CENTENNIAL COLLEGE CENTENNIAL COLLEGE

COURSE CODE: - MTID – 323

MILESTONE - 1
PROJECT: - HAND POWER SAW

GROUP NO: - 13

MANINDER SINGH SANDHU 301058516

ANMOL SINGH 301059896

AMANDEEP SINGH 301018410

GLENN VELASCO 300701109

DATE: 10/FEB/2020
LEVEL PART ITEM NAME MATERIAL MAKE/BUY QTY. DRAWING
NUMBER NO. NUMBER

1 1001 1 Frame ALUMINUM MAKE 1 M1


4 T6061 ALLOY
2 1104 2 Driving PLAIN CARBON BUY 1 B1
gear STEEL
2 1105 3 sprocket PLAIN CARBON BUY 1 B2
gear STEEL
3 1113 4 Inner ALLOY STEEL BUY 1 B3-02
Chain
1 1003 5 HANDLE RUBBER/ALLOY BUY 2 B4
STEEL
2 1103 6 Bushings BRASS BUY 4 B5

2 1107 7 Crank CAST IRON MAKE 1 M2


2 bar
2 1106 8 Cutting CARBIDE BUY 1 B6
Blade
SBHCSCR
7 2 1102 9 EW 0.25- ALLOY STEEL BUY 4 B7
20x0.75-
HX-N
5 3
Frame ALUMINUM
1 1002 10 support MAKE 2 M3
bar T6061 ALLOY-

1 8

10 6

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: HAND CRANK SAW ASSM SHEET
SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:8 1 2020/02/07 DRAWN BY: GROUP 3 01 of 12
.98

DETAIL A
SCALE 8 : 1

1.00

.625

.0125

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: BUSHING SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 2:1 B5 2020/02/07 DRAWN BY: GROUP 3 09 of 12
R.50 .675

.6250

4.75

.375

R.25

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: CRANK BAR SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:1 M 2020/02/07 DRAWN BY: GROUP 3 10 of 12
2
R.125
.06
.22
.18

R.03 R.02

R.06
DETAIL A
SCALE 1 : 1
.0625
A

8.00

.625

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: CUTTING BLADE SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:2 B6 2020/02/07 DRAWN BY: GROUP 3 11 of 12
.50

.385

DETAIL A
SCALE 1 : 1 .25
A
R3.00

.625

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: DRIVING GEAR SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:2 B1 2020/02/07 DRAWN BY: GROUP 3 04 of 12
1.00

3.00

.125

.20
135.00°
.20
.45

A 1.00
R.05

2X 1/4-20 TAP DETAIL A


SCALE 4 : 1

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: FRAME SUPPORT BAR SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:1 M 2020/02/07 DRAWN BY: GROUP 3 12 of 12
3
14.50
0.63

3.00
4.87


15

10.25

1.50
1.25 1.50

4x
1.0
0

15
.7
8
P

13
TA

.6
1.0 -2 0 0°
12.81

11.81

3
0 1/4 0.50 44. U
HR
PT
TA
15 20
/4-

0° 1
8

4x
45.

9.2
4

11.00
2.00

0.75

1.50
16.50

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: HAND CRANK SAW - FRAME SHEET
SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:5 M 2020/01/15 DRAWN BY: GROUP 1 03 of 12
1
2.529

.375-16 THREAD .70


.83
.31

1.00

A
.25

R.125 .03
6.91 .06
R.02
R.25

4.03
.12
.45

.325
R.31
.027 DETAIL A
SCALE 2 : 1.5
R.125

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: HANDLE SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 2:1 B4 2020/02/07 DRAWN BY: GROUP 3 08 of 12
.725 .60

.0625
.51

.15

R.225
R.19

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: INNER CHAIN LINK SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 4:1 B3 2020/02/07 DRAWN BY: GROUP 3 06 of 12
-0
.4375 .3125

.0625

.25

.55

R.25

.15
R.18

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: OUTER CHAIN LINK SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 4:1 B3 2020/02/07 DRAWN BY: GROUP 3 07 of 12
-0
.25

.26 .25

R1.50

.625

CENTENNIAL COLLEGE - CAD/CAM LAB PROJECT: SPROCKET GEAR SHEET


SCALE DRAWING NO. DATE: (YYYY/MM/DD)
THIRD ANGLE PROJECTION 1:1 B2 2020/02/07 DRAWN BY: GROUP 3 05 of 12
SCRAP RATES
Part No. Part Name Quantity Operations Calculated Parts per day
per day needed Scrap
1001 Frame 800 Cutting 20 821
Grinding
Welding
Drilling Operation Scrap Rates
Milling Cutting 1%
Painting Drilling 0.25%
1107 Crank bar 800 Cutting 19 819 Shearing 0.50%
Milling Stamping 0.25%
Drilling Bending -
Debur Welding -
1002 Frame support 1600 17 1617 0.50%
Cutting
bar Deburring
1103 Bushing 3200 Cutting 86 3286 Sanding 0.50%
Drilling Painting -
Turning Assembling -
Grinding Inspecting -
1003 Handle 800 Cutting 22 822 Packaging -
Turning Trimming 0.10%
Deburring Molding -
Threading Turning 0.75%
1104 Driving Gear 800 Cutting 19 819 Grinding 0.65%
Turning Threading 0.35%
Milling Milling 0.50%
TAKT TIME
Number of units to be manufacture = 800 units
Number of working shift = 3 Shifts
Total time in 3 shift = 1440 min
Time required to manufacture one unit
on MIG welding machine = 3 min
Downtime per shift (Breaks, Cleanup) = 50 min
Time remain after downtime in 3 shifts= 1290 min
At 75 % proformance time remain in 3 shifts = 967.5 min
Time required to produce one unit = 967.5/800
= 1.20 min(takt time)
Number of machines required = 0.500/1.20
= 2.5 machines

RESPONSIBILITY TABLE
S. NO. ITEM NAME
1 EXPLODED GLENN
2 BOM TABLE GLENN, ANMOL
3 SCRAP RATE TABLE MANINDER, ANMOL
4 TAKT TIME CALCULATION ANMOL, AMANDEEP