Operating depth (ft TVD) 100-16000 2000-6000 5000-15000 8000-19000 5000-15000 1000-15000
Well deviation Vertical Horizontal Deviated <20 deg Deviated Horizontal
Operating rate (bpd) 5-5000 5-4500 200-30000 1-5 300-15000 200-30000
Operating temperature (F) 100-550 75-250 100-400 120-900 100-500 100-400
Corrosion handling Good to Excellent Fair Good to Excellent Excellent Excellent Good
Gas handling Fair to Good Good Excellent Excellent Good Poor to Fair
Solids handling Fair to Good Excellent Good Poor to Fair Good Poor to Fair
GLR: 300 scf/bbl/1000 ft
Fluid gravity (API) >8 <35 >15 >8 >10
depth
wellhead
Servicing Workover/pulling rig Workover/pulling rig Wireline/workover rig Hydraulic or Wireline Workover/pulling rig
catcher/wireline
Prime mover Gas or Electric Gas or Electric Compressor Reservoir energy Multicylinder or Electric Electric motor
Source: Romer M.C., et al. Offshore ESP Selection Criteria SPE 146652
2%
O&M
16%
Instalasi
45%
PEMASANGAN
PERAKITAN
DESAIN
Target
Hitung HP Keekonomian
produksi
DESAIN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
DESAIN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
100000
10000
Laju alir (BFPD)
1000
100
10
VH H M L VL
1
-100% -80% -60% -40% -20% 0% 20% 40% 60% 80% 100%
Deviasi Laju Alir
*studi kasus lapangan PHE OSES
DESAIN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
100%
90% ---- Normal pump
80%
70% ___ Wide range pump
Efficiency (%)
60%
50%
40%
30%
20%
10%
0%
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000 22000 24000 26000 28000
Rate (BFPD)
100%
90%
80%
70%
Efficiency (%)
IM 1
60%
50% IM 2
40% IM 3
30%
20% IM 4
10% PMM
0%
DESAIN 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Motor Load
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Logistik Pengetesan
•Stages •Pompa •Pengepakan
•HP •Stok •Motor •Pompa •Tranportasi
•etc •Kondisi peralatan •Protector •Motor
•Kabel
•Sensor
ESP design Perakitan Pengiriman
PERAKITAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Others, WOE, 10.80,
16.20, 16% 11%
WOW, 73.00,
73%
PERAKITAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
“Quality Management System
(QMS)” • Contract review
• Planning
• Risk Assesment & management
• Design & Development
“QMS for Manufacturing
• Contingency Planning
Organizations for the Petroleum
and Natural Gas Industry" • Purchasing
• Execution of services
• Control of Testing, Measuring, Monitoring & Detection of Equipment
• Service Performance Validation
“QMS for Service Supply
Organizations for the Petroleum • Control of Nonconforming Product
and Natural Gas Industries” • Management of Change
PERAKITAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Pencabutan Pemasangan
• Kondisi dan • Clean-up • Pengepakan
kelengkapan • Kondisi • Stimulasi • Persiapan • Tranportasi
setelah peralatan • Run in hole
pengiriman
Pengkondisian
Cek barang Start -up
sumur
PEMASANGAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
300000 25
USD
250000 20
Jam
200000
15
Biaya
Jam
150000
10
100000
50000 5
0 Mobilization Rig Up Kill well Retrieve Pull out ESP Make Up ESP Install ESP Rig Down Clean Up
0
packer
PEMASANGAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Alarm Optimisasi
•Parameter ESP •Gas venting •Installation data
•Laju produksi •Manipulasi parameter •Failure data
•Kondisi abnormal ESP •Pengaturan parameter
ESP •Performa ESP
•Shut down ESP
•Membersihkan tubing
•Pengaturan fasilitas
permukaan
PENGAWASAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Oilfield
PENGAWASAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Predictive Reservoir Surveillance
ESP
Alarm
Machine learning ESP
troubleshooting
Machine learning
Digital Oilfield Accountable Well optimization
work process
Real-time data
Surface Facilities
Parameters
Realtime ESP
Parameters
Static Engineering
Multi Database
PENGAWASAN
Optimisasi Operasi ESP • IATMI Young Professional Presentation • Marda Vidrianto
Digital Oilfield
Trouble
Target Desain Rekondi Optimis
Logistik Cabut shootin
produksi ESP si sumur asi
g
Trouble
Target Desain Rekondi Optimis
produksi ESP
Future Skill
Logistik Cabut
si sumur
shootin
g
asi
Adaptive
Basic Skill
Stages
Pompa
Keekono
mian
Data analytic
Petroleum
Rakit
Eng. Cek
barang
Pasang Alarm Database
cooperation
IOT know how
HP
motor
Kebutuh
an listrik Value engineering
Tes
Transpo
rtasi
Start up
Status
Sumur
Review
Sumur