 170,000.00
Stop Kran Uk. 1.5" Bh 1.00 68,500.00 68,500.00
JUMLAH SUB. PEKERJAAN PENGADAAN PIPA DAN AKSESORIES 53,649,000.00
IV PEKERJAAN PEMASANGAN PIPA PVC DAN GI
1 Pemasangan 1 m’ pipa PVC Dia. 2” - 17,767.50 0.00
M1
2 Pemasangan 1 m’ pipa PVC Dia. 1 1/2” M1 1,332.00 57,873.75 77,087,835.00

JUMLAH SUB. PEKERJAAN PEMASANGAN PIPA DAN AKSESORIES 77,087,835.00


JUMLAH PEKERJAAN PENGADAAN PIPA/AKSESORIS + PEMSANGAN PIPA/AKSESORIS 176,011,908.58

Buranga, Maret 2020


Mengetahui/Di Setujui Oleh : Di Buat Oleh :
Kepala Bidang Cipta Karya Staf Perencanaan Bid. Cipta Karya
Dinas Pekerjaan Umum dan Penataan Ruang Dinas Pekerjaan Umum dan Penataan Ruang

NIP.( ZALMAN,
19781016 ST., MT.1 )006
200901 ( AHMAT HAAFI, ST )
NIP. 19900325 201903 1 015
PEMBESIAN 60 BEKISTING
Kolom 30 x 25 120 Dinding 300 x 220 Lebar (2x) = 0 m2
Besi Ø 12 0.887 kg x 4 Kolom Ujung (2x) = 0.3125 m2
6.0 titik panjang : 5
5m jarak : 0m 35 Dinding 400 x 220 Lebar (2x) = 14.1 m2
106.44 kg Ujung (2x) = 0.88 m2
10.65 kg perbatang (full) 20 17.74 Total = 14.98 m2
9.99 btg 12.666667
Dinding 400 x 220 Lebar (2x) = 11.75 m2
Besi Ø 6 0.222 kg x 4 Kolom 5.28 Ujung (2x) = 0.88 m2
23.0 titik panjang : 4.75 2.07504 Total = 12.63 m2
0.88 m jarak : 0.2 m Total 19.81504 27.61
0.78 kg 107.22
2.66 kg perbatang (full) 0
0.29 btg
Total 107.22

PEMBESIAN PEMBESIAN
Plat lantai Bawah 2.5 x 2.5 Plat lantai Bawah 1.6 x 1.6
Besi Ø 10 0.620 kg x 2 dinding Besi Ø 10 0.620 kg x 2 dinding
14.0 titik panjang : 1.5 7.3 titik panjang : 1.45
1.5 m jarak : 0.2 m 1.45 m jarak : 0.2 m
26.04 kg 13.04 kg
7.40 kg perbatang (full) 7.40 kg perbatang (full)
3.52 btg 1.76 btg

Besi Ø 10 0.620 kg x 2 dinding Besi Ø 10 0.620 kg x 2 dinding


14.0 titik panjang : 1.5 7.3 titik panjang : 1.45
1.5 m jarak : 0.2 m 1.45 m jarak : 0.2 m
26.04 kg 13.04 kg
7.40 kg perbatang (full) 7.40 kg perbatang (full)
3.52 btg 1.76 btg
Total 52.08 Total 26.07

Plat Atas 3 x 3
Besi Ø 10 0.620 kg x 2 dinding
10.0 titik panjang : 1.5
1.5 m jarak : 0.15 m
18.60 kg
7.40 kg perbatang (full)
2.51 btg
Besi Ø 10 0.620 kg x 2 dinding
10.0 titik panjang : 1.5
1.5 m jarak : 0.15 m
18.60 kg
7.40 kg perbatang (full)
2.51 btg
Total 37.20 29.26
Kurang Manhole

Besi Ø 10 0.620 kg x 2 dinding


4.0 titik panjang : 0.8
0.8 m jarak : 0.2 m
3.97 kg
7.40 kg perbatang (full)
0.54 btg

Besi Ø 10 0.620 kg x 2 dinding


4.0 titik panjang : 0.8
0.8 m jarak : 0.2 m
3.97 kg
7.40 kg perbatang (full)
0.54 btg
Total 7.94

PEMBESIAN
Plat Atas 700 x 3.9
Besi Ø 10 0.620 kg x 2 dinding
13.0 titik panjang : 2.75
35.75 m jarak : 0.2 m
44.33 kg 13.75
7.40 kg perbatang (full)
5.99 btg

Besi Ø 10 0.620 kg x 2 dinding


13.0 titik panjang : 2.75
35.75 m jarak : 0.2 m
44.33 kg
7.40 kg perbatang (full)
5.99 btg Manhole 11.35
Total 88.66 77.31
PEMBESIAN PEMBESIAN
Plat Atas 700 x 3.9 Plat Atas 700 x 3.9
Besi Ø 10 0.887 kg x 2 dinding Besi Ø 10 0.620 kg x 2
4.0 titik panjang : 0.8 5.0 titik panjang : 1.1
3.2 m jarak : 0.2 m 5.5 m jarak : 0.2 m
5.68 kg 6.82 kg
10.65 kg perbatang (full) 7.40 kg perbatang (full)
0.53 btg 0.92 btg

Besi Ø 10 0.887 kg x 2 dinding Besi Ø 10 0.620 kg x 2


4.0 titik panjang : 0.8 5.0 titik panjang : 1.1
3.2 m jarak : 0.2 m 5.5 m jarak : 0.2 m
5.68 kg 6.82 kg
10.65 kg perbatang (full) 7.40 kg perbatang (full)
0.53 btg 0.92 btg
Total 11.35 Total 13.64

PEMBESIAN BEKISTING
Pondasi Poer Plat Dinding 300 x 220 Lebar (2x) = 0 m2
Besi Ø 12 0.887 kg x 4 dinding Ujung (2x) = 0.3125 m2
6.0 titik panjang : 0.9
5.4 m jarak : 0m 35 Dinding 400 x 220 Lebar (2x) = 14.1 m2
19.16 kg Ujung (2x) = 0.88 m2
10.65 kg perbatang (full) 3.6 3.1932 Total = 14.98 m2
1.80 btg 12.666667
Dinding 400 x 220 Lebar (2x) = 11.75 m2
Besi Ø 8 0.393 kg x 4 dinding 5.28 Ujung (2x) = 0.88 m2
5.0 titik panjang : 0.9 0 Total = 12.63 m2
0.88 m jarak : 0.15 m Total 3.1932 27.61
6.92 kg 26.08
4.73 kg perbatang (full) 0
1.46 btg
Total 106.62

0.94 11.35 22.7 90.80 80.5


0.30
0.72
0.24
0.07
2.27
Plat Atas 700 x 3.9 Daerah Tumpuan (1/4 Bentangan)
Tumpuan Besi Ø 12 0.887 kg x 2 Bidang Jenis Ukuran Berat/Batang
Harga/BatangHarga/Kg
34.7 titik panjang : 6.94 Besi Polos 4 X 12 1.18 8,673 7,350
0.4 m jarak : 0.2 m Besi Polos 6 X 12 2.66 19,418 7,300
24.62 kg 40 Besi Polos 8 X 12 4.73 34,056 7,200
10.65 kg perbatang (full) Besi Polos 10 X 12 7.40 53,280 7,200
2.31 btg Besi Polos 12 X 12 10.65 76,680 7,200
Besi Polos 14 X 12 14.50 104,400 7,200
Lapangan Besi Ø 12 0.887 kg x 1 Bidang Besi Polos 16 X 12 18.94 136,360 7,200
34.7 titik panjang : 6.94
0.95 m jarak : 0.2 m Total
29.24 kg 2 Bh 53.86


10.65 kg perbatang (full) 107.72615 8 = 0.393
2.75 btg 10 = 0.620
12 = 0.887
14 = 1.209
Plat Atas 700 x 3.9 Daerah Tumpuan (1/4 Bentangan) 16 = 1.580
Tumpuan Besi Ø 12 0.887 kg x 2 Bidang
34.7 titik panjang : 6.94
0.4 m jarak : 0.2 m
24.62 kg
10.65 kg perbatang (full)
2.31 btg

Lapangan Besi Ø 12 0.887 kg x 1 Bidang


34.7 titik panjang : 6.94
0.95 m jarak : 0.2 m Total
29.24 kg 2 Bh 53.86
10.65 kg perbatang (full) 107.72615
2.75 btg

Plat Atas 700 x 3.9 Daerah Lapangan (1/4 Bentangan)


Tumpuan Besi Ø 12 0.887 kg x 2 Bidang
23.8 titik panjang : 4.75
1.75 m jarak : 0.2 m
73.73 kg
10.65 kg perbatang (full)
6.92 btg

Lapangan Besi Ø 12 0.887 kg x 1 Bidang


23.8 titik panjang : 4.75
3.7 m jarak : 0.2 m
77.95 kg 2 Bh 151.68
10.65 kg perbatang (full) 303.354
7.32 btg
Total 518.30 (Tul. Pokok + Tumpuan + Lapangan)

Dinding 300 x 230 ATAP 400 x 500 Lebar (1x) = 7.14 m2


Besi Ø 12 0.887 kg x 2 Lapis Sisi = 2.1 m2
8.3 titik panjang : 2.5 Total = 9.24 m2
2.3 m jarak : 0.3 m
34.00 kg LANTAI 400 x 300 Lebar = m2
10.65 kg perbatang (full) Sisi = 1.65 m2
3.19 btg Total = 1.65 m2
10.89
Besi Ø 12 0.887 kg x 2 Lapis
7.0 titik panjang : 2.3 10.89
0.3 m jarak : 0.3 m 11.5 1.6335
3.73 kg
10.65 kg perbatang (full)
0.35 btg Total 5.17
37.73
4 Dinding 150.90827

Plat Bawah 700 x 3.9


Pokok Besi Ø 12 0.887 kg x 2 dinding
34.7 titik panjang : 6.94
3.84 m jarak : 0.2 m 35
236.38 kg
10.65 kg perbatang (full)
22.20 btg

Besi Ø 12 0.887 kg x 2 dinding


19.2 titik panjang : 3.84
6.94 m jarak : 0.2 m Total
236.38 kg 472.76
10.65 kg perbatang (full)
22.20 btg

Plat Bawah 700 x 3.9 Daerah Tumpuan (1/4 Bentangan)


Tumpuan Besi Ø 10 0.62 kg x 2 Bidang
34.7 titik panjang : 6.94
0.4 m jarak : 0.2 m
17.21 kg
7.4 kg perbatang (full)
2.33 btg

Lapangan Besi Ø 10 0.620 kg x 1 Bidang


34.7 titik panjang : 6.94
0.95 m jarak : 0.2 m Total
20.44 kg 2 Bh 37.65
7.4 kg perbatang (full) 75.299
2.76 btg

Plat Bawah 700 x 3.9 Daerah Lapangan (1/4 Bentangan)


Tumpuan Besi Ø 10 0.620 kg x 2 Bidang
19.2 titik panjang : 3.84
1.75 m jarak : 0.2 m
41.66 kg
7.4 kg perbatang (full)
5.63 btg

Lapangan Besi Ø 10 0.620 kg x 1 Bidang


19.2 titik panjang : 3.84
3.7 m jarak : 0.2 m
44.04 kg 2 Bh 85.71
7.4 kg perbatang (full) 171.4176
5.95 btg
Total 719.48 (Tul. Pokok + Tumpuan + Lapangan)

Dinding Sayap 700 x 230


0 0 kg x 2 Lapis
34.7 titik panjang : 6.94
2.3 m jarak : 0.2 m
0.00 kg
34.7 kg perbatang (full)
0.00 btg
0.74 0.87
0 0.000 kg x 2 Lapis 0.78 1.54
11.5 titik panjang : 2.3 0.8
6.94 m jarak : 0.2 m 11.5 0.88 2.34
0.00 kg 0.93 11.36
34.7 kg perbatang (full) 0.98 16.11
0.00 btg Total 1.03
0.00 1.08
3 Dinding 0 1.13
1.18
6.2
15.73 31.84
Total Sayap 157.9264 63.68 39.4816

Total Besi Ø 12 140.44 kg 0.75 0.0625 0.0554375 0.22175 0.887


13.19 btg
= 144.95 Kg 0.44 5 2.2 0.1833333 0.1626167
Besi Ø 10 4.51 kg 0.6504667
0.4231 btg 1.5374667

0.5 0.4435 1.774


40 17.6 1.46666667 1.3009333
3.0749333
ATAP 300 x 250
Besi Ø 12 0.887 kg
30.0 titik panjang : 3 x 1 dinding
2.5 m jarak : 0.2 m
66.53 kg
10.65 kg perbatang (full)
6.25 btg 48
29.76
Besi Ø 10 0.620 kg x 1 dinding 4.0216216
30.0 titik panjang : 3
2.5 m jarak : 0.2 m
46.50 kg
7.4 kg perbatang (full)
6.28 btg
76
Total Besi Ø 12 66.53 kg 0.44 33.44
6.25 btg 13.14192
= 113.03 Kg 2.7784186
Besi Ø 10 46.50 kg 6.80004023
6.2838 btg

LANTAI 400 x 300 372.54


Besi Ø 12 0.887 kg
30.0 titik panjang : 3 x 1 dinding 4.96 33.066667
3m jarak : 0.2 m 3.0752 15.210667
79.83 kg 0.4155676 9.4306133
10.65 kg perbatang (full) 1.6622703 1.2744072
7.50 btg 2.9366775

Besi Ø 10 0.620 kg x 1 dinding 35.2


30.0 titik panjang : 3 21.824
4m jarak : 0.2 m 44
74.40 kg 2.9491892 4.84 0.744
7.4 kg perbatang (full) 0.393 0.10054054 1.2
10.05 btg 1.90212 0.40216216
0.4021395 0.71048649 1.2 8
Total Besi Ø 12 79.83 kg 0.46 3.68
7.50 btg 2.6086957 2.2816
= 154.23 Kg 0.3083243
Besi Ø 10 74.40 kg
10.054 btg

Besi Ø 12 0.887 kg x 2 dinding


10.7 titik panjang 0.8
0.15 m jarak : 0.15 m
2.84 kg
10.65 kg perbatang (full)
0.27 btg

Besi Ø 10 0.620 kg x 1 dinding


50.0 titik panjang 5
4m jarak : 0.2 m
124.00 kg
7.4 kg perbatang (full) 0.76 4.6666667
16.76 btg 3.5466667
0.23333333 2.1989333
0.2971532 1.1886126
0.9383784
2.8 1.736 0.2345946
LANTAI 100 x 100 LANTAI 0.25 x 0.25 0.9383784 2.126991
Besi Ø 12 0.887 kg Besi Ø 12 0.887 kg
10.0 titik panjang : 1 x 1 dinding 9.3 titik panjang : 0.7 x 1 dinding
1m jarak : 0.2 m 0.7 m jarak : 0.15 m
8.87 kg 5.80 kg
10.65 kg perbatang (full) 10.65 kg perbatang (full)
0.83 btg 0.54 btg

Besi Ø 10 0.620 kg x 1 dinding Besi Ø 10 0.620 kg x 1 dinding


10.0 titik panjang : 1 9.3 titik panjang : 0.7
1m jarak : 0.2 m 0.7 m jarak : 0.15 m
6.20 kg 4.05 kg
7.4 kg perbatang (full) 15.07 7.4 kg perbatang (full) 9.85
0.84 btg 0.55 btg

24.92
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 95,000.00 7,695.00
Tukang pipa L.02 OH 0.041 100,000.00 4,100.00
Mandor L.04 OH 0.008 110,000.00 880.00

JUMLAH TENAGA KERJA 12,675.00

B BAHAN
Pipa PVC Ø 63 mm m 1 0

JUMLAH HARGA BAHAN

C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.006

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 12,675.00


E Overhead & Profit (Contoh 15 %) 15% x D 1,901.25
F Harga Satuan Pekerjaan (D+E) 14,576.25

Catatan:
Koefisien peralatan yang digunakan pada A.8.4.1 ini adalah seperti yang tercantum pada tabel.
Apabila ada tambahan peralatan yang digunakan, harus disesuaikan dengan spesifikasi dan gambar kerja.

A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.094 95,000.00 8,930.00
Tukang pipa L.02 OH 0.047 100,000.00 4,700.00
Mandor L.04 OH 0.009 110,000.00 990.00

JUMLAH TENAGA KERJA 14,620.00


B BAHAN
Pipa PVC Ø 90 mm m 1 0
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &handle crane
hari 0.008 0
2T
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 14,620.00


E Overhead & Profit (Contoh 15 %) 15% x D 2,193.00
F Harga Satuan Pekerjaan (D+E) 16,813.00

A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.105
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011

JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 110 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.01
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.118
Tukang pipa L.02 OH 0.059
Mandor L.04 OH 0.012

JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 150 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.012
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.5 Pemasngan 1 m pipa PVC Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.189
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.019

JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 200 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.024
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.256
Tukang pipa L.02 OH 0.128
Mandor L.04 OH 0.026
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 250 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.034
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.294
Tukang pipa L.02 OH 0.147
Mandor L.04 OH 0.029
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 300 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.04
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.544
Tukang pipa L.02 OH 0.272
Mandor L.04 OH 0.054
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 400 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.08
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.669
Tukang pipa L.02 OH 0.335
Mandor L.04 OH 0.067
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 450 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)


A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.809
Tukang pipa L.02 OH 0.405
Mandor L.04 OH 0.081
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 500 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.122
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.957
Tukang pipa L.02 OH 0.479
Mandor L.04 OH 0.096
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 600 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.145
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.618
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 800 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.25
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.691
Tukang pipa L.02 OH 0.846
Mandor L.04 OH 0.169
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 900 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.262
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.895
Tukang pipa L.02 OH 0.948
Mandor L.04 OH 0.19
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 1000 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.294
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.099
Tukang pipa L.02 OH 1.05
Mandor L.04 OH 0.21
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 1100 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.327
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.303
Tukang pipa L.02 OH 1.152
Mandor L.04 OH 0.23
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 1200 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.359
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga


(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.035
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.003
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 63 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.019
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.04
Tukang pipa L.02 OH 0.02
Mandor L.04 OH 0.004
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 100 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.019
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)


A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.045
Tukang pipa L.02 OH 0.023
Mandor L.04 OH 0.005
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 125 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.019
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.062
Tukang pipa L.02 OH 0.031
Mandor L.04 OH 0.006
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 150 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.019
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.102
Tukang pipa L.02 OH 0.051
Mandor L.04 OH 0.01
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 200 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.019
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.067
Mandor L.04 OH 0.013
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 250 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.042
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.17
Tukang pipa L.02 OH 0.085
Mandor L.04 OH 0.017
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 300 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.065
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.29
Tukang pipa L.02 OH 0.145
Mandor L.04 OH 0.029
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 400 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.152
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.359
Tukang pipa L.02 OH 0.18
Mandor L.04 OH 0.036
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 450 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.2
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.433
Tukang pipa L.02 OH 0.216
Mandor L.04 OH 0.043
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.251
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.256
Mandor L.04 OH 0.051
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 500 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.307
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)


A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.893
Tukang pipa L.02 OH 0.446
Mandor L.04 OH 0.089
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 800 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.573
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.353
Tukang pipa L.02 OH 0.677
Mandor L.04 OH 0.135
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 900 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.883
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.659
Tukang pipa L.02 OH 0.83
Mandor L.04 OH 0.166
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 1000
m 1
mm
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1.093
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.818
Tukang pipa L.02 OH 0.909
Mandor L.04 OH 0.182
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 1100
m 1
mm
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1.205
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.37
Tukang pipa L.02 OH 1.185
Mandor L.04 OH 0.237
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 1200
m 1
mm
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1.584
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)


A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.345 95,000.00 32,775.00
Tukang pipa L.02 OH 0.172 100,000.00 17,200.00
Mandor L.04 OH 0.034 110,000.00 3,740.00
JUMLAH TENAGA KERJA 53,715.00
B BAHAN
Pipa GIP Ø 63 mm m 1 0 0
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 53,715.00


E Overhead & Profit (Contoh 15 %) 15% x D 8,057.25
F Harga Satuan Pekerjaan (D+E) 61,772.25

A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.4 95,000.00 38,000.00
Tukang pipa L.02 OH 0.2 100,000.00 20,000.00
Mandor L.04 OH 0.04 110,000.00 4,400.00
JUMLAH TENAGA KERJA 62,400.00
B BAHAN
Pipa GIP Ø 100 mm m 1 0 0
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &handle crane
hari -
2T
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 62,400.00

E Overhead & Profit (Contoh 15 %) 15% x D 9,360.00

F Harga Satuan Pekerjaan (D+E) 71,760.00

A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.448
Tukang pipa L.02 OH 0.224
Mandor L.04 OH 0.045
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 125 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.506
Tukang pipa L.02 OH 0.253
Mandor L.04 OH 0.051
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 150 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.796
Tukang pipa L.02 OH 0.398
Mandor L.04 OH 0.08
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 200 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.949
Tukang pipa L.02 OH 0.475
Mandor L.04 OH 0.095
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 250 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.958
Tukang pipa L.02 OH 0.479
Mandor L.04 OH 0.096
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 300 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)


A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.212
Tukang pipa L.02 OH 0.606
Mandor L.04 OH 0.121
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 400 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.353
Tukang pipa L.02 OH 0.676
Mandor L.04 OH 0.135
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 450 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.469
Tukang pipa L.02 OH 0.735
Mandor L.04 OH 0.147
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 500 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.327
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.133
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 600 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.327
Tukang pipa L.02 OH 1.163
Mandor L.04 OH 0.233
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 800 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.623
Tukang pipa L.02 OH 1.312
Mandor L.04 OH 0.262
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 900 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.911
Tukang pipa L.02 OH 1.456
Mandor L.04 OH 0.291
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 1000 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.2
Tukang pipa L.02 OH 1.6
Mandor L.04 OH 0.32
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 1100 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.488
Tukang pipa L.02 OH 1.744
Mandor L.04 OH 0.349
JUMLAH TENAGA
KERJA
B BAHAN
Pipa GIP Ø 1200 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.489
Tukang pipa L.02 OH 0.098
Mandor L.04 OH 0.049
JUMLAH TENAGA
KERJA
B BAHAN
Pipa DCI Ø 100 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.38
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.547
Tukang pipa L.02 OH 0.109
Mandor L.04 OH 0.055
JUMLAH TENAGA
KERJA
B BAHAN
Pipa DCI Ø 125 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.38
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.613
Tukang pipa L.02 OH 0.123
Mandor L.04 OH 0.061
JUMLAH TENAGA
KERJA
B BAHAN
Pipa DCI Ø 150 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.38
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D


F Harga Satuan Pekerjaan (D+E)

A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.855
Tukang pipa L.02 OH 0.171
Mandor L.04 OH 0.085
JUMLAH TENAGA
KERJA
B BAHAN
Pipa DCI Ø 200 mm M 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.38
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.951
Tukang pipa L.02 OH 0.19
Mandor L.04 OH 0.095
JUMLAH TENAGA
KERJA
B BAHAN
Pipa DCI Ø 250 mm M 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.05
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.973
Tukang pipa L.02 OH 0.195
Mandor L.04 OH 0.097
JUMLAH TENAGA
KERJA
B BAHAN
Pipa DCI Ø 300 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.071
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga


(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.545
Tukang pipa L.02 OH 0.309
Operator alat berat L.08 OH 0.093
Mandor L.04 OH 0.154
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 400 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa excavator type
hari 0.023
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.031
handle crane 2 T
JUMLAH HARGA ALAT

D Jumlah (A+B+C)

E Overhead & Profit (Contoh 15 %) 15% x D

F Harga Satuan Pekerjaan (D+E)

A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.813
Tukang pipa L.02 OH 0.363
Operator alat berat L.08 OH 0.143
Mandor L.04 OH 0.181
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 450 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa excavator type
hari 0.029
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
0.039
handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.047
Tukang pipa L.02 OH 0.409
Operator alat berat L.08 OH 0.193
Mandor L.04 OH 0.205
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 500 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa excavator type
hari 0.034
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
0.045
handle crane 2 T hari
JUMLAH HARGA ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.58 Pemasangan pipa 1 m DCI Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.011
Tukang pipa L.02 OH 0.402
Operator alat berat L.08 OH 0.293
Mandor L.04 OH 0.201
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 600 mm m 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
0.077
handle crane 2 T hari
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.59 Pemasangan 1 m pipa DCI Ø800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.859
Tukang pipa L.02 OH 0.772
Operator alat berat L.08 OH 0.493
Mandor L.04 OH 0.386
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 800 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.084
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.225
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.60 Pemasangan 1 m pipa DCI Ø900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.995
Tukang pipa L.02 OH 0.999
Operator alat berat L.08 OH 0.593
Mandor L.04 OH 0.499
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 900 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.093
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.248
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.61 Pemasangan 1 m pipa DCI Ø1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.931
Tukang pipa L.02 OH 1.186
Operator alat berat L.08 OH 0.793
Mandor L.04 OH 0.693
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1000 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.112
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.298
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.1.62 Pemasangan 1 m pipa DCI Ø1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.949
Tukang pipa L.02 OH 1.39
Operator alat berat L.08 OH 0.793
Mandor L.04 OH 0.695
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1100 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.152
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.304
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.63 Pemasangan 1 m pipa DCI Ø1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 8.056
Tukang pipa L.02 OH 1.611
Operator alat berat L.08 OH 0.893
Mandor L.04 OH 0.806
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 1200 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.18
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.36
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.499
Tukang pipa L.02 OH 0.1
Mandor L.04 OH 0.05
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 63 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.579
Tukang pipa L.02 OH 0.116
Mandor L.04 OH 0.058
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 100 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.66 Pemasangan 1 m pipa baja Ø 125 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.648
Tukang pipa L.02 OH 0.13
Mandor L.04 OH 0.065
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 125 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.708
Tukang pipa L.02 OH 0.142
Mandor L.04 OH 0.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 150 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.113
Tukang pipa L.02 OH 0.223
Mandor L.04 OH 0.111
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 200 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.69 Pemasangan pipa baja Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.325
Tukang pipa L.02 OH 0.265
Mandor L.04 OH 0.133
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 250 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.415
Tukang pipa L.02 OH 0.283
Mandor L.04 OH 0.141
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 300 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Tripot/Tackel &
hari 0.004
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.366
Tukang pipa L.02 OH 0.473
Mandor L.04 OH 0.237
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 400 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.027
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.231
Tukang pipa L.02 OH 0.446
Mandor L.04 OH 0.223
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 450 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.026
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.037
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.432
Tukang pipa L.02 OH 0.486
Mandor L.04 OH 0.243
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 500 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.029
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.045
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.208
Tukang pipa L.02 OH 0.442
Mandor L.04 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 600 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.027
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.039
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.897
Tukang pipa L.02 OH 0.779
Mandor L.04 OH 0.39
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 800 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.046
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.098
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.403
Tukang pipa L.02 OH 0.081
Mandor L.04 OH 0.44
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 900 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.052
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.115
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.895
Tukang pipa L.02 OH 0.979
Mandor L.04 OH 0.489
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1000 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.058
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.133
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.387
Tukang pipa L.02 OH 1.077
Mandor L.04 OH 0.539
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1100 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari 0.064
225 kap 0,5 -1,0 m3
Sewa Tripot/Tackel &
hari 0.15
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.897
Tukang pipa L.02 OH 1.176
Mandor L.04 OH 0.588
JUMLAH TENAGA KERJA
B BAHAN
Pipa Baja Ø 1200 mm m 1
JUMLAH HARGA BAHAN
C PERALATAN
Sewa excavator type
hari
225 kap 0,5 -1,0 m3 0.07
Sewa Tripot/Tackel &
hari 0.167
handle crane 2 T
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA

A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.005
Tukang pipa L.02 OH 0.002
Mandor L.04 OH 0.0005
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 63 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.2 Pemotongan 1 m pipa PVC Ø 90 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.014
Tukang pipa L.02 OH 0.007
Mandor L.04 OH 0.001
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 90 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.022
Tukang pipa L.02 OH 0.011
Mandor L.04 OH 0.002
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 110 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.031
Tukang pipa L.02 OH 0.015
Mandor L.04 OH 0.003
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.003
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081
Tukang pipa L.02 OH 0.04
Mandor L.04 OH 0.008
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.017
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.128
Tukang pipa L.02 OH 0.064
Mandor L.04 OH 0.013
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.03
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.155
Tukang pipa L.02 OH 0.077
Mandor L.04 OH 0.015
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.037
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.331
Tukang pipa L.02 OH 0.166
Mandor L.04 OH 0.033
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T1/manual (gergaji) hari 0.086
/saw
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.42
Tukang pipa L.02 OH 0.21
Mandor L.04 OH 0.042
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.054
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.518
Tukang pipa L.02 OH 0.259
Mandor L.04 OH 0.052
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.069
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.623
Tukang pipa L.02 OH 0.311
Mandor L.04 OH 0.062
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.086
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.089
Tukang pipa L.02 OH 0.545
Mandor L.04 OH 0.109
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.16
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.141
Tukang pipa L.02 OH 0.571
Mandor L.04 OH 0.114
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.168
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.285
Tukang pipa L.02 OH 0.643
Mandor L.04 OH 0.129
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.191
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.213
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.573
Tukang pipa L.02 OH 0.787
Mandor L.04 OH 0.157
JUMLAH TENAGA
KERJA
B BAHAN
Pipa PVC Ø 1200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.236
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.17 Pemotongan 1 buah pipa HDPE Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.002
Tukang pipa L.02 OH 0.001
Mandor L.04 OH 0.0002
Operator L.08 OH 0.034
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 63 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.004
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.006
Tukang pipa L.02 OH 0.003
Mandor L.04 OH 0.001
Operator L.08 OH 0.071
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.005
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.009
Tukang pipa L.02 OH 0.005
Mandor L.04 OH 0.001
Operator L.08 OH 0.096
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 125 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.006
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.016
Tukang pipa L.02 OH 0.008
Mandor L.04 OH 0.002
Operator L.08 OH 0.121
JUMLAH TENAGA
KERJA
B BAHAN
Pipa HDPE Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.009
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.044
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.004
Operator L.08 OH 0.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.017
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.22 Pemotongan 1 buah pipaHDPE Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.067
Tukang pipa L.02 OH 0.033
Mandor L.04 OH 0.007
Operator L.08 OH 0.221
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.023
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.09
Tukang pipa L.02 OH 0.045
Mandor L.04 OH 0.009
Operator L.08 OH 0.271
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.03
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.177
Tukang pipa L.02 OH 0.088
Mandor L.04 OH 0.018
Operator L.08 OH 0.371
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.055
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.225
Tukang pipa L.02 OH 0.113
Mandor L.04 OH 0.023
Operator L.08 OH 0.421
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.07
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.277
Tukang pipa L.02 OH 0.139
Mandor L.04 OH 0.028
Operator L.08 OH 0.471
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.085
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.333
Tukang pipa L.02 OH 0.167
Mandor L.04 OH 0.033
Operator L.08 OH 0.571
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.101
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.601
Tukang pipa L.02 OH 0.301
Mandor L.04 OH 0.06
Operator L.08 OH 0.771
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.179
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.913
Tukang pipa L.02 OH 0.456
Mandor L.04 OH 0.091
Operator L.08 OH 0.871
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.27
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.125
Tukang pipa L.02 OH 0.562
Mandor L.04 OH 0.112
Operator L.08 OH 0.971
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.332
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.238
Tukang pipa L.02 OH 0.619
Mandor L.04 OH 0.124
Operator L.08 OH 1.071
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1100
bh 1
mm
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.365
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.32 Pemotongan 1 buah pipa HDPE Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.619
Tukang pipa L.02 OH 0.809
Mandor L.04 OH 0.162
Operator L.08 OH 1.171
JUMLAH TENAGA KERJA
B BAHAN
Pipa HDPE Ø 1200
bh 1
mm
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.477
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.019
Tukang pipa L.02 OH 0.01
Mandor L.04 OH 0.002

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 63 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.058
Tukang pipa L.02 OH 0.029
Mandor L.04 OH 0.006

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.092
Tukang pipa L.02 OH 0.046
Mandor L.04 OH 0.009

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 125 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.131
Tukang pipa L.02 OH 0.066
Mandor L.04 OH 0.013

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.34
Tukang pipa L.02 OH 0.17
Mandor L.04 OH 0.034

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.475
Tukang pipa L.02 OH 0.237
Mandor L.04 OH 0.047

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.504
Tukang pipa L.02 OH 0.252
Mandor L.04 OH 0.05

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.738
Tukang pipa L.02 OH 0.369
Mandor L.04 OH 0.074

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.848
Tukang pipa L.02 OH 0.424
Mandor L.04 OH 0.085

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.471
Mandor L.04 OH 0.094

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.43 Pemotongan1 buah pipa GIP Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.864
Tukang pipa L.02 OH 0.432
Mandor L.04 OH 0.086

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.567
Tukang pipa L.02 OH 0.783
Mandor L.04 OH 0.157

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.77
Tukang pipa L.02 OH 0.885
Mandor L.04 OH 0.177

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.974
Tukang pipa L.02 OH 0.987
Mandor L.04 OH 0.197

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga


(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.178
Tukang pipa L.02 OH 1.089
Mandor L.04 OH 0.218

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.382
Tukang pipa L.02 OH 1.191
Mandor L.04 OH 0.238

JUMLAH TENAGA KERJA


B BAHAN
Pipa GIP Ø 1200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari -
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.071
Tukang pipa L.02 OH 0.014
Mandor L.04 OH 0.007

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.003
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.112
Tukang pipa L.02 OH 0.022
Mandor L.04 OH 0.011

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 125 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.01
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.159
Tukang pipa L.02 OH 0.032
Mandor L.04 OH 0.016

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.018
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.366
Tukang pipa L.02 OH 0.073
Mandor L.04 OH 0.037
JUMLAH TENAGA KERJA
B BAHAN
Pipa DCI Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.054
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.073
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.512
Tukang pipa L.02 OH 0.102
Mandor L.04 OH 0.051

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.079
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.941
Tukang pipa L.02 OH 0.188
Mandor L.04 OH 0.094

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.158
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.137
Tukang pipa L.02 OH 0.227
Mandor L.04 OH 0.114

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.176
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.312
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.192
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.309
Tukang pipa L.02 OH 0.262
Mandor L.04 OH 0.131

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.192
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.598
Tukang pipa L.02 OH 0.52
Mandor L.04 OH 0.26

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.31
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.37
Tukang pipa L.02 OH 0.674
Mandor L.04 OH 0.337

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.381
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.021
Tukang pipa L.02 OH 0.804
Mandor L.04 OH 0.402

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.441
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.731
Tukang pipa L.02 OH 0.946
Mandor L.04 OH 0.473

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.506
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.502
Tukang pipa L.02 OH 1.1
Mandor L.04 OH 0.55

JUMLAH TENAGA KERJA


B BAHAN
Pipa DCI Ø 1200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.576
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.028
Tukang pipa L.02 OH 0.006
Mandor L.04 OH 0.003

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 63 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.037
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.085
Tukang pipa L.02 OH 0.017
Mandor L.04 OH 0.008

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.04
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.133
Tukang pipa L.02 OH 0.027
Mandor L.04 OH 0.013

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 125 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.042
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.184
Tukang pipa L.02 OH 0.037
Mandor L.04 OH 0.018

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.045
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.476
Tukang pipa L.02 OH 0.095
Mandor L.04 OH 0.048

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.06
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.663
Tukang pipa L.02 OH 0.133
Mandor L.04 OH 0.066

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.068
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.745
Tukang pipa L.02 OH 0.149
Mandor L.04 OH 0.074

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.072
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.44
Tukang pipa L.02 OH 0.288
Mandor L.04 OH 0.144

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.105
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.399
Tukang pipa L.02 OH 0.28
Mandor L.04 OH 0.14

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.107
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.558
Tukang pipa L.02 OH 0.312
Mandor L.04 OH 0.156

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.107
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.437
Tukang pipa L.02 OH 0.287
Mandor L.04 OH 0.144

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.113
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.624
Tukang pipa L.02 OH 0.525
Mandor L.04 OH 0.262

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.166
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.971
Tukang pipa L.02 OH 0.594
Mandor L.04 OH 0.297

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.183
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.77 Pemotongan 1 buah pipa baja Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.319
Tukang pipa L.02 OH 0.664
Mandor L.04 OH 0.332

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.201
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.78 Pemotongan 1 buah pipa baja Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.667
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.367

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.218
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.2.79 Pemotongan 1 buah pipa baja Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.015
Tukang pipa L.02 OH 0.803
Mandor L.04 OH 0.402

JUMLAH TENAGA KERJA


B BAHAN
Pipa Baja Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.236
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA

A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.3
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.4
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2
Tukang pipa L.02 OH 1
Mandor L.04 OH 0.2

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.5
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.6 Pemasangan 1 buah Valve Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.429
Tukang pipa L.02 OH 1.715
Mandor L.04 OH 0.343

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4
Tukang pipa L.02 OH 2
Mandor L.04 OH 0.4

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.421
Tukang pipa L.02 OH 0.711
Mandor L.04 OH 0.142

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.6
Mobile crane =< 3 ton hari 0.3
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.429
Tukang pipa L.02 OH 0.715
Mandor L.04 OH 0.143

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 700 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.5
Mobile crane =< 3 ton hari 0.5
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.786
Tukang pipa L.02 OH 0.893
Mandor L.04 OH 0.179

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.5
Mobile crane =< 3 ton hari 0.5
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.714
Tukang pipa L.02 OH 0.857
Mandor L.04 OH 0.171

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.75
Mobile crane =< 3 ton hari 0.75
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.571
Tukang pipa L.02 OH 1.286
Mandor L.04 OH 0.257

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1
Mobile crane =< 3 ton hari 1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3
Tukang pipa L.02 OH 1.5
Mandor L.04 OH 0.3

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1
Mobile crane =< 3 ton hari 1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.14 Pemasangan 1 buah Valve Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3
Tukang pipa L.02 OH 1.5
Mandor L.04 OH 0.3

JUMLAH TENAGA KERJA


B BAHAN
Valve Ø 1200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 1
Mobile crane =< 3 ton hari 1
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.106
Tukang pipa L.02 OH 0.053
Mandor L.04 OH 0.011

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.028

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.216
Tukang pipa L.02 OH 0.108
Mandor L.04 OH 0.022

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.029

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.326
Tukang pipa L.02 OH 0.163
Mandor L.04 OH 0.033

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.039

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.18 Pemasangan 1 buah Tee Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.436
Tukang pipa L.02 OH 0.218
Mandor L.04 OH 0.044

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.5

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.656
Tukang pipa L.02 OH 0.328
Mandor L.04 OH 0.066

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.5

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.766
Tukang pipa L.02 OH 0.383
Mandor L.04 OH 0.077

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.5

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.876
Tukang pipa L.02 OH 0.438
Mandor L.04 OH 0.088

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.6

JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.096
Tukang pipa L.02 OH 0.548
Mandor L.04 OH 0.11

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.193
Mobile crane =< 3 ton hari 0.096
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.316
Tukang pipa L.02 OH 0.658
Mandor L.04 OH 0.132
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 700 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.225
Mobile crane =< 3 ton hari 0.113
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.536
Tukang pipa L.02 OH 0.768
Mandor L.04 OH 0.154

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.257
Mobile crane =< 3 ton hari 0.129
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.756
Tukang pipa L.02 OH 0.878
Mandor L.04 OH 0.176

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 900 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.321
Mobile crane =< 3 ton hari 0.161
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.976
Tukang pipa L.02 OH 0.988
Mandor L.04 OH 0.198

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 1000 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.366
Mobile crane =< 3 ton hari 0.183
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.27 Pemasangan 1 buah Tee Ø 1100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.196
Tukang pipa L.02 OH 1.098
Mandor L.04 OH 0.22

JUMLAH TENAGA KERJA


B BAHAN
Tee Ø 1100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.386
Mobile crane =< 3 ton hari 0.193
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.416
Tukang pipa L.02 OH 1.208
Mandor L.04 OH 0.242
JUMLAH TENAGA KERJA
B BAHAN
Tee Ø 1200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Sewa Tripot/Tackel &
handle crane 2 T hari 0.45
Mobile crane =< 3 ton hari 0.225
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA

A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.466
Tukang pipa L.02 OH 0.733
Mandor L.04 OH 0.147
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 80 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.606
Sewa Genset 1500
watt hari 0.075
Sewa Pompa
Submersible 3m3/h hari 0.968
Sewa Tripot/Tackel &
handle crane 2 T hari 0.865
JUMLAH HARGA
ALAT

D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.646
Tukang pipa L.02 OH 0.823
Mandor L.04 OH 0.165
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 100 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.65
Sewa Genset 1500
watt hari 0.159
Sewa Pompa
Submersible 3m3/h hari 1.078
Sewa Tripot/Tackel &
handle crane 2 T hari 0.911
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.096
Tukang pipa L.02 OH 1.048
Mandor L.04 OH 0.21
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 150 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.76
Sewa Genset 1500
watt hari 0.369
Sewa Pompa
Submersible 3m3/h hari 1.353
Sewa Tripot/Tackel &
handle crane 2 T hari 1.026
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.546
Tukang pipa L.02 OH 1.273
Mandor L.04 OH 0.255
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 200 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.87
Sewa Genset 1500
watt hari 0.579
Sewa Pompa
Submersible 3m3/h hari 1.628
Sewa Tripot/Tackel &
handle crane 2 T hari 1.141
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.996
Tukang pipa L.02 OH 1.498
Mandor L.04 OH 0.3

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 250 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 0.98

Sewa Genset 1500 watt


hari 0.789
Sewa Pompa
Submersible 3m3/h hari 1.903
Sewa Tripot/Tackel &
handle crane 2 T hari 1.256
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.446
Tukang pipa L.02 OH 1.723
Mandor L.04 OH 0.345
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 300 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 1.09
Sewa Genset 1500
watt hari 0.999
Sewa Pompa
Submersible 3m3/h hari 2.178
Sewa Tripot/Tackel &
handle crane 2 T hari 1.371
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.346
Tukang pipa L.02 OH 2.173
Mandor L.04 OH 0.435

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 400 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 1.31

Sewa Genset 1500 watt


hari 1.419
Sewa Pompa
Submersible 3m3/h hari 2.728
Sewa Tripot/Tackel &
handle crane 2 T hari 1.601
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 4.796
Tukang pipa L.02 OH 2.398
Mandor L.04 OH 0.48

JUMLAH TENAGA KERJA


B BAHAN
Pipa Ø 450 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 1.42
Sewa Genset 1500
watt hari 1.629
Sewa Pompa
Submersible 3m3/h hari 3.003
Sewa Tripot/Tackel &
handle crane 2 T hari 1.716
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 5.246
Tukang pipa L.02 OH 2.623
Mandor L.04 OH 0.525
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 500 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 1.53
Sewa Genset 1500
watt hari 1.839
Sewa Pompa
Submersible 3m3/h hari 3.278
Sewa Tripot/Tackel &
handle crane 2 T hari 1.831
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 6.146
Tukang pipa L.02 OH 3.073
Mandor L.04 OH 0.615
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 600 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 1.75
Sewa Genset 1500
watt hari 2.259
Sewa Pompa
Submersible 3m3/h hari 3.828
Sewa Tripot/Tackel &
handle crane 2 T hari 2.061
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.046
Tukang pipa L.02 OH 3.523
Mandor L.04 OH 0.705
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 700 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 1.97
Sewa Genset 1500
watt hari 2.679
Sewa Pompa
Submersible 3m3/h hari 4.378
Sewa Tripot/Tackel &
handle crane 2 T hari 2.291
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.4.12 Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga


(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 7.946
Tukang pipa L.02 OH 3.973
Mandor L.04 OH 0.795
JUMLAH TENAGA KERJA
B BAHAN
Pipa Ø 800 mm bh 1
JUMLAH HARGA
BAHAN
C PERALATAN
Peralatan potong pipa
T2/mekanik / cilinder saw hari 2.19
Sewa Genset 1500
watt hari 3.099
Sewa Pompa
Submersible 3m3/h hari 4.928
Sewa Tripot/Tackel &
handle crane 2 T hari 2.521
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.002
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.004
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.008
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.018
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.031
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.049
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN
JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.071
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Air test (air bersih) m3 0.126
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm

Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA
KERJA
B BAHAN
Air test (air bersih) m3 0.158
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)

A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.008
Mandor L.04 OH 0.0008
JUMLAH TENAGA
KERJA
B BAHAN
Air test (air bersih) m3 0.283
Bahan bakar liter 0.06
Oli liter 0.002

JUMLAH HARGA
BAHAN
C PERALATAN

JUMLAH HARGA
ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
pada tabel.
n gambar kerja.
Pek. 1 Bh Stop Kontak
Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja OH 0.2 95,000.00 19,000.00
Tukang Listrik OH 0.02 100,000.00 2,000.00
Kepala Tukang OH 0.02 110,000.00 2,200.00
JUMLAH TENAGA
23,200.00
KERJA
B BAHAN
Stop Kontak Bh 1.0 15,000.00 15,000.00

JUMLAH HARGA BAHAN 15,000.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 38,200.00


E Overhead & Profit (Contoh 15 %) 15% xD 5,730.00
F Harga Satuan Pekerjaan (D+E) 43,930.00

Pek. 1 Bh MCB Box


Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja OH 0.2 95,000.00 19,000.00
Tukang Listrik OH 0.02 100,000.00 2,000.00
Kepala Tukang OH 0.02 110,000.00 2,200.00
JUMLAH TENAGA
23,200.00
KERJA
B BAHAN
MCB Box Bh 1.0 240,000.00 240,000.00

JUMLAH HARGA BAHAN 240,000.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 263,200.00


E Overhead & Profit (Contoh 15 %) 15% xD 39,480.00
F Harga Satuan Pekerjaan (D+E) 302,680.00
Pek. 1 titik cahaya / instalasi listrik
Harga Jumlah

No Uraian Kode Satuan Koefisien Satuan Harga

(Rp) (Rp)
A TENAGA
Pekerja OH 0.2 95,000.00 19,000.00
Tukang Listrik OH 0.02 100,000.00 2,000.00
Kepala Tukang OH 0.02 110,000.00 2,200.00
JUMLAH TENAGA
23,200.00
KERJA
B BAHAN
Kabel NYM 2 x 2,5 mm M' 5.000 5,000.00 25,000.00
Pipa PVC 5/8" M' 4.000 2,500.00 10,000.00
Accesories dan alat bantu Ls 1.000 -

JUMLAH HARGA BAHAN 35,000.00


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 58,200.00


E Overhead & Profit (Contoh 15 %) 15% xD 8,730.00
F Harga Satuan Pekerjaan (D+E) 66,930.00
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 95,000.00 57,000.00
Tukang Batu L.02 OH 0.2 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 100,000.00 2,000.00
Mandor L.04 OH 0.03 110,000.00 3,300.00
JUMLAH TENAGA KERJA 82,300.00
B BAHAN
Bata merah Bh 140 750.00 105,000.00
Semen Portlan Kg 32.95 1,800.00 59,310.00
Pasir Pasang m3 0.091 200,000.00 18,200.00
JUMLAH HARGA BAHAN 182,510.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 264,810.00


E Overhead & Profit (Contoh 15%) 15% xD 39,721.50
F Harga Satuan Pekerjaan (D+E) 304,531.50
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

Harga Satuan Jumlah


No Uraian Kode Satuan Koefisien (Rp) Harga
(Rp)
A TENAGA
Pekerja L.01 OH 0.6 95,000.00 57,000.00
Tukang Batu L.02 OH 0.2 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.03 110,000.00 3,300.00
JUMLAH TENAGA KERJA 82,500.00
B BAHAN
Bata merah Bh 140 750.00 105,000.00
Semen Portlan Kg 32.95 1,900.00 62,605.00
Pasir Pasang m3 0.091 200,000.00 18,200.00
JUMLAH HARGA BAHAN 185,805.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 268,305.00


E Overhead & Profit (Contoh 15%) 15% xD 40,245.75
F Harga Satuan Pekerjaan (D+E) 308,550.75
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m

Harga Jumlah
N Koef
Uraian Kode Satuan Satuan Harga
o isien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.75 95,000.00 71,250.00
Mandor L.04 OH 0.025 110,000.00 2,750.00
JUMLAH TENAGA KERJA 74,000.00
B BAHAN

JUMLAH HARGA BAHAN

C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 74,000.00


E Overhead & Profit (Contoh 15 %) 15% x D 11,100.00
F Harga Satuan Pekerjaan (D+E) 85,100.00
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah

Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian

Harga Jumlah
N Koef
Uraian Kode Satuan Satuan Harga
o isien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.5 95,000.00 47,500.00
Mandor L.04 OH 0.05 110,000.00 5,500.00
JUMLAH TENAGA KERJA 53,000.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 53,000.00
E Overhead & Profit (Contoh 15 %) 15% x D 7,950.00
F Harga Satuan Pekerjaan (D+E) 60,950.00
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug

Harga Jumlah
N Koef
Uraian Kode Satuan Satuan Harga
o isien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3 95,000.00 28,500.00
Mandor L.04 OH 0.01 110,000.00 1,100.00
JUMLAH TENAGA KERJA 29,600.00
B BAHAN
Pasir urug M3 1.2 150,000.00 180,000.00
JUMLAH HARGA BAHAN 180,000.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 209,600.00
E Overhead & Profit (Contoh 15 %) 15% x D 31,440.00
F Harga Satuan Pekerjaan (D+E) 241,040.00
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP

Harga Jumlah
Satua Koef
No Uraian Kode Satuan Harga
n isien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.5 95,000.00 142,500.00
Tukang Batu L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 110,000.00 8,250.00
JUMLAH
TENAGA KERJA
234,000.00
B BAHAN
Batu belah m3 1.2 230,000.00 276,000.00
Semen
Portlan
Kg ### 1,900.00 309,700.00
Pasir Pasang m3 0.52 200,000.00 104,000.00
JUMLAH HARGA BAHAN 689,700.00
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) 923,700.00
E Overhead & Profit (Contoh 15 %) 15% x D 138,555.00
F Harga Satuan Pekerjaan (D+E) 1,062,255.00

A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping)

Harga Jumlah
Satua Koef
No Uraian Kode Satuan Harga
n isien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.78 95,000.00 74,100.00
Tukang Batu L.02 OH 0.39 100,000.00 39,000.00
Kepala Tukang L.03 OH 0.039 110,000.00 4,290.00
Mandor L.04 OH 0.039 110,000.00 4,290.00
JUMLAH TENAGA KERJA 121,680.00
B BAHAN
Batu belah m3 1.2 230,000.00 276,000.00
Pasir urug m3 0.432 150,000.00 64,800.00
JUMLAH HARGA BAHAN 340,800.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 462,480.00


E Overhead & Profit (Contoh 15 %) 15% x D 69,372.00
F Harga Satuan Pekerjaan (D+E) 531,852.00
A.5.1.1 31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.081 95,000.00 7,695.00
Tukang batu L.02 OH 0.135 100,000.00 13,500.00
Kepala tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.004 110,000.00 440.00
JUMLAH TENAGA KERJA 23,120.00
B BAHAN
Pipa PVC 3” M 1.2 - -
Perlengkapan % 35% - -
JUMLAH HARGA BAHAN -
C PERALATAN
Seal Teape Ls 1 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 23,120.00


E Overhead & Profit (Contoh 15%) 15% x D 3,468.00
F Harga Satuan Pekerjaan (D+E) 26,588.00
A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter 3/4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.054 95,000.00 5,130.00
Tukang batu L.02 0.09 100,000.00 9,000.00
Kepala tukang L.03 0.009 110,000.00 990.00
Mandor L.04 OH 0.027 110,000.00 2,970.00
JUMLAH TENAGA KERJA 18,090.00
B BAHAN
Pipa galvanis 3/4” M 1.2 - -
Perlengkapan % 35 - -
JUMLAH HARGA BAHAN -
C PERALATAN
Las Listrik Ls 1 - -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 18,090.00
E Overhead & Profit (Contoh 15%) 15% x D 2,713.50
F Harga Satuan Pekerjaan (D+E) 20,803.50

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.135 95,000.00 12,825.00
Tukang batu L.02 OH 0.225 100,000.00 22,500.00
Kepala tukang L.03 OH 0.023 110,000.00 2,530.00
Mandor L.04 OH 0.007 110,000.00 770.00
JUMLAH TENAGA KERJA 38,625.00
B BAHAN
Pipa galvanis 3” M 1.2 - -
Perlengkapan % 35% - -
JUMLAH HARGA BAHAN -
C PERALATAN
Las Listrik Ls 1 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 38,625.00


E Overhead & Profit (Contoh 15%) 15% x D 5,793.75
F Harga Satuan Pekerjaan (D+E) 44,418.75
A.5.1.1 26. Pemasangan 1 m’ pipa PVC tipe AW diameter 3/4”

Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 95,000.00 3,420.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.006 110,000.00 660.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 10,300.00
B BAHAN
Pipa PVC 3/4” M 1.2 9,300.00 11,160.00
Perlengkapan % 35% 3,255.00 3,255.00
JUMLAH HARGA BAHAN 14,415.00
C PERALATAN
Seal Teape Ls 1 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 24,715.00


E Overhead & Profit (Contoh 15%) 15% x D 3,707.25
F Harga Satuan Pekerjaan (D+E) 28,422.25
A.5.1.1 27. Pemasangan 1 m’ pipa PVC tipe AW diameter 1”
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.036 95,000.00 3,420.00
Tukang batu L.02 0.06 100,000.00 6,000.00
Kepala tukang L.03 0.006 110,000.00 660.00
Mandor L.04 OH 0.002 110,000.00 220.00
JUMLAH TENAGA KERJA 10,300.00
B BAHAN
Pipa PVC 1” M 1.2 - -
Perlengkapan % 35% - -
JUMLAH HARGA BAHAN -
C PERALATAN
Seal Teape Ls 1 - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 10,300.00


E Overhead & Profit (Contoh 15%) 15% x D 1,545.00
F Harga Satuan Pekerjaan (D+E) 11,845.00
HARGA PIPA

Kabupaten : MUNA BARAT


Propinsi : SULAWESI TENGGARA

Upah Angkut/ Total


Harga Satuan
No. Nama barang/alat Satuan Biaya Transfortasi Harga Satuan Spesifikasi Teknik Ket.
(Rp). (Rp). (Rp).
A. Bahan
I Pipa dan Assesories
PIPA PVC Standar SNI, Pj 6 meter
1 PVC dia. 6" (160 mm), S 12,5 RRJ atau SCJ batang 718,300
2 PVC dia. 4" (110 mm), S 12,5 RRJ atau SCJ batang 341,700
3 PVC dia. 3" (90 mm), S 12,5 RRJ atau SCJ batang 236,700 Tekanan Nominal pipa minimal 1,00 Mpa
atau 10 bar (SNI 06-0084- 2002) dengan
4 PVC Ø 2 1/2" (75 mm), S 12,5 RRJ atau SCJ batang 167,400 tebal dinding nominal S12,5.
5 PVC dia. 2" (63 mm), S 12,5 RRJ atau SCJ batang 117,300
6 PVC dia. 1 1/2" (50 mm), S 12,5 SCJ batang 72,700
7 PVC dia. 1 1/4" (40 mm), S 12,5 SCJ batang 47,300
8 Sistim Penyambungan dengan gelang karet
PVC dia. 1" (32 mm), S 12,5 SCJ batang 30,900
(RRJ = Rubber Ring Joint) dan dapat
9 PVC dia. 3/4" (25 mm), S 12,5 SCJ batang 19,500 dengan lem (SCJ = Solven Cement Joint).
10 PVC dia. 1/2" (20 mm), S 12,5 SCJ batang 13,000
Assesories Pipa PVC
Bend 90°
11 Ukuran dia. 4" buah 182,000
12 Ukuran dia. 3" buah 130,000
13 Ukuran dia. 2 1/2" buah 97,000 Assesories Pipa harus dari bahan dengan
kualitas yang sama dengan pipa yang
14 Ukuran dia. 2 buah 78,000 digunakan (SNI 06-0135- 1987) .
15 Ukuran dia. 1 1/2" buah 28,000
16 Ukuran dia. 1 buah 20,000
Bend 45°
17 Ukuran dia. 4" buah 165,000
18 Ukuran dia. 3" buah 112,000 Assesories Pipa harus dari bahan dengan
kualitas yang sama dengan pipa yang
19 Ukuran dia. 2 1/2" buah 88,000
digunakan (SNI 06-0135- 1987) .
20 Ukuran dia. 2 buah 68,000
Socket Drat Dalam
21 Ukuran dia. 4" buah 67,000
22 Ukuran dia. 3" buah 44,000 Assesories Pipa harus dari bahan dengan
kualitas yang sama dengan pipa yang
23 Ukuran dia. 2 1/2" buah 39,000
digunakan (SNI 06-0135- 1987) .
24 Ukuran dia. 2 buah 19,000
Tee
25 Ukuran dia. 3 x 3 x 3" buah 228,000
26 Ukuran dia. 2 x 2 x 1 1/2" buah 114,000
27 Ukuran dia. 2 x 2 x 2" buah 140,000
Reducer
28 dia. 3" x 2 1/2" buah 139,000
29 dia. 3" x 2" buah 118,000
30 dia. 2 1/2" x 2" buah 67,000
31 dia. 2" x 1 1/2" buah 24,000
End Cap / Dop
32 Ukuran dia. 3" buah 30,000
33 Ukuran dia. 2 1/2" buah 23,000
34 Ukuran dia. 2 buah 19,000
35 Ukuran dia. 1 1/2" buah 10,000
36 Sealtape buah 3,000
37 Lem Pipa @ 3 kg Klg 360,000

PIPA Besi Standar Medium A SNI,


38 SNI dia. 4" , Pj 6 meter batang 1,497,000
39 SNI dia. 3" , Pj 6 meter batang 1,034,000 SNI Klas Medium A, semua pipa dan alat
penyambung harus dapat menerima tekanan
40 SNI dia. 2 1/2" , Pj 6 meter batang 800,000 kerja minimum sebesar 10.0 kg/cm2 atau 10 bar
41 SNI dia. 2" , Pj 6 meter batang 628,000 dan maximum 50 kg/cm2 atau 50 bar.
42 SNI dia. 1 1/2" , Pj 6 meter batang 460,000
43 SNI dia. 1 1/4" , Pj 6 meter batang 400,000
44 SNI dia. 1" , Pj 6 meter batang 304,000
45 SNI dia. 3/4" , Pj 6 meter batang 199,000
46 SNI dia. 1/2" , Pj 6 meter batang 154,000
Upah Angkut/ Total
Harga Satuan
No. Nama barang/alat Satuan Biaya Transfortasi Harga Satuan Spesifikasi Teknik Ket.
(Rp). (Rp). (Rp).
Assesories Pipa GIP
Bend 90°
47 Ukuran dia. 4" buah 101,000
48 Ukuran dia. 3" buah 67,000 Semua material bantu seperti fitting, elbow 90,
49 Ukuran dia. 2 1/2" buah 58,000 reducer, tee, sock drat, coupling dan lainnya
50 Ukuran dia. 2 buah 40,000 harus dari bahan dengan kualitas yang sama
51 Ukuran dia. 1 1/2" buah 38,000 dengan pipa yang digunakan.
52 Ukuran dia. 1 buah 32,000
Bend 45°
53 Ukuran dia. 4" buah 83,000
54 Ukuran dia. 3" buah 55,000
55 Ukuran dia. 2 1/2" buah 50,000
56 Ukuran dia. 2 buah 37,000
57 Ukuran dia. 1 1/2" buah 35,000
58 Ukuran dia. 1 buah 30,000
Socket
59 Ukuran dia. 3" buah 70,000
60 Ukuran dia. 2 buah 40,000
61 Ukuran dia. 1 buah 30,000
Tee
62 Ukuran dia. 2 x 2 x 2" buah 76,000
63 Ukuran dia. 2 x 2 x 1 1/2" buah 75,000
Reducer
64 Ukuran dia. 3" x 2 " buah 38,000
65 Ukuran dia. 2 x 1" buah 32,000
66 V. L. Ring Ø 1/2" x Ø 1/4" buah
67 Manometer buah 159,000
68 Check Valve Ø 2" buah 1,000,000
69 Double Nipple Ø 3" buah 75,000
70 Double Nipple Ø 2" buah 39,000
71 Double Nipple Ø 1 1/2" buah 17,000
Flange
72 Ukuran dia. 3" buah 100,000
Assesories Pipa harus dari bahan dengan
73 Ukuran dia. 2 1/2" buah 96,000
kualitas yang sama dengan pipa yang
74 Ukuran dia. 2 buah 69,000
digunakan (SNI 06-0135- 1987) .
75 Ukuran dia. 1 1/2" buah 58,000
Waiter Mur
76 Ukuran dia. 3" buah 190,000
77 Ukuran dia. 2 1/2" buah 170,000
78 Ukuran dia. 2 buah 89,000
79 Ukuran dia. 1 1/2" buah 76,000
Gate Valve Onda Brass
80 Ukuran dia. 4" buah 2,922,000
Assesories Pipa harus dari bahan dengan
81 Ukuran dia. 3" buah 1,552,000
kualitas yang sama dengan pipa yang
82 Ukuran dia. 2 1/2" buah 1,132,000 digunakan (SNI 06-0135- 1987) .
83 Ukuran dia. 2 buah 535,000
84 Ukuran dia. 1 1/2" buah 374,000
85 Ukuran dia. 1 buah 194,000
Accesorries Lainnya
86 Sney Pipa dia. 1/2" - 2" set
87 Sney Pipa dia. 2 1/2" - 3" set
88 Kunci Pipa dia. 1/2" - 2" buah
89 Kunci Pipa dia. 1/2" - 3" buah

96 Pipa HDPE S-8 (SDR 17 PN 10 ) 160 mm 6" m' 169,560.00 Tekanan Nominal pipa minimal 1,00 Mpa
97 Pipa HDPE S-8 (SDR 17 PN 10 ) 110 mm 4" m' 80,950.00 atau 10 bar (SNI 06 - 4829 - 2005/
98 Pipa HDPE S-8 (SDR 17 PN 10 ) 90 mm 3" m' 54,200.00 ISO 4427 - 2007)
99 Pipa HDPE S-8 (SDR 17 PN 10 ) 75 mm 2,5" m' 37,650.00
100 Pipa HDPE S-8 (SDR 17 PN 10 ) 63 mm 2" m' 27,380.00
101 Pipa HDPE S-8 (SDR 17 PN 10 ) 50 mm 1 1/2" m' 17,120.00
Upah Angkut/ Total
Harga Satuan
No. Nama barang/alat Satuan Biaya Transfortasi Harga Satuan Spesifikasi Teknik Ket.
(Rp). (Rp). (Rp).
ASSECORIES PIPA HDPE
BAND 90
102 Ukuran dia. 4" buah 362,000.00
103 Ukuran dia. 3" buah 252,000.00 Assesories Pipa harus dari bahan
104 Ukuran dia. 2 1/2" buah 225,000.00 dengan kualitas yang sama dengan pipa
105 Ukuran dia. 2 buah 150,000.00 yang digunakan (SNI 06 - 4829 - 2005
106 Ukuran dia. 1 1/2" buah 149,000.00 / ISO 4427 - 2007)
107 Ukuran dia. 1 buah 50,000.00
Flange Adaptor
108 Ukuran dia. 4" buah 1,804,000.00
109 Ukuran dia. 3" buah 998,000.00
110 Ukuran dia. 2 1/2" buah 769,000.00
111 Ukuran dia. 2 buah 528,000.00
Tee
112 Ukuran dia. 3 x 3 x 3" buah 265,000.00
113 Ukuran dia. 2 x 2 x 1 1/2" buah 323,000.00
114 Ukuran dia. 2 x 2 x 2" buah 152,000.00
Reducer
115 dia. 3" x 2 1/2" buah 1,033,000.00
116 dia. 3" x 2" buah 435,000.00
117 dia. 2 1/2" x 2" buah 372,000.00
118 dia. 2" x 1 1/2" buah 175,000.00
End Cap / Dop
119 Ukuran dia. 3" buah 257,000.00
120 Ukuran dia. 2 1/2" buah 220,000.00
121 Ukuran dia. 2 buah 106,000.00
122 Ukuran dia. 1 1/2" buah 76,000.00
PPN
272,400,000
Dua Ratus Tujuh Puluh Dua Juta Empat Ratus Ribu Rupiah

272,400,000 272400000 000 0 0 0


272400000 272400 400 400 Ribu 4 Empat Ratus 0
272000 272 272 272 Juta 2 Dua Ratus 7 Tujuh
00 0 0 Milyard 0 0
00 0 0 Trilyun 0 0

0 0
1 Se 1 Satu
2 Dua 2 Dua
3 Tiga 3 Tiga
4 Empat 4 Empat
5 Lima 5 Lima
6 Enam 6 Enam
7 Tujuh 7 Tujuh
8 Delapan 8 Delapan
9 Sembilan 9 Sembilan
Rupiah Rupiah
0 000
0 Ribu Empat Ratus Ribu
Puluh 2 Dua Juta Dua Ratus Tujuh Puluh Dua Juta
0 000
0 000