Cable Routing

Management
Enabling efficient design of
cable installation

An AVEVA Business Paper

www.aveva.com
Cable Routing Management - An AVEVA Business Paper

Contents
Page

Introduction 3

Summary 4

The AVEVA Cable Routing and Management 5


solution

Seamless and efficient iterative workflow 5

Why do I need integrated cable routing? 7

Page 2
Cable Routing Management - An AVEVA Business Paper

Summary
Integrating Electrical & Instrumentation (E&I) system
design with 3D plant design is a complex, critical-path
project activity. Historically, the limitations of available tools
made it inefficient and error-prone, creating unnecessary
costs and delays and leading to suboptimal installations
that impair efficient asset management.

AVEVA Everything3D™ (AVEVA E3D™) now integrates


with AVEVA Electrical™ and AVEVA Instrumentation™ to
enable highly efficient design of plant cable installation.
Considerable savings of cost and time in both project
execution and asset management can be achieved with
out-of-the-box applications.

‘Integrating Electrical &


Instrumentation (E&I) system
design with 3D plant design
is a complex, critical-path
project activity. Historically, the
limitations of available tools
made it inefficient and error-
prone, creating unnecessary
costs and delays and leading
to suboptimal installations
that impair efficient asset
management...’

Page 3
Cable Routing Management - An AVEVA Business Paper

Introduction
As plant and offshore projects become ever more complex Historically, the design tools used by E&I engineers did not
and require ever more sophisticated E&I systems, so the interoperate with those used by their 3D design colleagues.
challenge of designing and installing cables increases. Negotiating and specifying equipment locations and
The professional E&I system designer must wrestle with a cable routings had to be – and, unfortunately, often still
number of issues: is – carried out manually by means of 2D drawings and
face-to-face discussion, with the inevitable scope for costly
z the complexity of the E&I systems themselves problems such as design errors, overfilled cable trays,
z the complex nature of the 3D environment in which interference between power and signal cables, difficult
cables must be routed and installed; particularly installation, wasted materials and even compromised
challenging in the confined space of a typical offshore system performance or safety.
platform
Separately, both disciplines have powerful software
z the interrelation between an electrical system’s physical
tools for their own tasks. AVEVA Electrical and AVEVA
layout and its functional characteristics; for example,
Instrumentation today provide comprehensive functions
cable resistance or electrical interference
for the efficient design of E&I systems, while AVEVA
z continual design changes as the overall project design PDMS™ has long been the tool of choice for 3D plant layout
evolves from outline concept to completion design. With the advent of AVEVA E3D, however, 3D design
z the need to minimise usage and wastage of increasingly has now extended its reach to integrate with E&I design.
costly cable materials For the first time, these two disciplines can collaborate
z the need to consider long-term maintainability. seamlessly to create an optimum overall design.

‘Historically, the design tools used by E&I engineers did not


interoperate with those used by their 3D design colleagues...’

Page 4
Cable Routing Management - An AVEVA Business Paper

The AVEVA Cable Routing and Seamless and efficient iterative workflow
Management solution
The process starts with the electrical system design;
Together, AVEVA E3D, AVEVA Electrical and/or AVEVA the engineer creates the system using AVEVA Electrical,
Instrumentation offer: specifies the interconnections between the various items
of equipment and makes provisional assignments of cable
z a highly productive, intuitive to use, multi-user type and size according to function and their estimated
environment for the design and installation of optimum length. Built-in calculation functions, extended by
cabling layouts interoperability with third-party electrical analysis solutions,
enable the provisional cable sizes to be verified.
z assured data consistency across 2D, 3D and reporting
deliverables
Because the electrical parts catalogue and the system data
z automatic updating of deliverables as the overall project are managed within the project’s entire dataset, the AVEVA
design is developed E3D user can see the interconnections in the 3D model
z Compare & Update functionality, which combines view. Provisional cableways can be reserved, through
efficient collaborative working with robust change which intelligent cable trays are routed. The electrical
control. interconnections can be assigned to suitable cable trays
and routed automatically, manually or by a combination of
both methods.

Cable route status, length and route node information passed between AVEVA Electrical and AVEVA E3D

‘Because the electrical parts catalogue and the system data are
managed within the project’s entire dataset, the AVEVA E3D user
can see the interconnections in the 3D model view...’

Page 5
Cable Routing Management - An AVEVA Business Paper

Automatic routing applies preconfigured rules to choose Throughout this design evolution, change management
the most suitable route. It is normally used to create an ensures that each discipline works with information of
initial routing which may be adjusted and refined manually known maturity status. Eventually, a point is reached
if desired. Route Node Allocation in AVEVA E3D speeds this at which elements of the design can be released for
process up by automatically creating bulk nodes across production. Cables that have reached this status can be
a number of cableways. But even fully manual routing is locked, a change that normally also involves the cables
highly efficient; a user can typically route upwards of 150 being drummed. Further changes to their lengths are then
cables per day. inhibited.

Rules may be configured to enable optimum cable routing AVEVA Instrumentation eliminates error sources in change
and the user is alerted if a rule is broken. Interference rules management. Because its functional modules share a
will, where possible, apply minimum separations between, common database, each information item is controlled
say, noisy high-current supply cables and signal cables. in a single location. Robust change control processes
Tray-fill rules route cables so that cable trays are only can be applied at source and all referencing applications,
partially populated during construction, leaving capacity for documents and deliverables update automatically once a
subsequent in-service modification work. change is approved.

In any task initial designs are, inevitably, approximate or Changes often arise out of a new, out-of-scope
incomplete. Typically, an exact 3D routing will change the requirement from the client. Here, it is important to be
lengths of cables. AVEVA E3D automatically flags a cable able to quickly and accurately assess the impact of the
for resizing where this has happened. Data integration change in order to agree any necessary price or delivery
enables the actual installed lengths to be returned to adjustments. As delivery dates invariably seem to remain
AVEVA Electrical to update the system specification. fixed even in the face of specification creep, the ability to
Occasionally, this update may be sufficient to require minimise programme impact through efficient change
re-analysis of the cable’s voltage drop, which may either implementation is a valuable business benefit.
require a thicker cable or show that a thinner cable can be
used, saving cost and cable tray capacity. The collaborative
use of a common dataset enables such two-way design
refinements to be carried out quickly and efficiently.

Page 6
Cable Routing Management - An AVEVA Business Paper

Why do I need integrated cable routing?


During project development, all engineering and design
activities are interdependent; make a change in one area and
its effects ripple outwards across almost every other. This is
particularly true when developing the E&I system because it
is the ‘nervous system’ that controls and monitors the entire
plant. Moving an item of equipment to make room for another
may be relatively straightforward in the 3D layout, but could
require major redesign of the electrical and instrumentation
installation to ensure that the correct power supplies are
re-specified and re-routed, that signal cables are moved to
different cable trays, and so on.

Integrated cable routing makes the E&I installation as


intelligent as the piping layout, so that cable lengths
automatically update, rules continue to be obeyed, alerts
are generated if equipment or cable trays are moved, and
both production deliverables and Materials Take-Off remain
consistent with the revised design.

The benefits are considerable. During project execution, E&I


is invariably on the critical path, so anything which improves
efficiency here has a direct effect on the overall programme.
Integrated cable routing extensively eliminates opportunities
for errors which would otherwise absorb skilled effort in
checking and correcting, increase cost, waste materials and
create delays. Once in service, poor installation design can
hamper efficient maintenance and modification, and may
even harbour hidden safety hazards.

Integrated cable routing, in contrast, promotes high-quality,


standards-compliant electrical installation that is inherently
more reliable, easier to work with during routine maintenance,
and more easily modified for in-plant engineering projects.

These benefits are achievable now, with proven, out-of-the-


box technology not available from any other vendor.

‘Integrated cable routing


extensively eliminates
opportunities for errors which
would otherwise absorb skilled
effort in checking and correcting,
increase cost, waste materials
and create delays...’

Page 7
AVEVA Group plc Headquartered in Cambridge, England, AVEVA Group plc and its operating
High Cross subsidiaries currently employ staff worldwide in Australia, Austria, Belgium,
Madingley Road Brazil, Canada, China, Colombia, Denmark, France, Germany, Hong Kong,
Cambridge Hungary, India, Italy, Japan, Malaysia, Mexico, Norway, Poland, Russia, Saudi
CB3 0HB Arabia, Singapore, Spain, Sweden, South Korea, the United Arab Emirates,
UK the United Kingdom and the United States of America. AVEVA also has
representatives in additional countries around the world.
Tel +44 (0)1223 556655
Fax +44 (0)1223 556666 For more details on AVEVA Worldwide Offices, visit www.aveva.com/offices

www.aveva.com

Copyright © 2015 AVEVA Solutions Limited and its subsidiaries. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means,
including photocopying or recording, without permission. Permission must also be obtained before any part of this publication is stored in a retrievable system of any nature.
No responsibility can be accepted by AVEVA for action taken as a result of information contained in this publication. Licenses issued by the Copyright Licensing Agency Limited
or any other reproduction rights organisations do not apply to AVEVA. ABP/CRM/15

You might also like