Description of Urea Plant

Typical process steps involved in a urea plant are


urea synthesis, urea purification, concentration &
prilling and process water treatment, Figure 2.

Figure 1: General Layout of Complex

Occupational Fire Utility Air


& Cooling Towers for Compression
Health
Safety Ammonia-1& Urea-1 Units
Centre

Ammonia-1 Urea-1
Power
Generation
Unit-1

Central Control room


for Power Generation
Ammonia-1& Urea-1 Unit-2

Ammonia-2 Urea-2

The booster pump discharge is fed to the


The urea plant where the incident took place
reciprocating HP ammonia feed pumps and
operates with all the latest features, such as:
pressure is further increased to around 23500KPa
(240 Kscg) before it is fed to the urea reactor for
1. 14 improved Casale Sieve trays in the urea production of Urea, Figure 3.
reactor.
2. Bi-metallic HP stripper
The reciprocating pumps were supplied by M/s
3. Dedicated vacuum section for the pre-
Peroni, Italy. The pumps have five horizontal
concentrator
type plungers, with oil lubrication / sealing for
4. Pre MP decomposer to utilize the excess low
packings / plungers. Table 1 shows pump
pressure steam generated in the plant.
specification sheet and Figure 5 the plunger
5. Wet and dry de-dusting systems for the prill
packing arrangement.
tower and conveyor gantry.
Incident
Ammonia coming from the ammonia plant or
ammonia storage is drawn into a receiver tank and
On 04th May 2007, at around 03.33 hrs, Urea
pressure is initially boosted via centrifugal pumps
plant-1 field operators, who were in the field
to around 2000 KPa (21Kscg).

AMMONIA TECHNICAL MANUAL 86 2010


room, heard some sound in the field and came out.
They noticed a heavy ammonia leak from the HP
ammonia feed pump (P101-C) and immediately
informed the control room via the paging system.

Figure 2: General Layout of Equipments in Urea Plant-1

Carbamate Urea N
Condenser Reactor
CO2
Ammonia Compressor Decomposition
Compressor House & Vacuum
House concentration

Prill
Tower
Ammonia
Syn.Loop
And
Hydrogen
Recovery
Unit
HP Ammonia Feed HP Carbonate
Pumps Pumps

Area Operators
Cabin

Figure 3: Ammonia Network in Urea Plant

NH3 from
Ammonia Plant/
Storage

Ammonia Receiver
(V-101) Urea Reactor

On - Off HP Ammonia feed pumps


Valve P-101A/B/C

Ammonia Booster Pumps


P-105A/B

2010 87 AMMONIA TECHNICAL MANUAL


At 03.35 hrs, the pump was tripped locally by the On-site emergency (Level-2 emergency), which
field operator. Normally, operators use has the potential to affect the neighboring plants,
radios/Walkie-Talkies only during Start-up and but not beyond the boundaries of NFCL was
Shut-down operations. declared. Assistance from Fire & Safety staff in
the form of Fire tender reached the site. Under the
Unfortunately, the leak did not rescind and guidance of the incident controller, spray curtains
ammonia vapors began spreading towards North – were arranged to contain the spreading ammonia
East/West directions (Ammonia plant-1, Urea vapour cloud.
plant, CO2 compressor house, Unit-1 cooling
towers and Unit-2 Power generation plant (Ref. Arresting leak and handling the emergency
Fig No.4)).
1. Thick Ammonia vapors started spreading to
At 03.40 hrs, it was decided to shut the plant
the Unit-2 Power Generation plant (combined
down. The other running HP ammonia feed pump
cycle gas turbine with waste heat recovery
(P101-A) was tripped from the control room and
boiler), Ammonia Plant-I back end and other
the shut-off valve in the HP ammonia feed pumps
areas as indicated in Figure 4.
suction was closed via the Shutdown System
(SDS) in the control room and the centrifugal
2. The Manual Call Point (MCP) (an alarm
booster pump was stopped from the electrical
button) was activated and a message was sent
substation. Thereafter, the leak came under
to Fire & Safety control centre.
control and plant shutdown actions were followed.
3. The Urea-I Shift in charge (SIC) (who had
Table 1: Details HP Feed Pump Specification taken charge as Incident controller) declared
an onsite emergency as the leak was not
arrested even upon tripping the besieged
pump. The other feed pump was also tripped
and then the shut-off valve in the common
suction was closed from a remote area i.e.
control room. Ammonia leaking out from the
besieged pump was completely stopped.

4. As the ammonia feed to the urea reactor got


cut off, the urea plant shutdown was initiated.

5. All important actions were carried out


immediately by the field operators by wearing
Self Contained Breathing Apparatus (SCBA)
after the urea plant shut down, viz. putting the
CO2 compressor on barring, diverting the urea
melt from the vacuum section to the storage
tank and washing different lines like reactor
feed lines, melt line etc.