The document describes three types of cementing equipment used in oil and gas wells:
1) The Drillable Cementing Bushing (DCB) seals the area between the work string and liner during cementing but can be drilled out, leaving minimal material in the housing.
2) The Cementing Pack Off Coupling (POC) utilizes a polished bore receptacle seal to provide pressure integrity when sealing into the liner or tieback receptacle.
3) The Swab Cup Assembly (SWCA) uses commercially available swab cups to hold pressure when moving fluid into the well but does not require more advanced equipment and can be easily redressed in the field.
Bearings And Bearing Metals: A Treatise Dealing with Various Types of Plain Bearings, the Compositions and Properties of Bearing Metals, Methods of Insuring Proper Lubrication, and Important Factors Governing the Design of Plain Bearings
The document describes three types of cementing equipment used in oil and gas wells:
1) The Drillable Cementing Bushing (DCB) seals the area between the work string and liner during cementing but can be drilled out, leaving minimal material in the housing.
2) The Cementing Pack Off Coupling (POC) utilizes a polished bore receptacle seal to provide pressure integrity when sealing into the liner or tieback receptacle.
3) The Swab Cup Assembly (SWCA) uses commercially available swab cups to hold pressure when moving fluid into the well but does not require more advanced equipment and can be easily redressed in the field.
The document describes three types of cementing equipment used in oil and gas wells:
1) The Drillable Cementing Bushing (DCB) seals the area between the work string and liner during cementing but can be drilled out, leaving minimal material in the housing.
2) The Cementing Pack Off Coupling (POC) utilizes a polished bore receptacle seal to provide pressure integrity when sealing into the liner or tieback receptacle.
3) The Swab Cup Assembly (SWCA) uses commercially available swab cups to hold pressure when moving fluid into the well but does not require more advanced equipment and can be easily redressed in the field.
The document describes three types of cementing equipment used in oil and gas wells:
1) The Drillable Cementing Bushing (DCB) seals the area between the work string and liner during cementing but can be drilled out, leaving minimal material in the housing.
2) The Cementing Pack Off Coupling (POC) utilizes a polished bore receptacle seal to provide pressure integrity when sealing into the liner or tieback receptacle.
3) The Swab Cup Assembly (SWCA) uses commercially available swab cups to hold pressure when moving fluid into the well but does not require more advanced equipment and can be easily redressed in the field.
The Drillable Cementing Bushing FEATURES AND BENEFITS:
(DCB) performs the same func- Small piston area reduces forces tion as the Retrievable Cementing acting on work string during cir- Bushing but must be drilled out culating and cementing to achieve unrestricted access to Aluminum alloy insert for easy the liner below. Normally this seal drill out, leaves minimal material assembly is installed in a separate in housing when drilled out with housing. A polished OD slick joint full gauge bit or mill completes the assembly. Cemented insert style available in
STANDARD LINER EQUIPMENT
most sizes
C EMENTING PACK O FF C OUPLING
The Cementing Pack Off Cou- FEATURES AND BENEFITS: pling (POC) is a Polished Bore Premium PBR sealing system DCB Receptacle (PBR)-type seal for optimum pressure integrity attached to the liner setting tool. Sleeve design permits easy seal It seals into a PBR run in the liner size changes to accommodate assembly or the tieback receptacle. different seal bore IDs This seal assembly utilizes one Elastomer selection available PBR seal unit for premium pres- for compatibility with various sure integrity. Following retrieval, drilling / wellbore fluids access to the liner is unrestricted. POC
S WAB CUP A SSEMBLY
The Swab Cup Assembly (SWCA) FEATURES AND BENEFITS: is used in applications that do not Utilizes commercially available require the higher performance swab cups capability of a Retrievable Cementing Field re-dressable without Bushing, Drillable Cementing Bush- special tools ing or a Pack Off coupling. The packer API end connections allow cup assembly uses commercially easy “space out” using standard available swab cups. When assembled pup joints to the mandrel, these swab cups are designed to hold pressure in one direction only. The SWCA is run on tail pipe below the setting tool, pro- viding unrestricted access to the liner when retrieved.
Bearings And Bearing Metals: A Treatise Dealing with Various Types of Plain Bearings, the Compositions and Properties of Bearing Metals, Methods of Insuring Proper Lubrication, and Important Factors Governing the Design of Plain Bearings