Parma Justice Center Building Camera Modernization Project - Scope of Work February 2021 Objective
Parma Justice Center Building Camera Modernization Project - Scope of Work February 2021 Objective
Parma Justice Center Building Camera Modernization Project - Scope of Work February 2021 Objective
Objective: The current cameras are over 21 years old. We would like to
replace the cameras for better resolution units and add cameras
to address blind spots. We also wish to install a better recording
unit for the cameras. The access control boards at the police
front desk, jail control center, and jail booking desk shall also be updated.
Current Cameras
See the attached listing for current cameras (73).
The new cameras should have the same capabilities as the current cameras
e.g., stationary or PTZ/multi axis.
Option A: Use existing coax cable and power supplies with appropriate
adapters to carry the signal.
New Cameras:
Locations:
For any new locations, the vendor shall supply networking and power.
- On the sally port covering the two garage buildings
- Inside the new storage building (2 angles, or 360 degrees in the center)
- On a pole in the court employee lot to view entrance and lot (360 degrees)
- North parking lot to view court entrance and parking lot (360 degrees)
- Police parking lot to view employee, public and garage entrances and lot (360)
Audio
Install microphones in the following locations
Police Front Desk – motion activated and/or linked to intercom
Lobby at police front desk, at window – motion activated
Juvenile holding room – motion activated
Police public lobby – option of 24/7 or motion.
Bailiff station in public lobby – motion activated
Recording
A centralized server system shall be installed that shall have the capacity
to record all the cameras and audio on this system and hold the data for 45 days of
24/7 recording. But we want the option of 24/7 or motion per each camera.
This server shall have remote access ability within our network.
Monitoring
The new camera system shall be able to be routed to the existing monitor stations.
Jail, front desk, bailiff station. And remotely via network.
Intercom Interface
The new camera system shall interface with the TOA intercom system.
When an intercom station is activated, the proper monitoring station will
automatically view the appropriate camera for that TOA intercom station.
Access Control
Our key fob system uses a Continental Controls system. This interfaces with our
fire alarm system and access control boards in the jail and police department.
The touch boards in the jail (2) and police department need to be replaced
with all of the same functions to monitor/clear alarms, open doors, activate cameras.
Current Camera Listing
Camer
a Description DVR
1 Outside S-2 Jail
2 Sally port jail
3 Outside Jail Driveway building
4 Pat Down Wall Jail
5 Booking jail
6 Processing jail
7 Outside jail dock
8 Processing jail
9 Inside jail dock Build2
10 Jail back hallway
11 Jail back hallway
12 Jail Admin2 door
13 Booking Jail
14 Jail service hallway
15 Booking Jail
16 Booking Jail
17 A3 A pod door
18 Outside spinning, malfunc. Build2
19 Outdoor recreation Jail
20 Indoor recreation jail
21 Jail visitation 4 Jail
22 SV4 Pod E Jail
23 Work release /Det 1
24 Detention 2 Jail
25 Detention 1/lobby jail
26 PodE2, SV6
27 Sally port jail
28 Det1 lobby (same as 25)
29 Secure hallway
30 Secure hall/elevator
31 Honor Guard hallway
32 Bottom North stairs
33 Hall by dock 1
34 Dock 1
35 Maintenance hallway
36 Doors VMO/Evid. Gar
37 VMO garage (needs adj.)
38 Evidence cage building
39 Evidence garage building
40 Outside G1, G2 Build2
41 PPD parking building
42 Police entrance Build2
43 Outside Prop. Office Hall
44 Workout Room hallway
45 Visitor Lot building
46 NA
47 3rd floor hallway
48 3rd floor holding area
49 Bailiff & PPD front desk
50 North stairs, command door
51 Stair C, 3rd floor landing
52 Bailiff station building
53 Civil clerk window
54 2nd floor vending, lobby
55 Probation, stair B
56 Court employee entrance building
57 Stair B, Top
58 Elevator
59 Elevator
60 Elevator, jail
61 Court entrance/pay window Build2
62 PPD parking lot building
63 NA
64 Outside court entrance building
65 Front desk building
66 Stair A top building
67 Court holding area
68 Elevator outside court holding
69 Top stair of atrium
70 NA
71 Evidence Garage building
76 Top stair of atrium
Property Office building
SWAT 1 building
SWAT 2 building
SWAT3 building