Republic of the Phillipines

Department of Public Works and Highway


OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

July 24, 2019


(Date)

CONCRETE POURING PERMIT


Name of Project 19KA0002- Off carriageway Improvement shoulder Pavinf/Construction
along Jct. SH-Bangcud-Mailag rd (By-Pass) (S00635MN) K1525+(-324)
Location to K1525+714, Malaybalay City, Bukidnon
Contractor MAFIL BUILDERS, INC.
Part of Structure to be Estimated Volume
POURING OF PCCP
Poured to be Poured
Sation Limits/Section
Date of Pouring July 26, 2019 Time of Pouring 10:00 AM
Requested by:
LORNA M. FILIPINAS
Contractor: MAFIL BUILDERS, INC./President

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
DENNIS A. RAMAYAN
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

DAGARANAO C. CASAN
Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon
First District Engineering Office
REGION X
Malaybalay City
(Date)

CONCRETE POURING PERMIT


Name of Project 20KA0097-Construction of One (1) Storey Two (2) Classroom School
Building at Apo Macote, National High Malaybalay City, Bukidnon
Location
Contractor MAFIL BUILDERS, INC.
Part of Structure to be Estimated Volume
Pouring of Footing
Poured to be Poured
Sation Limits/Section
Date of Pouring Time of Pouring 10:00 a.m
Requested by:
LORNA ,M. FILIPINAS
Contractor: MAFIL BUILDERS, INC.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
DOUBARD LAGRAMA
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Project Inspector's Name & Signature Date


REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

BARNICK GONZALES
Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

February 26, 2016


(Date)

CONCRETE POURING PERMIT


Name of Project 15KA0055 Construction of 1 Unit School Building 2-Storey, 6-
Classroom Cabulohan- Paradise NHS, Cabanglasan, Bukidnon
Location
Contractor ANGEL & SAM Const. & GEN. MDSE.
Part of Structure to be Estimated Volume
R.C. for STAIR
Poured to be Poured
Sation Limits/Section
Date of Pouring February 29, 2016 Time of Pouring 8:00 A.M.
Requested by:
Tessie B. Bulatao
Contractor: ANGEL & SAM Const. & GEN. MDSE.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

SOTERO Z. CANTIL, JR.


Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

February 17, 2016


(Date)

CONCRETE POURING PERMIT


Name of Project 15KA0055 Construction of 1 Unit School Building 2-Storey, 6-
Classroom Cabulohan- Paradise NHS, Cabanglasan, Bukidnon
Location
Contractor ANGEL & SAM Const. & GEN. MDSE.
Part of Structure to be R.C. for Second Floor Estimated Volume
Columns
Poured to be Poured
Sation Limits/Section
Date of Pouring February 19, 2016 Time of Pouring 9:00 A.M.
Requested by:
Tessie B. Bulatao
Contractor: ANGEL & SAM Const. & GEN. MDSE.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

SOTERO Z. CANTIL, JR.


Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

(Date)

CONCRETE POURING PERMIT


Name of Project 19KA0097-Construction of Multi-Purpose Building Barangay Bugcaon,
Lantapan, Bukidnon
Location
Contractor MAFIL BUILDERS, INC.
Part of Structure to be Estimated Volume
Pouring of Beam
Poured to be Poured
Sation Limits/Section
Date of Pouring Time of Pouring
Requested by:
LORNA M. FILIPINAS
Contractor: MAFIL BUILDERS, INC.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
DOUBARD LAGRAMA
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Project Inspector's Name & Signature Date


REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

ROMMEL D. NOCUM
Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

January 11, 2016


(Date)

CONCRETE POURING PERMIT


Name of Project 15KA0055 Construction of 1 Unit School Building 2-Storey, 6-
Classroom Cabulohan- Paradise NHS, Cabanglasan, Bukidnon
Location
Contractor ANGEL & SAM Const. & GEN. MDSE.
Part of Structure to be Estimated Volume
R.C. for COLUMNS
Poured to be Poured
Sation Limits/Section
Date of Pouring January 14, 2016 Time of Pouring 8:00 A.M.
Requested by:
Tessie B. Bulatao
Contractor: ANGEL & SAM Const. & GEN. MDSE.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

SOTERO Z. CANTIL, JR.


Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

January 04, 2016


(Date)

CONCRETE POURING PERMIT


Name of Project 15KA0055 Construction of 1 Unit School Building 2-Storey, 6-
Classroom Cabulohan- Paradise NHS, Cabanglasan, Bukidnon
Location
Contractor ANGEL & SAM Const. & GEN. MDSE.
Part of Structure to be Estimated Volume
R.C. for TIE BEAM
Poured to be Poured
Sation Limits/Section
Date of Pouring January 5, 2016 Time of Pouring 8:00 A.M.
Requested by:
Tessie B. Bulatao
Contractor: ANGEL & SAM Const. & GEN. MDSE.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
VF BARNICK P. GONZALES
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

SOTERO Z. CANTIL, JR.


Project Engineer's Name & Signature
Accreditation Number
Republic of the Phillipines
Department of Public Works and Highway
OFFICE OF THE DISTRICT ENGINEER
Bukidnon First District Engineering Office
City of Malaybalay

March 11, 2021


(Date)

CONCRETE POURING PERMIT


Name of Project 21KA0014-CONCRETING OF LOCAL ROAD, BRGY. CATUMBALON,
VALENCIA CITY, BUKIDNON
Location
Contractor MAFIL BUILDERS, INC.
Part of Structure to be Estimated Volume
PCCP 238.51
Poured to be Poured
Sation Limits/Section STA 0+000-0+340 L/S
Date of Pouring March 11, 2021 Time of Pouring 8:00 AM
Requested by:
LORNA M. FILIPINAS
Contractor: MAFIL BUILDERS, INC.

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder Molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbness
Finishing Tools/Equipment Quality of Materials Used (Result of Design
(screeder, broom, etc.) Trial Mix, Test Reports, etc.)
Line and Grade Alignment Lighting System
(form setting, elevations, etc.)
Required Construction Equipment Electrical Layout (Roughing-ins/Embedments)
Rebars Sizes, Spacing & Number Plumbing Layout (Roughing-ins/Embedments)
Rebars Installation Requirements Falsework Formworks Adequacy
Checked by
MARICEL L. BARDE
Materials Engineer's Name & Signature Date
REMARKS/
RECOMMENDATIONS
DENNIS A. RAMAYAN
Project Inspector's Name & Signature Date
REMARKS/
RECOMMENDATIONS

Request Approved Disapproved


REMARKS/
RECOMMENDATIONS

DAGARANAO C. CASAN
Project Engineer's Name & Signature
Accreditation Number