Concrete Pouring Permit: Checklist
Concrete Pouring Permit: Checklist
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
DENNIS A. RAMAYAN
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS
DAGARANAO C. CASAN
Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon
First District Engineering Office
REGION X
Malaybalay City
(Date)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
DOUBARD LAGRAMA
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
BARNICK GONZALES
Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS
(Date)
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
DOUBARD LAGRAMA
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
ROMMEL D. NOCUM
Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS
CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
DENNIS A. RAMAYAN
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS
DAGARANAO C. CASAN
Project Engineer's Name & Signature
Accreditation Number