Doc. No.

TEC-032111T-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev02
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020
032111T Reinforcement for Post tension Slab Check List Rev: 2 Page 1 of 3

For updates of this and other subject shop drawings checklist


• Click Link to shop drawing checklist OR

• Search for “Technical Engineer Civil Google Sites” in Google OR


• Copy and paste the following URL: https://sites.google.com/site/technicalengineercivil/

1. Scope
This Checklist is for reviewing the shop drawings for rebar used in Post tensioned Slab.

2. Project Details
Project Name Project Code

Client Name / Subcontractor


PMC Name

Consultancy Drawings No

3. Check List.
Sr.
Description OK/Not OK Remarks
No.

Reviewed with “TEC-013000-SPD-CLT-Rev02_All Shop Dwg common Checklist”


0 and found acceptable.

A GENERAL NOTES

1 Legends, general notes given

B CHECKLIST

B1 GRIDS

1 All Grid lines shown, dimension of the slab shown

COLUMNS & WALL

3 Extra Bars around column top & Bottom

4 Anti-shear Zigzag

Page 1 of 3
Doc. No. TEC-032111T-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev02
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020
032111T Reinforcement for Post tension Slab Check List Rev: 2 Page 2 of 3

Sr.
Description OK/Not OK Remarks
No.

B2 BEAMS

6 Al beam types mentioned with sizes on the plan

COLUMNS

All column below the slab shown in dark shade


8 All Columns starting from a slab (Planted /Floating Column) shown with a hatch

SLAB

All Levels mentioned


9 Slab thickness mentioned

10 All opening and pockets shown

B1 & B2 in one plan in dark continuous line


T1 & T2 in another plan in dashed lines
11 Bottom Mesh : If 10mm @250mm bottom both ways, no BBS for
Rebar Detailer required. Main contractor to use Stock Length bars at site cut the
extra bars by Chain Cutter on the slab itself.

12 Chair bars shown

13

OPENINGS

OPENING & PAN BOXES


14 Provide trimmer bar around openings for openings like MEP and for pan Boxes

15
DEAD END AND LIVE END
16 Anti-bursting Spiral

Page 2 of 3
Doc. No. TEC-032111T-SPD-CLT-
TECHNICAL DEPARTMENT-CIVIL (Rev No.) Rev02
Shop Drawings-Check List Issue Date August 2011
CSI No Subject Doc Type Rev. Date 17th April 2020
032111T Reinforcement for Post tension Slab Check List Rev: 2 Page 3 of 3

4. Summary result.

Reviewed by Approved by Date Decision

Signature
Received from
Subcontractor
Return this shop drawing to
Subcontractor ☐
Date
Transmittal to
Consultant on
Forward this shop drawing to
Subcontractor ☐
Received from
Name
consultant back on

Designation

Page 3 of 3