Doc. No.

TEC-032111C-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev2
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020

Rebar & BBS Checking for Core wall/


032111 Shear wall
Check List Rev: 2 Page 1 of 2

For updates of this and other subject shop drawings checklist

• Click Link to shop drawing checklist OR


• Search for “Technical Engineer Civil Google Sites” in Google OR
• Copy and paste the following URL: https://sites.google.com/site/technicalengineercivil/

1. Scope
This Checklist is for reviewing the rebar drawings for core wall.

2. Project Details
Project Project Code
Name
Client Name Subcontractor
/ PMC Name
Consultancy Drawings No

3. Check List.
Sr. No. Description OK/Not OK Remarks
1
Title bloc complies to TEC-013000-SPD-CLT-Rev02_All Shop Dwg common Checklist
2 Legends, general notes given: TEC-032111 -SPD-CLT-Rev02_Rebar Shop Drawing-
General Notes Checklist.
Key plan for the core wall given e.g.

4 PLAN

The layout of the core wall matches to general arrangement drawings OR


4.1 To be checked with MEP subcontractor drawings
For core wall for list it should match /To be rechecked with Elevator subcontractor
4.2 shop drawings
The door openings for the timber doors & steel doors provided with additional
4.3 tolerance.

4.4 The shafts for MEP to be shown

Starter bar and lapping location to be adjusted for slip form requirements if being
4.5 used in the project.
Doc. No. TEC-032111C-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev2
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020

Rebar & BBS Checking for Core wall/


032111 Shear wall
Check List Rev: 2 Page 2 of 2

5 REBAR ARRANGEEMNT
All horizontal bars to be easily installable type
2 short U bars and long straight bars

5.1

Provide “Hooks” instead of “C” shaped bars

5.2

5.2 All pull-out bars for the Mid landing provided

SLIP FORM
5.3 Pull-out bars of the slab Is provided

6 ELEVATION/ SECTION
The Start level/ Lower slab level and the upper slab level of the
Core wall is given
The height between the two slab is given

Lap of the rebar is shown and dimensioned

4. Summary result.

Reviewed by Approved by Date Decision

Signature
Received from
Subcontractor
Return this shop drawing to
Subcontractor ☐
Date
Transmittal to
Consultant on
Forward this shop drawing to
Subcontractor ☐
Received from
Name
consultant back on

Designation

You might also like