Professional Documents
Culture Documents
Notes:-: Timber Doors Key Plan
Notes:-: Timber Doors Key Plan
NOTES :-
A A
B B
H
1200
Gb
C C
7000
Ga
2200
MJ MJ MJ
STR-02-04
4800
DISABLE FFL. DN UP
LOBBY
TOILET
2ND-02-06
09-D01 2ND-02-10
10-D01
2ND-02 BLOCK 5C
2ND-02
CORRIDOR CORRIDOR
29-D11 29-D07
4000
+33.350(MSL)
FFL. BLOCK 5A
Fb ZONE 9B
PANTRY ZONE 3C ZONE 3D ZONE 7C ZONE 7D
2ND-02-30
2ND-02-12a
E PROPOSED
E
3500
TOILET ZONE 9A
ZONE 3B ZONE 3A ZONE 7B ZONE 7A
2ND-02-31
UP
Fa ZONE 1B ZONE 1C
CORRIDOR
2ND-02-29 DN ZONE 2B ZONE 2A ZONE 8B ZONE 8A
31-D01
2ND-02
3500
ZONE 1A
29-D12 LAW AND ORDER LIFT LOBBY LAW AND ORDER
29-D13 29-D06
2ND-02 2ND-02 SECTION 2ND-02 2ND-02-29a 12-D01 SECTION
F (POLICE DIVISION)
+33.350(MSL)
2ND-02
2ND-02-34 2ND-02-12
LAW AND ORDER SECTION FFL.
+33.350(MSL) +33.350(MSL)
(CHIEF ACC: OFFICE)
2ND-02-28
FFL. FFL. KEY PLAN
3500
+33.350(MSL)
FFL.
F 29-D04
F
IT ROOM 2ND-02
Rev. Date Desd. Description Drwn. Chk'd App'd
2ND-02-33
+33.350(MSL)
E FFL. This drawing was prepared by CECB based on Architectural design drawings prepared by M/s Muditha Jayakody Associates Pvt.
14-D01 Ltd, who was the Main Consultant/Architectural Consultant for Defence Headquarters Complex Project, Akuregoda till 30.09.2016.
2ND-02
ACC: PROCUREMENT
TOILET Client DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA
CORRIDOR CORRIDOR 12-D02
2ND-02
4000
25-D01
ACC: TOILET 2ND-02
DRAUGHT
LOBBY LOBBY
FINANCE
Dc 2ND-02-27 PRIVATE
23-D01
2ND-02
2ND-02-20
2ND-02-16 Project Management & Procurement
LFT-02-01 LIFT
LIFT LOBBY
PROJECT MANAGEMENT UNIT OF THE ARMED FORCES
+33.350(MSL) LOBBY
FFL. 2ND-02-25 DN UP
2200
2ND-02-22
OFFICER DISABLE JAN.
TOILET TOILET ROOM OFFICER
FEMALE TOILET MALE Architectural Consultant (with effect from 01-10-2016)
Db 2ND-02-15 2ND-02-15a
2ND-02-17
MJ AHU 2ND-02-19 MEETING
1300
ROOM
2ND-02-21
ROOM CENTRAL ENGINEERING CONSULTANCY BUREAU
Da +33.350(MSL)
G ELECTRICAL 2ND-02-24
LFT-02-02
FFL. G
PANEL ROOM &
+33.350(MSL) Engineering , Quantity Surveying & Construction Management
UPS ROOM
FFL.
3500
MJ Construction by
MJ
CONSTRUCTION MANAGEMENT UNIT OF THE ARMED FORCES
3500
Drawing Title
MAIN BUILDING
Cb BLOCK 02 - SECOND FLOOR
TIMBER DOORS
KEY PLAN
Designed Recommended
YGAD ...............................................
CONSULTANT ARCHITECT / SENIOR ARCHITECT
Drawn KKD
H Approved H
........................................
Checked THA DGM (Architectural)
Submitted Scale Date Status
TGRS NTS 17.12.2020
CAD File P:\02_Bldgs\01_MB\MB_AR\ARPrint\TI\DETAILS\TIMBER DOORS\Block 2\LAYOUTS TEN
Sheet Size Drawing No. Rev. No.
This drawing is sole property of CECB. Data contained on this drawing shall not to be used, reproduced, duplicated in whole or part without the A1 DHQC-CECB-MB-TI-AR-DW-2F-02-80706 -
prior permission of CECB. CECB shall not be held responsible for the unauthorized use of this drawing on Projects other than for which it was used.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 23 December 2020