GOVERNMENT OF ASSAM

Shelf of Projects

Industries and Commerce Department


Block- D, Assam Secretariat, Dispur, Guwahati - 6
Phone- 0361-2237239/40
E-mail- assamindustries2016@gmail.com
India's expressway to ASEAN
Contents

River Transport and Port Township 2

Tourism Hospitality and Wellness 26

Plastics and Petrochemicals 52

Pharmaceuticals and Medical Equipment 75

Power 79

Handloom, Textiles and Handicrafts 94

Agriculture and Food Processing


including Organic Cultivation and Bamboo 108

IT & ITeS 139

Skill Development 150

Healthcare 154

Urban Infrastructure 163

Road Infrastructure 190

Education 204

Industrial Infrastructure 220


River Transport
and Port
Township
Inland Water Transport Terminal, Karimganj

Name of Project Inland Water Transport Terminal, Karimganj

Project Location Karimganj


Approx. Project cost INR 267 crores (~ USD 41.08 million)
Focus sector Inland Water Transport
Status of approvals Pre-feasibility study for the proposed terminal to be developed on PPP mode has already been done
Connectivity Karimganj is connected by NH44. NH44 connects to NH40 and runs through Meghalaya via Shillong and
terminates at NH37 at Jorabat near Guwahati. NH44 is also connected to NH53 and thereby connects Karimganj
to Silchar and beyond to Manipur entering at Jiribam. NH53 connects with NH54 (Ext.) at Silchar, which in turn
connects with NH36 at Doboka, and NH36 in turn connects with NH37 at Nagaon. NH37 is one of the main
National Highways in Assam; it connects all the districts on the southern bank of River Brahmaputra and also to
NH31, which in turn connects Assam to West Bengal and rest of India.

The proposed site is at distance of 2 km from the Karimganj Railway Station. The Railway line is under gauge
conversion. It connects Karimganj to Badarpur and Silchar and finally intersects with the Trunk Route at
Lumding, which in turn connects it to West Bengal and beyond to rest of India.

The nearest airport is the Silchar Airport, which is ~ 86 kms away.


Project contours The development of terminal involves land development, creation of common infrastructure facilities,
port works such as quays and trestle, bank shore protection, cargo terminal infrastructure, cargo handling
equipment’s, provision of external communication networks.
Investment Develop, operate and maintain the terminal on PPP mode
Opportunities
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

3
Inland Water Transport Terminal, Nimati Ghat

Name of Project Inland Water Transport Terminal, Nimati Ghat

Project Location Nimati, Jorhat District


Approx. Project cost INR 121 crores (~ USD 18.62 million)
Focus sector Inland Water Transport
Status of approvals Pre-feasibility study for the proposed terminal to be developed on PPP mode has already been done
Connectivity Nimati Ghat is connected by MDR Jt-M-2 and Jt-M-3 to NH37, which connects all the districts of Assam on the
southern bank of river Brahmaputra in the Brahmaputra valley. Jt-M-2 further connects Nimati to SH-1, which
runs parallel to the NH37 and Nagaland Border. The SH1 has been proposed to be upgraded as a National
Highway, which will act as alternate to NH37.

The nearest Railway station is at Jorhat, ~ 15.5 kms from the proposed site. The railway line running from
Jorhat Railway station meets at the Trunk Route at Furkating and Mariani. The trunk route in turn connects it
to Guwahati and beyond to West Bengal and Rest of India.

The nearest airport is the Jorhat airport which is ~ 21 km from the proposed site
Project contours The development of terminal involves land development, creation of common infrastructure facilities,
port works such as quays and trestle, bank shore protection, cargo terminal infrastructure, cargo handling
equipment’s, provision of external communication networks.
Investment Develop, operate and maintain the terminal on PPP mode
Opportunities
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

4
Inland Water Transport Terminal, Silghat

Name of Project Inland Water Transport Terminal, Silghat

Project Location Silghat, Nagaon District


Approx. Project cost INR 127 crores (~ USD 19.54 million)
Focus sector Inland Water Transport
Status of approvals Pre-feasibility study for the proposed terminal to be developed on PPP mode has already been done
Project contours The development of terminal involves land development, creation of common infrastructure facilities,
port works such as quays and trestle, bank shore protection, cargo terminal infrastructure, cargo
handling equipment’s, provision of external communication networks.
Connectivity Silghat is connected by MDR Ng-M-16 and Ng-M-15 to NH37, which connects it to Nagaon and all
other districts of Assam on the Southern Bank. As discussed earlier NH37 is intersected by various
highways coming from the Barak Valley and the neighboring states of Nagaland and Manipur. It is also
connected by MDR Ng-M-17 to NH37 (A), which connects it to NH52 on the northern bank of River
Brahmaputra. NH52 in turn connects it to the upper and central Assam districts on the northern bank
of river Brahmaputra.

The nearest railway station is the Nagaon Railway station which is ~ 50 km from Silghat. However it is
not the trunk route.

The Guwahati Airport is located at ~ 187 km from Silghat. The nearest Airport is Tezpur Airport which
is ~ 21 km from Silghat
Investment Opportunities Develop, operate and maintain the terminal on PPP mode
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

5
Development of Greenfield Port Township - Palasbari

Name of Project Development of Greenfield Port township - Palasbari


Project Location Palasbari (Kamrup Rural District)
Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.

With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Palashbari is 15 kms away from NH 37 and 15 kms away from Guwahati Airport. Proximity to proposed IT park
and Chaygaon Industrial Growth centre makes Palashbari an ideal location for development of a new port
based township.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

6
Development of Greenfield Port township – Bogibeel

Name of Project Development of Greenfield Port township – Bogibeel

Project Location Bogibeel (Dibrugarh District)


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Bogibeel is 15 kms away from NH 37 and 50 kms away from Dibrugarh Airport. Proximity to BCPL and other
large industries make Dibrugarh an ideal location for development of a new port based township.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

7
Development of Greenfield Port Township - Jogighopa

Name of Project Development of Greenfield Port township - Jogighopa

Project Location Jogighopa (Bongaigaon District)


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Jogighopa is along NH 37 and has a railway station. It is 138 kms away from Guwahati Airport.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

8
Development of Greenfield Port Township – Kurua

Name of Project Development of Greenfield Port township – Kurua

Project Location Kurua (Darrang District)


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.

With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Kurua is 20 kms away from NH 52 and 65 kms away from Guwahati Airport. Proximity to Guwahati via ferry
and Dalgaon Industrial Growth centre makes Kurua an ideal location for development of a new port based
township.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

9
Development of Greenfield Port township - Nimati Ghat

Name of Project Development of Greenfield Port township - Nimati Ghat

Project Location Nimati Ghat (Jorhat District)


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Nimati Ghat is 15 kms away from Jorhat and 10 kms from AT Road. Nearest airport is at Jorhat which is
approximately 21 kms.

Proximity to the proposed tourist circuit of Majuli makes Nimatighat an ideal location for development of a
new port based township build around a mixed economic model primarily based on tourism.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

10
Operation of River Taxi

Name of Project Operation of River Taxis

Project Location Guwahati to North Guwahati


Darrang to Morigaon
Guwahati to Umananda
Palasbari to Sualkuchi
Guijan to Dibru Saikhowa
Bogibeel to Dhemaji
Neemati Ghat to Kamalabari
Guwahati to Sualkuchi
Dhubri
Approx. Project cost Subject to DPR preparation
Focus sector River Transport and port townships
Employment Subject to DPR
Status of approvals New Project
Project contours Concerned authority intends to further develop passenger ferry services within the State on the river Brah-
maputra and make the river an alternate means of transport for commuters as well as for tourists.
Investment Opportunities Operation and Maintenance of passenger ferries ( both smaller boats taxis carrying 1-4 passengers ,larger
ferry carrying up to 50-60 passengers) and Hovercrafts
Connectivity All the port terminals are well connected with roads.
Proposed Infrastructure Terminal facilities at River Bank at Notified ferry and hovercraft services to be developed/refurbished by
concerned authority.
Noda agency Directorate of Inland Water Transport, Assam

11
Operation of Freight Ferry

Name of Project Operation of Freight Ferry

Project Location Barpeta-Guwahati


Guwahati-North Guwahati-Kurua
Mukalmua-Guwahati
Sualkuchi-Guwahati
Chaygaon-Palasbari-Guwahati
Majuli-Nimati Ghat
Dhubri
Approx. Project cost Subject to DPR preparation

Focus sector River Transport and port townships


Employment Subject to DPR
Status of approvals New Project
Project contours Concerned authority intends to develop cargo ferry services within the State on the river Brahmaputra and
make the river an alternate and cost effective means of transport for transportation of cargo.
Investment Opportunities Operation and Maintenance of cargo ferries (both smaller cargo boats carrying 1-2 tonne freight and cargo
ferry carrying up to 10-15 tonnes) in PPP mode
Connectivity All the port terminals are well connected with roads.
Proposed Infrastructure Terminal facilities at River Bank at notified ferry services to be developed/refurbished by concerned
authority.
Noda agency Directorate of Inland Water Transport, Assam

12
Modern IWT terminal with Commercial Complex at Sonaram (Bharalumukh)

Name of Project Modern IWT terminal with Commercial Complex at Sonaram (Bharalumukh)

Project Location Bharalamukh, Kamrup (M) District, Assam


Approx. Project cost Subject to DPR preparation
Project Area 10 acres (approx.) of greenfield township development in land to be reclaimed from Brahmaputra River
Focus sector River Transport & Port Townships
Status of approvals Green Field project
Project contours The proposed project is identified based on its advantageous location to bring down the logistic costs of
transportation of goods.
As the proposed site is in a commercial location, the terminal will also serve as a Commercial hub serving the
dual purpose of transport and tourism
Investment Development of Inland Water Transport Terminal and maintain the same on PPP basis
Opportunities Terminal Building to be a multi utility building with shopping complex, hotel restaurant, gaming zone, movie
hall, modern washrooms, ATMs etc.
Terminal to be used for operation of river taxis from Guwahati to North Guwahati / Sualkuchi / Kuruwa
Provision of dredging the river near the banks should be there to maintain the required minimum depth all
throughout the year

Connectivity Bharalumukh is well connected by Major District Roads. It is located near the banks of the mighty river
Brahmaputra and is surrounded by commercial places like Fancy bazar and Pan bazar.
The nearest railway station is in Paltan bazar and Kamakhya, which is 3 kms (approx.) and 4 kms (approx.) away
from Bharalumukh.
The nearest airport is the LGBI Guwahati Airport, which is ~ 19 kms from the site.
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

13
Riverfront Development Project at Jorhat

Name of Project Riverfront Development Project at Jorhat

Project Location Near By Pass Road, Borigaon, Jorhat (Length – Approximately 1 km along Bhogdoi River)

Approx. Project cost Subject to DPR preparation


Focus sector Riverfront development, Urban Infrastructure
Status of approvals Project identified
Project contours Bhogdoi is a tributary of the River Brahmaputra and flows through Jorhat
The proposed site is adjoining to the By Pass Road
Jorhat is one of Assam’s largest towns and derives its name from two haats or bazaars – Macharhat and
Chowkihat – on either bank of the river Bhogdoi
Jorhat is also referred as Assam’s tea capital.
Investment Opportunities Project would be implemented under PPP mode to reclaim and beautify the 1 km stretch.
Envisaged features of the Project:
Restaurants
Shops
Landscaped Gardens
Walkways
Theme park
Water sports
Wellness zone with Yoga centre
Musical fountain
Solar lighting
Parking Lots
Convention Centre
Proposed Infrastructure Govt. to facilitate / support in:
Water and Electricity supply
Road connectivity / access to the proposed site
Nodal agency Urban Development Dept., Govt. of Assam

14
Development of Greenfield Port Township - Lakhipur

Name of Project Development of Greenfield Port township - Lakhipur

Project Location Lakhipur (Cachar District)


Area of the project 500 acres (approx.) of greenfield township development
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
Lakhipur town is located in Cachar district one of the three administrative districts of Barak valley. The Barak
river flows in the barak valley and with planned usage of the mighty river for logistics and transportation,
there is immense potential for developing land along the river for development of greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Lakhipur town is 36 kms away from Silchar and 31 kms away from Silchar railway station. Nearest airport is at
Silchar which is approximately 42 kms.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

15
Riverfront Development Project at Tezpur

Name of Project Riverfront Development Project at Tezpur

Project Location Tezpur (Length – Approximately 1 km along Brahmaputra River)

Approx. Project cost Subject to DPR preparation


Focus sector Riverfront development, Urban Infrastructure
Status of approvals Project identified
Project contours Tezpur is on the northern banks of the Brahmaputra.
The proposed site is located near to the Agnigarh which is one of the visiting place.
Tezpur is referred as “Cultural Capital of Assam”.
Tezpur is also known as Most Clean city of Assam.
Investment Opportunities Project would be implemented under PPP mode to reclaim and beautify the 1 km stretch.
Envisaged features of the Project:
Restaurants
Shops
Landscaped Gardens
Walkways
Theme park
Water sports
Wellness zone with Yoga centre
Musical fountain
Solar lighting
Parking Lots
Convention Centre
Proposed Infrastructure Govt. to facilitate / support in:
Water and Electricity supply
Road connectivity / access to the proposed site
Nodal agency Urban Development Dept., Govt. of Assam

16
Development of Greenfield Port Township – Silghat

Name of Project Development of Greenfield Port township – Silghat

Project Location Silghat, Nagaon, Assam


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging
of Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of
Assam. This has necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty
river for logistics and transportation, there is immense potential for developing land along the
river for development of greenfield township.
Investment Opportunities Civil work related to construction of:
River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Silghat is 12 kms away from NH 37 and 59 kms away from Tezpur Airport.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

17
Development of Greenfield Port township – Dikhoumukh

Name of Project Development of Greenfield Port township – Dikhoumukh

Project Location Dikhoumukh, Sibasagar District, Assam


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Dikhoumukh, located in Sibsagar district of Assam is 9 kms from NH 37. The nearest airport at Dibrugarh is
located 112 kms away
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

18
Development of Greenfield Port township – Sualkuchi

Name of Project Development of Greenfield Port township – Sualkuchi

Project Location Sualkuchi, Kamrup Rural, Assam


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure

Employment Direct Employment : Subject to DPR


Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Sualkuchi, located 50 kms from Guwahati is well connected with rest of Assam by road through MDR. State
Highway 02 is 15 kms from Sualkuchi. Nearest airport LGBI is 8 kms away by waterway and 50 kms by road.

Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

19
Development of Greenfield Port Township – Dhubri

Name of Project Development of Greenfield Port township – Dhubri

Project Location Dhubri, Assam


Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Approx. Project cost Subject to DPR preparation
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Dhubri, located 260 kms from Guwahati is well connected with rest of Assam by road through NH 31 and 27.
Nearest airport LGBI 248 kms by road.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

20
Operation of Hovercraft Taxis

Name of Project Operation of Hovercraft Taxis

Project Location Guwahati to Dharapur near LGBI Airport


Approx. Project cost Subject to DPR preparation
Focus sector River Transport and port townships
Employment Subject to DPR
Status of approvals New Project
Project contours Concerned authority intends to further develop passenger ferry services within the State on the river
Brahmaputra and make the river an alternate means of transport for commuters as well as for tourists.
This project shall help commuters using the LGBI airport for ease of access traveling to and from the airport.
Investment Operation of passenger hovercraft ferries (both smaller boats taxis carrying 5- 30 passengers.
Opportunities
Connectivity All the port terminals are well connected with roads.
Proposed Infrastructure Terminal facilities at River Bank at Notified ferry and hovercraft services to be developed/refurbished by
concerned authority.
Noda agency Directorate of Inland Water Transport, Assam

21
Inland Water Transport Terminal, North Guwahati

Name of Project Inland Water Transport Terminal, North Guwahati

Project Location North Guwahati, Kamrup, Assam


Approx. Project cost Subject to DPR
Focus sector River Transport & Port Township
Status of approvals New Project
Employment Subject to DPR
Connectivity North Guwahati is well connected to Guwahati and adjoining districts. NH 27 is 8 kms from the North
Guwahati. Nearest Railway station, Agyathori is 7 kms away and nearest Airport, LGBI Airport is 25 kms away
Project contours The development of terminal involves land development, creation of common infrastructure facilities,
port works such as quays and trestle, bank shore protection, cargo terminal infrastructure, cargo handling
equipment’s, provision of external communication networks.
Investment Develop, operate and maintain the terminal on PPP mode
Opportunities
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

22
Inland Water Transport Terminal, Kurua

Name of Project Inland Water Transport Terminal, Kurua

Project Location Kurua, Darrang, Assam


Approx. Project cost Subject to DPR
Focus sector River Transport & Port Township
Status of approvals New Project
Employment Subject to DPR
Connectivity Kurua is well connected to Guwahati and adjoining districts. NH 27 is 24 kms from the North
Guwahati. Nearest Railway station, Agyathori is 25 kms away and nearest Airport, LGBI Airport is 47
kms away
Project contours The development of terminal involves land development, creation of common infrastructure facilities,
port works such as quays and trestle, bank shore protection, cargo terminal infrastructure, cargo
handling equipment’s, provision of external communication networks.
Investment Opportunities Develop, operate and maintain the terminal on PPP mode
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

23
Inland Water Transport Terminal, Biswanath Ghat

Name of Project Inland Water Transport Terminal, Biswanath Ghat

Project Location Biswanath Ghat, Sonitpur District, Assam


Approx. Project cost INR 85 crores (~ USD 13.08 million)
Focus sector Inland Water Transport on NW 2 & NW 16
Status of approvals Pre-feasibility study for the proposed project to be implemented on PPP mode has already been
completed.
Connectivity Biswanath Gath is connected by the Major District Road Sn-M-12 to the National Highway NH52,
which is the major artery connecting the districts in the upper Assam region on the northern part
of River Brahmaputra. The NH52 is connected to NH31 which connects it West Bengal and rest of
India. The NH 52 is also connected to NH37 which is the main artery connecting the districts on the
southern bank of River Brahmaputra, by NH37 (A) via the Nara- Narayan bridge at Tezpur.
The nearest railway station is Helem, which is 52 kms away from Biswanath Ghat. It is close to the
route which connects to Rangiya junction, the route is currently under gauge conversion.
The nearest airport is the Tezpur Airport, which is ~ 73 kms from the site
Project contours The proposed project is identified based on its advantageous location to bring down the logistic
costs of transportation of goods from rest of India to Upper Assam and beyond substantially. Once
developed, the proposed terminal will be highly beneficial to some of the power projects coming up
in Arunachal Pradesh as well.
Investment Opportunities Develop and maintain the proposed IWT Terminal at Biswanath Ghat on PPP basis
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

24
Inland Water Transport Terminal, Dhubri

Name of Project Inland Water Transport Terminal, Dhubri

Project Location Dhubri


Approx. Project cost INR 277 crores (~ USD 42.62 million)
Focus sector Inland Water Transport on NW 2 & NW 16
Status of approvals Pre-feasibility study for the proposed project to be implemented on PPP mode has already been
completed.
Connectivity The district of Dhubri is well connected by NH31 which is one of the main arteries of National
Highways in the state of Assam connecting all the districts in lower Assam. NH31 also connects
Dhubri to West Bengal and is also connected to NH52 and NH37, thereby connecting Dhubri to the
districts in central and upper Assam on both sides of the river Brahmaputra. The town of Dhubri is
connected to NH31 by the State Highway SH28. A new National Highway has been proposed which
will connect Dhubri to NH31C directly, which in turn will connect it to West Bengal.
The District of Dhubri is well connected by Rail. The Dhubri Railway station is connected to the
Fakiragram Junction, where the line coming from Dhubri intersects with the line coming from Bengal
to Assam – which connects mainland India with Guwahati and further to Dibrugarh. Dhubri is again
well connected to the hinterland of Kokrajhar, and also to Cooch Behar and New Jalpaiguri with rail.
At present there is no airport in Dhubri as well as in the border sharing districts. The nearest airport is
the Lokpriya Gopinath International Airport at Guwahati which is ~ 238 km away
Project contours The proposed project involves construction and upgrade of quays and trestle, bank shore protection,
creation of terminal infrastructure, cargo handling infrastructure etc.
Investment Opportunities Develop and maintain the proposed IWT Terminal at Biswanath Ghat on PPP basis
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam

25
Tourism, Hospitality
and Wellness
Tourism: Destination Development

Destination Development - Resort / Tourist Lodge at Tinsukia

Name of Project Development of Resort / Tourist Lodge at Tinsukia

Project Location Dag No.12(Pt)


Village: Bezaltoli Gaon
Mouza: Roggagora
Revenue Circle: Tinsukia
Area of the project 3.33 Acres
(Vacant land in possession of Assam Tourism)
Approx. Project cost INR 33 – 40 Cr. (~USD 5.08 - 6.15 million)
Focus sector Tourism
Employment 50 - 75
Status of approvals Project identified
Project contours The land is located near the Dibru-Saikhowa National Park
It is bounded by the Brahmaputra River and Arunachal hills in the north and Dibru and Patkai hills on the south.
Largest Salix swamp forest in north east India
Dibru-Saikhowa National Park is one of the 19 biodiversity hotspots in the world
Investment Resort / Tourist Lodge in Design, Build, Operate and Transfer (DBOT) mode
Opportunities
Connectivity Mohanbari (Dibrugarh) airport is ~40 Km from the site
Nearest Railway Station is Dibrugarh railway station
Buses can be taken to the town of Tinsukia which is well connected with Dibrugarh town by NH 37
Proposed Infrastructure Tourist Reception Centre
Restaurant
Parking for visitors
Souvenirs store
3 Star Resort / tourist lodge with 100 rooms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

27
Destination Development - Resort / Hotel at Lokhra Buragaon, Chariduar, Sonitpur

Name of Project Development of Resort / Hotel at Chariduar, Sonitpur

Project Location Dag No.3


Village: Lokhra Burhagaon
Mouza: Chariduar
Revenue Circle: Chariduar
Area of the project 4.33 Acres
(Vacant land in possession of Assam Tourism)
Approx. Project cost INR 33 – 40 Cr. (~U Development SD 5.08 - 6.15 million)
Focus sector Tourism
Employment 50 - 75
Status of approvals Project identified
Project contours The site is in close proximity with the Nameri National Park
Nameri, the third National Park of Assam is located in the foothills of the Eastern Himalayas. Area is crisscrossed
by the river Jia- Bhoroli and its tributaries namely the Diji, Dinai, Doigurung, Nameri, Dikorai and Khari.
Investment Resort / Hotel in Design, Build, Operate and Transfer (DBOT) mode
Opportunities
Connectivity Tezpur airport is ~37 km from the site. Tourist buses and taxis are available from the airport
Nearest railway station is Rangapara which is 25 km from the site and connects to Guwahati.
It is near the Bomdila Highway which connects Guwahati, Nameri and Tawang (Arunachal Pradesh). Well
connected by buses from Guwahati, Tezpur and Nagaon.
Proposed Infrastructure Tourist Reception Centre
Restaurant
Parking for visitors
Souvenirs store
3 star Resort / Hotel with 100 rooms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

28
Destination Development - Resort / Hotel at Chandrapur, Kamprup (M)

Name of Project Development of Golf Resort / Hotel at Chandrapur, Kamrup (M)

Project Location Dag No.753 to 763


Village: Chandrapur
Mouza: Panbari
Revenue Circle: Chandrapur
Area of the project 60 Acres
(Vacant land in possession of Assam Tourism)
Approx. Project cost INR 312 – 330 Cr. (~US 48.00 - 50.70 million)
Focus sector Tourism
Employment 125 – 140
Status of approvals Project identified
Project contours It will be first of its kind Golf Resort in the region
The site is in close proximity with the Pobitora Wildlife sanctuary. Pobitora has a dense population of the Great
Indian one-horned rhinoceros
Investment Resort / Hotel in Design, Build, Operate and Transfer (DBOT) mode
Opportunities
Connectivity Nearest Airport is Lokpriya Gopinath Bordoloi International Airport, Brojhar, Guwahati
Nearest Railway Station is Guwahati Railway Station
Well connected to Guwahati by Road
Proposed Infrastructure Golf Course
Tourist Reception Centre
Restaurant
Cafe
Parking for visitors
Golf Carts, Gazebos and Benches
Solid Waste Management
Sewage Treatment Plant
5 star Resort / Hotel with 250 rooms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

29
Destination Development - Resort at Chandubi

Name of Project Development of Resort at Chandubi, Kamrup

Project Location Kamrup


Area of the project 5 Acres
Approx. Project cost INR 33 – 40 Cr. (~USD 5.08 - 6.15 million)
Focus sector Eco-Tourism, Adventure Sports
Employment 50 - 75
Status of approvals Project identified
Project contours Natural lake located at a distance of 64 Kms from Guwahati accessible through NH 37. 
Located at the foot of Garo hills surrounded by Assam and Meghalaya. The place is calm and peaceful covered
by deep forest, tea garden and a small villages.
Natural sightseeing and picnic spot.
Attracts sizable amount of migratory birds during winter
Investment Resort in Design, Build, Operate and Transfer (DBOT) mode
Opportunities
Connectivity Nearest Airport is Lokpriya Gopinath Bordoloi International Airport, Brojhar, Guwahati
Nearest Railway Station is Guwahati Railway Station
Well connected to Guwahati by Road
Proposed Infrastructure Tourist Reception Centre
Restaurant
Cafe
Parking for visitors
Souvenirs store
3 star Resort with 100 rooms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

30
Luxury Tourist Lodge at Amingaon, Guwahati

Name of Project Development of Luxury Tourist Lodge at Amingaon

Project Location Guwahati


Area of the project 2 Acres
Approx. Project cost INR 10.50 – 12.00 Cr. (~USD 1.62 - 1.85 million)
Focus sector Tourism
Employment 35-40
Status of approvals Project identified
Project contours Vacant piece of land near District Collector’s Office, Kamrup (Rural) at Amingaon
North Guwahati is an important tourist destaination and the gateway to the northern part of lower Assam
Investment Opportu- Ideal location for development of
nities Luxury Tourist lodge with 70 rooms
Implementation format: PPP (Land on long term lease)
Connectivity NH 31 passes through Amingaon
Nearest Airport is LGB International Airport, Borjhar, Guwahati
IIT Guwahati is at a distance of ~8 Kms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

31
Luxury Tourist Lodge at Kaliabari, Tezpur, Sonitpur

Name of Project Development of Luxury Tourist Lodge at Kaliabari

Project Location Tezpur


Area of the project 1.2 Acres
Approx. Project cost INR 7.50 - 8.00 Cr. (~USD 1.15 - 1.23 million)
Focus sector Tourism
Employment 25-30
Status of approvals Project identified
Project contours Vacant piece of land in the heart of Tezpur town
Tezpur is a historic place of medieval era and an important tourism destination of Assam.
Right from Mahabhairab Temple and Agnigarh to the Eco-Camp, the city has a lot to offer to tourists and the
adventure seekers
Investment Opportunities Ideal location for development of Tourist lodge with 50 rooms
Implementation format: PPP (Land on long term lease)
Connectivity Tezpur enjoys good connectivity with all the major places of the state. Guwahati, is about 181 km from the city
and it takes only 4 hours to reach the place, by road.
It is about 82 km from Kaziranga, 65 km from the Orang Wildlife Sanctuary and 60 km from Bhalukpung.
Tezpur Airport is ~10 km from the main town
Nearest major railway station is the Rangapara North Railway Station
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

32
Luxury Heritage Resort at Chariduar, Sonitpur

Name of Project Development of Luxury Heritage Resort at Chariduar, Sonitpur

Project Location Chariduar, Sonitpur


Area of the project 0.88 Acres
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment 20-30
Status of approvals Project identified
Project contours Land with a heritage bungalow
Investment Ideal property for development of
Opportunities Luxury Heritage Resort
Implementation format: PPP (Land on long term lease)
Connectivity Good Road connectivity to Tezpur
It is about 118 km from Kaziranga
Tezpur Airport is ~20 km from the site
Nearest major railway station is the Rangapara North Railway Station
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

33
Luxury Resort / Museum / Convention Centre at Kuthari Tea Estate, Kaliabor, Nagaon

Name of Project Luxury Resort / Museum / Convention Centre at Kuthari Tea Estate, Kaliabor, Nagaon

Project Location Nagaon


Area of the project 1.32 Acres
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment 15-20
Status of approvals Project identified
Project contours Vacant land near Kaziranga National Park
Other nearby sites:
- Bordowa – birthplace of Srimanta Sankardev
(Assamese saint-scholar, poet, playright and social-religious reformer)
- Akashiganga Waterfall
- Laokhowa Wildlife Sanctuary
- Chapanalla falls / Champawati Kunda
Investment Ideal property for development of
Opportunities Luxury Resort / Museum / Convention centre
Implementation format: PPP (Land on long term lease)
Connectivity Buses connect Nagaon with other parts of Assam
The nearest railway junction is at Chaparmukh, which is around 28 km from Nagaon
The nearest airport is Tezpur Airport. The nearest International Airport is LGB International Airport in Borjhar,
Guwahati
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

34
Luxury Tourist Lodge, Garmur, Majuli

Name of Project Luxury Tourist Lodge, Garmur, Majuli

Project Location Majuli


Area of the project 1.32 Acres
Approx. Project cost INR 7.50 - 8.00 Cr. (~USD 1.15 - 1.23 million)
Focus sector Tourism
Employment 25-30
Status of approvals Project identified
Project contours Vacant land at Garmur, Majuli
The river island district, Majuli is a unique place in the world for its cultural and natural heritage
Investment Ideal property for development of
Opportunities Tourist Lodge
Implementation format: PPP (Land on long term lease)
Connectivity Jorhat is the nearest airport to Majuli. It is connected to some of the major domestic airports.
Jorhat is the nearest road linked with Majuli.
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

35
Luxury Tourist Lodge, Sivasagar

Name of Project Luxury Tourist Lodge, Sivasagar

Project Location Sivasagar


Area of the project 0.46 Acres
Approx. Project cost INR 4.5 - 5.00 Cr. (~USD 0.69 - 0.77 million)
Focus sector Tourism
Employment 15 – 20
Status of approvals Project identified
Project contours Vacant land with an existing building
Sivasagar is a historically important place of Ahom era and a tourist place in upper Assam
Investment Opportunities Ideal property for development of Tourist Lodge
Implementation format: PPP (Land on long term lease)
Connectivity The nearest Airport is Jorhat Airport, Assam, roughly one hour drive from Sivasagar
The nearest International Airport is LGB International Airport, Borjhar Guwahati, roughly six hour drive from
the city.
The nearest Railway Station is Simalguri Railway Station which is 16 Kms from Sibsagar and is well
connected to Dibrugarh. It is also well linked with many cities of the state like Mariani, Jorhat, North
Lakhimpur, Dibrugarh and Mokokchung etc.
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

36
Tea Museum / Luxury Resort at Barbari, Dibrugarh

Name of Project Tea Museum / Luxury Resort at Barbari, Dibrugarh

Project Location Dibrugarh


Area of the project 2.66 Acres
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours Vacant land
Dibrugarh is known as Tea City of India
The place is also famous for Oil fields
Investment Opportunities Ideal property for development of Tea Museum / Luxury resort
Implementation format: PPP (Land on long term lease)
Connectivity There are regular trains from other major cities of the country to Dibrugarh
Dibrugarh is well connected to other major cities of the country via regular buses.
Dibrugarh has an operational Airport
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

37
Luxury Resort at Pobitora, Morigaon

Name of Project Luxury Resort at Pobitora, Morigaon

Project Location Pobitora, Morigaon


Area of the project 8.26 Acres
Approx. Project cost INR 33 – 40 Cr. (~USD 5.08 - 6.15 million)
Focus sector Tourism
Employment 50 – 75
Status of approvals Land being proposed
Project contours Pobitora is the nearest Wildlife sanctuary from Guwahati city
Investment Opportunities Ideal property for development of Luxury Resort with 100 rooms
Implementation format: PPP (Land on long term lease)
Connectivity Nearest Airport is Lokpriya Gopinath Bordoloi International Airport, Brojhar, Guwahati
Nearest Railway Station is Guwahati Railway Station
Well connected to Guwahati by Road
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

38
Upgradation of Kaliabhomora Island Tourist Recreational Park, Nagaon

Name of Project Upgradation of Kaliabhomora Island Tourist Recreational Park, Nagaon

Project Location Near Kaliabhomora bridge, Bhurbandha, Nagaon


Area of the project Free Hold
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours Located on the side of the highway near Kaliabor between Kaziranga and Tezpur
Existing Assets: Water sports, Restaurant, Accommodation
Investment Opportunities Upgrade with more water activities
Refurbishment works
Set up new recreational activities
Implementation format: Partnership with ATDC
Connectivity The property is on NH 37A
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

39
Upgradation of Rudra Singha Ethnic Village Resort, Sivasagar

Name of Project Upgradation of Rudra Singha Ethnic Village Resort, Sivasagar

Project Location Near Na-Pukhuri, Rudrasagar, Sivasagar


Area of the project Free Hold
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours Historical place; Na-Pukhuri was excavated by Rudra Singha
Existing Assets: 10 cottages and 1 Assam type restaurant 8 suites
Investment Opportunities Upgrade to a star category tourist resort
Refurbishment works
Set up new activities
Implementation format: Partnership with ATDC
Connectivity The nearest Airport is Jorhat Airport, Assam, roughly one hour drive from Sivasagar
The nearest International Airport is LGB International Airport, Guwahati, roughly six hour drive from the
city.
The nearest Railway Station is Simaluguri Railway Station which is 16 Kms from Sivasagar and is well
connected to Dibrugarh. It is also well linked with many cities of the state like Mariani, Jorhat, North
Lakhimpur, Dibrugarh and Mokokchung etc.
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

40
Mini Film City, Haflong, Dima Hasao

Name of Project Development of Film City at Assam

Project Location Haflong, Dima Hasao


Area of the project 50 Acres
Approx. Project cost INR 500.00 – 600.00 Cr. (~USD 76.92 – 92.31 million)
Focus sector Film Tourism
Employment More than 300
Status of approvals Land identified
Project contours Vast scenic area covering 50 Acres
The area has varied natural topography with hills, valleys, ravines, flat open spaces, natural woods and
water bodies
Investment Opportunities 30 outdoor shooting locations to be developed
Outdoor locations to be developed such as – Shopping complex, Mosque, temple, church, helipad,
playground, jail, buildings, gardens, lake, bridges, court room, hotels, club house etc.
Studios to be developed in 80,000 to 1,25,0000 sq. ft area
Make up rooms to be developed
Design Build Operate & Transfer
Connectivity Nearest airport is Silchar airport
Nearest railway station is Haflong
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

41
5-Star hotel, Samaguri, Nagaon

Name of Project Development of Five Star Hotel in Samaguri, Nagaon

Project Location Rangagora, Samaguri, Nagaon


Area of the project 6.5 Acres of Land adjacent to Food Craft Institute
Approx. Project cost INR 250.00 – 280.00 crores (~USD 38.46 – 43.08 million)
Focus sector Tourism
Employment 100-120
Status of approvals Land identified
Project contours The land is located near Rangagora, Samaguri
Various scenic spots are nearby the location
Silghat is around 50 kms from the area
Champawati Kunda a famous fall situated in Chapanala
Bordowa the birth place of Srimanta Sankardev in an hour drive by road
Investment Opportunities Tourist Reception Centre
Restaurant
Cafe
Parking for visitors
Souvenirs store
Solid Waste Management
Sewage Treatment Plant
200 Luxury rooms with state of the art amenities
Connectivity Nearest airport is LGB International Airport, Borjhar, Guwahati
Nearest railway station is at Nagaon and Haiborgaon
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

42
Amusement Park/ Rural / Ethnic Retreat, Samaguri Beel

Name of Project Amusement Park/ Rural / Ethnic Retreat, Samaguri Beel

Project Location Samaguri, Nagaon


Area of the project Beel Area spans 47 sq. km
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Area of land identified
Project contours The land is located about 16 kms to the east of Nagaon town
It is a migratory destination for migratory birds from all over the world
Various scenic spots are nearby the location
Silghat is around 50 kms from the area
Champawati Kunda a famous fall situated in Chapanala
Bordowa the birth place of Srimanta Sankardev
Investment Opportunities Paddle and House boat
Floating Restaurant
Cafeteria
Bird watchers and Watch towers
Parking for visitors
Luxury rooms with state of the art amenities
Cottages
Connectivity Nearest airport is LGB International Airport, Borjhar, Guwahati
Nearest railway station is at Nagaon and Haiborgaon
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

43
Floating Hotels/ House boats

Name of Project Floating Hotels/House Boats in Kajali Chowki (Near Mayong)

Project Location Kajali Chowki (Near Mayong)


Area of the project Water front
Approx. Project cost Subject to preparation of DPR
Focus sector Water Tourism
Employment Subject to preparation of DPR
Status of approvals Area identified
Project contours The area lies in the bank of river Brahmaputra
Various tourist spots are nearby including Mayong which is a tourist attraction spot due to its black magic
history
Investment House boats with one to five bedrooms
Opportunities Floating Restaurant
Cafeteria
Other infrastructure development
Connectivity Nearest airport is LGB International Airport, Borjhar, Guwahati
Nearest railway station is at Panbari and Digaru
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

44
Adventure Tourism - Ziplines (Tezpur, Dima Hasao, Chandrapur, Chandubi)

Name of Project Ziplines (Tezpur, Dima Hasao, Chandrapur, Chandubi)

Project Location Tezpur, Dima Hasao, Chandrapur, Chandubi


Area of the project Free hold
Approx. Project cost Subject to preparation of DPR
Focus sector Adventure Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified - DPR being prepared
Project contours Various tourist spots are nearby in Tezpur, Dima Hasao, Chandrapur and Chandubi
Investment Setting up of zip liners with adequate infrastructures in the selected areas
Opportunities
Connectivity Airports are available at Guwahati, Tezpur and Silchar
Railway stations are available at Guwahati, Tezpur, Digaru
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

45
Long Distance Cruise Liners and Speed Boats along Brahmaputra

Name of Project Long Distance Cruise Liners and Speed Boats along Brahmaputra

Project Location Kachari ghat, Guwahati


Area of the project Water front
Approx. Project cost Subject to preparation of DPR
Focus sector Adventure Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours 891 kms of NW-2 along the length of river Brahmaputra
Investment Setting up of cruise liners and speed boats along Brahmaputra on PPP mode
Opportunities
Connectivity Nearest Airport is LGB International Airport, Borjhar, Guwahati
Nearest Railway station is Guwahati
Nearest Inland Water Terminal is Pandu, 5kms from proposed site
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

46
Wellness Zone, Kaliabor

Name of Project Wellness Zone at Kaliabor (15 Bighas near Bridge)

Project Location Kaliabor, Nagaon


Area of the project 5 Acres
Approx. Project cost Subject to preparation of DPR
Focus sector Wellness Tourism
Employment 35-40
Status of approvals Land identified
Project contours Vacant land at kaliabor
Other nearby sites:
- Bordowa – birthplace of Srimanta Sankardev (Assamese saint-scholar, poet, playright and social-religious
reformer)
- Akashiganga Waterfall
- Laokhowa Wildlife Sanctuary
- Chapanalla falls / Champawati Kunda
Investment Ideal property for development o Wellness zone/ resort
Opportunities Implementation format: PPP (Land on long term lease)
Connectivity Buses connect Nagaon with other parts of Assam
The nearest railway junction is at Chaparmukh, which is around 28 km from Nagaon
The nearest airport is Tezpur Airport. The nearest International Airport is LGB International Airport in Guwahati
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

47
Wayside Amenity Centres – Dibrugarh

Name of Project Wayside Amenity Centre Development at:


Khowang
Rajmai, Moran

Project Location Dibrugarh Cluster


Area of the project Khowang | Land area: 1.33 Acre
Rajmai, Moran | Land area: 1.33 Acre
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project Identified
Project contours Investor to develop both the Wayside Amenity Centres in the Cluster
Dibrugarh is famous for its oil and tea industries. The headquarters of the Oil India Ltd. is located at Duliajan,
which is at a distance of around 50 km from Dibrugarh town. Dibrugarh is also known for 2 large industries –
Fertilizer Corporation of India and Assam Petro Chemicals Ltd.

Investment Design, Develop, Operate and Transfer Star Category Wayside Amenity Centres
Opportunities Refurbishment of existing properties
Connectivity NH 31 connects all these districts to Guwahati
Dhamalgaon, Moranhat,Dibrugarh railway station, Dibrugarh Town railway station and Safrai railway station
are close to Khowang and Rajmai.
Dibrugarh Airport is the nearest airport.

Proposed Infrastructure Star Category Wayside Amenity Centre with


- washrooms and bathing areas with modern fittings
- drinking water facility
- multi utility shops
- rest area for drivers
- restaurant
- adequate parking facility
Refurbishment of existing interiors and rooms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

48
Wayside Amenity Centres - Sonitpur

Name of Project Wayside Amenity Centre Development at:


Gohpur
Biswanath Chariali
Dhekiajuli

Project Location Sonitpur Cluster


Area of the project Gohpur | Land area: 0.33 Acre
Biswanath Chariali | Land area: 1 Acre
Dhekiajuli | Land area: 0.33 Acre
Approx. Project Subject to preparation of DPR
cost
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours Investor to develop 4 Wayside Amenity Centres in the Cluster
Assam Valley School, Tezpur University and Darrang College are famous institutions in the
district which attracts students from across Assam and other NE states
Investment Design, Develop, Operate and Transfer Star Category Wayside Amenity Centres
Opportunities Refurbishment of existing properties
Connectivity The district headquarters are located at Tezpur. Distance from Dispur is 198 km and 181 Km
respectively via Nagaon and via Mangaldoi.
Nearest Airport is Lokpriya Gopinath Bordoloi International Airport which is approximately
133 kms from Sonitpur
Nearest Railway Stations are at Jakhalabandha and Amoni
Proposed Star Category Wayside Amenity Centre with
Infrastructure - washrooms and bathing areas with modern fittings
- drinking water facility
- multi utility shops
- rest area for drivers
- restaurant
- adequate parking facility
Refurbishment of existing interiors and rooms
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

49
Development / Conversion of existing properties into Star Category Hotels / Resorts:
Kaziranga Cluster
Name of Project Development of Star category Hotels / Resorts in the Kaziranga Cluster
Project Location Hotels / Lodges and Resorts near Kaziranga National Park:
Agaratoli, Kaziranga
Aranya Tourist Lodge, Kaziranga
Bonani Tourist Lodge, Kaziranga
Banashree Tourist Lodge, Kaziranga
Kunjabon Tourist Lodge, Kaziranga
Prashaanti Tourism Cottages, Kohora, Kaziranga
Reception Centre at Kaziranga (Jonaki Kareng)
Area of the project Agaratoli, Kaziranga
Land: Freehold - ~11520 sq. ft.
Building: 6 cottages, restaurant, 2 –dormitory rooms, staff block
Aranya Tourist Lodge, Kaziranga
Land: Free Hold – 3.33 Acre
Building: Lodge (Building: RCC (G+2)), 3 Cottages, Facilities: Rooms-29 (deluxe-10, Standard-12,
cottages-6, suite-1), Restaurant, Bar, Conference Hall, souvenir shop etc.
Bonani Tourist Lodge, Kaziranga
Land: Free Hold – 0.33 Acre
Building: Duplex Assam type house
Banashree Tourist Lodge, Kaziranga
Land: Free Hold – 0.67 Acre
Building: Assam type building
Kunjabon Tourist Lodge, Kaziranga
Land:Free Hold – 1 Acre
Building: Assam type building
Facilities: Dormitory
Prashaanti Tourism Cottages, Kohora, Kaziranga
Land: 0.67 Acre Free Hold
Facilities: Cottages, Facilities- 6 cottages, restaurant, 2 –dormitory rooms, staff block
Reception Centre at Kaziranga (Jonaki Kareng)
Land: 8640 sq. ft.
Building: Cottages,
Facilities: 6 cottages, restaurant, 2 –dormitory rooms, staff block
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours Kaziranga National Park attracts thousands of tourists every year
Investor to develop all 7 Properties in the Cluster
Investment Develop all the properties to Star Category properties
Opportunities Refurbishment of existing rooms and interior
Facilities for conducted tours

Implementation format: JV / Partnership


Connectivity All the properties are on NH-37
Nearest Airports are at Guwahati and Jorhat
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

50
Development/Conversion of existing properties in Star Category Hotels/Resorts:
Kamrup (M), Kamrup (R) and Morigaon Cluster

Name of Project Development of Star category Hotels / Resorts in the Kamrup (M), Kamrup (R) and Morigaon Cluster

Project Location Prashaanti Tourist Lodge, Guwahati


Prashaanti Tourist Lodge, Pabitara
Prashaanti Tourist Lodge, Kamakhya
Prashaanti Tourist Lodge, Hajo

Area of the project Prashaanti Tourist Lodge, Guwahati


Land: Free Hold – 0.83 Acre
Building: 1 RCC (G+5 storied) building
Facilities: AC Room – 13, Non AC Room – 14, Bar & Restaurant, Conference Hall, space for PCO, shop etc.
Prashaanti Tourist Lodge, Pabitara
Land: Free Hold – 5 Acres
Building: 2 RCC buildings (163sqm) and 1 new building to be built
Facilities: Rooms 10 nos., Bar, Restaurant, Conference Hall 2 nos.
Prashaanti Tourist Lodge, Kamakhya
Land: Free Hold – 0.67 Acre
Building: RCC (G+2), 2 twin cottage
Facilities: 7 rooms, cottage, kitchen, dining, multipurpose hall
Prashaanti Tourist Lodge, Hajo
Land: Free Hold – 0.67 Acre (2 Acres with water body)
Facilities: 3- cottages & restaurant block
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours All locations attract thousands of tourists every year
Investor to develop all 4 Properties in the Cluster
Investment Develop all the properties to Star Category properties
Opportunities Refurbishment of existing rooms and interior
Facilities for conducted tours

Implementation format: JV / Partnership


Connectivity 2 properties are in Guwahati, Pobitara is ~50 km from Guwahati and Hajo is ~30 km from Guwahati.
Nearest Airport is Lokpriya Gopinath Bordoloi International Airport, Guwahati
Nearest railway station is Guwahati Railway Station
Nodal agency Assam Tourism Development Corporation Ltd. (ATDC)

51
Plastics
and
Petrochemicals
Plastic Park at Gelapukuri, Tinsukia

Name of Project Assam Plastic Park

Project Location Gelapukhuri, Tinsukia, Assam


Area of the project 173 Acres
Approx. Project cost INR 250 crores (~USD 38.46mn)
Focus sector Plastics
Employment Direct Employment : Approx. 1000 nos
Status of approvals Approved by State Government
Project contours The park is situated approx 50 km away from Bramhmaputra Crackers and Polymers Ltd. (BCPL), the source of
Raw Material (HDPE/LLDPE-220000 MT and Polypropylene-60000 MT)
It is expected to provide integrated infrastructure for making value added products like woven sacks, plastic
pipes, injection moulded components, films, pouches, packaging products and other consumer plastic
products. The project site will also include supporting infrastructures such as training institutes, research
facilities and testing centres.
Investment Opportunities include investment in injection moulding, blow & roto moulding and extrusion moulding
Opportunities facilities.
Connectivity The site is 2 km form NH-37
Nearest railway station is at Tinsukia, 5 kms away from the site
Nearest Airport is located 40 kms away at Dibrugarh.
Proposed Infrastructure Developed Plots – 250000 Sq. M. (Area Range- 2000sqm to 20000 sqm)
Industrial sheds- 10 Nos. ( 1800 Sq. ft, with Open Space- 3000 Sq. ft. each)
Internal roads – 3.5 Km, Ware houses – 2 Nos. (3000 Sq. ft. each)
Water supply system, Electrical Sub-station 10 MVA with provision to expand upto 20MVA, Internal Drainage
system, Street Lighting facilities & Internal distribution network, Proposed Common Facility Centre- (Office,
Tool room, Quality Control Lab, Training Hall, Business Centre, Conference Hall), Proposed Service Apartment
and Solid Waste Management, Commitment of required water from Water Resources Department, Assam

Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

53
Chemical Hub, Chandrapur

Name of Project Chemical Hub

Project Location Chandrapur, Kamrup


Area of the project 51 acres
Approx. Project cost INR 72.67 crores (~USD 11.18mn)
Focus sector Downstream and Specialty Chemicals
Status of approvals Pre-feasibility for the hub has already been prepared and approved by competent authority
Project contours There exists significant potential to add value by promoting end user petrochemical industries in Assam.
There already exist petrochemical industries based on PVC, HDPE, LLDPE & Polypropylene products which have
experienced impressive growth trends in the past
Assam has four refineries and together they produced 146 TMT and 259 TMT of LPG and Naphtha respectively
in 2012 – 13.
There is a demand for organic chemicals in the Indian domestic market
Strong demand for cosmetics in India and Demand for chemicals from neighbouring countries such as Bhutan
Investment and Bangladesh
Opportunities
Downstream units of petro chemicals using the feedstock available locally
Connectivity Chandrapur is well connected by SH3, which runs from Narengi to Nagaon where it intersects NH37. SH3B also
connects SH3 to NH37 at Chamtapathar
The rail connects the proposed site to West Bengal and beyond to the rest of India towards west. Towards east,
the trunk route connects Chandrapur to Dibrugarh
The nearest airport is the Lokpriya Gopinath Bordoloi International Airport at Guwahati which is at a distance of
~ 42 km from Chandrapur.
The nearest IWT Terminal is at Pandu, which is at a distance of ~ 31 km from Chandrapur

Proposed Infrastructure The nearest IWT Terminal is at Pandu, which is ~ 31 km from Chandrapur in addition to the 60MW power plant
nearby
Adequate water will be made available from ground and surface to meet the needs of the units in the proposed
park
The state gas company will extend the existing pipe line to the proposed site
Private as well as public telecom service providers provide extensive service in this region
Nodal agency Assam Industrial Development Corporation (AIDC)

54
Manufacturing of Disposable Syringes

Name of Project Facility for Manufacturing of Disposable Syringes

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 10,000-12,000 sq ft
Approx. Project cost Total cost for Machinery & Mould: INR 133-172 lakh
1ml syringe :INR 71 – 94 lakh
2ml syringe :INR 81– 101 lakh
5ml syringe :INR 83 – 105 lakh
Project Scale Capacity production per annum with 3 shifts per day
1 ml syringe - 2,53,44,000 pieces
2 ml syringe -2,11,20,000 pieces
5 ml syringe - 1,90,08,000 pieces
Process Flow Chart

Tube by Injection Piston by Injection


Moulding Moulding Machine

Rubber

Assembling and
Finishing

Sterilization

Packing and
Dispatching
Manufacturing Process
Disposable syringes are moulded using Injection moulding machines and special Hot-Runner moulds,
having 16 – 32 cavity mould.
Polypropylene (PP), from Assam Gas Cracker Project (AGCP), is the raw material required for Injection
Moulding Grade.
Moulding is carried out in chilled condition to get better clarity of the PP used.
The moulded syringes are then assembled with the rubber.
The whole assembly is then sterilized in sterilization plant using ethylene oxide.
The completed syringe is then blister packed in automatic packing machine.
Utilities Electricity (connected Load) : Approximately 88 kW
80 litre/min Water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 21 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

55
Manufacturing of Plastic Crates

Name of Project Facility for Manufacturing of Plastic Crates


Project Location Gelapukhuri, Tinsukia, Assam
Area Requirement 15,000 – 20,000 sq ft (Bakery and Dairy Crate)
20,000- 25,000 sq ft ( Fishery Crate)
Approx. Project cost Total cost :
Machinery and Mould cost for Bakery Crate (20 L) and Dairy Crate (10-12L) : INR 106-125 lakh
Machinery and Mould cost for Fishery Crate (80L): INR 126-157 lakh
Project Scale Capacity: Production capacity per day @ 120 sec for single crate, for 22 hours)
Bakery Crate: 1,98,000 Components ( annually -300 days)
Dairy Crate: 1,98,000 Components ( annually -300 days)
Production Capacity per day for Fishery Crate @140 seconds for single crate, for 22 hours
Fishery Crate: 1,69,500 Components ( annually -300 days)
Process Process Flow Chart
PP + Colourant (Opotional)

Fixing of Mound in Machine

Injection of Molten PP material into the mould

Cooling and Opening of Mould

Ejection of Component & Packing


Manufacturing Process
In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper,
plasticized by heating and then injected under pressure into a cold mould, where it sets and is then ejected
as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process
Finishing of the moulded product

Utilities For Bakery & Diary Crates


Electricity (Connected Load) 97 kW
Water about 150 litre/min
For Fishery Crates
Electricity (Connected Load): 173 kW
Water about 200 litre/min

Water will be circulated through fixed tank capacity is 15,000-20,000 litre


Manpower Requirement 13 workers for 1 shift
Nodal Agency Assam Industrial Development Corporation (AIDC)

56
Manufacturing of Armed Chair and Armless Chair

Name of Project Facility for Manufacturing of Armed Chair and Armless Chair

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement Armed Chair: 25,000-30,000 sq ft
Armless Chair:20,000-25000 sq ft
Approx. Project cost Armed Chair: INR 177-214 lakh
Armless Chair: INR 141-178 lakh
Project Scale Production Capacity per day per single cavity for 22 hours:
Armed Chair: @65 sec per single cavity -1,220 pieces
Armless Chair @50 sec per single cavity -1,584 pieces
Process In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper,
plasticized by heating and then injected under pressure into a cold mould, where it sets and is then
ejected as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process.
Finishing of the moulded product.

Note: The manufacturing process for both Armed Chair and Armless chair is the same.
Utilities Armed Chair
Electricity (connected Load): 223KW
Water: About 200 litre/min
Armless Chair
Electricity (connected Load): 84 KW
Water: About 200 litre/min
Water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 11 workers for Armed Chair
17 workers for Armless Chair
Nodal Agency Assam Industrial Development Corporation (AIDC)

57
Manufacturing of Rocking Chairs

Name of Project Facility for Manufacturing of Rocking Chairs

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 10,000-15,000 sq ft
Approx. Project cost INR 112-170 lakh
Project Scale Production Capacity per day: @120 sec for single cavity for 22 hours:660 pieces
Process Manufacturing Process
In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper,
plasticized by heating and then injected under pressure into a cold mould, where it sets and is then ejected
as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process.
Finishing of the moulded product.

Utilities Electricity ( connected Load) : Approximately 148 KW


150 litre/min Water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 14 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

58
Manufacturing of Battery Case

Name of Project Facility for Manufacturing of Battery Case

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement Land required :
1,110 Gram Battery Box: 15,000- 20,000 sq ft
1,500 Gram Battery Box: 12,000- 15,000 sq ft
2,000 Gram Battery Box : 15,000-20,000 sq ft
Approx. Project cost Total cost ( Machinery and Mould ):
1,110 Gram Battery Box: ~INR 114-140 lakh
1,500 Gram Battery Box: ~INR 124-150 lakh
2,000 Gram Battery Box: ~INR 150-176 lakh
Project Scale Capacity: Production capacity per day for 22 hours:
1,110 Gram Battery Box : a.1,760 pieces @45 seconds for 1 litre Battery case b.3,168 pieces @25 seconds for single
Battery Lid
1,500 Gram Battery Box: a. 1,320@60 seconds for single Battery case b. 3,168 pieces @25 seconds for single Battery
Lid
2,000 Gram Battery Box: a. 1,056 pieces @75 seconds for single Battery case b. 3,168 pieces @25 seconds for single
Battery Lid
Process Manufacturing Process
PP is fed into the hopper of the injection moulding machine
The mould is held between the two platens which are kept closed by the locking pressure. Prior to mould closure,
the metal insert is skilfully kept in the mould.
The material which gets plasticized in the barrel is injected under higher pressure into the Mould which results in
a moulded article i.e. Battery Lid with Metal Insert. On similar terms, a Battery Case is also manufactured, but with
or without rim, depending upon the mould.
The Battery Case is then finished by removing the injection feed etc.
The second stage processing operations such as printing, labelling are carried out on the Battery housing.

Utilities 1,110 Gram Battery Box


Electricity ( connected Load) : 150 KW
Water: 100 litre/min.
1,500 Gram Battery Box
Electricity ( connected Load): 155 KW
Water: 100 litre/min
2000 Gram Battery Box
Electricity ( connected Load): 165 KW
Water: 100 litre/min
Water will be circulated through fixed tank capacity is 15,000-20,000 liter
Manpower Requirement 1,110 Gram Battery Box - 13 workers
1,500 Gram Battery Box - 13 workers
2,000 Gram Battery Box -13 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

59
Manufacturing of Tooth Brushes

Name of Project Facility for Manufacturing of Tooth Brushes

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 8,000 – 10,000 sq ft
Approx. Project cost INR 91-115 lakh
Project Scale Capacity: Production capacity per day @20 sec for 16 cavity mould for 22 hours: 63,360 pieces
Process Manufacturing Process
Generally, toothbrushes consist of plastic handles and nylon bristles.

Moulding the tooth brush handles using Injection moulding Machine

Bristle fixing using filling machine

Trimming the bristles

Packing the tooth brushes

Utilities Electricity ( connected Load) : ~ 89 kW


Water :100 litre/min water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 14 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

60
Manufacturing of Lunch Boxes

Name of Project Facility for Manufacturing Lunch Boxes

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 8000 -10,000 sq ft
Approx. Project cost INR 62-82 lakh
Project Scale Production capacity per day @25 seconds for single lunch box for 22 hours: 3,168 pieces
Process Manufacturing Process
In this injection moulding process, the cold, hard plastic material is loaded into the machine via
hopper, plasticized by heating and then injected under pressure into a cold mould, where it sets and is
then ejected as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process.
Finishing of the moulded product.

Utilities Electricity ( connected Load) : ~72 KW


Water: 80 litre/min water will be circulated through fixed tank capacity is 15,000-20,000 Litres
Manpower Requirement 10 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

61
Manufacturing of Buckets

Name of Project Facility for Manufacturing of Buckets

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 12,000-15,000 sq ft
Approx. Project cost for 5L Bucket: (Machinery &Mould ) : ~INR 49-59 Lakhs
for 10 L Bucket ( Machinery & Mould ): ~INR 49-61 Lakh
for 5L & 10 L Bucket (Machinery & Mould) : ~INR 51-65 lakh
Project Scale Capacity: Production Capacity per day for 22 hours
5L buckets 11,88,000 pieces per annum
10 L buckets 9,40,400 pieces per annum
Process Manufacturing Process
In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper,
plasticized by heating and then injected under pressure into a cold mould, where it sets and is then eject-
ed as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process.
Finishing of the moulded product.

Utilities Electricity ( connected Load) : 93 KW


Water: 130 litre/min water will be circulated through fixed tank capacity is 15,000- 20,000 litre
Manpower Requirement 16 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

62
Manufacturing of Caps & Closures

Name of Project Facility for Manufacturing of Caps & Closures

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 5,000-8,000 sq ft
Approx. Project cost INR 78-97 lakh
Project Scale Production capacity per day ( for 16 cavity mould, for 22 hours)
Bottle Cap (without rubber liner) : 63,360 pieces @20 seconds
Bottle Cap ( with rubber liner) : 50,688 pieces @25 seconds
Process Manufacturing Process
In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper,
plasticized by heating and then injected under pressure into a cold mould, where it sets and is then eject-
ed as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process.
Finishing of the moulded product.

Utilities Electricity: 107 KW


Water: 150 litre/min water will be circulated through fixed tank capacity is 15,000 -20,000 litre
Manpower Requirement 13 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

63
Manufacturing of Combs

Name of Project Facility for Manufacturing of Combs

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 6,000-8,000 sq ft
Approx. Project cost INR 58-72 Lakhs
Project Scale Production Capacity per day @ 20 seconds for 16 cavity mould for 22 hours: 63,360 pieces
Process In this injection moulding process, the cold, hard plastic material is loaded into the machine via hopper,
plasticized by heating and then injected under pressure into a cold mould, where it sets and is then ejected
as the finished products.
The three successive main stages that are followed in the procedure of manufacturing
Feeding of PP raw material into the hopper
Injection moulding process.
Finishing of the moulded product.

Utilities Electricity : 72KW


Water: 80 Litre/min water will be circulated through fixed tank capacity is 15,000-20,000 lit
Manpower Requirement 9 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

64
Manufacturing of Woven Sack
Name of Project Facility for Manufacturing of Woven Sack
Project Location Gelapukhuri, Tinsukia, Assam
Area Requirement 60,000-70,00 sq ft
Approx. Project cost INR 144 lakh
Project Scale Machine output rate : 110 kg/hr
Process

Rafia Tape of PP is first produced by extruder, which is equipped with a suitable die, cooling ring,
temperature and process controls etc. From the extruder, the tape is taken off by a set of rollers.
The tape then goes to a slitting unit where it slits into tapes of 6 to 12 mm width depending upon
the requirements. The tapes thus made are conveyed to stretching orientation oven in which hot air
circulates at controlled temperature. The tapes are stretched to the desired level.
The oriented tapes are passed through a second godet station and then through the stabilizing oven.
The stabilized tapes are passed through a third gadget station and then to a cheese winder unit where
each tape is wound on a separate cheese.
The monoaxially oriented tapes of PP produced are woven into fabrics in circular looms. The necessary
working machine and prim winders are provided. The woven fabric can then be stitched into bags
in an industrial stitching machine. After converting the fabric into bags, it is printed with suitable ink
wherever necessary
For some cases laminated woven sacks are used. For packaging of fertilizers, it is necessary to
laminate the fabric before making it into bags. Whereas, in woven sacks, for cement packaging,
lamination is not required.
Utilities Power consumption: 3.7 KW-Phase 415V 50 Hz
Power requirement :
Tape line: 48 KW
Cheese winder : 4KWx 120=5.4 KW
Circular Loom: 4 KW x12=48 KW
Stitching and cutting machine: 5KW
Water Cooling tower: 8 KW
Air Compressor 3HP: 5 KW
Manpower Requirement 38 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

65
Manufacturing of Woven Jumbo Bag/ Flexible Intermediate Bulk Containers
Name of Project Facility for Manufacturing of Woven Jumbo Bag/Flexible Intermediate Bulk Containers
Project Location Gelapukhuri, Tinsukia, Assam
Area Requirement 35,000-40,000 sq ft
Approx. Project cost Machinery Cost : INR 685-720 lakh
Project Scale Machine Output : 500kg/hr
Process Manufacturing Process
Production of FIBC involves the conversion of PP Granules to long tapes and later woven, cut to size, printed
and stitched to be used. The step wise production process is explained below.
Extrusion
Here the mix of virgin and recycled PP(optional) granules are being melted and converted into form of tapes
in a extrusion plant and at the end of the process are wound on bobbins of required size. This is the first
stage of process which determines the tensile strength of the tape.
Weaving
Extruded tape bobbins will be loaded in the Circular weaving machine or Flat weaving machine. Here the
tapes will be woven to fabric of required specification and will be wound in roll form. These fabrics will be-
come the body fabric of the FIBC.
Lamination (Optional)
PP fabric is being laminated with LDPE film for making the fabric moisture proof. This is optional process as
per the requirement of the customer.
Cutting
The woven PP fabric in rolls will be fed in the automatic cutting machine and will be cut in to cut bit of re-
quired size. This Automatic process is adopted to get better accuracy in cut size.
Printing
The cut bits that are the body fabric will be fed into the heavy duty printing machine to make the printing
impression on the fabric. Heavy duty printing machine, gives the best impression with maximum of three
colours.
Webbing
Heavier Polypropylene Tapes are woven in to webbing which forms the lifting loop of the Jumbo bag.
Sewing
Here all the components used to manufacture Jumbo bags are brought together along with the printed
body fabric. All the gathered parts are assembled to a Jumbo bag by highly skilled labours under the super-
vision of technically qualified supervisors.
Packing / Bailing
Here the bags which have been produced will be compressed with the help of the bale press and neatly
packed as per the requirement of the customers.
Storage
Once the bag is baled, it will be immediately shifted to a clean storage room, from where the dispatches are
affected.
Utilities Tape Extrusion Line:
Compressor: Capacity Pressure-165 CFM, 6-7 bar, Separate air tank of capacity 1,000 litres is recommended
for tape line & winders (excluding tape guns
Air Drying Unit: Capacity 165 CFM, Pressure 6-7 bar, Dew point 3 degree Centigrade
Chilled War Requirement: Process Requirement 58 TR, flow rate: 42,686 L/hr, Intel Temp: 18 degree centi-
grade
Water pressure: 4 bar
Filament/Tape Winder : Three phase voltage with mains supply of 3X 415 V/50 Hz or 3X 415V/50 Hz or
3X420V/50 Hz with separate neutral and earth Admissible fluctuations
Voltage- 10% to +5%
Frequency : +/- 2%
Manpower Requirement 38 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

66
Manufacturing of Non-Woven Fabric

Name of Project Facility for Manufacturing of Non-Woven Fabric

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 30,000- 40,000 sq ft
Approx. Project cost Machinery cost : INR 370-400 lakh
Project Scale Machinery Output: 375 Kg/hr
Process Manufacturing Process
The mix of virgin and recycled PP granules (optional) along with additives and colour are fed to the
extruder. The molten PP is fed to a spinning die via a filter and measuring pump. After this step the
fibres are passed through the orientation zone for stretching to get the required tensile strength.
The fibres are spread /arranged to form the web and then hot rolled to form the fabric. The thickness
and weight of fabric will depend on the quantity of fibre that are used to form the web.
The fabric thus formed is trimmed/silted on the sides and wound on a winder to get the roll.
Utilities Electricity Connected Load: 455 KW
Cooling Tower : 80 T/hr
Manpower Requirement 29 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

67
Manufacturing of Blown Film (BOPP)

Name of Project Facility for Manufacturing of Blown Film (BOPP)

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 15,000- 20,000 sq ft
Approx. Project cost Extruder: 40mm: INR 25-30 lakh
65mm :INR 45-50 lakh
Project Scale Capacity :Machine output rate: 15-20 Kg/hr
Process Manufacturing
• Extruder
• Die Head
• Bubble
• Cooling system
• Nip Roller
• Collapsible Frame
• Winder
• Corona discharge

Process
PP is first melted by subjecting it to heat and pressure inside the barrel of an extruder and finally forcing the melt
through a narrow slit in a circular die. The resulting thin film has a form of a tube, also called a “bubble” (blown
film). As the film comes out of the die, it is cooled and then rolled up on a core.
Air is introduced in the center of die to blow up the tube like a balloon.
Air ring blows onto the hot film to cool it from inside and outside of the tube.
The tube passes through nip rolls where it is flattened.
Collapsed tube is taken back down the extrusion tower via more idler rollers.
On winder the tube or film is wound into rolls.
Utilities Power Requirement: 40 mm dia: 30 KW
65mm dia : 50 KW
Manpower Requirement 14 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

68
Manufacturing of Box Strap

Name of Project Facility for Manufacturing of Box Strap

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 5000 to 8000 Sq.ft
Approx. Project cost INR 30-40 lakh
Project Scale Machine Output Rate: 65Kg/hr
Process PP homo-polymer along with colorant and reprocessed material is fed into the hopper of the extruder
which was present with the processing temperature.
Extruder started and molten material passes through the die. The molten strap so produced is
quenched in the water tank.
The strap is then fed to the first godet unit for pulling the strap.
The strap is then fed to the hot water tank for heating the strap in order to make it stretchable .The hot
strap is pulled by stretching godet unit.
The stretched strap is then passed through the stabilizing hot air oven for maintaining the temperature
to get proper orientation and the strength. It is then cooled by pulling through a cold water tank with
the help of last godet unit.
The final strap so obtained is checked for its properties and processing parameters are set for the right
process, which gives the required properties.
The strap is then wound on to bobbins and rolls of marketable lengths are packed and shipped
Utilities Power: 3-phase 440V+10% 50 Hz +_ 5%
Electricity Connected Load : 133 KW
Electric Running Load : 80 KW
Water cooling Tower: 10 TR
Water Recirculation System : 2 HP Pump and Related Piping Arrangement
Manpower Requirement 14 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

69
Manufacturing of Ropes

Name of Project Facility for Manufacturing of Ropes

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 50,000 to 60,000 sq ft
Approx. Project cost INR 290-310 lakh
Project Scale Production Capacity
6 mm: 30 kg/hr
8 mm: 60 kg/hr
10 mm: 170 kg/hr
12 mm: 175 kg/hr
Process

Extrusion process for getting pp yarns

Ring Extruder
Twister Twister

Rope Making Machine - Rope Making Machine -


2 mm to 3.5 mm 4mm to 20 Mm

Packing & Dispatch

Manufacturing Process
Extrusion
Plastic granules are extruded and monofilament is produced from the die-head and drawn in water bath
and subsequently dried by hot air as well as stretched
Yarn Twister
Ring twisters are used to twist the bunched strands for 2 mm to 3.5 mm ropes for getting higher outputs
Extruder twisters are used for twisting the yarns for 4 mm and above rope sizes.
The twisted yarns are converted into rope by a combined strander/ rope making
Machine and coiling in one single operation. The resulting rope is wound into a bundle and packed.
Utilities Electricity: 197 KW
Manpower Requirement 36 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

70
Manufacturing of Fishing Net

Name of Project Facility for Manufacturing of Fishing Net

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 15,000-20,000 sq ft
Approx. Project cost INR 60-80 lakh
Machine Output : 150 Kg/hr
Project Scale Production Capacity per day @ 100 Kg/hr, for 22 h, 2,200 Kg
Process Manufacturing Process
The fishnet twine or yarn is available in bobbins. This yarn is loaded on to the creel stand of the fishnet
machine. The same type of yarn is also filled into spool by means of spool winder machine. The filled spools
are then loaded into the machine.
Yarn on creel stand forms the warp.
Yarn on the spool forms the weft.
The fish net making machine knots these together and the net is produced. This is wound on to a roller.
When net of predetermined length is produced it is cut. The net is then unwound from the roller. It is then
checked for any breakage of yarn on a mending stand. Any breakage found is mended/ rectified by hand.
The net is then washed in tank.
It is then stretched lengthwise in a length stretching machine. Here the net is heated to about 120 to 150
0C and ironed to fix the knots. The net is then bundled on a bundling machine, weighted and then packed.
Utilities Power: 3-Phase 440V +10% , 50 Hz, 75 Hz
Electricity (small) connected load : 2.2 KW
Electricity (Large) connected load: 3.75 KW
Manpower Requirement 19 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

71
Manufacturing of PPR Pipes

Name of Project Facility for Manufacturing of PPR Pipes

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 30,000-35,000 sq ft
Approx. Project cost INR 50-68 lakh
Project Scale Production capacity per day @100 Kg/hr for 22 hours- 2,200 Kg.
Process Material is fed to the extruder hopper either automatically or manually.
Start the extruder and increase the speed to get the required thickness and adjust the temperature
of extruder barrel to get proper melting and homogeneity of pipe molten material. Feed the molten
material to the calibrator fitted to the vacuum tank.
Hook the pipe to the lead line and start the haul off. Set the haul off speed to control the pipe
thickness and vacuum. Adjust vacuum of vac. Tank to get proper roundness, smoothness of pipe
surface.
Set the length of pipe to be cut and cutter cuts the pipe after sensing the length set automatically.
The printer is set on the pipe to print the pipe details on the pipe. The cut pipes are collected and
bundled

PP-R Raw Colouring

Extrusion

Sizing/Calibration unit

Cooling

Printing

Haul-off

Cutting

Stacking

Utilities Electricity: Approximately 120 KW, 3 Phase 440 V+10% 50 Hz


Manpower Requirement 13 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

72
Manufacturing of Blow Moulding Containers

Name of Project Facility for Manufacturing of Blow Moulding Containers

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 10,000 to 12,000 sq ft
Approx. Project cost Total Machinery and Mould cost :
500 ml container: ~INR15-20 lakh
3 Litre container : ~INR 30-40 lakh
10 Litre container : ~INR 45-55 lakh
Process Manufacturing Process
PP granules are fed in to an automatic extrusion blow moulding machine and is subjected to heat and
pressure in an extruder. The semi-molten plastic in extruder is passed through the nozzle and air is
blown into the mould to force the molten plastic against the sides of the mould. The final product is then
cooled before removal from the mould. The article is then trimmed to remove flashes.

Utilities Electricity: Connected Load of 120 KW


Power: 500 ml: 15 HP
3 Litre : 28 HP
10 Litre : 45 HP
Water: 20 Tr/hr
Manpower Requirement 25 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)

73
Manufacturing of Disposable Caps

Name of Project Facility for Manufacturing of Disposable Caps

Project Location Gelapukhuri, Tinsukia, Assam


Area Requirement 15,000- 20,000 Sq .ft.
Approx. Project cost Cost ( Machinery and Mould ) : ~INR 117-149 lakh
Project Scale Production capacity per day @ 25 shots/minute for 22 hours- 3,96,000
Process MANUFACTURING PROCESS
Thermoforming is the process of converting a thermoplastic sheet into a three-dimensional.

CLAMPING

HEATING

PRE-STRETCH

VACUUM

PLUG WASTE

COOLING & RELEASING

TRIMMING & FINISHING

Utilities Electricity ( connected Load): 130 KW


Water: 50 litre/min Water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 22 workers for 1 shift
Nodal Agency Assam Industrial Development Corporation (AIDC)

74
Pharmaceuticals
and
Medical Equipment
Pharmaceutical Park at Chaygaon, Kamrup Rural

Name of Project Pharmaceutical Park

Project Location Chaygaon, Kamrup Rural


Area of the project 100 acres
Approx. Project cost INR 153.64 crores (~USD 23.64 million)
Focus sector Pharmaceutical products
Status of approvals Pre-feasibility report for the proposed park has already been prepared and approved by the competent
authority
Project contours Kamrup district is the most industrialized district in the state
The district has one Export Processing Industrial Park at Amingaon, two Industrial Growth Centres
at Chaygaon, one Integrated Infrastructure Development Centre at Rangiya, two Industrial Areas at
Kalapahar and Rani, three Industrial Estates at Kalaphar, Rani and Bamunimaidam.
Kamrup has one oil refinery at Noonmati, which is ~ 51 km from Chaygaon
Investment Opportunities Demand side market assessment reveals that there is good potential for the pharmaceutical industry in
the region and therefore it is an attractive destination for investments into the entire range of activities
involved in pharma manufacturing
There are only 34 manufacturing units, all of them in Assam, this leaves most of the demand to be
fulfilled by supply from outside the region. This presents an opportunity for Pharma manufacturing
companies can set up units in Assam to serve both the local markets and the markets in Bhutan and
Myanmar, and API markets in Bangladesh.
Connectivity Chaygaon is well connected by NH37 which connects it to all the districts on the southern banks of River
Brahmaputra. NH37 gets connected to NH31 by the Nara Narayan Bridge, and in turn NH31 connects
Chaygaon to West Bengal.
There is a railway station in Chaygaon, which is close to the site
The nearest airport is the Lokpriya Gopinath Bordoloi International Airport at Guwahati which is at a
distance of ~ 25.5 km from Chaygaon.
The nearest IWT Terminal is at Pandu, which is at a distance of ~ 39 km from Chaygaon
Proposed Infrastructure A new power generation plant of 21 MW is coming up at Amring in addition to the 60 MW power plant
nearby
Abundant ground water and surface water is available at the proposed site
Assam Gas Company has plans to extend its existing gas pipe line network to proposed site
Private as well as public telecom service providers provide extensive service in this region.
Nodal agency Assam Industrial Development Corporation (AIDC)

76
Development of Pharmaceutical cluster in Assam

Name of Project Development of Pharmaceutical cluster in Assam: Kuruwa

Project Location Kuruwa, Kamrup Rural District, Assam


Area of the project 30-50 acres
Approx. Project cost INR 10 crore (~USD 1.5 million) for the development of common utilities and CETP at the cluster site
Focus sector Pharmaceutical Products
Status of approvals New project proposed
Project contours The state of the art park is being developed in PPP mode to enable advancement of Biotechnology
sector in the State.

The park is designed with common facilities such as testing centres and R&D labs to facilitate the
industries in advanced manufacturing practices.

The park also contains Incubation Centres to enable budding entrepreneurs in developing their own
biotech industry.
Investment Opportunities The major investment opportunities lie in setting up Biotechnology, Pharmaceuticals, generic drugs
manufacturing and R&D units.
Connectivity Kuruwa is located in Kamrup Rural District.
The site is 14 kms from to NH-31
The nearest railway station is 15 km at Mirza and Guwahati Railway Station is 45 kms away.
The nearest airport is situated at a distance of 25 km at Borjhar, Guwahati

Proposed Infrastructure Government of Assam will assure provision of the required water and uninterrupted power to the
project.
Nodal agency Assam Industrial Development Corporation (AIDC)

77
Development of Pharmaceutical cluster in Assam

Name of Project Development of Pharmaceutical cluster in Assam: Balipara

Project Location Balipara, Sonitpur District, Assam


Area of the project 30-50 acres
Approx. Project cost INR 10 crore (~USD 1.5 million) for the development of common utilities and CETP at the cluster site
Focus sector Pharmaceutical Products
Status of approvals New project proposed
Project contours The state of the art park is being developed in PPP mode to enable advancement of Biotechnology
sector in the State.

The park is designed with common facilities such as testing centres and R&D labs to facilitate the
industries in advanced manufacturing practices.

The park also contains Incubation Centres to enable budding entrepreneurs in developing their own
biotech industry.
Investment Opportunities The major investment opportunities lie in setting up Biotechnology, Pharmaceuticals, generic drugs
manufacturing and R&D units.
Connectivity Balipara is located in Sonitpur District.
The site is 1 kms from to NH-52
The nearest railway station is 23 km at Tezpur
The nearest airport is situated at a distance of 13 km at Tezpur

Proposed Infrastructure Government of Assam will assure provision of the required water and uninterrupted power to the
project.
Nodal agency Assam Industrial Development Corporation (AIDC)

78
Power
220 kV S/C line from Samaguri to Khumtai

Name of Project 220 kV S/C line from Samaguri to Khumtai

Project Location Samaguri to Kumtai


Approx. Project cost INR 206 crores (~USD 31.69 Million)
Employment Potential Direct employment: 200
Focus sector Power Transmission
Status of approvals Assessment of the financial and costing details done and suitability of PPP model for the project
development undertaken.

Project contours Plan, implement and manage power transmission infrastructure in the state to make available 24x7 hours
uninterrupted power supply to all the 33/11 kV sub-stations in the state of Assam
For efficient transmission of power, the state intends to develop the power infrastructure of the state, in
line with international standards to cater to electricity demand of 13000 MW by FY 2034-35 by adopting
innovative technologies though public private partnership (PPP) initiatives
State Transmission Company (AEGCL) to plan & implement projects so as to have a cumulative transmission
capacity of 12000 MVA by FY 2024-25 and 40000 MVA by FY 2034-35

Investment Opportunities Development of the project in PPP mode


Proposed Infrastructures LILO from Khumtai to Mariani
132 kV D/C line from Khumtai to Sarupathar (60 km)
LILO from Jorhat (W) to Bokakhat 132 kV S/C line
Supply and Installation of 220 kV, 3150A, 50 kA for 1 sec, Main-I & main-II Bus arrangement
Supply and Installation of 132 kV, 3150A, 40 kA for 1 sec, Main-I & main-II Bus arrangement
Outdoor Equipment (220 kV, 132 kV)
Switchgears
Insulators, hardware & Conductors
Control Relay & Protection Panel
Bus Reactors
Spares & testing equipment
Construction of switchyard, erection, testing & commissioning
Civil Works

Nodal agency Assam Electricity Grid Corporation Limited

80
Sonapur Sub-Station

Name of Project Sonapur Sub-Station

Project Location Sonapur, Guwahati


Approx. Project cost INR 370.31 crores (~USD 56.97 Million)
Employment potential Direct employment: 60
Focus sector Power Transmission
Status of approvals Assessment of the financial and costing details done and suitability of PPP model for the project
development undertaken.
Project contours Plan, implement and manage power transmission infrastructure in the state to make available 24x7
hours uninterrupted power supply to all the 33/11 kV sub-stations in the state of Assam
For efficient transmission of power, the state intends to develop the power infrastructure of the state,
in line with international standards to cater to electricity demand of 13000 MW by FY 2034-35 by
adopting innovative technologies though public private partnership (PPP) initiatives
State Transmission Company (AEGCL) to plan & implement projects so as to have a cumulative
transmission capacity of 12000 MVA by FY 2024-25 and 40000 MVA by FY 2034-35
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Land development and civil works for substation infrastructure
Supply and installation of 400 kV, 4000 A, 63 kA for 1 sec, one and half CB arrangement
Supply and installation of 220 kV, 3150 A, 50 kA for 1 sec, Main-I & main-II Bus arrangement
Supply Testing and Maintenance Equipment for GIS
Outdoor Equipment
33kV Switchgear
Insulators, hardware & Conductors
Control Relay & Protection Panel
Bus Reactor with NGR
Structures for 400 kV, 220 kV & 33 kV, Gantry, structures for outdoor equipment
PLCC System and PA, CCTV
Lighting System
Nodal agency Assam Electricity Grid Corporation Limited

81
20 MW Solar Power Generation units proposed at Dhing, Nagaon

Name of Project 20 MW Solar Power Generation units proposed at Dhing, Nagaon

Project Location Dhing, Nagaon


Approx. Project cost INR 128.74 crores (~USD 31.69 Million)
Employment potential Direct employment: 50
Focus sector Renewable Energy (Solar)
Status of approvals Existing premise of IPAL
Project contours Dhing is located at a distance of around 25 km from Nagaon town. The road from Nagaon town is
the main road through which Dhing is connected the town is also connected with Guwahati by a
broad-gauge railway track.
State Generating Company (APGCL) to plan & implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Assam has a huge potential of generating power from non-conventional energy sources which largely
remains untapped
Assam has around 3.4 to 4.6 kWh of solar power potential/sq.m/day and with the estimated number
of clear days in the range of 240 to 260, which translate into a solar potential of around 13.76 GW2 to
13.76 GWh.
Connectivity The proposed area is well connected through roads and railways
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Architectural design and construction of structural works for the main buildings, typical inverter
stations, guard and gate buildings, and foundation of PV panels
Review and individual design check related to mounting substructure frames of solar panel
Design and construction of drainages system, main and service roads
Design and installation of MEP systems for main buildings, inverter stations and guard houses including
electrical, telecommunications, fire protection, HVAC, and sanitation services
Nodal agency Assam Power Generation Company Ltd.

82
20 MW Solar Power Generation units proposed at Balipara, Tezpur

Name of Project 20 MW Solar Power Generation units proposed at Balipara, Tezpur

Project Location Balipara, Tezpur


Approx. Project cost INR 128.74 crores (~USD 31.69 Million)
Employment potential Direct Employment: 50
Focus sector Renewable Energy (Solar)
Status of approvals Land approved for the proposed project
Project contours Balipara is located 32 km towards west from District head quarter Tezpur, the town is at the border of
the Sonitpur District and Nagaon District. Nagaon District is South of Tezpur.
State Generating Company (APGCL) to plan & implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Assam has a huge potential of generating power from non-conventional energy sources which
largely remains untapped
Assam has around 3.4 to 4.6 kWh of solar power potential/sq.m/day and with the estimated number
of clear days in the range of 240 to 260, which translate into a solar potential of around 13.76 GW2 to
13.76 GWh.
Connectivity The proposed area is well connected through roads and railways
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Architectural design and construction of structural works for the main buildings, typical inverter
stations, guard and gate buildings, and foundation of PV panels
Review and individual design check related to mounting substructure frames of solar panels
Design and construction of drainages system, main and service roads
Design and installation of MEP systems for main buildings, inverter stations and guard houses
including electrical, telecommunications, fire protection, HVAC, and sanitation services
Nodal agency Assam Power Generation Company Ltd.

83
20 MW Solar Power Generation units proposed at Goalpara

Name of Project 20 MW Solar Power Generation units proposed at Goalpara

Project Location Goalpara


Approx. Project cost INR 128.74 crores (~USD 31.69 Million)
Employment potential Direct Employment: 50
Focus sector Renewable Energy (Solar)
Status of approvals Land approved for the proposed project
Project contours The district of Goalpara is situated on the south bank of the river Brahmaputra and is bounded by West
and East Garo Hill districts of Meghalaya on the south and Kamrup district on the East, Dhubri district on
the West and mighty river Brahmaputra all along the North.
State Generating Company (APGCL) plans to implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Assam has a huge potential of generating power from non-conventional energy sources (Solar) which
largely remains untapped
Assam has around 3.4 to 4.6 kWh of solar power potential/sq.m/day and with the estimated number
of clear days in the range of 240 to 260, which translate into a solar potential of around 13.76 GW2
to 13.76 GWh.
Connectivity The proposed area is well connected through roads and railways
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Architectural design and construction of structural works for the main buildings, typical inverter stations,
guard and gate buildings, and foundation of PV panels
Review and individual design check related to mounting substructure frames of solar panel
Design and construction of drainages system, main and service roads
Design and installation of MEP systems for main buildings, inverter stations and guard houses including
electrical, telecommunications, fire protection, HVAC, and sanitation services
Nodal agency Assam Power Generation Company Ltd.

84
20 MW Solar Power Generation units proposed at CSM campus

Name of Project 20 MW Solar Power Generation units proposed at CSM campus

Project Location CSM campus, Sugar Mill, Cachar District


Approx. Project cost INR 128.74 crores (~USD 31.69 Million)
Employment potential Direct employment: 50
Focus sector Renewable Energy (Solar)
Status of approvals Land approved for the proposed project
Project contours The District of Cachar is located in the southernmost part of Assam. It is bounded on the North by Barali
and Jayantia hill ranges, on the South by the state of Mizoram, on the East by the state of Manipur and
West by sister districts Hailakandi and Karimganj. The Barak is the main river of the district.
State Generating Company (APGCL) plans to implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Exploit the Renewable Energy potential in the state of Assam and generate 1500 MW of electricity from
RE sources by FY 2034-35
Assam has a huge potential of generating power from non-conventional energy sources which largely
remains untapped
Assam has around 3.4 to 4.6 kWh of solar power potential/sq.m/day and with the estimated number
of clear days in the range of 240 to 260, which translate into a solar potential of around 13.76 GW2 to
13.76 GWh.
Connectivity The proposed area is well connected through roads and railways
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Architectural design and construction of structural works for the main buildings, typical inverter
stations, guard and gate buildings, and foundation of PV panels
Review and individual design check related to mounting substructure frames of solar panel
Design and construction of drainages system, main and service roads
Design and installation of MEP systems for main buildings, inverter stations and guard houses including
electrical, telecommunications, fire protection, HVAC, and sanitation services
Nodal agency Assam Power Generation Company Ltd.

85
2 x 800 MW Margherita Thermal Power Station Phase I

Name of Project 2 x 800 MW Margherita Thermal Power Station Phase I

Project Location Saleki and Lekhapani villages of Makum, Margherita


Approx. Project area 667 acres
Approx. Project cost INR 10,720 crores (~USD 1.649 Billion)
Employment potential Direct Emplyment:600
Focus sector Power
Status of approvals Land acquired by APGCL
Govt. of Assam assigned NTPC for preparation of the DPR. NTPC visited the site
Project contours The Margherita town is surrounded by hills, tea gardens, forest and the Dihing River
and the Patkai hills are visible from the town
State Generating Company (APGCL) plans to implement power plants so as to have
a cumulative generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY
2034-35

Establishing green field power generating stations with supercritical technology


based thermal power plant proposed in Margherita which would use the untapped
coal reserve of North Eastern Coal Fields
Connectivity Nearest airport is Dibrugarh
Nearest railway stations are Ledo & Lekhapani which are 8 and 2 kms away from the
project site respectively.
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Boiler, Turbine, Generator, Associated auxiliaries, Transformers, Switchgears, cables,
cable facilities, Grounding & Lighting packages, Control & Instrumentation, Initial
Spares for BTG, Balance of Plant including cooling tower, water system, coal han-
dling plant, ash handling plant, Fuel oil unloading & storage, Mechanical miscella-
neous package, switchyard, Chimney, Emergency DG set
Nodal agency Assam Power Generation Company Ltd. (APGCL)

86
Silchar Gas based power project (30 MW)

Name of Project Silchar Gas based power project (30 MW)

Project Location Silchar


Approx. Project cost INR 197.02 crores (~USD 31.69 Million)
Employment potential Direct employment: 120
Focus sector Power generation
Status of approvals Gas supply agreement with ONGCL is under discussion.
Project contours Silchar is the second-largest city of the state in terms of population and municipal area and is located
in the southern part of Assam situated on the banks of the Barak River. Silchar serves as a major point
of connection for Tripura, Manipur and Mizoram.
State Generating Company (APGCL) plans to implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Connectivity Nearest airport is Silchar airport
Nearest railway station is Silchar
Investment Opportunities Development of the project in PPP model
Proposed Infrastructures Gas Engine technology shall be adopted, Turbine Generator island, Associated auxiliaries,
Transformers, Switchgears, cables, cable facilities, Grounding & Lighting packages, Control &
Instrumentation, Initial Spares for BTG, Balance of Plant including cooling tower, water system, coal
handling plant, ash handling plant, Fuel oil unloading & storage, Mechanical miscellaneous package,
switchyard, Chimney, Emergency DG set
Nodal agency Assam Power Generation Company Ltd. (APGCL)

87
Borpani Middle St-II (24 MW)

Name of Project Borpani Middle St-II (24 MW)

Project Location Borpani, Karbi Langpi


Approx. Project cost INR 234.56 crores (~USD 36.09 Million)
Employment potential Direct employment: 100
Focus sector Power generation
Status of approvals Approved by State Government
Project contours State Generating Company (APGCL) to plan & implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Exploit the Renewable Energy potential in the state of Assam and generate 1500 MW of electricity
from RE sources by FY 2034-35
Assam has a huge potential of generating power from non-conventional energy sources which largely
remains untapped
Connectivity Nearest airport is in LGBI, Guwahati
Nearest railway station is in Diphu
Investment Opportunities Development of the project in PPP model
Proposed infrastructures Installation of Hydro Turbines & Generators
New sub-stations
New transmission lines
Development of internal infrastructures
Development of internal roads, drainage etc.
Nodal agency Assam Power Generation Company Ltd. (APGCL)

88
NRPP Ph-II (100 MW)

Name of Project NRPP Ph-II (100 MW)

Project Location Namrup


Approx. Project cost INR 688.29 crores (~USD 105.89 Million)
Employment potential Direct employment: 200
Focus sector Power generation
Status of approvals Approval for allocation of additional gas is awaited
Project contours State Generating Company (APGCL) plans to implement power plants so as to have a cumulative
generation capacity of 2000 MW by FY 2024-25 and 4000 MW by FY 2034-35
Connectivity Nearest airport is in Dibrugarh
Nearest railway station is in Namrup
Investment Opportunities Development of the project in PPP model
Proposed infrastructures New sub-stations
Installation of Gas based Turbines
Development of internal infrastructures
Nodal agency Assam Power Generation Company Ltd. (APGCL)

89
Development of combined Solar Park on sand bars of Brahmaputra, Upper Assam (2000 MW)

Name of Project Development of combined Solar Park on sand bars of Brahmaputra, Upper Assam (2000 MW)

Project Location Dibrugarh, Sibsagar, Jorhat, Sonitpur, Goalpara, Dhubri


Approx. Project cost INR 11,000 crores (~USD 1.7 Billion)
Employment potential Direct employment: 4000
Focus sector Renewable Energy (Solar)
Status of approvals Project preparation activities underway
Project contours Development of solar parks on identified permanent sand bars which are above High Flood Level on
river Brahmaputra.
Total identified area is approximately 7000 acres.
Solar PV projects will be developed at nine sites spread across four district of the State
The projects are envisaged to be developed under the Solar Park Scheme of MNRE.
Connectivity The proposed area is well connected through waterways
Investment Opportunities Development of the project in PPP model
Proposed infrastructures The projects are envisaged to be developed under the Solar Park Scheme of MNRE
New sub-stations
New transmission lines
Development of internal infrastructures
Nodal agency Assam Power Generation Company Ltd. (APGCL)

90
Strengthening of Power Distribution System, Assam

Name of Project Strengthening of Power Distribution System, Assam

Project Location Covering the entire state of Assam


Approx. Project cost INR 3000 to 4000 crores (~USD 460 - 615 Million)
Employment potential Direct employment: 1500
Focus sector Power distribution
Status of approvals Project preparation activities underway
Project contours Plan, implement and manage power distribution infrastructure in the state to make available reliable
and affordable power to the state populace and contribute to the socio-economic development
State Distribution Company (APDCL) to plan & implement projects so as to have a cumulative
distribution capacity of 11,000 MVA by FY 2024-25 and 25,000 MVA by FY 2034-35
Plan and arrange for power from within and outside the state of Assam to cater the electricity demand
of the state
Connectivity The proposed areas are well connected through roads and railways
Investment Opportunities Development of the project in PPP model
Proposed infrastructures New Electrical sub-stations
New Power transmission lines
New Distribution Transformers
New Low Transmission feeder
New metering systems
Nodal agency Assam Power Distribution Company Ltd. (APDCL)

91
Augmentation of power transmission system, Assam

Name of Project Augmentation of power transmission system, Assam

Project Location Covering the entire state of Assam


Approx. Project cost INR 3000 to 4000 crores (~USD 460 - 615 Million)
Employment potential Direct employment: 600
Focus sector Power transmission
Status of approvals Project preparation activities underway
Project contours Plan, implement and manage power transmission infrastructure in the state to make available 24x7
hours uninterrupted power supply to all the 33/11 kV sub-stations in the state of Assam
For efficient transmission of power, the state intends to develop the power infrastructure of the state,
in line with international standards to cater to electricity demand of 13000 MW by FY 2034-35 by
adopting innovative technologies though public private partnership (PPP) initiatives
State Transmission Company (AEGCL) to plan & implement projects so as to have a cumulative
transmission capacity of 12000 MVA by FY 2024-25 and 40000 MVA by FY 2034-35

Connectivity The proposed area is well connected through roads.


Investment Opportunities Design Built Finance Operate and Transfer
Build Own Operate and Maintain model provides perpetual ownership of assets with the private player
with greenfield investments and duration of the contract is 35 years
In Design Built Finance Operate and Transfer model the assets are transferred back to public authority
by the end of the contract period and duration of the contract is 25 years + 10 years
Proposed infrastructures New Electrical sub-stations
New Power Transmission lines
New Transmission feeder
Feeder segregation of industries and domestic feeders

Nodal agency Assam Electrical Grid Corporation Ltd. (AEGCL)

92
Micro Solar Power Projects, 10 major cities of Assam

Name of Project Micro Solar Power Projects, 10 major cities of Assam

Project Location Across the 10 major cities of Assam


Approx. Project cost INR 30 crores (~USD 4.62 Million)
Focus sector Renewable Energy (Solar)
Status of approvals Project preparation activities underway
Project contours Assam has around 3.4 to 4.6 kWh of solar power potential/sq.m/day and with the estimated
number of clear days in the range of 240 to 260, which translate into a solar potential of around
13.76 GW2 to 13.76 GWh.
Rooftop solar projects of 2.5 MW on existing public buildings in ten major cities of Assam
The roof top space of government buildings, Hospitals, Railways Stations, Airport can be utilized for
generating substantial rooftop solar energy.
Investment Opportunities Investment opportunity through PPP Model
Proposed infrastructures Setting up of solar power units on pre-identified rooftops having more than 200 square feet built
area
Nodal agency Assam Power Distribution Company Ltd.

93
Handloom, Textiles
and
Handicrafts
Name of Project Setting up of Handloom Production Unit at HPC, Dhemaji

Project Location Leluwani Village, District Dhemaji


Area of the Project 4.64 Acre
Approx. Project Cost INR 5 to 10 Crores
Focus Sector Handloom and Textile sector
Employment 500 to 1000 approx.
Status of approvals Land approved by Govt. of Assam and handed over to Directorate of Handloom and Textiles
Department
Project contours The project is surrounded by well- established presence of suppliers of raw materials, locally available
skilled workers, ancillary operators and other associated services
Investment Opportunities Infrastructure development like roads, drainage, buildings, power etc.
Setting up of Machineries and Work sheds
Modern Looms with higher production capacity.
Jacquards.
CATD and Automatic Card punching machine.
Automatic Stitching machines for Garment manufacturing.
Embroidery Machines.
Calendaring machine.
Work Shed with all modern amenities.
Connectivity The site is located about 4 kms from NH-15 (earlier NH-52)
Railway station is located at 6 kms from the location
Airport is at a distance of about 70 kms
Proposed Infrastructure Production centre with modern amenities
Computer aided textile design studio
Processing and finishing unit
Packaging unit
Value addition centre
Garment manufacturing unit
Packaging unit
Sales outlets
Nodal Agency Directorate of Handloom and Textiles

95
Setting up of Handloom Production Unit at HPC, Patbausi

Name of Project Setting up of Handloom Production Unit at HPC, Patbausi

Project Location Patbausi Village, District Barpeta


Area of the Project 0.33 Acre
Approx. Project Cost INR 2 to 3 Crore
Focus Sector Handloom and Textile sector
Employment 100 approx.
Status of approvals Land approved by Govt. of Assam and handed over to Directorate of Handloom and Textiles De-
partment
Project contours The project is surrounded by well- established presence of suppliers of raw materials, locally availa-
ble skilled workers, ancillary operators and other associated services
Investment Opportunities Infrastructure development like roads, drainage, buildings, power etc.
Setting up of Machineries and Work sheds
Modern Looms with higher production capacity.
Jacquards.
CATD and Automatic Card punching machine.
Calendaring machine.
Work Shed with all modern amenities
Connectivity The site is located about 5 kms from NH-37
Railway station (Guwahati) is located at 84 kms from the location
Airport is at a distance of about 69 kms
Proposed Infrastructure Production centre with modern amenities
Computer aided textile design studio
Processing and finishing unit
Value addition centre
Sales outlets
Nodal Agency Directorate of Handloom and Textiles

96
Setting Setting up of Handloom Production Unit at HPC, Jajari

Name of Project Setting up of Handloom Production Unit at HPC, Jajari

Project Location Jajari Village, District Nagaon


Area of the Project 0.33 Acre
Approx. Project Cost INR 2 to 3 Crore
Focus Sector Handloom and Textile sector
Employment 200 approx.
Status of approvals Land approved by Govt. of Assam and handed over to Directorate of Handloom and Textiles
Department
Project contours The project is surrounded by well- established presence of suppliers of raw materials, locally
available skilled workers, ancillary operators and other associated services
Investment Opportunities Infrastructure development like roads, drainage, buildings, power etc.
Setting up of Machineries and Work sheds
Modern Looms with higher production capacity.
Jacquards.
CATD and Automatic Card punching machine.
Automatic Stitching machines for Garment manufacturing.
Embroidery Machines.
Calendaring machine.
Work Shed with all modern amenities.
Connectivity The site is well connected with NH-37
Railway station is at Bebeji, Nagaon approx. 8 kms
Airport is at a distance of about 120 kms
Proposed Infrastructure Production centre with modern amenities
Computer aided textile design studio
Processing and finishing unit
Value addition centre
Garment manufacturing unit
Sales outlets
Nodal Agency Directorate of Handloom and Textiles

97
Setting Setting up of Handloom Production Unit at HPC, Solmara

Name of Project Setting up of Handloom Production Unit at HPC, Solmara

Project Location Solmara Village, District Nalbari


Area of the Project 0.07 Acre
Approx. Project Cost INR 2 to 3 Crore
Focus Sector Handloom and Textile sector
Employment 50 to 100 approx.
Status of approvals Land approved by Govt. of Assam and handed over to Directorate of Handloom and Textiles Department
Project contours The project is surrounded by well- established presence of suppliers of raw materials, locally available
skilled workers, ancillary operators and other associated services
Investment Opportunities Infrastructure development like roads, drainage, buildings, power etc.
Setting up of Machineries and Work sheds
Modern Looms with higher production capacity.
Jacquards.
CATD and Automatic Card punching machine.
Calendaring machine.
Work Shed with all modern amenities.
Connectivity The site is located about 22 kms from NH-47
Railway station is located at 20 kms from the location
Airport is at a distance of about 85 kms
Proposed Infrastructure Production centre with modern amenities
Computer aided textile design studio
Value addition centre
Packaging unit
Nodal Agency Directorate of Handloom and Textiles

98
Handloom Training cum Production Unit, Bamunimaidam, Guwahati

Name of Project Handloom Training cum Production Unit, Bamunimaidam, Guwahati

Project Location Industrial Estate, Bamunimaidam, Guwahati


Area of the Project 3.71 Acre
Approx. Project Cost Rs.450.00 lakhs (USD 0.69 million)
Focus Sector Handloom and Textile sector (Hand woven products with made ups)
Employment 1800 approx.
Status of approvals Land approved by ARTFED, a Govt. of Assam undertaking
Project contours Availability of work shed and other required machinery for production of hand woven products and
made ups.
Presence of good marketing networks through which the products will be sold through existing
sales outlet of ARTFED
Investment Opportunities Upgrade of infrastructure development like roads, drainage, buildings, power etc.
Upgrade of Machineries and Work sheds
Connectivity The location is established in the mid of the Guwahati city and well connected through roads,
railways and airport
Proposed Infrastructure Additional infrastructures as required for the project
Nodal Agency Assam Apex Weavers & Artisans Co-operative Federation Ltd.

99
Apparel & Garment Making Centre, Paschim Boragaon, Guwahati

Name of Project Apparel & Garment Making Centre, Paschim Boragaon, Guwahati

Project Location Bigyan Path, Paschim Boragaon, Guwahati


Area of the Project 1.5 Acre
Approx. Project Cost INR 1426 lakh (USD 2.19 million)
Focus Sector Handloom and Textile sector (Hand woven products with made ups)
Employment 1800 approx.
Status of approvals Land approved by ARTFED, a Govt. of Assam undertaking
Project contours There are three units in the Incubation centre. One is for skill development and other two are for
production. The three units has at present 300 nos. of sophisticated swing machines
Presence of good marketing networks through which the products will be sold through existing sales
outlet of ARTFED
Investment Opportunities Upgrade of infrastructure development like roads, drainage, buildings, power etc.
Upgrade of Machineries and Work sheds
Connectivity The site is located at 1.5 km from NH - 37, 17 km from LGBI Airport and 13 km from Guwahati Railway
Station
Proposed Infrastructure Additional infrastructures as required for the project
Nodal Agency Assam Apex Weavers & Artisans Co-operative Federation Ltd.

100
Establishment of Silk Processing and Blending Park, Khanapara, Guwahati

Name of Project Establishment of Silk Processing and Blending Park, Khanapara, Guwahati

Project Location Muga Vgr, Sualkuchi, Kamrup


Approx. Project cost INR 20 crore (~USD 3.08 million)
Focus sector Sericulture Sector
Employment Approx. 300
Status of approvals Land approved by Govt. of Assam
Project contours Silk processing and blending park for silk spinning reeling & twisting and blending mill of eri, muga &
mulberry silk
The park will help the silk spinning industry in particular to provide appropriate enabling infrastructure,
electricity and water for setting up processing and blending mills.
Investment Opportunities Govt. Share 51%
Private investor share 49%
Private players can partner State Govt. in development and maintenance of the Silk Spinning Park
Private Spinning players can lease in space in the park to establish silk spinning and marketing facility.
Connectivity The proposed site is located at govt. Muga vgr, sualkuchi, Kamrup, Assam just 25 km. Away from the
capital of Assam, Dispur. It is conveniently connected with road ways, railways and air ways
Proposed Infrastructure Civil construction works
Construction of approach road
Plant & machineries
Godown
Power etc.
Heat/ dry chamber
Carry van ( vehicle)
Nodal agency Directorate of Sericulture, Assam

101
Silk Value Chain based Cluster Development

Name of Project Silk Value Chain based Cluster Development

Project Location Various locations across the state distributed in four zones (West, Central, East and South)
Approx. Project cost INR 3 crore – 5 crore (~USD 0.46 million – 0.77 million) per zone
Focus sector Sericulture Sector
Employment 300 to 500 approx. (direct and indirect)
Status of approvals Land approved by Govt. of Assam
Project contours Silk based cluster development to enable a planned and focused approach towards developing
backward integration for spinning industry in the state.
The clusters will have access to technology consultancy cells at a zonal level, training centres
providing continual training addressing industry requirements, access to cocoon banks,
warehousing facilities, logistics network, packaging facilities.
Units will be housed in existing spinning & reeling units.
There are 52 existing spinning and reeling centres under directorate of sericulture, government of
Assam. (eri spinning centre -17, muga reeling unit -14, mulberry reeling unit -21)
Development of organized silk market with silk auction facilities.
Investment Opportunities Govt. Share 51%
Private investor share 49%
Partner State Govt. in development of infrastructure and operation and maintenance.
Connectivity All these centres are well connected through roads
Proposed Infrastructure Upgradation of infrastructure like buildings, power etc.
Construction of approach road
Plant & machineries
Godown
Power
Heat/ dry chamber
Carry van ( vehicle)
Nodal agency Directorate of Sericulture, Assam

102
Garment Manufacturing Unit

Name of Project Garment Manufacturing Unit

Project Location Suitable site to be finalised


Area of the project 0.12 acre (500sqm)
Approx. Project cost INR 0.41 crores (~USD 0.063 mn)
Focus sector Handloom, Textiles and Handicraft
Employment 23
Status of approvals New Project
Project contours The proposed apparel unit will be engaged in the business of manufacturing and trading of
garments, both for contract working and own brand manufacturing.

It will procure orders from various agents of the large multinationals for producing renowned
branded apparels. The unit would be equipped with most modern manufacturing facilities with
state-of-the-art machines, for every activity, from stitching to finishing.
Investment Opportunities Investors are invited for Design Build Operate and Transfer of the project
Proposed Infrastructure The concerned authority will facilitate supply of power and water.

Total connected load of about 21 kW will be required. 0.4 - 0.6 KL of water will be required every
working day.
Nodal agency Directorate of Handlooms and Textiles

103
Manufacturing of Bamboo Mat Board, Bamboo Mat Corrugated Sheets & Bamboo Floor Board

Name of Project Manufacturing of Bamboo Mat Board, Bamboo Mat Corrugated Sheets & Bamboo Floor Board

Project Location Suitable site to be finalised


Area of the project 4 acre
Approx. Project cost INR 8.21 crores (~USD 1.27mn)
Focus sector Handloom, Textiles and Handicraft
Employment Direct Employment: 93
Status of approvals New Project
Project contours Bamboo found to be most suitable to replace timber as it grows more rapidly than trees and start to
yield within three or four years of planting.
The project intends to tap bamboo production potential of Assam for raw materials and add value
to it in the form of Mat Boards, Bamboo Mat Corrugated Sheets & Bamboo Floor Board which in turn
is used in manufacturing of Walls, Doors, Panelling, Partitions, Flush doors, furniture & cupboard,
Roof and sides of carts & trucks, Packing cases, Storage bin, Shuttering, and many more include
constructing prefabricated houses.
Investment Opportunities Investors are expected to install appropriate Plant & Machinery, source raw material, ensure waste
disposal, provide for store facility & refrigeration system and create marketing infrastructure
Proposed Infrastructure Total connected load of about 350 kW will be required. About 75 KL of water will be required very
working day. Concerned authority shall facilitate supply of requisite water and power for the project
Nodal agency Directorate of Handloom and Textiles

104
Common Facility Centre (Handicraft), Belsore, Nalbari

Name of Project Common Facility Centre (Handicraft), Belsore, Nalbari

Project Location Belsore, Nalbari District.


Area of the Project 800 sq. m.
Approx. Project Cost INR 45.39 lakh excluding land value
Focus Sector Handicrafts
Employment 30 approx.
Status of approvals Land approved by ARTFED, a Govt. of Assam undertaking
Project contours Availability of workshed and other required machinery for processing of cane and bamboo products.
Investment Opportunities Upgrade Machineries and equipment for increase production
Connectivity Nearby Billeswar Devalaya, Belsore. The site is well connected to Nalbari and Barpeta Road.
Proposed Infrastructure Additional infrastructures may be required for the project
Nodal Agency Assam Apex Weavers & Artisans Co-operative Federation Ltd.

105
Cane & Bamboo based Handicrafts Production Unit

Name of Project Cane & Bamboo based Handicrafts Production Unit

Project Location Bigyan Path, Pachim Boragaon, Guwahati


Area of the Project 465 sqm
Approx. Project Cost 50.00 Lakh
Focus Sector Handicrafts on Cane & Bamboo
Employment 50 each (approx.)
Status of approvals Land approved by ARTFED, a Govt. of Assam undertaking
Project contours Presence of good marketing linkages. The products can be sold through existing sales outlet of
ARTFED
Investment Opportunities Setting up of Cane & Bamboo based Handicrafts Production Unit
Connectivity The site is located at 1.5 km from NH - 37, 17 km from LGBI Airport and 13 km from Guwahati Railway
Station
Proposed Infrastructure Assam Type Building
Roads, drainage, water and power are available.
Nodal Agency Assam Apex Weavers & Artisans Co-operative Federation Ltd.

106
Milk Processing Plant- Dhekiajuli

Name of Project Milk Processing Plant- Dhekiajuli

Project Location Dhekiajuli, Sonitpur District, Assam


Area of the project 0.67 acre
Approx. Project cost As per Detailed Project Report
Focus sector Dairy
Status of approvals Greenfield project
Project contours With the rising income level of the growing middle class in Assam, the demand for milk and milk
products is also increasing significantly. Besides traditional milk products which have urban as well as
rural markets, there is also a tremendous scope for marketing of value added milk products.

The Department envisages augmenting the dairy sector by bringing in private investments for further
organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Dhekiajuli is located along NH 15
The nearest railway station is at Dhekiajuli
The nearest airport is at Tezpur, 33.4 kms from Dhekiajuli
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture

107
Agriculture and Food
Processing including
Organic Cultivation
and Bamboo
Milk Processing Plant- Silchar

Name of Project Milk Processing Plant- Silchar

Project Location Silchar, Assam


Area of the project 0.67 acre
Approx. Project cost As per Detailed Project Report
Focus sector Dairy
Status of approvals Greenfield project
Project contours With the rising income level of the growing middle class in Assam, the demand for milk and milk
products is also increasing significantly. Besides traditional milk products which have urban as well as
rural markets, there is also a tremendous scope for marketing of value added milk products.

The Department envisages augmenting the dairy sector by bringing in private investments for further
organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Silchar is located on NH306
The nearest railway station and airport is at Silchar
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture

109
Milk Processing Plant- Tezpur

Name of Project Milk Processing Plant- Tezpur

Project Location Tezpur, Sonitpur Assam


Area of the project 0.67 acre
Approx. Project cost As per Detailed Project Report
Focus sector Dairy
Status of approvals Greenfield project
Project contours With the rising income level of the growing middle class in Assam, the demand for milk and milk
products is also increasing significantly. Besides traditional milk products which have urban as well as
rural markets, there is also a tremendous scope for marketing of value added milk products.

The Department envisages augmenting the dairy sector by bringing in private investments for further
organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Tezpur is located on NH52
The nearest Railway Station and airport is at Tezpur
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture

110
Milk Processing Plant- Nagaon

Name of Project Milk Processing Plant- Nagaon

Project Location Nagaon, Assam


Area of the project 0.67 acre
Approx. Project cost As per Detailed Project Report
Focus sector Dairy
Status of approvals Greenfield project
Project contours With the rising income level of the growing middle class in Assam, the demand for milk and milk
products is also increasing significantly. Besides traditional milk products which have urban as well
as rural markets, there is also a tremendous scope for marketing of value added milk products.

The Department envisages augmenting the dairy sector by bringing in private investments for
further organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure
waste disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Nagaon is located on NH37
The nearest railway station is at Nagaon and airport is at Guwahati, 140 kms away
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture

111
Milk Processing Plant - Bajali, Barpeta

Name of Project Milk Processing Plant - Bajali, Barpeta

Project Location Bajali, Barpeta


Area of the project Land to be identified

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals The project is identified and DPR is under preparation

Project contours With the rising income level of the growing middle class in Assam, the demand for milk and milk
products is also increasing significantly. Besides traditional milk products which have urban as well
as rural markets, there is also a tremendous scope for marketing of value added milk products

The Department envisages augmenting the dairy sector by bringing in private investments for
further organising the value chain
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure
waste disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Barpeta is connected by NH 31
Nearest railway station is Pathsala and nearest airport is Lokpriya Gopinath Bordoloi International
Airport, Guwahati.
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Govt. of Assam.

112
Processing unit of medicinal herbs with marketing facilities

Name of Project Processing unit of medicinal herbs with marketing facilities

Project Location Sarutari Departmental Farm, Byrnihat, Kamrup, Assam


Area of the project 20860 sq ft
Approx. Project cost INR 5 crore (~USD 1.85 million)
Focus sector Horticulture
Status of approvals Greenfield project
Project contours Assam produces 11700 MT of various herbs with medicinal value and adjoining state of Meghalaya
produces 5600 MT.
To provide processing and marketing platform for farmers of the region, cultivating the medicinal
plants.
To initiate commercial cultivation of medicinal plants in the farmers’ field as per market demand and
raw materials requirements/ capacity of the processing unit with buy back arrangements.
To process and market locally available medicinal herbs within the state, thereby decreasing the
outflow of volume of raw herbs from North east to other states.
Investment Opportunities Across areas of medicinal herb value chain in PPP mode
Connectivity The site is located near Guwahati - Shillong Road
The nearest railway station is Guwahati
The nearest airport is at Guwahati.

Proposed Infrastructure Construction of building, purchasing machineries and creation of marketing infrastructures
Nodal agency Directorate of Horticulture & Food Processing

113
Ginger Processing Unit

Name of Project Ginger Processing Unit

Project Location Bokajan, Assam


Area of the project Approx. 2.47 acres. Site shall be finalised in consultation with Karbi Anglong Autonomous Council
Approx. Project cost INR 12 crore (~USD 1.85 million)
Focus sector Food Processing
Status of approvals Greenfield project
Project contours Bokajan produces 17213 MT of ginger annually and Dima Hasao produces 39533 MT
Processing of locally produced gingers for export. Final product may be ginger powder, oleoresin,
ginger paste etc.
Investment Opportunities Civil Construction, plant & machineries and O&M across ginger value chain
Connectivity The site is along the NH-39, well connected by rail network. The nearest airport is at Guwahati, 295
kms away
Proposed Infrastructure The site is well connected by 3 phase electricity and water is available round the clock
Nodal agency Directorate of Horticulture & Food Processing.

114
Modern Rice Processing unit (Specially for Red Rice)

Name of Project Modern Rice Processing unit (Specially for Red Rice)

Project Location Biswanath District, Assam


Area of the project 2.47 acres
Approx. Project cost INR 10 crore (~USD 1.54 million)
Focus sector Horticulture and Food Processing
Status of approvals Greenfield project
Project contours Dhemaji and Majuli produces 18661 MT and 11466 MT respectively
Processing with retention of specialty of the red rice produced in Dhemaji and Majuli
Investment Opportunities Private Sector investment in rice processing
Connectivity The proposed project area is well connected with both railways and roads
Proposed Infrastructure Civil construction and installation of plant and machineries
Nodal agency Directorate of Horticulture & Food Processing

115
Banana Park

Name of Project Banana Park

Project Location Matia, Goalpara


Area of the project 7.41 acres
Approx. Project cost INR 18 crore (~USD 2.77 million)
Focus sector Horticulture and Food Processing
Status of approvals Greenfield project
Project contours Production of banana in the districts of Goalpara, Kamrup Rural and Dhubri is substantial with
production stats of 81646 MT, 4344 MT and 17856 MT respectively in 2015-16.
Processing and value addition of banana from harvesting to final product
Investment Opportunities Private Sector investment in Banana Processing and whole value chain
Connectivity The project area is well connected with both railways and roads (NH 37), Matia is 126 km from
Guwahati
Nearest airport is at Guwahati
Proposed Infrastructure Civil construction and installation of plant and machineries
Nodal agency Directorate of Horticulture & Food Processing.

116
Mustard Oil Processing Unit with marketing facilities

Name of Project Mustard Oil Processing Unit with marketing facilities

Project Location Kamalabari, Majuli


Area of the project 2.47 acre
Approx. Project cost INR 1 crore (~USD 0.15 million)
Focus sector Food Processing
Status of approvals Greenfield project
Project contours Majuli produces good quantum of quality mustards with production of 6275 MT of mustard in 2015-
16. To process and market locally available mustard of Majuli and nearby districts, thereby decreasing
the outflow of volume of raw mustard
Investment Opportunities Private sector investment in design, development and operations of the unit
Connectivity Kamalabari is located in the river island Majuli and is well connected by ferries with the nearest town
of Jorhat.
Jorhat lies along the NH 37
Jorhat has a railway station and an airport (Rowriah)
Proposed Infrastructure Civil construction and installation of plant and machineries
Nodal agency Directorate of Horticulture & Food Processing

117
Tissue Culture Laboratory

Name of Project Tissue Culture Laboratory

Project Location Khanapara, Guwahati


Area of the project Land to be identified
Approx. Project cost INR 1.5 crore (~USD 0.22 million)
Focus sector Horticulture
Status of approvals The tissue culture lab was established in 2014-15 under RKVY scheme
Project contours Raising of tissue culture saplings of high value
Investment Opportunities Investment is sought in PPP mode for operation and maintenance of the laboratory
Connectivity The site is within Guwahati city and is well connected with rail, road and air with rest of the
country
Proposed Infrastructure Ready infrastructure provided by the Department
Nodal agency Directorate of Horticulture & Food Processing

118
V Type Nursery

Name of Project V Type Nursery

Project Location Ulubari, Guwahati


Area of the project 21, 000 sq. ft.
Approx. Project cost INR 1.5 crore (~USD 0.22 million)
Focus sector Horticulture
Status of approvals The V type nursery was established in 2014-15 under RKVY scheme
Project contours For raising of high quality planting materials of vegetables and flower crops having high tech green
house with automated seeding machine and production capacity – Approx. 50 Lakhs per year
Investment Opportunities Investment is sought for in PPP mode for operation and maintenance of the project
Connectivity The site is within Guwahati city and is connected with rail road and air with rest of the country.
Proposed Infrastructure Ready infrastructure provided by the Department
Nodal agency Directorate of Horticulture & Food Processing

119
Orchid Park

Name of Project Orchid Park

Project Location Guwahati (to be made available with consultation with District Administration)
Area of the project 2.47 acre
Approx. Project cost INR 20 crores (~USD 2.08 mn)
Focus sector Horticulture
Status of approvals Greenfield project

Project contours Commercial cultivation of locally available orchids both open field and protected conditions
To provide primary processing and marketing platform of the Orchids
To initiate commercial cultivation of orchids in the farmers’ field as per market demand with buy back
arrangements
Investment Opportunities Investment is sought in PPP mode
Connectivity The site is within Guwahati city and is connected with rail, road and air with rest of the country
Proposed Infrastructure Construction of protected structures, building, installation of machineries and creation of marketing
infrastructures.
Nodal agency Directorate of Horticulture & Food Processing

120
Spices Park for Ginger and Turmeric Processing

Name of Project Spices Park for Ginger and Turmeric Processing

Project Location Horticultural farms at Kathiatholi – owned by Director of Horticulture, Nagaon District, Assam
Area of the project 24 acre
Approx. Project cost INR 10 Crore (~USD 15.38 million)
Focus sector Food Processing
Status of approvals The government of Assam has approved the proposal and Spices Board is in the stage of identifying an
agency for the preparation of a DPR for the project.
Project contours A Spices Park can be defined as an industrial park for processing and value addition of spices and spice
products which offers facilities at par with the international standards.

Nagaon produced 6494 MT of ginger and 1731 MT of turmeric in 2015-16

The processing for both spices


Cleaning/Washing: To ensure quality and to ensure that the product of free from extraneous matter, animal
or insect waste, mud etc, spices must first be washed well.
Boiling of tumeric: Turmeric rhizomes are first boiled before further processing is done to them. Therefore,
they may first be boiled and then sent for drying.
Drying: The fresh produce will be at its most useful to the spice processors or exporters once it has been
dried well. Higher content of moisture makes the spices susceptible to insect and fugal attack. At harvest,
ginger has a moisture content of around 80%. Raw materials must not have a moisture content above 6 –
7%.
Slicing of ginger: Mechanised slicing machinery can be used for the purpose of slicing of ginger.
Peeling of turmeric: The outer skin of the rhizome maybe peeled off mechanically.

121
Investment Opportunities The Regional crop specific Spices Park is a well-conceived approach to have an integrated operation for
cultivation, post harvesting, processing for value addition, packaging, storage and exports of spices and
spice products by meeting the quality specifications of the consuming countries.
High exports for ginger and turmeric: Ginger and turmeric are among the spices that are exported in large
quantities from India.
Intrinsic qualities of North eastern ginger and turmeric: The North East grows indigenous varieties of ginger
and turmeric that is not available elsewhere. This gives these North Eastern spices an edge over the same
spices produced elsewhere.
For example, North east produces turmeric if high curcumin content like the lakadong and Megha varieties
with approximately 7.4% curcumin as opposed to regular turmeric which contains curcumin at around 5%.
Connectivity Road
Located a few kilometres off of NH 37, the plot is not far from this major highway.
Rail
The closest railway station of Jamunamukh is 10 KM away. Still further away, a second station of Lanka is at a
40 KM distance.
Airway
The closest airport is the Tezpur airport (Tezpur, Assam) at a distance of 73.8 KM.
Transportation of spices to the park for processing and from the park, after processing can go smoothly
without any hindrance.

Proposed Infrastructure Electricity


The plot previously had electricity supply and none currently because of lack of requirement. Kaliabor power
station is the nearest power substation in the area
Water
Water that has been used here is sourced from a body of water that flows directly behind the plot
Nodal agency Spices Board

122
Tea Park

Name of Project Tea Park

Project Location Jorhat


Area of the project 123 acres
Approx. Project cost INR 126 crores (~USD 19.38 million)
Focus sector Food Processing
Status of approvals Pre-feasibility for the park has been prepared and approved by the concerned authority
Project contours The proposed site is in the district of Jorhat, which is in the highest tea producing region in Assam
Jorhat is expected to transform into a Class I town within the next 10 years
The Numaligarh refinery is located at a distance of 66 km from Jorhat via NH37.
Investment Opportunities Being the largest tea producing region of Assam, good investment opportunities exists along the
different activities of tea value chain
Connectivity Jorhat is well connected by NH37 which connects it to Guwahati and all the other district of Assam
on the southern bank of river Brahmaputra
It is well connected to Dibrugarh in the east and Guwahati and to the rest of India on the west
Jorhat airport is the third largest airport in Assam
The nearest IWT Terminal is at Neamati which is ~ 17 km from Jorhat Town
Proposed Infrastructure A new power generation plant of 50 MW is coming up at Amguri, which is at a distance of ~ 38 km
from the proposed site.
Natural gas will be made available to the site from the existing terminal at Duliajan
Private as well as public telecom service providers provide extensive service in this region. Internet
and telecom services are provided by mobile companies such as Airtel, Vodafone, Aircel, and BSNL in
the district.
Nodal agency Assam Industrial Development Corporation

123
Multi Fruit Juice Production Unit

Name of Project Multi Fruit Juice Production Unit

Project Location Bokakhat District, Assam


Area of the project 4 acre
Approx. Project cost INR 15 crores (~USD 2.31 million)
Focus sector Food Processing
Status of approvals Greenfield project
Project contours There is good international demand for certain fresh fruits as well as processed fruits products. Fresh
fruits identified as having good export potential are: mango, banana, litchi and exotics like passion
fruit, grown in this area
The project intends to tap the local fruit market for raw materials and add value to it in the form of
NFC and concentrated fruit juices
Bokakhat produced 3549 MT of pineapple and 1067 MT of oranges.
Nearby district of Karbi Anglong produced 36687 MT of pineapple and 25297 MT of oranges
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity NH 37 passes through Bokakhat
The nearest railway stations are Badulipar and Furkating
Proposed Infrastructure Total connected load of about 250kW will be required. About 75 KL of water will be required every
working day.
Concerned authority shall facilitate supply of requisite water and power for the project
Nodal agency Directorate of Horticulture, Department of Agriculture

124
Exotic Pig Germplasm Bank

Name of Project Exotic Pig Germplasm Bank

Project Location Kathiatoli , Nagaon


Area of the project 14 Acres
Approx. Project cost As per Detailed Project Report
Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours Assam has a huge pig market potential. The total pork production during 2014-15 was around 16544
tonne.
A quality Pig Germplasm shall boost and augment pig production
Investment Opportunities Opportunity for private sector investment in setting up of Exotic Pig Germplasm Bank with modern
infrastructure
Connectivity Nagaon is connected to the National Highway 36 and 37 providing easy access to important places in
Assam. Kathiatoli is 20km away from district headquarter Nagaon.
There are two railway stations in Nagaon town, one at Haiborgaon and another at Nagaon town. The
nearest railway junction is at Chaparmukh, which is around 28 km from Nagaon
The nearest airport is Tezpur Aiport. The nearest international airport is Lokpriya Gopinath Bordoloi
International Airport in Guwahati
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

125
Pig Processing Plant and Farm

Name of Project Pig Processing Plant and Farm

Project Location Jagiroad, Morigaon


Area of the project 11.61 Acres

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours Assam has a huge pork market potential with the total pork production during 2014-15 was around
16544 tonne.
The state records highest pork consumption in the country and the strategic location of the state
shall help to export pork and its allied products to neighbouring countries such as Nepal, Bhutan and
Myanmar

Investment Opportunities Opportunity for private sector investment in setting up of pork processing plant and necessary
infrastructure facilities.
Connectivity Jagiroad is well connected with NH-37 and 49 KM away from Guwahati by road
Nearest Airport is Lokapriya Gopinath Bordoloi International Airport, Guwahati
Jagiroad is well connected to other major cities of the country via regular trains. The nearest railway
station is Jagiroad
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

126
Feed Mill Plant at Dibrugarh

Name of Project Feed Mill Plant at Dibrugarh

Project Location Dibrugarh


Area of the project Land to be Identified

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours The state has a huge demand for livestock and potential for breeding livestock such as buffalo, sheep,
goat, pig, flow, and duck etc. With rising income level of the growing middle class in Assam, the demand
for meat also increase significantly which has also created higher demand for balanced concentrate feed.
To tap the potential market, department has envisaged creating concentrated feed mill plants.
Investment Opportunities Opportunity for setting up of feed mill plant with ultra-modern infrastructure and equipped labs which
ensure the best raw materials are utilized to produce quality end products.
Connectivity Nearest airport is Dibrugarh
Nearest railway station is Dibrugarh Railway Station
Dibrugarh is connected to the rest of India by NH-37
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

127
Feed Mill Plant at Bongaigaon

Name of Project Feed Mill Plant at Bongaigaon

Project Location Bongaigaon


Area of the project Land to be identified

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals Greenfield project

Project contours The state has a huge demand for livestock and potential for breeding livestock such as buffalo,
sheep, goat, pig, flow, and duck etc. With rising income level of the growing middle class in Assam,
the demand for meat also increase significantly which has also created higher demand for balanced
concentrate feed. To tap the potential market, department has envisaged creating concentrated feed
mill plants.
Investment Opportunities Opportunity for setting up of feed mill plant with ultra-modern infrastructure and equipped labs
which ensure the best raw materials are utilized to produce quality end products.
Connectivity The nearest domestic and international airport is Lokpriya Gopinath Bordoloi International Airport,
Guwahati
Nearest railway station is at Bongaigaon
Bongaigaon is connected to rest of Assam through NH 31 and NH 37
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

128
Concentrated feed and feed block manufacturing plant at Bajali, Barpeta

Name of Project Concentrated feed and feed block manufacturing plant at Bajali, Barpeta

Project Location Bajali, Barpeta, Assam


Area of the project 0.67 acre
Approx. Project cost As per Detailed Project Report
Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours The proportion of crossbred animals or improved strains of birds has increased over the years in
Assam. This has necessitated higher demand for balanced concentrate feed. To tap the potential
market, department has envisaged creating concentrated feed and feed block manufacturing
plants.
Investment Opportunities Potential Players are expected to construct of factory building, go-downs for raw materials as
well as for finished products, office, canteen, generator room, essential quarters, etc. Purchase of
equipment such as grinder, feed mixer, pelletizer, elevators, feed packing units, etc. Miscellaneous
equipment such as transformer, generators, weighing scales vehicles etc.
Connectivity Barpeta is located on NH427
The nearest railway station is in Barpeta and airport is at Guwahati, which is 97kms away
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam

129
Concentrated Feed Block Manufacturing Plant at Sonapur

Name of Project Concentrated Feed Block Manufacturing Plant at Sonapur

Project Location Sonapur, Kamrup (M)


Area of the project Land to be identified

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals Greenfield project

Project contours The proportion of crossbred animals or improved strains of birds increased over the years in Assam.
This has necessitated higher demand for balanced concentrate feed. To tap the potential market,
department has envisaged creating concentrated feed and feed block manufacturing plants.
Investment Opportunities Potential Players are expected to construct of factory building, go-downs for raw materials as well as
for finished products, office, canteen, generator room, essential quarters, etc. Purchase of equipment
such as grinder, feed mixer, pelletizer, elevators, feed packing units, etc. Miscellaneous equipment
such as transformer, generators, weighing scales vehicles etc.
Connectivity Sonapur is located 20 KM from Guwahati City and well connected with roads.
Nearest railway station is in Guwahati and nearest airport is Lokpriya Gopinath Bordoloi International
Airport, Guwahati.
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

130
Organic Milk Production - All Districts

Name of Project Organic Milk Production - All Districts

Project Location All Districts of Assam


Area of the project 8-10 acres of land per unit
Approx. Project cost As per Detailed Project Report
Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours With the rising income level of the growing middle class in Assam and rising awareness about health
benefits of organic products, the demand for organic milk and milk products is also increasing
significantly. Organic milk has very high demand in Assam and being a niche product, yields higher
margins.
This project aims at meeting the demand supply gap of organic milk products and providing citizen
with a healthier product class.
MOVCD scheme, implemented across 10 clusters of Assam covering 5000 ha of net cultivable land for
organic farming of vegetables and other crops shall act as a feeder to this project.
Investment Opportunities Investors are expected to procure and manage livestock, provide for organic fodder, provide for store
facility & refrigeration system and create marketing infrastructure
Connectivity Districts are well connected with roads and railways
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam

131
Organic Fodder Production – All Districts

Name of Project Organic Fodder Production – All Districts

Project Location All Districts


Area of the project Will be based on area available in the district.
Approx. Project cost As per Detailed Project Report
Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours With the rising demand for organic product including milk, demand for organic fodder has
increased manifold, there is a huge gap of demands and supply in terms of fodder production
This project aims at meeting the demand supply gap of organic fodder.
MOVCD scheme, implemented across 10 clusters of Assam covering 5000 ha of net cultivable land
for organic farming of vegetables and other crops shall act as a feeder to this project.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, provide for
store facility and create marketing infrastructure under PPP framework
Connectivity All proposed places / districts are well connected with good road ways and railways
Proposed Infrastructure Developed land with electricity and water source is provided by the concerned department
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam

132
Bio Gas Plant

Name of Project Bio Gas Plant

Project Location Across all Dairy Cooperative Societies in Assam


Area of the project 0.07 acre per Biogas plant
Approx. Project cost As per Detailed Project Report
Focus sector Renewable Energy and Animal Husbandry
Status of approvals Greenfield project
Project contours The projects are envisaged to produce electricity / Biogas from the cattle excreta generated locally,
to ensure environmentally safe disposal of cattle excreta from dairies and prevent degradation of soil
and pollution of water and to produce, as a by-product, organic manure for use in agriculture.
Investment Opportunities Investors are free to choose any type of technology for production of biogas from the cattle excreta
and other such type of biomass to be used in the project for power generation / biogas conforming
to the standard norms approved by MNRE,GOI / BIS Specifications for Biogas as per specifications IS
16087: 2013 confirming to the prevailing laws as applicable.
Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility and create marketing infrastructure
Connectivity All proposed places / districts are well connected with good road ways and railways
Proposed Infrastructure Developed land with electricity and water source is provided by the concerned department
Nodal agency Directorate of Dairy Development, Department of Agriculture

133
Setting up of Broiler Parent Breeding Farm at Kamrup and Jorhat District

Name of Project Setting up of Broiler Parent Breeding Farm at Kamrup and Jorhat District

Project Location Kamrup and Jorhat district


Area of the project Land to be identified
Approx. Project cost As per Detailed Project Report
Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours Assam has a huge market demand for broiler, the strategic location of the state shall help to export
meat to neighbouring countries such as Nepal, Bhutan, Bangladesh and Myanmar
Investment Opportunities Opportunity for private sector investment in setting up of Broiler Parent Breeding Farm and
necessary infrastructure facilities.
Connectivity Kamrup and Jorhat districts are well connected with roads
Nearest Airport in Kamrup district is Lokapriya Gopinath Bordoloi International Airport, Guwahati
and Rowriah Airport in Jorhat district
Both Kamrup district and Jorhat district is well connected to other major cities of the country via
regular trains
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

134
Establishment of Commercial Layer Farms

Name of Project Establishment of Commercial Layer Farms

Project Location 15 nos. in different districts of the state


Area of the project Land to be identified
Approx. Project cost As per Detailed Project Report
Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours Commercial production of eggs is required to meet the increased demand for eggs in the State. The
strategic location of the state shall also help to export eggs to neighbouring countries such as Nepal,
Bhutan, Bangladesh and Myanmar
Investment Opportunities Opportunity for private sector investment in establishing commercial layer farms necessary
infrastructure facilities.
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

135
Setting up of Multiplier pig farm (500 capacity)

Name of Project Setting up of Multiplier pig farm (500 capacity)

Project Location North Lakhimpur, Dibrugarh, Kamrup and Nagoan


Area of the project Land to be identified

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours Assam has a huge pork market potential with the total pork production during
2014-15 was around 16544 tonne. The state records highest pork consumption in
the country and the strategic location of the state shall help to export pork and its
allied products to neighbouring countries such as Nepal, Bhutan, Bangladesh and
Myanmar
Investment Opportunities Opportunity for private sector investment in setting up of Multiplier pig farm with
500 capacity and necessary infrastructure facilities.
Connectivity All the four districts are well connected with roads, railways and airways
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned
department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.

136
Setting up of Veterinary Biologicals Products (Vaccines)

Name of Project Setting up of Veterinary Biologicals Products (Vaccines)

Project Location Kamrup(M)


Area of the project Land to be identified

Approx. Project cost As per Detailed Project Report


Focus sector Animal Husbandry
Status of approvals Greenfield project
Project contours Productivity of livestock & poultry depends on timely vaccination of different contagious diseases.
Livestock & poultry are mostly affected viral /bacterial diseases which are contagious in nature
can be prevented by different vaccine produced under ISO protocol. Considering huge demand of
vaccines in the entire N.E. States can be the consumer/user
Investment Opportunities Opportunity for private sector investment in setting up of Veterinary Biologicals (Vaccines)
Connectivity The district is well connected with roads, railways and airways
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam

137
Aqua Park at Hajo

Name of Project Aqua Park at Hajo

Project Location Hajo, Kamrup (R)


Area of the project 8 to 10 acres
Approx. Project cost As per Detailed Project Report
Focus sector Fishery
Status of approvals Greenfield project
Project contours Assam is one of the major maritime States, offering vast scope for development of inland, brackish
water and marine fisheries. Hence, awareness relating to farming of fishery products shall boost the Fish
business to meet the domestic and export demand which in turn will also the economy of state and
generate sustainable employment.
To boost revenue generation and attract tourists foot fall, other allied activities like water park,
recreational fish catching, fish therapy spa, sports fishing facilities (angling), boating, swimming pool,
musical fountain with laser show, conventional hall, restaurants and resorts is planned. The private
investors can charge entry fees, rentals from food zone, retail zone, Hospitality (Resorts & Cottages) etc.
The Aqua Park will serve as a breeding of traditional and ornamental fishes. The fish varieties will be
bred in different floating cages.
The park is envisaged to propagate suitable technology to protect indigenous fish resources, besides
protecting natural fish diversity.
The park will also act as a training centre for farmers in handling and feeding fishes, checking water
quality and disease diagnosis and packing and marketing of fish after harvest.
Investment Opportunities Investors are expected to construct floating cages with platform and solar lights, lake reclamation,
procurement of fish feed and fish seeds, Aquarium cum interpretation Centre, Training and Awareness
Centre, Hostel Facility for the trainer and trainees, Theme restaurant on Fish and other recreational and
amusement park infrastructure.
Connectivity The area is well connected through roads, airports and railways
LGBI Airport in Guwahati is 36 km (approx.) from Hajo
Nearest railway station is at Agyathuri
Proposed Infrastructure Power supply and water supply will be provided by the concerned department

Nodal agency Directorate of Fisheries, Govt. of Assam

138
IT & ITeS
IT Park at Guwahati

Name of Project IT Park at Guwahati

Project Location Bangara ,Kamrup (M) District


Area of the project 100 acre
Approx. Project cost INR 989 crore (~USD 152.15 million)
Focus sector IT & ITES
Employment Approx. 4000
Status of approvals Approved by Information Technology Department, Government of Assam. Plot area of 100 acres has
been acquired at Bangara Village near LGBI Airport for the Park.
Project contours The Information Technology (IT) Park is to be setup in the State in the city of Guwahati with an objective
for enabling suitable environment for IT/ITeS industries. The ecosystem in the State is ready in terms of
available Urban Infrastructure and Public facilities, good air and rail connectivity, engineering colleges,
large pool of English speaking skilled population and city living standards. The IT Park will not only pro-
vide facilities for the IT industry to have offices but would also generate employment thus contributing to
growth and progress of the State.
Investment Opportunities Major opportunities are in development of the entire physical and social infrastructure for ‘IT Park’ along
with the government. Estimated 15 lakh Sqft. of built-up space.
Setting up IT & ITeS facilities in the Park
O&M of the park for stipulated period
Connectivity The project is situated near National Highway 37.
The project is situated on the outskirts of Guwahati and is just 20 kms from Guwahati station and 5 km
from the airport.
Proposed Infrastructure Requirement of water and power will be facilitated by the Government. Approach road to the project site
has been completed.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

140
Electronics Manufacturing Cluster, Guwahati

Name of Project Electronics Manufacturing Cluster, Guwahati

Project Location Guwahati, Assam


Area of the project 35 acres within IT Park in Guwahati.
Approx. Project cost INR 290 crore (~USD 44.62 million)
Focus sector IT & ITES
Status of approvals DPR prepared. Land Identification is in progress.
Project contours To develop the infrastructure for the growth of IT and electronics industry in the State, the project
needs urgent attention. Electronics Manufacturing project will build a complete electronics eco-
system with a long term technology development path.

Investment Opportunities An amount of more than INR 750 Crore (~USD 115.38 million) is estimated to be invested in this
sector over the next 5 years by private investors. Potential industries in this sector are Solar panel
manufacturing, LED, CPE, photonics, optoelectronics etc.
To start manufacturing of existing technology products, consolidating the ecosystem and driving
the technology roadmap, incubation units, SME’s and embedding core design and manufacturing
skills
Evolution to new technologies and establishing a world class centre for innovation and
manufacturing.
Connectivity The project is planned to be setup in Guwahati and is well connected by rail, road and air
Proposed Infrastructure Requirement of water and power will be facilitated by the Government.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

141
IT Park at Dibrugarh

Name of Project IT Park at Dibrugarh

Project Location Dibrugarh District


Area of the project 33 acres
Approx. Project cost INR 326 crore (~USD 50 million)
Focus sector IT & ITES
Employment Approx. 3000
Status of approvals New Project
Project contours The Information Technology (IT) Park is to be setup in the State in the city of Dibrugarh with an
objective for enabling suitable environment for IT/ITeS industries. The ecosystem in the State is
ready in terms of available Urban Infrastructure and Public facilities, good air and rail connectivity,
engineering colleges, large pool of English speaking skilled population and city living standards.
The IT Park will not only provide facilities for the IT industry to have offices but would also generate
employment thus contributing to growth and progress of the State.
Investment Opportunities Major opportunities are in development of the entire physical and social infrastructure for ‘IT Park’
along with the government. Estimated 10 lakh sqft of built-up space.
Setting up IT & ITeS facilities in the Park
O&M of the park for stipulated period
Connectivity The project is situated near National Highway 37
The project is situated on the outskirts of Dibrugarh and is near to Dibrugarh Airport.
Proposed Infrastructure Requirement of water and power will be facilitated by the Government.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

142
IT Park at Silchar

Name of Project IT Park at Silchar

Project Location Silchar, Assam


Area of the project 43 acres
Approx. Project cost INR 425 crore (~USD 65 million)
Focus sector IT & ITES
Employment Approx. 3000
Status of approvals New Project
Project contours The Information Technology (IT) Park is to be setup in the State in the city of Silchar with an objective
for enabling suitable environment for IT/ITeS industries. The ecosystem in the State is ready in terms
of available Urban Infrastructure and Public facilities, good air and rail connectivity, engineering
colleges, large pool of English speaking skilled population and city living standards. The IT Park will
not only provide facilities for the IT industry to have offices but would also generate employment
thus contributing to growth and progress of the State.
Investment Opportunities Major opportunities are in development of the entire physical and social infrastructure for ‘IT Park’
along with the government. Estimated 10 lakh sqft of built-up space.
Setting up IT & ITeS facilities in the Park
O&M of the park for stipulated period
Connectivity The project is planned near Silchar and is well connected to Silchar Airport and Railway Station.
Proposed Infrastructure Requirement of water and power will be facilitated by the Government.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

143
Business Process Outsourcing Centre - Silchar

Name of Project Business Process Outsourcing Centre - Silchar

Project Location Silchar, Assam


Area of the project 1 acre
Approx. Project cost INR 20 Crore (~USD 3.1 million)
Focus sector IT & ITES
Employment Approximate : 400
Status of approvals New Project
Project contours The nodal agency envisages starting Business Process Outsourcing Centres in the state.
Investment Opportunities The BPOs to offer voice and data handling services, content translation, content management services.
Service can be online or offline.
Civil and other infrastructure to be built and developed
PPP partner to bring expertise in operation, training etc. The operation cost of the BPO to be borne by
the PPP partner, the initial setup cost to be borne by the State.
Connectivity The project proposed in Silchar is well connected by Rail, Road and Air
Proposed Infrastructure Required Water and Electricity to be provided by the concerned authority.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

144
Business Process Outsourcing Centre - Dibrugarh

Name of Project Business Process Outsourcing Centre - Dibrugarh

Project Location Dibrugarh District, Assam


Area of the project 1 acre
Approx. Project cost INR 20 Crore (~USD 3.1 million)
Focus sector IT & ITES
Employment Approximate : 400
Status of approvals New Project
Project contours The nodal agency envisages starting Business Process Outsourcing Centres in the state.
Investment Opportunities The BPOs to offer voice and data handling services, content translation, content management
services. Service can be online or offline.
Civil and other infrastructure to be built and developed
PPP partner to bring expertise in operation, training etc. The operation cost of the BPO to be borne by
the PPP partner, the initial setup cost to be borne by the State.
Connectivity The project is situated near National Highway 37
The project is situated on the outskirts of Dibrugarh and near Dibrugarh Airport and Railway Station.
Proposed Infrastructure Required Water and Electricity to be provided by the concerned authority.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

145
Rural BPO

Name of Project Rural BPO

Project Location 15 locations across Assam


Area of the project 10000 sqft per location
Approx. Project cost INR 635.56 Crore (~USD 97.78 million) for all 15 centres
Focus sector IT & ITES
Employment Approximate : 3500
Status of approvals New Project
Project contours Rural BPOs are proposed to create a platform to train and employ rural youth, ensuring development
of the rural economy and at the same time, offering public services. Significant service can be
rendered in mid skill regional specific work through the Rural BPOs. The nodal agency envisages
starting Rural Business Process Outsourcing Centres in the state.
Investment Opportunities To setup at least 15 BPOs across the State in the rural areas. Each BPO is to be 100 seater.
The BPOs to offer voice and data handling services, content translation, content management
services. Service can be online or offline.
Civil and other infrastructure to be built and developed
PPP partner to bring expertise in operation, training etc. The operation cost of the BPO to be borne
by the PPP partner, the initial setup cost to be borne by the State.
Proposed Infrastructure Required Water and Electricity to be provided by the concerned authority.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

146
State Wide Connectivity (IT)

Name of Project  State Wide Connectivity (IT)

Project Location State Headquarter and 33 Districts headquarters


Approx. Project cost INR 100 crore (~USD 15.485 million)
Focus sector IT & ITES
Status of approvals New Project
Project contours Keeping in view the Sustainable Development Goals, GoA envisages bridging major gap areas in last
mile IT connectivity.
Investment Opportunities Last mile connectivity to around 75000 Govt institutions including schools and colleges, in a phased
manner, majorly by 2022
Last mile Connectivity to 26000 villages from the GP in a phased manner majorly to be completed by
2022
At the Govt. institution level, the bandwidth projection is projected as follows:

S No Category of Govt. office Bandwidth Requirement


1 State Secretariat 1 GB
2 Directorates 300 Mb
3 Offices at district and sub district 100 Mb
level

At the citizen level, assuming 80 lac households by 2030, and 1 Gbps per household, the bandwidth
requirement is projected at 8 Ptbs, say 10Petabyte/sec.
To provide OFC back-haul for mobile service providers
Creation of redundancy at all level DHQ, BHQ, GP etc.
Augmenting and replacing equipment for vertical connectivity
Operation and maintenance of PoPs, vertical and horizontal connectivity
Provide community Wi-Fi internet service across, hotspots so that entire community has access to high
speed Broadband till 2025
Each last mile connection can have upto 5 cables of 12 core each, as such the bandwidth can be scaled
upto 60 GB. GPON (Gigabyte Ethernet Passive Optical Fiber Network) technology to be used for maxi-
mum utility.
Proposed Infrastructure Requirement of water and power will be facilitated by the Government.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

147
Assam State Data Centre

Name of Project Assam State Data Centre

Project Location Guwahati City


Approx. Project cost INR 232.40 crores (~USD 35.75million)
Focus sector IT & ITeS
Status of approvals New Project
Project contours Government envisages provisioning of a secure place for the Govt. data, a suitable Disaster recovery
solution and cloud hosting infrastructure
Investment Opportunities A Disaster recovery solution, including facility for Backup as a Service
Cloud Hosting in public or private cloud for department applications upto 10 TB
Operation & Maintenance of the AMTRON Data Centre which is a near DR and backup data centre
IT Augmentation of the State Data Centre in addition to the DeitY funded components
Operation & Maintenance of the SDC after initial 5 years
Connectivity The project will be implemented in Guwahati and is well connected by Rail, Road and Air.
Proposed Infrastructure Construction of building for the State Data Centre has been completed
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

148
IT Start-up Incubation Centre

Name of Project IT Start-up Incubation Centre

Project Location Guwahati, Assam


Investment Approx. INR 40 crore - 15 crore (~USD 6.15 million)
Land Area Approx. 1.5 acres
Mode of Development PPP (Public Private Participation)
Project contours Government through PPP will create a plug and play start-up infrastructure which will be a
futuristic Green Building
To have a research centre for incubation, testing and development of new ideas.
Provide fast efficient and transparent application and approval procedure over a single window.
Government will help setting up new units through seed assistance, office rentals and technical
know-how
Technical knowhow and incubation support on IoT as IOT projects have tremendous potential
for surveillance of forests, international borders, and generating alert in the event of natural
disasters viz. earthquake, flood etc.
Technical knowhow and incubation support on E-Health as Assam has significant potential for
tele-medicine. The e-health solutions across the Government and Private sectors has the poten-
tial to attract investment to the tune of INR 500-600 Crores.
Investment Opportunities Government through PPP will create a plug and play start-up infrastructure which will be a futur-
istic Green Building.
Connectivity The project is planned to be setup in Guwahati and is well connected by rail, road and air.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)

149
Skill Development
Development of Skill City in Guwahati / Sonapur / North Guwahati

Name of Project Development of Skill City in Guwahati / Sonapur / North Guwahati

Project Location Guwahati / Sonapur / North Guwahati


Area of the project ~30-35 acres of land
Approx. Project cost To be finalised post preparation of DPR
Focus sector Skill Development in Healthcare, IT-ITES, Tourism & Hospitality, Beauty & Wellness, Construction,
Security & allied Services, Retail, Apparels & Clothing, Automobiles, Infrastructure Equipment,
Plumbing, Logistics, Media & Entertainment, Textiles, Life Sciences, Green and Renewable Energy,
Telecommunication, Agriculture & Allied etc.
Employment ~500
Status of approvals Green Field
Project contours Land on Lease
Ready / Available basic infrastructures
Huge gap of Demand vs supply of skilled manpower in market
Annually 5,000+ candidates to be skilled under various skill development schemes / CSR funds /
revenue based model
Talent pool ready to be employed available in the State
A strong base in the form of an established State Skill Development Mission.
Investment Opportunities Sector Specific State of Art Skill Institutions / Centres to be run on PPP mode on Long term lease
Vacant plots / Developed infrastructure to be provided
Connectivity Project location would be in Guwahati, the Industrial and development hub of North-East
Proposed Infrastructure State-of-the-art Sector Specific Model skill centers
Migration Support / Source Centre
Recreational area for trainees
Residential Complex for trainees
Health and wellness Centre
Library / Knowledge Info Centre
Offices of Sector Skill Councils
Placement Cell at each Skill Centers
Technology Business Incubation Centre
Entrepreneurship Development Cell
Grievance Redressal Cell
Mini Commercial Complex
Nodal agency Assam Skill Development Mission

151
Advanced Skills Training Institute (ASTI) – Model A

Name of Project Advanced Skills Training Institute (ASTI) – Model A


under Assam Skill Development Mission (ASDM)

Project Location Locations for Model A: Guwahati, Nagaon, Jorhat, Dibrugarh, Tinsukia, Tezpur, Bongaigaon and
Silchar
Project contours Finishing and Advanced skills linked to employment for youth
Recognition of Prior Learning and Self-Employment for youth
The ASTIs and ITIs to operate in a Hub & Spoke model
Skill fresh entrants and a cadre of 250 Master Trainers
International level quality assurance and benchmarking
Technology enable teaching and learning
Professional management through Assam Skill Development Mission
Mode of Private Participation Training operations of ASTIs (selection through ASTI operations bid)
Civil construction of ASTIs (selection through civil construction bid)
Equipment supply to ASTIs (selection through equipment supply bid)
Quality Assurance Consultants (selection of firm through QAC bid)
Project Management Consultants (selection of firm through PMC bid)
Self-Employment Operator (selection of firm through SEO bid)
Training Capacity ASTIs to target 3000-4000 youth per year as below
ITI pass outs – not in employment, not in training
Unemployed engineers, graduates, polytechnic students/graduates
Customized skill up-gradation of existing workforce
Investment Envisaged ASTIs (Model A)
No Capital Investment
Working Capital Investment for training operations
Revenue generation and payback to ASDM
Infrastructure to be provided by ASTIs (Model A)
Govt. of Assam Ready to use state of the art training institutions (land, building and equipment to be provided
by Govt. of Assam)
Support to be provided by Govt. of Overall Quality Assurance, Assessment & Certification, Benchmarking and Industry Linkages
Assam Mobilization of youth from network institutions
Pre and Post Placement support
Support of spoke ITIs to each ASTI
Nodal agency Assam Skill Development Mission (ASDM)

152
Advanced Skills Training Institute (ASTI) – Model B

Name of Project Advanced Skills Training Institute (ASTI) – Model B


under Assam Skill Development Mission

Project Location Locations for Model B: Any two locations in Assam as proposed by the private operator where it
holds land and building to operate an ASTI. To avoid coinciding with Model ‘A’ locations
Project contours Finishing and Advanced skills linked to employment for youth
Recognition of Prior Learning and Self-Employment for youth
The ASTIs and ITIs to operate in a Hub & Spoke model
Skill fresh entrants and a cadre of Master Trainers
International level quality assurance and benchmarking
Technology enable teaching and learning
Professional management through Assam Skill Development Mission
Mode of Private Participation Training operations of ASTIs (selection through ASTI operations bid)
Civil construction of ASTIs (selection through civil construction bid)
Equipment supply to ASTIs (selection through equipment supply bid)
Quality Assurance Consultants (selection of firm through QAC bid)
Project Management Consultants (selection of firm through PMC bid)
Self-Employment Operator (selection of firm through SEO bid)
Training Capacity ASTIs to target 3000-4000 youth per year as below
ITI pass outs – not in employment, not in training
Unemployed engineers, graduates, polytechnic students/graduates
Customized skill up-gradation of existing workforce
Investment Envisaged ASTIs (Model B)
Use of existing land and building. Joint Ventures would be allowed.
Working Capital Investment for training operations
Revenue generation and payback to ASDM
Infrastructure to be provided by Govt. ASTIs (Model B)
of Assam Permission to use existing infrastructure of private sector to be used as ASTIs
Full Equipment support to the ASTIs
Support to be provided by Govt. of Overall Quality Assurance, Assessment & Certification, Benchmarking and Industry Linkages
Assam Mobilization of youth from network institutions
Pre and Post Placement support
Support of spoke ITIs to each ASTI
Nodal agency Assam Skill Development Mission

153
Healthcare
Establishment of New Medical College attached with existing District Hospital

Name of Project Establishment of New Medical College attached with existing District Hospital

Project Location Karimganj District, Assam


Area of the project 30 acres of land for Medical College within 10 km from existing District Hospital
Approx. Project cost Subject to DPR
Focus sector Healthcare
Status of approvals New Project under ‘Establishment of New Medical Colleges attached with existing District/Referral
hospitals’ scheme of MoHFW, GoI

Project contours Trained and competent human resource is the foundation of an effective healthcare delivery system.

The concerned department envisages mitigating the shortage of doctors by increasing the number
of undergraduate seats in the state by utilising existing infrastructure of district hospitals in a cost
effective manner.
Investment Opportunities Construction, refurbishment, procurement, installation of equipment, commissioning & management
of the Medical College under PPP framework
Connectivity Karimganj is well connected by Road, Railways and Air.
Proposed Infrastructure Supply of power and water will be facilitated by the department
Nodal agency Health and Family Welfare Department, Assam

155
Establishment of New Medical College attached with existing District Hospital

Name of Project Establishment of New Medical College attached with existing District Hospital

Project Location Goalpara District, Assam


Area of the project 30 acres of land for Medical College within 10 km from existing District Hospital
Approx. Project cost Subject to DPR
Focus sector Healthcare
Status of approvals New Project under ‘Establishment of New Medical Colleges attached with existing District/Referral
hospitals’ scheme of MoHFW, GoI

Project contours Trained and competent human resource is the foundation of an effective healthcare delivery system.

The concerned department envisages mitigating the shortage of doctors by increasing the number
of undergraduate seats in the state by utilising existing infrastructure of district hospitals in a cost
effective manner.
Investment Opportunities Construction, refurbishment, procurement, installation of equipment commissioning & management
of the Medical College under PPP framework
Connectivity Goalpara is connected by Road, Railways. Nearest Airport, LGBI is 125 kms away.
Proposed Infrastructure Supply of power and water will be facilitated by the department
Nodal agency Health and Family Welfare Department, Assam

156
Establishment of Urban Primary Health Centres (UPHC) in all District Headquarters of Assam

Name of Project Establishment of Urban Primary Health Centres (UPHC) in all District Headquarters of Assam

Project Location Across all district headquarters of Assam


Area of the project 2500 sqft per UPHC
Approx. Project cost Subject to DPR
Focus sector Healthcare
Status of approvals New Project
Project contours The concerned department envisages operating Urban Primary Health Centres to provide integrated
and sustainable system for primary health care with focus on urban poor living in slums and other
health vulnerable groups in cities.

On one hand, this initiative will help in reducing out of pocket expenditure on healthcare for urban
poor and on the other hand reduce footfall of patients who do not require secondary/tertiary attention
in district hospitals/medical colleges in the urban areas.

2 UPHCs per district Headquarter and 10 UPHCs in Guwahati


Total: 74 Urban Primary Health Centres.

Investment Opportunities The bidder/Service Provider will be entrusted to run the UPHC services as per the Standard operating
procedures. This would include provisioning of MBBS doctor along with necessary para-medical and IT
technical staff at each site.

Proposed Infrastructure UPHC infrastructure shall comply with Indian Public Health Standards guidelines.
Nodal agency Health and Family Welfare Department, Assam

157
Setting up and Maintenance of Haemodialysis Units in Medical Colleges

Name of Project Setting up and Maintenance of Haemodialysis Units in Medical Colleges

Project Location Across all Medical Colleges of Assam


Area of the project 3000 sqft per unit
Focus sector Healthcare
Status of approvals New Project
Project contours The concerned authority proposes to invite private sector players for setting up of a Haemodialysis
unit for management of Haemodialysis procedure at all medical colleges of Assam. Haemodialysis
Units shall be set up for catering to the needs of the patients in Assam, who are presently going to
faraway places for getting these services.

Investment Opportunities Investors would be required to Build, Operate, Maintain and Transfer the Haemodialysis unit at
the space provide by Medical Colleges. They would recruit and manage all the required personnel
including consulting Nephrologists, technicians, nurses, ward boys and other support staff apart
from providing required Electronic Medical Record system.
Proposed Infrastructure Water, Electricity, Space for setup and power backup would be provided by the concerned authority.
Nodal agency Health and Family Welfare Department, Assam

158
Setting up and Management of Cardiac Centres in District Hospitals

Name of Project Setting up and Management of Cardiac Centres in District Hospitals

Project Location Across all District Hospitals of Assam


Area of the project 3000 sqft per unit
Focus sector Healthcare
Status of approvals New Project
Project contours The concerned department apart from undertaking the strengthening of the primary health care
services in the state has also been making efforts to provide specialized secondary and tertiary care
facilities in the government hospitals.

There are number of patients who require cardiac treatment on regular basis as well as emergency
interventions. Cardiac treatment in private hospitals is unaffordable for the poor patients.

In this regard, the concerned authority invites interested investors to commission, operate, maintain
and manage the Cardiac Centres across all district hospitals of Assam.
Investment Opportunities
Investors are required to Build, Operate and Transfer the Cardiac Centres at the space provide by
District Hospitals. They would recruit and manage all the required personnel including consulting
cardiologists, technicians, nurses, ward boys and other support staff and provide for Electronic
Medical Record System.
Proposed Infrastructure Water, Electricity, Space for setup and power backup would be provided by the concerned authority.
Nodal agency Health and Family Welfare Department, Assam

159
Engagement of Healthcare Service Provider for Operations and Management of Primary/Secondary
Healthcare Centres

Name of Project Engagement of Healthcare Service Provider for Operations and Management of Primary/
Secondary Healthcare Centres

Project Location 30 Community Health Centres (CHC) across Assam. A cluster based approach will be followed. Each
cluster shall consist of one CHC and its associated PHCs.
Area of the project All associated Primary Health Centres and one Community Health Centre
Focus sector Healthcare
Status of approvals New Project
Project contours The concerned authority invites interested investors to commission, operate, maintain and manage
the Cluster of CHCs and associated PHCs in accordance with IPHS Guidelines
Investment Opportunities Potential Investors would be required to recruit and manage all the required personnel including
consulting physicians, technicians, nurses, ward boys and other support staff and provide Electronic
Medical Record system
Proposed Infrastructure The concerned authority envisages to have state of the art healthcare facilities accessible to public.
The infrastructure and facilities within the CHC and PHC should be compliant with IPHS guidelines
Nodal agency Health and Family Welfare Department, Assam

160
Establishment and operations of Nursing Colleges with 60 seats each

Name of Project Establishment and operations of Nursing Colleges with 60 seats each

Project Location 10 districts of Assam


Area of the project 54,470 sqft of Built-up Space per Nursing College (Nursing Council of India Norms)
Focus sector Healthcare
Status of approvals New Project
Project contours Trained and competent human resource is the foundation of an effective healthcare delivery
system.

The concerned department envisages mitigating the shortage of nurses and paramedics by
increasing the number of undergraduate seats in the state for equitable health care accessibility
across the state.

It also envisages to become a supplier of skilled paramedical human resources across the globe.

Investment Opportunities Construction, refurbishment, procurement, installation of equipment, commissioning &


management of the Nursing Colleges under PPP framework
Proposed Infrastructure Land to be provided by the concerned department under PPP framework.
Nodal agency Health and Family Welfare Department, Assam

161
AYUSH Training Institute cum Wellness Centre

Name of Project AYUSH Training Institute cum Wellness Centre

Project Location Nabagraha Hills, Guwahati, Assam


Area of the project 0.33 acre
Approx. Project cost INR 10 crores (~USD 1.54 mn)
Focus sector Healthcare
Status of approvals New Project
Project contours With ancient Indian medicine systems like AYUSH (Ayurveda, Yoga, Unani, Siddha and
Homeopathy) gaining popularity amongst people in Assam, there is a need for establishment
of new AYUSH wellness centers and hospitals in the region. Similarly, there is a need for training
manpower for taking the practice forward.

This Training cum wellness center will act as hub for skilling manpower in AYUSH sector and at
the same time act as a wellness and healing center for people of the city as well as for tourists.
This will further promote health seeking behavior amongst people of Guwahati.
Investment Opportunities Investors are invited for set up and operate the centre in PPP mode
Connectivity Nabagraha is located in Guwahati and is connected to rest of city through excellent network of
Roads. Guwahati Railway Station is 4 kilometers from the project site and Guwahati Airport is 22
kilometers away.
Proposed Infrastructure Proposed Infrastructure shall consist of:
Training Institute, Wellness and Healing Zone for people seeking alternative healthcare.
Nodal agency Health & Family Welfare Department, Assam

162
Urban
Infrastructure
Water Supply Project, Bongaigaon

Name of Project Water Supply Project, Bongaigaon

Project Location Bongaigaon


Approx. Project cost INR 79 crores (~USD 12.15 million)
Focus sector Urban Water Supply
Status of approvals Pre-feasibility study for the project on PPP mode has already been done.
Project contours Total demand for water supply in Bongaigaon is expected to be 14 MLD and 18 MLD by 2025 and
2035 respectively.

Significant gaps exists between demand and supply of potable piped water in the town and it is
expected to become acute in the years to come when one factors in the industrial development
planned in the region.

To augment water supply and ensure 24x7 piped supply to all consumers, the proposed project has
been conceived. The project covers the entire water supply value chain from source development
to O&M.
Investment Opportunities Development and maintenance of water supply system on PPP mode.
Nodal agency Urban Development Department, Government of Assam

164
Water Supply Project, Dhubri

Name of Project Water Supply Project, Dhubri

Project Location Dhubri


Approx. Project cost INR 81 crores (~USD 12.46 million)
Focus sector Urban Water Supply
Status of approvals Pre-feasibility for the project on PPP mode has already been done.
Project contours The estimated demand for water supply to all consumers is expected to be 13 MLD and 18 MLD by 2025
and 2035 respectively.

Currently less than 20% of households are connected with the water supply network. Further the
planned industrial development in the region will add further pressure to the existing water supply
network.

To meet the existing demand and future demand, the proposed project on PPP mode has been
conceived to ensure 24x7 water supply to all the consumers.

The proposed project involves creating and augmenting the water supply network across the water
supply value chain.
Investment Opportunities Development and maintenance of water supply network on PPP mode.
Nodal agency Urban Development Department, Government of Assam.

165
Water Supply Project, Dibrugarh

Name of Project Water Supply Project, Dibrugarh

Project Location Dibrugarh


Approx. Project cost INR 162 crores (~USD 24.92 million)
Focus sector Urban Water Supply
Status of approvals Pre-feasibility study for the project on PPP mode has already done.
Project contours The estimated demand for water supply to all consumers is expected to be 27 MLD and 36 MLD by
2025 and 2035 respectively.

Currently less than 30% of households are connected with the water supply network. Further the
planned industrial development in the region will add further pressure to the existing water sup-
ply network.

To meet the existing and future demand, the proposed project on PPP mode has been conceived
to ensure 24x7 water supply to all the consumers.

The proposed project involves creating and augmenting the water supply network across the
water supply value chain.
Investment Opportunities Development and maintenance of water supply project on PPP mode.
Nodal agency Urban Development Department, Government of Assam

166
Water Supply Project, Nagaon

Name of Project Water Supply Project, Nagaon

Project Location Nagaon


Approx. Project cost INR 118 crores (~USD 18.15 million)
Focus sector Urban Water Supply
Status of approvals Pre-feasibility for the proposed project to be executed on PPP mode has already been prepared
Project contours The estimated demand for water supply to all consumers is expected to be 27 MLD and 36 MLD
by 2025 and 2035 respectively.

Currently less than 30% of households are connected with the water supply network. Further
the planned industrial development in the region will add further pressure to the existing water
supply network.

To meet the existing and future demand, the proposed project on PPP mode has been conceived
to ensure 24x7 water supply to all the consumers. The proposed project involves creating and
augmenting the water supply network across the water supply value chain.
Investment Opportunities Development and maintenance of the proposed water supply project on PPP mode
Nodal agency Urban Development Department, Government of Assam

167
Water Supply Project, Tezpur

Name of Project Water Supply Project, Tezpur

Project Location Tezpur


Approx. Project cost INR 67 crores (~USD 10.31 million)
Focus sector Urban Water Supply
Status of approvals Pre-feasibility study for the proposed project to be taken up on PPP mode has already been prepared
Project contours The estimated demand for water supply to all consumers is expected to be 11 MLD and 15 MLD by 2025
and 2035 respectively.

Currently less than 75% of households are connected with the water supply network. Further the
planned industrial development in the region will add further pressure to the existing water supply
network.

To meet the existing and future demand, the proposed project on PPP mode has been conceived to
ensure 24x7 water supply to all the consumers.

The proposed project involves creating and augmenting the water supply network across the water
supply value chain.
Investment Opportunities Development and maintenance of water supply project on PPP mode.
Nodal agency Urban Development Department, Government of Assam

168
Solid Waste Management, Dibrugarh

Name of Project Solid Waste Management, Dibrugarh

Project Location Dibrugarh


Approx. Project cost INR 74 crores (~USD 11.38 million)
Focus sector Urban Sanitation
Status of approvals Pre-feasibility study for the proposed Solid waste Management to be implemented on PPP mode
at Dibrugarh has been prepared
Project contours The population of Dibrugarh is expected to increase from the 2011 figure of 138,661 to 213,433 by
2025 and 286,840 by 2035.

Dibrugarh being a Class I town, the total waste generated is expected to be 83 TPD and 128 TPD
by 2025 and 2035 respectively, and accordingly the treatment capacity will have to be increased.

For 100% coverage, the network will have to cover 49,636 houses and 66,707 houses by 2025 and
2035 respectively.

The project envisages the complete range of activities involved in solid waste management i.e.
from collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam

169
Integrated Solid Waste Management, Guwahati

Name of Project Integrated Solid Waste Management, Guwahati

Project Location Guwahati


Approx. Project cost INR 605 crores (~USD 93.08 million)
Focus sector Urban Sanitation
Status of approvals Pre-feasibility study for the proposed Integrated Solid waste Management to be implemented on
PPP mode at Guwahati has been prepared
Project contours The population of Guwahati is expected to increase from the 2011 figure of 1,209,908 to
1,706,233 by 2025 and 2,205,530 by 2035.

The total waste generated is expected to be 932 TPD and 1375 TPD by 2025 and 2035
respectively, and accordingly the treatment capacity will have to be increased.

For 100% coverage, the network will have to cover 396,798 houses and 512,914 houses by 2025
and 2035 respectively.

The project envisages the complete range of activities involved in solid waste management i.e.
from collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam

170
Solid Waste Management, Jorhat

Name of Project Solid Waste Management, Jorhat

Project Location Jorhat


Approx. Project cost INR 33 crores (~USD 5.08 million)
Focus sector Urban Sanitation
Status of approvals Pre-feasibility study for the proposed Solid waste Management to be implemented on PPP mode at
Jorhat has been prepared
Project contours The population of Jorhat is expected to increase from the 2011 figure of 71,398 to 100,694 by 2025
and 130,166 by 2035.

Jorhat will transform into a Class I town by 2025, the total waste generated is expected to be 39 TPD
and 58 TPD by 2025 and 2035 respectively, and accordingly the treatment capacity will have to be
increased.

For 100% coverage, the network will have to cover 23,417 houses and 30,271 houses by 2025 and
2035 respectively.

The project envisages the complete range of activities involved in solid waste management i.e. from
collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam

171
Solid Waste Management, Nagaon

Name of Project Solid Waste Management, Nagaon

Project Location Nagaon


Approx. Project cost INR 48 crores (~USD 7.38 million)
Focus sector Urban Sanitation
Status of approvals Pre-feasibility study for the proposed Solid waste Management to be implemented on PPP mode at
Nagaon has been prepared
Project contours The population of Nagaon is expected to increase from the 2011 figure of 116,355 to 158,876 by 2025
and 191,784 by 2035.

Nagaon being a Class I town, the total waste generated is expected to be 62 TPD and 86 TPD by 2025
and 2035 respectively, and accordingly the treatment capacity will have to be increased.

For 100% coverage, the network will have to cover 37,129 houses and 49,773 houses by 2025 and
2035 respectively.

The project envisages the complete range of activities involved in solid waste management i.e. from
collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam

172
Solid Waste Management, Silchar

Name of Project Solid Waste Management, Silchar

Project Location Silchar


Approx. Project cost INR 81 crores (~USD 12.46 million)
Focus sector Urban Sanitation
Status of approvals Pre-feasibility study for the proposed Solid waste Management to be implemented on PPP mode at
Silchar has been prepared
Project contours The population of Silchar is expected to increase from the 2011 figure of 172,709 to 244,276 by 2025
and 318,855 by 2035.

Silchar being a Class I town, the total waste generated is expected to be 95 TPD and 142 TPD by 2025
and 2035 respectively, and accordingly the treatment capacity will have to be increased.

For 100% coverage, the network will have to cover 56,808 houses and 74,152 houses by 2025 and
2035 respectively.

The project envisages the complete range of activities involved in solid waste management i.e. from
collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam

173
Waste water recycling and storm water reuse

Name of Project Waste water recycling and storm water reuse

Project Location Guwahati


Approx. Project cost Subject to preparation of DPR
Focus sector Urban Infrastructure/ Smart City
Status of approvals Greenfield Project
Project contours Presently the streams carry untreated sewage water, which is envisaged to be collected through an
Inceptor Drain then carried to small decentralized biological waste water treatment facilities and
the treated water shall be allowed to flow back

Entire water channel to be designed to have solar powered aerators to improve the quality of water

Floating islands shall be created with a variety of plants which feed on the nutrients in the storm
water to keep it clean

The focus of the entire project is to help the city to manage its storm water, and help it to recycle its
waste water.
Investment Opportunities Creation of waste water recycling infrastructure and maintenance of the same in PPP mode
Nodal agency Urban Development Department, Government of Assam

174
Area Based Development Project in Borsola Beel (Lake)

Name of Project Area Based Development Project in Borsola Beel (Lake)

Project Location Guwahati


Approx. Project cost First Year: SPV fund: INR 45 crores, Private Funds : INR 20 Crores, Convergence: INR 15 crores (~USD
3.08 million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours The department envisages retrofitting of contiguous area of 696 acres of connected water bodies of
the city. Borsola Beel is one of the water bodies identified by the department for the same.

Use of eco-restoration, bio-remediation techniques is envisaged to transform this degraded water


body into a performing ecological landscape and further into a tourist attractions.

The project will essentially be a flood mitigation plan which will double up as a newly reclaimed
vibrant public realm for walking and cycling.

Investment Opportunities -Construction of Treatment Plant


-Cleaning & resection of Beel (Lake)
-Development of parks
-Lease the space for commercial activities to generate revenue
-Operation & Maintenance
- Activity areas like art and craft zone, vendor market, water sports and cycling, organic farming, solar
power generation, and other tourism activities can be clubbed.
Nodal agency Urban Development Department, Government of Assam

175
Area Based Development Project in Morabharalu River, 12Km length

Name of Project Area Based Development Project in Morabharalu River, 12 km length

Project Location Guwahati


Approx. Project cost First Year: SPV fund: Rs 80 crores, Convergence: INR 20 crores,
Second Year: SPV fund: INR 40 crores, Private : INR 40 crores, Convergence: INR 40 crores
Third Year: SPV fund: INR 50 crores, Private : INR70 crores, Convergence: INR 61 crores (~USD 16.92
million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours The department envisages retrofitting of contiguous area of 696 acres of connected water bodies of
the city. Morabharalu is one of the water bodies identified by the department for the same.

Use of eco-restoration, bio-remediation techniques is envisaged to transform this degraded water


body into a performing ecological landscape and further into a tourist attractions.

The project will essentially be a flood mitigation plan which will double up as a newly reclaimed
vibrant public realm for walking and cycling.

Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes infrastructure for
treatment of the water body, activity areas like art and craft zone, vendor market, water sports and
cycling, organic farming, food court, solar power generation and other tourism activities.
Nodal agency Urban Development Department, Government of Assam

176
Area Based Development Project in Bharalu River, 6km length

Name of Project Area Based Development Project in Bharalu River, 6km length

Project Location Guwahati


Approx. Project cost First Year: SPV fund: INR 50 crores, Convergence: INR 30 crores
Second Year: SPV fund: INR 40 crores, Private : INR 61 crores, Convergence: INR 35 crores
Third Year: Private : INR 45 crores, Convergence: INR 35 crores (~USD 16.31 million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours The department envisages retrofitting of contiguous area of 696 acres of connected water bodies of the
city. Bharalu River is one of the water bodies identified by the department for the same.

Use of eco-restoration, bio-remediation techniques is envisaged to transform this degraded water body
into a performing ecological landscape and further into a tourist attractions.

The project will essentially be a flood mitigation plan which will double up as a newly reclaimed vibrant
public realm for walking and cycling.

Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes infrastructure for
treatment of the water body, activity areas like art and craft zone, vendor market, water sports and
cycling, organic farming, food court, solar power generation and other tourism activities.
Nodal agency Urban Development Department, Government of Assam

177
Area Based Development Project in Brahmaputra Riverfront Development, 5km length

Name of Project Area Based Development Project in Brahmaputra Riverfront Development, 5km length

Project Location Guwahati


Approx. Project cost First Year: SPV fund: INR 70 crores, Convergence: INR 10 crores
Second Year: SPV fund: INR 80 crores, Convergence: INR 20 crores
Third Year: SPV fund: INR 120 crores, Convergence: INR 20 crores
Fourth Year: Private fund: INR 80 crores Convergence : INR 20 Crores
Fifth Year: Private fund: INR 62 crores, Convergence: INR 50 crores (~USD 12.31 million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours The department envisages retrofitting of contiguous area of 696 acres of connected water bodies of
the city. Brahmaputra Riverfront is one of the areas identified by the department for the same.

Use of eco-restoration, bio-remediation techniques is envisaged to transform this riverfront into a


performing ecological landscape and further into a tourist attraction.

The project will essentially be a flood mitigation plan which will double up as a newly reclaimed
vibrant public realm for walking and cycling.

Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes activity areas
like art and craft zone, vendor market, water sports and cycling, organic farming, food court, solar
power generation and other tourism activities.
Nodal agency Urban Development Department, Government of Assam

178
Area Based Development Project in Deepar Beel (Lake/wetland), 382 acres

Name of Project Area Based Development Project in Deepar Beel (Lake/wetland), 382 acres

Project Location Guwahati


Approx. Project cost SPV INR 200 Crores, Private fund: INR 50 crores (~USD 7.69 million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours Deepar Beel is an internationally acclaimed Ramsar convention site, which attracts migratory bird and
has a potential to be developed as a wetland park.

Deepar Beel is one of the water body identified by the department as a part of the contiguous area of
696 acres of connected water bodies of the city.

Use of eco-restoration, bio-remediation techniques is envisaged to transform this waterbody into


performing ecological landscape and further into tourist attractions.

Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes flood mitigation
mechanism for Deepar Beel.
Activity areas like art and craft zone, vendor market, water sports and cycling, organic farming, food
court, solar power generation and other tourism activities can be clubbed to the project.
Nodal agency Urban Development Department, Government of Assam

179
Ropeway from Kamakhya to Sonaram School area

Name of Project Ropeway from Kamakhya to Sonaram School area

Project Location Guwahati


Approx. Project cost INR 100 crore (~USD 15.38 million)
Focus sector Urban Infrastructure
Status of approvals Concept stage
Project contours Department envisages to provide an alternate means of transport for the commuters, devotees and
tourists visiting the holy shrine of Kamakhya temple in Nilachal Hills.

The project shall connect Kamakhya temple to Sonaram School via a ropeway network.

Investment Opportunities Opportunities for private parties for development and O&M through competitive bidding process
Nodal agency Urban Development Department, Government of Assam

180
Multilevel Car Parking, Ganeshguri, Guwahati

Name of Project Multilevel car parking, Ganeshguri, Guwahati

Project Location Ganeshguri, Guwahati


Approx. Project cost INR 18 crore (~USD 2.77 million)
Focus sector Urban Infrastructure
Status of approvals DPR stage
Project contours Increasing density of population necessitates vertical growth of parking spaces in Guwahati for
better land utilisation.

Government envisages to develop a multilevel car parking complex in Ganeshguri, Guwahati

This automatic car parking system will enable the parking of vehicles, floor after floor and thus
reducing the space used. Here any number of cars can be parked according to the requirement.
These makes the system modernized and thus space-saving one.

Investment Opportunities Opportunities for private parties through competitive bidding process
Nodal agency Urban Development Department

181
Multilevel car parking, Panbazar, Guwahati

Name of Project Multilevel car parking, Panbazar, Guwahati

Project Location Panbazar, Guwahati


Approx. Project cost INR 18 crore (~USD 2.77 million)
Focus sector Urban Infrastructure
Status of approvals DPR stage
Project contours Increasing density of population necessitates vertical growth of parking spaces in Guwahati for
better land utilisation. Government envisages to develop a multilevel car parking complex in
Panbazar, Guwahati

This automatic car parking system will enable the parking of vehicles, floor after floor and thus
reducing the space used. Here any number of cars can be parked according to the requirement.
These makes the system modernized and thus space-saving one.

Investment Opportunities Opportunities for private parties through competitive bidding process
Nodal agency Urban Development Department, Government of Assam

182
Installation of lifts in Footbridge at Ganeshguri, Bharalumukh and Ulubari

Name of Project Installation of lifts in Footbridge at Ganeshguri, Bharalumukh and Ulubari

Project Location Ganeshguri, Bharalumukh and Ulubari


Approx. Project cost Subject to preparation of DPR
Focus sector Urban Infrastructure
Status of approvals Concept stage
Project contours To enhance the overall accessibility of the foot bridges by the pedestrians’ automated lifts will be
installed for the pedestrian overhead foot bridges

Construction of elevated platforms to connect the proposed lifts

Ancillary works including electrical and mechanical, drainage, landscaping and lighting works
Investment Opportunities Opportunities for private parties through competitive bidding process
Nodal agency Urban Development Department, Government of Assam

183
Development of Bus Bay and Bus Stop

Name of Project Development of Bus Bay And Bus Stop

Project Location Guwahati


Approx. Project cost Private fund: INR 40 crores (~USD 6.15 million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours Within the city the dedicated bus bays and bus stops shall help to reduce the traffic congestion and
also provide convenience to the passengers.

The design and location of the bus bays shall improve the efficiency of transport system. The idea is to
decongest the roads and facilitate the safety and convenience of bus passengers and other road users

Investment Opportunities Investment to private firms on PPP for construction of Bus Stops and Bus Bays
Nodal agency Urban Development Department, Government of Assam

184
Improvement of Footpath, Road Crossing and Roads

Name of Project Improvement of Footpath, Road Crossing and Roads

Project Location Guwahati


Approx. Project cost AMRUT Funds: INR 430 crores (~USD 66.15 million)
Focus sector Urban Infrastructure/ Smart City
Status of approvals Approval under Smart Cities Mission, Government of India
Project contours The project shall involve:
Development of pathways
Improvement and upgradation of the existing infrastructure
Maintenance and improvement of the pedestrian facilities to improve the pedestrian commute.

Investment Opportunities Investment opportunity includes development and O&M of improvement of Footpaths, Road
Crossings And Roads.
Nodal agency Urban Development Department, Government of Assam

185
Mass Rapid Transit System (MRTS) Phase I, Guwahati

Name of Project Mass Rapid Transit System (MRTS) Phase I, Guwahati

Project Location Guwahati, Assam


Area of the project / length 61.4 km in Phase I
Approx. Project cost INR 18,020 Crore (~USD 2.77 Billion)
Focus sector Urban Infrastructure
Employment ~500
Status of approvals Detailed Project Report (DPR) approved
Project contours Train with three car racks will have a carrying capacity up to 975 passengers
Under Phase I, there will be four corridors namely, Dharapur-Narangi (elevated) with a length 22.6
km, M.G. Road to Khanapara (underground) 10 km, Jalukbari to Khanapara (elevated) 19.4 km and
ISBT to Paltanbazar (elevated) covering a stretch of 9.4 km.
There will be altogether 54 stations across all the routes.
Investment Opportunities Development and O&M of MRTS in Design Build Operate and Transfer (DBOT)
Nodal agency Guwahati Metro Rail Corporation Ltd. (GMRCL), a wholly owned company of Govt. of Assam

186
Development of Multi level Market Complex at Uzan Bazaar

Name of Project Development of Multi level Market Complex at Uzan Bazaar

Project Location Uzan Bazar, Guwahati


Area of the project 1 acre
Approx. Project cost INR 30 crores (~ USD 5 million)
Focus sector Infrastructure
Employment Direct:100
Status of approvals New Project
Project contours Increasing density of population necessitates vertical growth of existing market and parking
spaces in Guwahati for better land utilisation.

Government envisages to develop the existing Uzan bazar market into a multilevel complex.

Investment Opportunities Opportunities for private parties through competitive bidding process
Connectivity Uzanbazar is a busy residential colony within Guwahati well connected through buses to rest of
the city.
Proposed Infrastructure The multilevel market complex will have:
Parking facility for 75 vehicles
Parking bay for 2 trucks
Space for 100 shops
Space for 100 open vegetable/fruit vending tuck shops
Public Toilets at each level
Escalators, Lifts
Specially abled friendly access.
Waste Disposal facilities
Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam

187
Ropeway across Brahmaputra in Guwahati

Name of Project Ropeway across Brahmaputra in Guwahati

Project Location Across River Brahmaputra, Guwahati and North Guwahati, Assam
Area of the project
Approx. Project cost INR 12 crores (~USD1.84 mn)
Focus sector Infrastructure
Employment Direct Employment :30
Status of approvals New Project
Project contours With growth of commercial, industrial and institutional activities across both banks of river
Brahmaputra in Guwahati, commuting across the river has increased manifold. Most of the
commuters are presently using country boats and ferries for crossing the river. Country boats are
not the safest means of transport especially during the monsoons and flooding season.

The proposed mass transit ropeway will act as a safe and convenient mode of commuting. Also,
a halt in Umananda will enable hundreds of tourist visiting the temple island daily to use the
ropeway.

Investment Opportunities Investors are invited for Design Build Operate and Transfer of the project
Connectivity North Guwahati is connected with rest of Guwahati through excellent network of Roads and
Ferries, which ply on River Brahmaputra. Guwahati Railway Station, the nearest station, is 7 km
from North Guwahati by ferry and Guwahati Airport is 40 km away.
Proposed Infrastructure Proposed Infrastructure shall consist of a Bi-cable ropeway system with a carrying capacity of
600-700 passengers per hour during peak flow.

Nodal agency Public Works Department, Government of Assam

188
Development of Adabari land in PPP mode

Name of Project Development of Adabari land in PPP mode

Project Location Adabari, Guwahati


Area of the project 18 acres
Approx. Project cost INR 500 crores
Focus sector Urban Infrastructure
Employment 100 to 200
Status of approvals Land identified and possession taken by Guwahati Municipal Corporation (GMC)
Project contours Model to be developed in PPP-DBFOT mode
GMC transfers usage rights to Concessionaire against fixed annual concession fee
Concession period: 30 years
Indicative space allocation based on market study
Investment Opportunities Opportunities for private parties through competitive bidding process
Connectivity Nearest Airport in International LGB airport
Nearest Waterways port is Pandu port (1 km)
Nearest Railway station is Paltan bazar, Guwahati station.
Proposed Infrastructure Construction of Bus Terminal-cum-Commercial Complex
Construction and provision of related passenger amenities on the project site
Construction of other infrastructure (power and back up arrangements/ CCTV etc)
Operation & maintenance of Integrated facility for Concession Period
Ensure all KPIs are met / Demand and levy User fee
Nodal agency Guwahati Municipal Corporation, Assam
Indicative Layout

189
Road
Infrastructure
Construction of bridge over river Brahmaputra connecting Panbazar to North Guwahati

Name of Project Construction of bridge over river Brahmaputra connecting Panbazar to North Guwahati

Project Location Pan bazar to North Guwahati


Approx. Project cost INR 1890 crores (~USD 290.77 million)
Focus sector Urban Infrastructure
Status of approvals DPR stage
Project contours Six lane bridge over river Brahmaputra
Expansion of the city towards the north bank which will reduce the congestion in the existing
city areas

Investment Opportunities Development of project in PPP mode


Nodal agency Urban Development Department, Government of Assam

191
Construction of bridge over river Brahmaputra connecting Sualkuchi to Palashbari

Name of Project Construction of bridge over river Brahmaputra connecting Sualkuchi to Palashbari

Project Location Sualkuchi to Palashbari


Focus sector Urban Infrastructure
Status of approvals DPR stage
Project contours Six lane bridge over river Brahmaputra
Expansion of the city towards the north bank which will reduce the congestion in the existing city
areas

Investment Opportunities Development of project in PPP mode


Nodal agency Urban Development Department, Government of Assam

192
Amingaon to Chapaguri Road Project

Name of Project Amingaon to Chapaguri Road Project

Project Location Amingaon -Hajo-Kalitakuchi-Barpeta-Lengtisinga-Abhayapuri-North Salmara-Chapaguri


Length of the project road 144 km
Approx. Project Cost INR 1,375 crores (~USD 211.54 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has been done
Investment Opportunities Development of project in PPP mode
Nodal agency Public Works Department, Government of Assam

193
Bhilasapuri to Sherfanguri Road project

Name of Project Bhilasapuri to Sherfanguri Road project

Project Location Bilasipara – Fakiragram, Fakiragram – Dotma, Dotma - Sherfanguri


Length of the project road 50 km
Approx. Project Cost INR 280 crores (~USD 43.08 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility studies completed
Investment Opportunities Development of project in PPP mode
Nodal agency Public Works Department, Government of Assam

194
Chamaria to Pancharatna Road project

Name of Project Chamaria to Pancharatna Road project

Project Location Lampara – Goraimari, Goraimari – Goalpara, Chamaria – Nagarbera, Nagarbera – Simlitola, Simlitola
– Matia, Matia – Mornoi, Mornoi – Goalpara, Goalpara - Pancharatna
Length of the project road 101 km
Approx. Project Cost INR 540 crores (~USD 83.08 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study for the stretch has already been done
Investment Opportunities Development of proposed infrastructure on PPP Mode
Nodal agency Public Works Department, Government of Assam

195
Lumding to Umrongso Road project

Name of Project Lumding to Umrongso Road project

Project Location Lumding – Lanka, Lanka – Kheroni, Kheroni – Dayangmukh, Dayangmukh - Haflong Tinali,
Haflong Tinali – Umrongso
Length of the project road 64 km
Approx. Project Cost INR 597 crores (~USD 91.85 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of the proposed road stretch on PPP mode
Nodal agency Public Works Department, Government of Assam

196
Rowta to Barpeta Road Stretch

Name of Project Rowta to Barpeta Road Stretch

Project Location Rowta – Udalguri, Udalguri – Paneri, Paneri – Tamulpur, Tamulpur – Salbari, Salbari - Manas
National Park, Salabari – Simlaguri, Simlaguri-Barpeta Road
Length of the project road 230 km
Approx. Project Cost INR 980 crores (~USD 150.77 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam

197
Brahmaputra Expressway

Name of Project Brahmaputra Expressway

Project Location Sadiya to Dhubri along the banks of River Brahmaputra


Length of the project road 890 km along the river Brahmaputra
Approx. Project cost INR 40,000 crores (~USD 6.1 billion)
Focus sector Infrastructure
Employment -
Status of approvals Approved by Govt. of India. The feasibility study is commencing shortly and the bid process for
selection of private sector developer will be carried out post feasibility.
Project contours The proposed expressway, a greenfield corridor, will connect Sadiya with Dhubri touching all the
major towns/ cities on south bank of Brahmaputra, significantly reducing the travel time.

Investment Opportunities Development of project on PPP mode.


Connectivity
Proposed Infrastructure 6 lane expressway with controlled access.
Nodal agency National Highways Authority of India

198
Kalitakuchi to Nalbari Road Stretch

Name of Project Kalitakuchi to Nalbari Road Stretch

Project Location Kalitakuchi-Bijuloghat-Nalbari


Length of the project road 21.85 km
Approx. Project Cost INR 168.74 crores. (~USD 25.96 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam

199
Dhakuwakhana to Garamur Road Stretch

Name of Project Dhakuwakhana to Garamur Road Stretch

Project Location Dhakuwakhana-Jengraimukh-Garamur Road


Length of the project road 48 km
Approx. Project Cost INR 267.02 crores (~USD 41.08 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam

200
Lanka to Garmapani Road Stretch

Name of Project Lanka (from East West Corridor) to Garampani Road Stretch

Project Location Lanka-Umrangso-Garampani Road


Length of the project road 73.133 km
Approx. Project Cost INR 438.09 crores (~USD 67.40 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam

201
North Lakhimpur to Kamalabari Road Stretch

Name of Project North Lakhimpur-Kamalabari(Majuli) Road Stretch

Project Location North Lakhimpur-Kamalabari(Majuli) Road


Length of the project road 39.72 km
Approx. Project Cost INR 225.98 crores. (~USD 34.77 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam

202
Raha to Hamren Road Stretch

Name of Project Raha to Hamren Road Stretch

Project Location Raha-Kampur-Baithalangso-Hamren Road


Length of the project road 74.411 km
Approx. Project Cost INR 461.52 crores (~USD 71 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam

203
Education
Management College at Jorhat

Name of Project Management College at Jorhat

Project Location Jorhat


Area of the project Land to be identified by Department.
Approx. Project cost INR 15 - 20 crores (~USD 2.31 – 3.08 million)
Focus sector Higher Education
Employment 30 to 40
Status of approvals New project
Project contours Jorhat district is bounded by Lakhimpur district on north, Nagaland state on the south,
Sivasagar on the east and Golaghat on the west. On the North of the district, the river Brahma-
putra forms the largest riverine island of the world.
The Education department envisages establishing a state of the art management college by
bringing in private investments.

Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Spacious seminar halls with excellent acoustics
Amphi-theater classrooms
Excellent library with unmatched brilliance and aesthetics
Halls of residence for students
Residential accommodation for faculty and staff
food court
Administrative block
Departmental stores
Fitness center
Recreational facilities
Healthcare center
Connectivity Nearest airport is Jorhat airport around 7 kms. South west of Jorhat city
Nearest railway station is at Jorhat town and Mariani

Proposed Infrastructure Installation of dedicated electricity transformers


Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Internet connectivity with WLAN provisions

Nodal agency Directorate of Technical Education, Govt. of Assam

205
Engineering College at Dibrugarh

Name of Project Engineering College at Dibrugarh

Project Location Dibrugarh


Area of the project Land to be identified by Department.
Approx. Project cost INR 40 - 50 crores (~USD 6.15 – 7.19 million)
Focus sector Technical Education
Employment 50 to 60
Status of approvals New project
Project contours Dibrugarh district is divided by the tributary of Brahmaputra from east-to-west. It is the
gateway to the three tea-producing districts of Tinsukia, Dibrugarh, and Sivasagar.
The Education department envisages establishing a state of the art engineering college by
bringing in private investments.

Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Manufacturing workshops
Specialist welding and fabrication areas
Pneumatics and hydraulics training equipment
3D printers
CAD suites and PLC
Welding bays with TIG, MIG and MMA, grinding bays, and cutting and folding equipment.
Strong floor for testing structural strength
Connectivity Nearest airport is Dibrugah airport
Nearest railway station is at Dibrugarh town and Banipur

Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
Nodal agency Directorate of Technical Education, Govt. of Assam

206
Management College at Dibrugarh

Name of Project Management College at Dibrugarh

Project Location Dibrugarh


Area of the project Land to be identified by Department.
Approx. Project cost INR 15 - 20 crores (~USD 2.31 – 3.08 million)
Focus sector Higher Education
Employment 30 to 40
Status of approvals New Project.
Project contours Dibrugarh district is divided by the tributary of Brahmaputra from east-to-west. It is the
gateway to the three tea-producing districts of Tinsukia, Dibrugarh, and Sivasagar.
The Education department envisages establishing a state of the art management college by
bringing in private investments.

Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Spacious seminar halls with excellent acoustics
Amphi-theater classrooms
Excellent library with unmatched brilliance and aesthetics
Halls of residence for students
Residential accommodation for faculty and staff
food court
Administrative block
Departmental stores
Fitness center
Recreational facilities
Healthcare center
Connectivity Nearest airport is Dibrugah airport
Nearest railway station is at Dibrugarh town and Banipur

Proposed Infrastructure Installation of dedicated electricity transformers


Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Internet connectivity with WLAN provisions

Nodal agency Directorate of Technical Education, Govt. of Assam

207
Polytechnic Institution at Tezpur

Name of Project Polytechnic Institution at Tezpur

Project Location Tezpur


Area of the project Land to be identified by Department.
Approx. Project cost INR 5 - 10 crores (~USD 0.75 – 1.5 million)
Focus sector Technical Education
Employment 30 to 40
Status of approvals New Project
Project contours Tezpur in the district of Sonitpur is one of the important education hub in the state with good
industrial base.
The Education department envisages in establishing a state of the art polytechnic college to pro-
vide the much needed vocational training and upskilling of the local youth, especially to cater to
the industries in the catchment.
Investment Opportunities Project envisages private investments in PPP mode with infrastructures like:
Water and Power infrastructure
Road infrastructure
Library infrastructure
Hostel infrastructure
Canteen infrastructure
Medical infrastructure
Sports infrastructure

Connectivity Nearest airport is Salonibari Airport, Tezpur


Nearest railway station is at Tezpur town and Dekargaon
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters

Nodal agency Directorate of Technical Education, Govt. of Assam

208
Polytechnic Institution at Lakhimpur

Name of Project Polytechnic Institution at Lakhimpur

Project Location Lakhimpur


Area of the project Land to be identified by Department.
Approx. Project cost INR 5 - 10 crores (~USD 0.75 – 1.5 million)
Focus sector Technical Education
Employment 30 to 40
Status of approvals New Project
Project contours Lakhimpur district is situated on the North bank of the river Brahmaputra and is bounded by
lower Subhansiri and Papumpare districts of Arunachal Pradesh on the north, Dhemaji district on
the east, Majuli district on the south and Sonitpur district on the west
The Education department envisages in establishing a state of the art polytechnic college to
provide the much needed vocational training and upskilling of the local youth, especially to cater
to the industries in the catchment.
Investment Opportunities Project envisages private investments in PPP mode with infrastructures like:
Water and Power infrastructure
Road infrastructure
Library infrastructure
Hostel infrastructure
Canteen infrastructure
Medical infrastructure
Sports infrastructure
Connectivity Nearest airport is at Lilabari Airport, North lakhimpur
Nearest railway station is North Lakhimpur
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
Nodal agency Directorate of Technical Education, Govt. of Assam

209
Polytechnic Institution at Kokrajhar

Name of Project Polytechnic Institution at Kokrajhar

Project Location Kokrajhar


Area of the project Land to be identified by Department.
Approx. Project cost INR 5 - 10 crores (~USD 0.75 – 1.5 million)
Focus sector Technical Education
Employment 30 to 40
Status of approvals New Project
Project contours The Kokrajhar district is located on the north bank of the mighty Brahmaputra and stretches to the
international border with the Kingdom of Bhutan. It is bounded on the north by the Himalayan
Kingdom and by West Bengal on the west; the district of Dhubri in the south and in the east by
Chirang district
The Education department envisages in establishing a state of the art polytechnic college to provide
the much needed vocational training and upskilling of the local youth, especially to cater to the
industries in the catchment.
Investment Opportunities Project envisages private investments in PPP mode with infrastructures like:
Water and Power infrastructure
Road infrastructure
Library infrastructure
Hostel infrastructure
Canteen infrastructure
Medical infrastructure
Sports infrastructure
Connectivity Nearest airport is at Borjhar LGBI Airport around 196 Kms
Nearest railway station is Kokrajhar
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
Nodal agency Directorate of Technical Education, Govt. of Assam

210
Polytechnic Institution at Dima Hasao

Name of Project Polytechnic Institution at Dima Hasao

Project Location Dima Hasao


Area of the project Land to be identified by Department.
Approx. Project cost INR 5 - 10 crores (~USD 0.75 – 1.5 million)
Focus sector Technical Education
Employment 30 to 40
Status of approvals New Project
Project contours The Dima Hasao district is known for its garlanded hills and is surrounded by Karbi Anglong district
(E) and Nagaland on North east, Manipur on East, Nagaon Dist. on North, Karbi Anglong district (W)
on North-west, Meghalaya on West and Cachar district on South.
The Education department envisages in establishing a state of the art polytechnic college to
provide the much needed vocational training and upskilling of the local youth, especially to cater to
the industries in the catchment.

Investment Opportunities Project envisages private investments in PPP mode with infrastructures like:
Water and Power infrastructure
Road infrastructure
Library infrastructure
Hostel infrastructure
Canteen infrastructure
Medical infrastructure
Sports infrastructure

Connectivity Nearest airport is at Silchar around 96 Kms


Nearest railway station is New Haflong

Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters

Nodal agency Directorate of Technical Education, Govt. of Assam

211
Setting up of Marine Institute at Jorhat

Name of Project Setting up of Marine Institute at Jorhat

Project Location Jorhat


Area of the project Land to be identified by Department.
Approx. Project cost As per DPR
Focus sector Technical Education
Training on various aspects of inland water transportation namely management of waterways,
surveying and dredging of waterways
Design and construction of terminals, repair of vessels
Commercial operation of vessels, running of vessels, terminal management and traffic
management.
Employment 30 direct employment
Status of approvals New Project
Project contours Jorhat is one of the most important towns of Assam in terms of economic development and one of
the historical heritage towns
There is huge gap of demand and supply of skilled manpower in market
Investment Opportunities The institute to be first of its kind in North East India and envisages private players in PPP mode
Connectivity Project location is in Jorhat, well connected by NH-37 and approximately 15kms away from the
mighty Brahmaputra, the National Waterway-II
Nearest airport is Rowriah Domestic Airport in Jorhat
Proposed Infrastructure Vacant land to be made available to set up State-of-the-art Institute
Administrative building
Training workshops and laboratory
Training ship
Recreational area for trainees which shall include a swimming pool
Residential complex for trainees
Primary Health Centre (PHC)
Library/knowledge Info center/ Placement Cell/ Grievance Cell
Technology Business Incubation Centre
Entrepreneurship Development Cell
National Inland Navigation Institute to act as mentorship Institution
IWAI to act as Technical support agency to design syllabus promulgated/to be promulgated by
the state water/inland water transport department under the Inland vessel Act 1917 for obtaining
respective certificate of competency.
Nodal agency Directorate of Technical Education, Govt. of Assam

212
Setting up of Job facilitation cells in Govt. Polytechnics and Engineering Colleges

Name of Project Setting up of Job facilitation cells in Govt. Polytechnics and Engineering Colleges

Project Location (s) At 4 Govt. Engineering Colleges viz.,


Assam Engineering College, Guwahati
Jorhat Engineering College, Jorhat
Jorhat Institute of Science & Technology, Jorhat
Bineswar Brahma Engineering College, Kokrajhar
And
At 10 Polytechnic Institutions of Assam viz.,
Assam Engineering Institute, Guwahati
Nowgong Polytechnic, Nagaon
Prince of Wales Institute of Engineering & Technology, Jorhat
Bongaigaon Polytechnic, Bongaigaon
Dibrugarh Polytechnic, Dibrugarh
Silchar Polytechnic, Silchar
Girls’ Polytechnic, Guwahati
Residential Girls’ Polytechnic, Golaghat
Diphu Polytechnic, Diphu
Assam Textile Institute, Guwahati
Area of the project Suitable space to be provided at the above stated institutions
Approx. Project cost Approximately INR 6 – 7 Cr. (~USD 1 million) for a period of 3 years
Focus sector Technical Education
Employment 50 to 60
Status of approvals New Project
Project contours 14 established Govt. Institutions at prominent locations of the State
Total intake capacity of 2500 every year across the institutions
Standardised Curriculum development (not in the scope of job facilitation service provider)
Development of Software for covering the value chain of activities (not in the scope of job facilitation
service provider)
Investment Opportunities No capital expenditure
Deployment of 4-5 qualified resources (Counsellors, Trainers, Placement Officers) per Institution
Connectivity All the 14 institutions are at prominent locations with good connectivity to air, rail and road
Nodal agency Directorate of Technical Education, Govt. of Assam

213
Setting up Life skills training centres (LSTCs) at 301 nos. Govt. / Provincialized colleges of Assam

Name of Project Setting up Life skills training centres (LSTCs) at 301 nos. Govt. / Provincialized colleges of Assam

Project Location (s) Across Assam


(List available on Directorate of Higher Education’s Website)
Area of the project Land to be identified by Department.
Approx. Project cost Approximately INR 2 – 3 Cr. (~USD 0.31 to 0.46 million) for a period of 3 years per cluster of 8 to 10
Govt. / Provincialized colleges of Assam
Focus sector Higher Education
Employment 620 – 700
Status of approvals Greenfield
Project contours 301 nos. Govt. and Provincialized colleges of Assam
Total combined intake capacity of approximately 50,000-60,000 candidates across the institutions per
year
Standardised Curriculum development (not in the scope of Life Skill Training Organisations)
Development of Software for covering the value chain of activities (not in the scope of Life Skill
Training Organisations)

Investment Opportunities No capital expenditure


Deployment of 2 qualified resources (1 basic IT Trainer and 1 Behavioural & Communication Skills
Trainer) per Institution
Eligible organisation can be allotted suitable space at 8 to 10 Govt. / Provincialized Colleges of Assam.
Connectivity All the Institutions are at prominent locations with good connectivity to rail and road
Nodal agency Directorate of Higher Education, Govt. of Assam

214
Setting up polytechnics

Name of Project Setting up polytechnics

Project Location (s) Kamrup - Baihata, Barpeta, Sonitpur - Dhekiajuli, Nalbari - Chandkuchi,
Golaghat - Furkating, Baksa - Belguri Pathar, Karimganj - Maizgaon
Goalpara - Goalpara East, Sibsagar – Dimow, Dhemaji – Silapathar, Tingkhong and Lumding.

Area of the project Suitable space to be provided for each institution as per institution building norms.

Approx. Project cost As per DPR.

Focus sector Technical Education


Employment ~1000

Status of approvals New project


Project contours The major engineering based industries in Assam are textiles, chemicals, food processing, plastics,
cement, power and IT&ITES. Polytechnics can provide the impetus to these industries by providing
technically qualified manpower.
Favourable Policy environment will lead to rapid industrialisation which will further increase the
need for technically equipped manpower.

Investment Opportunities These projects envisage private investments through an appropriate PPP model. The scope of Private
Partners are as follows , but not limited to;
Design and Construct requisite infrastructure (institute building, laboratories, workshops, drawing
hall, communication lab, conference hall, Hostels etc as per AICTE norms.)
The private partner is expected to frame the curriculum attuned to the prevailing industry require-
ments.
Procurement and Installation of machines and equipment needed for the prescribed curriculum.

Connectivity All the Institutions are at prominent locations with good connectivity to rail and road

Nodal agency Directorate of Technical Education, Govt. of Assam

215
Engineering College at Bongaigaon

Name of Project Engineering College at Bongaigaon

Project Location Bangaigaon


Area of the project Land to be identified by Department.
Approx. Project cost As per DPR
Focus sector Technical Education
Employment 50 to 60
Status of approvals New project
Project contours Bongaigaon district covers an area of 2510 sq. km. and is surrounded by Barpeta in the east, the
Brahmaputra in the south and Kokrajhar in the north and west corner.
The Education department envisages establishing a state of the art engineering college by bringing in
private investments.
Favourable Policy environment will lead to rapid industrialisation which will further increase the need for
technically equipped manpower.

Investment Opportunities These projects envisage private investments through an appropriate PPP model. The scope of Private
Partners are as follows , but not limited to;
Design and Construct requisite infrastructure (institute building, laboratories, workshops, drawing hall,
communication lab, conference hall, Hostels etc as per AICTE norms.)
The private partner is expected to frame the curriculum attuned to the prevailing industry requirements.
Procurement and Installation of machines and equipment needed for the prescribed curriculum.

Connectivity The Institute is at prominent locations with good connectivity to rail and road
Nodal agency Directorate of Technical Education, Govt. of Assam

216
Engineering College at Nalbari

Name of Project Engineering College at Nalbari

Project Location Nalbari


Area of the project Land to be identified by Department.
Approx. Project cost As per DPR
Focus sector Technical Education
Employment 50 to 60
Status of approvals New project
Project contours Nalbari district covers an area of 1009.57 sq. km. and is surrounded by Baska in the north, Barpeta in
the west and Kamrup in the south and east corner.
The Education department envisages establishing a state of the art engineering college by bringing in
private investments.
Favourable Policy environment will lead to rapid industrialisation which will further increase the need
for technically equipped manpower.

Investment Opportunities These projects envisage private investments through an appropriate PPP model. The scope of Private
Partners are as follows , but not limited to;
Design and Construct requisite infrastructure (institute building, laboratories, workshops, drawing hall,
communication lab, conference hall, Hostels etc as per AICTE norms.)
The private partner shall be responsible for recruitment of teachers & staff.
The private partner is expected to frame the curriculum attuned to the prevailing industry
requirements.
Procurement and Installation of machines and equipment needed for the prescribed curriculum.

Connectivity The Institute is at prominent locations with good connectivity to rail and road
Nodal agency Directorate of Technical Education, Govt. of Assam

217
Engineering College at Matia, Goalpara

Name of Project Engineering College at Matia, Goalpara

Project Location Paschim Matia, Goalpara


Area of the project Total land available with the Education Department is 17 acre
Approx. Project cost INR 40 - 50 crores (~USD 6.15 – 7.19 million)
Focus sector Technical Education
Employment 50 to 60
Status of approvals Land has been identified and possession taken in Paschim Matia, Goalpara district
Project contours The land is well developed and is ready to start construction
Goalpara district covers an area of 1,824 sq. km. and is bounded by West and East Garo Hill districts of
the state of Meghalaya on the south and Kamrup district on the East, Dhubri district on the West and
mighty river Brahmaputra all along the North.
The Education department envisages establishing a state of the art engineering college by bringing in
private investments.

Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with spe-
cialized amenities like:
Manufacturing workshops
Specialist welding and fabrication areas
Pneumatics and hydraulics training equipment
3D printers
CAD suites and PLC
Welding bays with TIG, MIG and MMA, grinding bays, and cutting and folding equipment.
Strong floor for testing structural strength
Connectivity Nearest airport is LGB International airport in Borjhar, Guwahati around 135 kms.
Nearest railway station is at Goalpara
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
Nodal agency Directorate of Technical Education, Govt. of Assam

218
Management College at Matia, Goalpara

Name of Project Management College at Matia, Goalpara

Project Location Paschim Matia, Goalpara


Area of the project Total land available with the Education Department is 17 acre
Approx. Project cost INR 15 - 20 crores (~USD 2.31 – 3.08 million)
Focus sector Higher Education
Employment 30 to 40
Status of approvals Land has been identified and possession taken in Paschim Matia, Goalpara district
Project contours The land is well developed with ready to construct area.
Goalpara district covers an area of 1,824 sq. km. and is bounded by West and East Garo Hill districts
of the state of Meghalaya on the south and Kamrup district on the East, Dhubri district on the West
and mighty river Brahmaputra all along the North.
The Education department envisages establishing a state of the art management college by
bringing in private investments.
Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Spacious seminar halls with excellent acoustics
Amphi-theater classrooms
Excellent library with unmatched brilliance and aesthetics
Halls of residence for students
Residential accommodation for faculty and staff
food court
Administrative block
Departmental stores
Fitness center
Recreational facilities
Healthcare center
Connectivity Nearest airport is LGB International airport in Borjhar, Guwahati around 135 kms.
Nearest railway station is at Goalpara
Proposed Infrastructure Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Internet connectivity with WLAN provisions
Nodal agency Directorate of Technical Education, Govt. of Assam

219
Industrial
Infrastructure
Industrial Growth Centre (IGC) Matia, Goalpara

Name of Project Industrial Growth Centre (IGC) Matia, Goalpara

Project Location Matia, Goalpara


About the Location Matia at Mornoi in the District of Goalpara has been developed to provide high standard
infrastructural facilities to industrial units. The principal agricultural produce are paddy, jute,
banana, green and black gram and potato. However, the district is also known for its produc-
tion of areca nut, cashew nut, rubber and banana. A big market of banana has come up at
Darangiri

Area of the project Land (all in acres) Total Allocable Allotted Available
Developed 461.81 74.38 33.92 40.46
Semi Developed 387.43 198.34 189.09

Infrastructure Facilities Available Plot size: 21528 Sqft , 43056 Sqft , 86111 Sqft and above
Developed plots of 0.25 acres and above with internal road of 6 km, water supply distribution
network with 2,50,000 litres capacity, overhead reservoir, power supply system with 5 MVA
substation, internal drainage system, street lighting, guest house etc.
Medium & Large Industries in vicinity Eveready India Ltd.
VLCC
Cavinkare
Connectivity National Highway 37 passes through the site;
Nearest Railway station is at Goalpara and Dudhnoi. Railway siding facility available at Jogig-
hopa Railway Station
Nearest River including River Port : Brahmaputra River – 3 km;
Nearest Town/City: Goalpara - 15 km, Bongaigaon - approx. 50 km, Jogighopa -35 km.

Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

221
Industrial Growth Centre (IGC), Balipara, Sonitpur

Name of Project Industrial Growth Centre (IGC), Balipara, Sonitpur

Project Location Balipara, Sonitpur


About the Location The growth centre at Chariduar (Balipara) in the district of Sonitpur has been developed to provide
infrastructural facilities of high standard in the District. The major industries in Sonitpur consist of
tea processing, cane products and food products etc.

Area of the project Land (all in acres) Total Allocable Allotted Available
Developed 396.36 69.42 42.31 27
Semi Developed 196.46 177.85 18.61
Infrastructure Facilities Available Plot size: 2153 Sqft , 10764 Sqft , 21528 Sqft , 43056 Sqft , 86111 Sqft and above
117 acres of land with all infrastructure facilities like approach road of approx. 2 km from NH-15,
internal road, storm water drains, water supply network, underground and overhead water tank,
street light, 132/33 kV, 2x16 MVA substation for dedicated power line, administrative building and
other common facilities etc.
Medium & Large Industries in Patanjali
vicinity Dabur India Ltd.
Surya Taap
Innovative Tech Park
Connectivity National Highway 15 is two km from the site
Nearest Railway is at station Dekargaon -5 km
Nearest Town/ Cities/ District: Tezpur - 15 km, Balipara -9 km, Dhekiajuli - 34 km, Nagaon - 53 km
approx .
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

222
North East Mega Food Park, Tihu, Nalbari

Name of Project North East Mega Food Park, Tihu, Nalbari

Project Location Tihu, Nalbari


About the Location The project M/s North East Mega Food Park Ltd. (NEMFPL) under Mega Food Park Scheme
of the Ministry of Food Processing Industries (MoFPI), Govt. of India is established with the
objective of providing adequate infrastructure for the food processing industry along with the
value chain from the farm to the market. It is located at Nathkuchi, Nalbari district. Although
predominantly agrarian, industrial units are gradually being established in the district.
Area of the project Total Land: 50.023 Acres (151.25 Bighas);
Total Allocable Area 27.61 Acres
Acres; Area Already Allotted 0.6832 Acres;
Balance Allocable Area 26.931 Acres
Infrastructure Facilities Available Approach road is approx. 1.0 km from NH 31. Standard Design Factory (SDF) for small and
medium enterprise (SME), developed industrial plots, cold storage of 1500 MT, Common
Effluent Treatment Plant, Quality Control Labs etc., Common administrative building for office
and other uses. Five Primary Processing Centres (PPC) and few Collection Centres (CC) are also
proposed to be set up across the State. Internal Electrical Distribution Network with 33/11 kV
Substation.
Medium & Large Industries in vicinity Berger Paints India Ltd. (British Paints)
Ravi Food Products
Duke Products
Assam Agrotech etc.

Connectivity The site is near National Highway 31


Nearest Railway station is at Tihu – 4.5 km.
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port – 90 km
Nearest Towns/Cities: Tihu – 3 km, Pathsala – 7 km, Nalbari - 22 km, Barpeta Road - 32 km,
Guwahati -99 km.

Nodal agency M/s North East Mega Food Park Limited

223
Integrated Infrastructure Development Centre (IIDC), Demow, Sibasagar

Name of Project Integrated Infrastructure Development Centre (IIDC), Dimow, Sibasagar

Project Location Dimow, Sibasagar


About the Location The district Sibasagar is situated in the eastern part of Assam.
The IIDC has been developed to provide infrastructural facilities of high standard to promote
and strengthen small, medium industries in the district.
Area of the project Total Land: 30.41 Acres
Total Allocable Area 20.75 Acres
Area Already Allotted 5.961 Acres;
Balance Allocable Area 14.79 Acres
Infrastructure Facilities Available Approach road is approx. 1.0 km from NH 37, Boundary wall with gate and gate house, internal
road with drain and culvert, Overhead water tank with water supply network, 33/11 KV, 2.5
MVA and 11/0.43 KV, 100 KVA sub stations, street lighting system, administrative and other
common facilities etc.
Medium & Large Industries in vicinity OIL India Ltd (Navaratna Company)
ONGC (Navaratna Company)
Maisang Product (P) Ltd. (Bamboo Product)
Hillman International Ltd.
Unique Tea Company (P) Ltd.
Connectivity IIDC is near National Highway 37;
Nearest Railway station is Simaluguri Junction;
Nearest River including River Port: Brahmaputra River, Nearest Town/ Cities/ District: Sibasagar -
16 km approx, Dibrugarh - 48 km Approx.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

224
Integrated Infrastructure Development Centre (IIDC), Titabor, Jorhat

Name of Project Integrated Infrastructure Development Centre (IIDC), Titabor, Jorhat

Project Location Titabor, Jorhat


About the Location Jorhat, a commercial town located in eastern part of Assam, is a major exporter of tea, jute,
forest produce, oil, cake etc. Products like pulses, mustard oil, tobacco, cement, textile, chem-
icals drugs etc. are imported into the district.
The project is established to provide infrastructural facilities for SMEs.
Area of the project Total Land: 39.669 Acres
Total Allocable Area 19.81 Acres
Area Already Allotted 3.39 Acres
Balance Allocable Area 16.41 Acres
Infrastructure Facilities Available Approach road, internal road with drainage, power supply system with street lighting, water
Supply Network with overhead tank, administrative building etc.

Medium & Large Industries in vicinity OIL India Ltd (Navaratna Company)
ONGC (Navaratna Company)

Connectivity The site is near National Highway-37


Nearest Railway station Titabor
Nearest River including River Port : Brahmaputra and River port located at Nemati ghat -31
km,
Nearest Town/ Cities : Jorhat -16 km, Moriani - 15 km distance, Golaghat -29 km.

Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

225
Integrated Infrastructure Development Centre (IIDC), Silapathar, Dhemaji

Name of Project Integrated Infrastructure Development Centre (IIDC), Silapathar, Dhemaji

Project Location Silapathar, Dhemaji


About the Location The project is established to provide infrastructural facilities for SMEs. The district headquarter is
Dhemaji town. The economy of Dhemaji is generally agro based. Sericulture, fishing and drift-
wood businesses are practiced in smaller scale.

Area of the project Total Land: 20.139 Acres


Total Allocable Area 14.62 Acres
Area Already Allotted 1.235 Acres
Balance Allocable Area 13.393 Acres
Infrastructure Facilities Available Plot size: 4306 Sqft , 5382 Sqft & above
Approach road of approx 500 mtr from National Highway, Internal road with drainage, power
supply system with street lighting, Water Supply Network with overhead reservoir etc.

Medium & Large Industries in vicinity OIL India Ltd (Navaratna Company)
ONGC (Navaratna Company)
Connectivity NH 15 passes through Silapathar
Nearest Railway station Silapathar is at a distance of 5km
Nearest River including River Port: Brahmaputra, Bagibeel Ghat which is at a distance of ~15 km
Nearest Town/ Cities/ District: Dibrugarh (24 km), North Lakhimpur (56 km), Tinsukia (70 km)

Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

226
Integrated Infrastructure Development Centre (IIDC), Naltali/Bhomoraguri, Nagaon

Name of Project Integrated Infrastructure Development Centre (IIDC), Naltali/Bhomoraguri, Nagaon

Project Location Naltali/Bhomoraguri, Nagaon


About the Location The project is established to provide infrastructural facilities for small industries. Ag-
riculture is the predominant economic activity of the people of the district. The main
plantation and horticultural crops are banana, pineapple, betel-nut and coconut. Next to
agriculture, handloom and weaving are the main cottage industrial activities.
Area of the project
Land (all in acres) Total Allocable Allotted Balance
Developed 40.66 25.78 15.2 10.58
Semi Developed 0 0 0
Infrastructure Facilities Available Plot size: 4306 Sqft , 5382 Sqft , 10764 Sqft & above
Approach road of approx 650 mtrs from NH- 37, internal road with drainage, power sup-
ply system with street lighting, Water Supply Network with overhead reservoir etc.

Medium & Large Industries in vicinity Tata Spice Park


Powerline Green (Kirloskar)
Berger Paints India Ltd.
Dabur India Ltd.
Nezone Biscuits Ltd.
K D Cement
Patanjali
Connectivity The site is near National Highway 37;
Nearest Railway station Silghat- 10km
Nearest River including River Port : Brahmaputra, Silghat,
Nearest Town/ Cities/ District: Tezpur, 8 km, Nagaon at 45 km, Guwahati at 145 km.

Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

227
Infrastructure Development Project, IDP Pathsala, Barpeta

Name of Project Infrastructure Development Project, IDP Pathsala, Barpeta

Project Location Pathsala, Barpeta


About the Location The project is established to provide infrastructural facilities for small industries. Barpeta is one
of oldest districts of Assam and district headquarter is located at Barpeta Town. The district
economy, though predominantly agrarian, has variety of sectors like handicrafts, handloom,
fishery, sericulture and tea. The district also produces the famed Assam Silk viz., Eri and Muga.
Area of the project Total Land: 33.05 Acres (100 bigha)
Total Allocable Area 17.29 Acres;
Balance Allocable Area 17.29 Acres
Infrastructure Facilities Available Approach Road of 2.5 km from Pathsala Town, Internal road with drainage, Power supply
system with Street lighting, Water Supply Network with overhead reservoir, Administrative and
other services complex, Developed/ Semi Developed land with common Boundary wall etc.
Medium & Large Industries in vicinity Duke Products Ltd.
Ravi Food Pvt. Ltd.
Connectivity National Highway 31; Nearest Railway station Pathsala;
Nearest River including River Port: Brahmaputra Pandu Port
Nearest Town/ Cities/ District: Barpeta town at 37 km distance
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

228
Integrated Infrastructure Development Centre (IIDC), Malinibeel, Cachar

Name of Project Integrated Infrastructure Development Centre (IIDC), Malinibeel, Cachar

Project Location Malinibeel, Cachar


About the Location The project is established to provide infrastructural facilities for small industries in Cachar district.
Silchar, the district headquarter is one of the most active business centres of Assam. The healthy
economic condition of Cachar comes from Tea, Rice, Timber, Bamboo, Cane, Stone, Sand and Natu-
ral Gas. Strategically, the district is important as it is the gateway to Mizoram and also to the western
part of Manipur.
Area of the project
Land (all in acres) Total Allocable Allotted Balance
Developed 29.75 14.87 9.91 4.96
Semi Developed 0 0 0
Infrastructure Facilities Available Plot size: 5382 Sqft , 10764 Sqft , 21528 Sqft and above
Approach Road of 1 km from NH-53, Internal road with drainage, Electrical Distribution network,
Water Supply Network with Overhead Reservoir, Administrative and other services complex, Devel-
oped/ Semi Developed land with common Boundary wall etc.
Medium & Large Industries in Ladi Steel
vicinity Barak Ispat
CG Foods
Cement International Ltd.
Barak Valley Cement

Connectivity It is situated near National Highway 53


Nearest Railway station Silchar -2 km
Nearest River including River Port: Barak River
Nearest Town/ Cities/ District: Silchar – 1.5 km, Hailakandi - 31 km , Karimganj - 47 km
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

229
Food Park, Chaygaon, Kamrup (R)

Name of Project Food Park, Chaygaon, Kamrup (R)

Project Location Chaygaon, Kamrup (R)


About the Location Chaygaon is located at Chatabari in the Kamrup (R) district. The land area measuring 33
acres has been developed to provide standard infrastructural facilities for Food Processing
Industrial units.
Area of the project Total Land: 33.05 Acres
Total Allocable Area 16.52 Acres
Area Already Allotted 13.81 Acres
Balance Allocable Area 2.71 Acres
Infrastructure Facilities Available Power : 2.5 MVA substation with 33/11 kVA
Water Supply: 50000 ltr. capacity
Internal Road and Drainage : Yes
Cold Storage facility: 2500 MT.

Medium & Large Industries in vicinity Bhogali Food Products


KDG Food products
Asian Thai Foods India Pvt Ltd
Uma Polymers Pvt Ltd
Sigma Spice Industries Pvt Ltd
Oja Trade and Industry
Sigma Food Industries.
Connectivity National Highway 37 passes through the site
Nearest Railway station: Bamunigaon
Nearest River including River Port: Brahmaputra
Nearest Town/ Cities/ District: Guwahati - 60 km, Jogighopa -50 km.
Nodal agency Assam Small Industries Development Corporation Ltd. (ASIDC)

230
Bamboo Technology Park, Chaygaon, Kamrup (R)

Name of Project Bamboo based Manufacturing Units

Project Location Bamboo Technology Park, Industrial Growth Centre, Jambari -II, Chaygaon, Kamrup (R), Assam
About the Location Chaygaon is located at Chatabari in the Kamrup (R) district. The site, comprising of 20 acres of
land has been developed to provide standard infrastructural facilities for Bamboo Processing
Industrial units.
Area of the project Total Land: 20 acres
Total Allocable Area: 6.61 acres

Infrastructure Facilities Available Bamboo Technology Park (BTP) offers wide array of common processing facilities like:
Facilities for Bamboo Stick Manufacturing: Cross cutting Machine, Splitting Machine, Slicing
Machine, Sticking Making Machine, and Sizing Machine, Polishing Machine.
Facilities for Bamboo plastic composite (BPC): Bamboo Crusher Machine, Powder Milling
Machine or Pulverizer, Dryer Machine, Mixing Unit, Granulator or Palletizing Machine, Extruder
Machines with Mould Profiles, Brushing and Sanding machine, Embossing Machine, Recycle
Crusher Machine.
Strand Woven Block facility
Vacuum Pressure Treatment Plant facility
Resin Plant facility
Bamboo Charcoal Making Facility
Administrative Cum Marketing Centre
BTP facilities are available to all bamboo enterprises against user charge as fixed by BTP from
time to time.

231
Medium & Large Industries in vicinity Bhogali Food Products
KDG Food products
Asian Thai Foods India Pvt Ltd
Uma Polymers Pvt Ltd
Sigma Spice Industries Pvt Ltd
Oja Trade and Industry
Sigma Food Industries.
Connectivity Bamboo Technology Park is located in Jambari Industrial Growth Centre in Kamrup Rural
district, its nearest town is 13 km away in Chaygaon and is 80 km from Central Guwahati. The
international airport is 50 km from the location and the railway station at 78 km. It is connect-
ed by motor able road from NH 31.
Investment Opportunity Investment Opportunity lies in setting up of manufacturing unit for Bamboo based materials
like:
Bamboo Flooring
Affordable Housing Material
Mat Board and Mat Sheets
Bio-plastics
Charcoal
Medium Density Fibreboard (MDF)  
Nodal agency Bamboo Technology Park and Assam Industrial Development Corporation Ltd. (AIDC)

232
Bamboo Furniture Production Unit, Bamboo Technology Park

Name of Project Bamboo Furniture Production Unit in Bamboo Technology Park

Project Location Bamboo Technology Park, Industrial Growth Centre, Jambari -II, Chaygaon, Kamrup (R), Assam

Status of Approval New Project


Infrastructure Facilities Available Bamboo Technology Park (BTP) offers wide array of common processing facilities like:
Facilities for Bamboo Stick Manufacturing: Cross cutting Machine, Splitting Machine, Slicing
Machine, Sticking Making Machine, and Sizing Machine Polishing Machine.
Facilities for Bamboo plastic composite (BPC): Bamboo Crusher Machine, Powder Milling Machine
or Pulverizer, Dryer Machine, Mixing Unit, Granulator or Palletizing Machine, Extruder Machines
with Mould Profiles, Brushing and Sanding machine, Embossing Machine, Recycle Crusher
Machine.
Strand Woven Block facility
Vacuum Pressure Treatment Plant facility
Resin Plant facility
Bamboo Charcoal Making Facility
Administrative Cum Marketing Centre
BTP facilities are available to all bamboo enterprises against user charge as fixed by BTP from time
to time.
Connectivity Bamboo Technology Park is located in Jambari Industrial Growth Centre in Kamrup Rural
district, its nearest town is 13 km away in Chaygaon and is 90 km from Central Guwahati. The
international airport LGBI is 50 km from the location and the railway station Kamakhya at 78 km.
It is connected by motor able road from NH 31.
Investment Opportunity Investment Opportunity lies in setting up of manufacturing unit for Bamboo based furniture like:
Sofas and Sectionals
Recliners and Rocking Chairs
Futons
Settees and Lounges
Display and Entertainment Units
Tables
Racks
Beds
Chests of Drawers
Bar Units
Nodal agency Bamboo Technology Park and Assam Industrial Development Corporation Ltd. (AIDC)

233
Integrated Infrastructure Development Centre (IIDC), Banderdewa, Lakhimpur

Name of Project Integrated Infrastructure Development Centre (IIDC), Banderdewa, Lakhimpur

Project Location Banderdewa, Lakhimpur


About the Location The project is developed on a plot of land measuring 30 acres to provide infrastructure facilities
to industrial units. It is about 5 km from the Arunachal Pradesh Border and 40 km from Lakhimpur
Town

Area of the project Total Land: 29.75 Acres


Total Allocable Area 17.85 Acres
Area Already Allotted 8.61 Acres
Balance Allocable Area 9.23 Acres

Infrastructure Facilities Available Plot size: 3229 Sqft/5382 Sqft


Power: 2.5 MVA Substation with dedicated
33/11 kV power line.
Water: 1 lakh litre
Internal Road and Drainage: Available

Medium & Large Industries in Gopal Concrete Pipe Industries.


vicinity Purbanchal Inra Pvt Ltd
Laxmi Enterprise
Green Tech Eco Industries

Connectivity The site is near National Highway 15;


Nearest Railway station is Harmoti-8 km;
Nearest River Dikrong,
Nearest Airport: Lilabari;
Nearest Town/ Cities/ District: Banderdewa and Lakhimpur

Nodal agency Assam Industrial Infrastructure Development Corporation (AIIDC)

234
Integrated Infrastructure Development Centre (IIDC), Serfunguri

Name of Project Integrated Infrastructure Development Centre (IIDC), Serfunguri

Project Location Serfunguri, Kokrajhar


About the Location The project is developed in a plot of land measuring 33 acres to provide infrastructure facili-
ties to industrial units. It is about 30 km from Kokrajhar and 45 km from Bongaigaon Town
Area of the project Total Land: 26.72 Acres
Total Allocable Area 15.81 Acres
Area Already Allotted 0.074 Acres
Balance Allocable Area 15.74 Acres
Infrastructure Facilities Available Plot size: 3229 and 5382 Sqft
Power: 250 kVA substation
Water: 50000 litre
Internal Road and Drainage: Available
Medium & Large Industries in vicinity Bongaigaon Refinery & Petrochemical Ltd.
Connectivity The site is near National Highway 31 A;
Nearest Railway station Fakiragram-22 km;
Nearest River Gaurang;
Nearest Town/ Cities Kokrajhar;
Nearest International Border Point with Bhutan at Hatisar ( Dadgiri) is 45 km from the site.
Nodal agency Assam Industrial Infrastructure Development Corporation (AIIDC)

235
Integrated Infrastructure Development Centre (IIDC), Parbatipur, Tinsukia

Name of Project Integrated Infrastructure Development Centre (IIDC), Parbatipur, Tinsukia

Project Location Parbatipur, Tinsukia


About the Location The project is developed in a plot of land measuring 43 acres to provide infrastructure
facilities to industrial units It is about 81 km from Tinsukia, 32 km from Margherita, and 7 km
from Joyrampur ( Border point of Assam and Arunachal Pradesh).
Area of the project Total Land: 42.973 Acres
Total Allocable Area 25.78 Acres
Area Already Allotted 7.95 Acres
Balance Allocable Area 17.83 Acres
Infrastructure Facilities Available Plot size: 3229 and 5382 Sqft
Power: 100 KW with 250 kVA transformer
Water : 50000 litre capacity
Internal Road and Drainage: yes
Medium & Large Industries in vicinity Prabhat Food Products Industry
IOC Digboi Refinery
Hindustan Unilever Ltd
Connectivity The site is near National Highway 153 (Stilwell Road)
Nearest Railway station is Ledo - 25 km
Nearest River - Tirap river
Nearest Town/ Cities: Margherita, Digboi and Tinsukia
Nearest Airport: Mohanbari-130 km.
Nodal agency Assam Industrial Infrastructure Development Corporation (AIIDC)

236
Prag Jyoti Textile Park Pvt. Ltd., Bijulibari, Sipajhar, Darrang

Name of Project Prag Jyoti Textile Park Pvt. Ltd., Bijulibari, Sipajhar, Darrang

Project Location Bijulibari, Sipajhar, Darrang


About the Location The project has been set up under the Scheme for Integrated Textile Park (SITP) under the
Ministry of Textile, Govt. of India. It has been developed in a land area measuring 60.08
acres to provide standard infrastructural facilities for Textile based industrial units.
Area of the project Total Land: 60.07 Acres
Total Allocable Area 38.5 Acres
Balance Allocable Area 38.5 Acres
Infrastructure Facilities Available Approach road from NH 15, Boundary wall with gate and gate house, internal road with
drain and culvert, Water distribution network of capacity 0.68 MLD Internal electrical
distribution with street lighting system, power supply by 17.83 MVA sub station with 132
KV dedicated line, administrative and security barrack house, security system and other
common facilities required as per scheme etc.
Medium & Large Industries in vicinity SRD Nutrients,
Trinity Fructa Ltd
SRD Flour Mills
Connectivity The nearest National Highway is NH-15
Nearest Railway station is at Baihata
Nearest River Navigable river Brahmaputra is around 10 km by road and its Amingaon port
is around 45 km
Nearest Town / Cities: Guwahati 60 km, Mangoldoi- 19 km
Nearest Airport: LGBI, Guwahati
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

237
Tea Park, Chaygaon

Name of Project Tea Park, Chaygaon

Project Location Chaygaon, Kamrup (R), Assam


Total Allotted Area 45.67 Acre
Total project cost 356,449,230 INR
Focus Sector Tea Processing
Infrastructure Facilities to be Available Warehousing space, Logistic infrastructure -Truck yard, service centres, driver facilities &
other transport related infrastructure, Office.
Common Facilities : space for Tea auction centre, convention centre, meeting rooms, exhibi-
tion halls, hotel, tea tasting facility, tea R&D facilities, packaging related space, tea blending
related space, recreation facilities, Internal road with drainage system, sewerage, drainage
etc.
Connectivity Tea park is located at a distance of 45 km from Central Guwahati. The international airport
LGBI is 27 km from the location and the railway station Kamakhya is at 40 km. It is connect-
ed by motor able road from NH 31.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

238
Multi Sector Industrial Park, Bongaigaon

Name of Project Multi Sector Industrial Park

Project Location Bongaigaon


Area of the project 726 acres

Approx. Project cost 596,029,860 INR

Focus sector Industrial Infrastructure

Status of approvals Pre-feasibility report completed and approved

Project contours The proposed site is in the district of Bongaigaon, which is in close proximity to Bhutan,
Bangladesh, Guwahati and West Bengal
The district of Bongaigaon is one the most industrialized districts in lower Assam
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
A new power generation plant of 750 MW is coming up at Salakati, Kokrajhar, which is at a
distance of ~ 2.3 km from the proposed site.
There are plans to extend the Duliajan-Numaligarh pipeline till Guwahati and then subsequently
till Bongaigaon. At present the company has to capacity to transport 5.5 Million Metric Standard
Cubic Meter Per Day of natural gas.

Investment Opportunities Given the proximity of the location to international borders and to the adjoining states, huge
investment opportunities exists in diverse sectors as petrochemicals, plastics, food & agro
processing etc

Connectivity The district is well connected by NH31C which connects it to West Bengal and rest of India and
NH31
There are two major railway stations in the vicinity of the site – the New Bongaigaon Railway
Junction and Bongaigaon Railway Station
The nearest airport is the Lokpriya Gopinath Bordoloi International Airport at Guwahati which is
179 km away from Bongaigaon.
The nearest IWT Terminal is at Jogighopa, which is at a distance of ~44.5 km from the proposed
site. 25 Acres of land has already been acquired to develop the terminal as a permanent terminal.

Nodal agency Assam Industrial Infrastructure Development Corporation (AIIDC)

239
Multi Sector Industrial Park, Tinsukia

Name of Project Multi Sector Industrial Park

Project Location Tinsukia


Area of the project 433.3 acres
Approx. Project cost 315,545,220 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report has already been prepared and approved by Government of Assam
Project contours The proposed site is in the district of Tinsukia, which is in the second most industrialized regions of
Assam
Good base for industrial development with adequate social infrastructure thereby creating the ideal
circumstances for an integrated industrial and urban infra development.
Already a thriving industrial region exists within a radius of 100 kms from the proposed site
A new power generation plant of 600 MW is coming up at Margherita, which is at a distance of ~ 51 km
from the proposed site.
Investment Opportunities Based on the economic scenario of the state, its proximity to neighbouring countries, availability of
raw materials provides ample investment opportunities in the sector identified for the proposed site
Connectivity Tinsukia is well connected by NH37
Dibrugarh, which is 50 kms away from Tinsukia is the originating and terminating station of many
important trains running from & to Assam to & from important destinations such as New Delhi,
Kolkata, Bangalore, Kanyakumari, Amritsar, and Chandigarh.
The nearest airport is the Dibrugarh airport.
The nearest IWT Terminal is the Dibrugarh IWT Terminal.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

240
Multi Sector Industrial Park, Jagiroad

Name of Project Multi Sector Industrial Park

Project Location Jagiroad Town, Morigaon District, (at the property previously belonging to Assam Spun Silk
Mills Ltd)
Area of the site 18.33 acres
Approx. Project cost INR 5.8 crores (~USD 0.90mn)
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Morigaon, which is in close proximity to Guwahati
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Project site is situated near to NH 37, a strategic location which is well accessible by both road
and rail
Distance to Guwahati, the largest market in North East, is ~60 km.
Investment Opportunities Based on the economic scenario of the state, its proximity to neighbouring countries, availability
of raw materials provides ample investment opportunities in the sector identified for the
proposed site
Connectivity The site is located in the heart of Jagiroad Town, and is well connected by road and rail network.
Jagiroad has a railway station. Guwahati Airport is 77 kilometres away. NH 37 connects Jagiroad
to rest of Assam.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

241
Women Entrepreneurship Hub, Guwahati

Name of Project Women Entrepreneurship Hub

Project Location Bamunimaidam, Guwahati (at the property previously belonging to Assam Conductors and Tubes Ltd.)
Area of the Project 1.5 acres
Project cost ~ USD 1.7 mn (INR 110 Cr.)
Status of Approval Pre-feasibility report completed and approved
Focus Sector Industrial Infrastructure
Project Contours Involvement of Women entrepreneurs can bolster the economy of Assam
Empowerment of women through establishment of entrepreneurship facility.
Encourage participation of women to boost start up environment in the state
Connectivity The site is located in the heart of Guwahati city, and is well connected by road and rail network.
Guwahati Railway Station is 5 kilometres away and LGBI Airport is 30 kilometres away
Investment Opportunity Development of Entrepreneurship units for individual Entrepreneurs.
Establishment of an incubation centre for new product design, and R&D.
Establishment of a training hall, crèche, conference hall, information cell and PoS.
Construction of a 7 storey RCC state-of-the-art building of approximate 65000 sq ft with Automated
Car Parking facility
Nodal agency Assam Small Industries Development Corporation, Government of Assam.

242
Establishment of Transformers Manufacturing Unit, Nalbari

Name of Project Establishment of Transformers Manufacturing Unit

Project Location Nathkuchi, Tihu, District: Nalbari (at the property previously belonging to Assam Syntex Ltd.)
Area of the Project 23 Acres
Focus sector Power
Status of approvals Greenfield Project
Project contours This project envisages in establishing a facility for transformer manufacturing unit which will man-
ufacture different kinds of transformer for a variety of applications.
The types of transformer will be based on their application, such as
Power transformer (Ranging from 400 kV to 33kV),
Distribution transformer (Ranging from 11kV to 3.3 kV, whereas 440 V and 220 V for domestic users)
and
Others (e.g. Rectifier transformer, Furnace transformer, specialty transformer, reactor and reactors
and inductors.)
Investment Opportunities This project shall be developed through appropriate PPP model.
Connectivity The site is near National Highway 31
Nearest Railway station Tihu – 4.5 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port – 80 km,
Nearest Town/ Cities/ District: Tihu – 3 km, Pathsala – 7 km, Nalbari - 22 km, Barpeta Road - 32 km.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

243
Agro-tech (Textile application in Agriculture)

Name of Project Agrotech (Textile application in Agriculture)

Project Location Nathkuchi, Tihu, District: Nalbari (at the property previously belonging to Assam Syntex Ltd.)
Focus sector Textile
Status of approvals Greenfield Project
Project contours This proposed project involves setting up of an agrotech textile facility which, with the help of
some latest techniques, such as wrap knitting, will produce end products like shading nets used in
Agriculture, Horticulture and fisheries.
Connectivity The site is near National Highway 31
Nearest Railway station Tihu – 4.5 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port – 80 km,
Nearest Town/ Cities: Tihu – 3 km, Pathsala – 7 km, Nalbari - 22 km, Barpeta Road - 32 km.
Investment Opportunities The entire value chain of project shall be developed through PPP mode.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

244
Multi Sector Industrial Park, Nagaon

Name of Project Multi Sector industrial Park

Project Location Katimari Pathar, Nagaon (at the property previously belonging to Assam State Weaving &
Manufacturing Co. Ltd.)
Area of the Project 23 acres
Project cost 74,666,050 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Nagaon, which is in close proximity to Guwahati
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Nagaon is situated on the southern bank of the mighty Brahmaputra, a strategic location which is well
accessible by both road and river.
NH 37 passes through the project site providing it all weather accessibility
Distance to Guwahati, the largest market in North East, is ~150 km.
Investment Opportunities Based on the economic scenario of the state, its proximity to neighbouring countries, availability of raw
materials provides ample investment opportunities in the sector identified for the proposed site
Connectivity Nearest Railway station is at Silghat- 10km
Nearest River including River Port : Brahmaputra, Silghat
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

245
Manufacturing of Technical Textiles for Defence Sector

Name of Project Technical Textiles for Defence Sector

Project Location Jabjakuchi, Ghagrapar, Nalbari (at the property previously belonging to Assam State Weaving &
Manufacturing Co. Ltd.)
Area of the Project 15.5 Acres
Focus sector Textile

Status of approval Greenfield Project


Project contours The annual purchases of technical textiles are expected to grow at 9% CAGR and the industry size is
pegged at ~INR3.8 billion, led by growing demand for the key products used by the defence person-
nel.
Bullet proof jackets and high-altitude clothing accounts for the majority of the purchases.
The project envisages to setup a manufacturing unit of technical textile products based on the
growing demand.
Investment Opportunities This project shall be developed through appropriate PPP model.
Connectivity The site is near National Highway 31
Nearest Railway station Nalbari – 7 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port – 65 km
Nearest Town/ Cities/ District: Nalbari -7 km, Rangiya- 18-km, Guwahati- 70 km,
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

246
Multi Sector Industrial Park, Bonda, Guwahati

Name of Project Multi Sector Industrial Park

Project Location Bonda, Narengi, Guwahati (at the property previously belonging to Fertichem Ltd.)
Area of the Project 15.5 Acres
Project cost 50332762.50 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours Chandrapur Thermal Powet Plant is situated at 10km from the project site.
Industrial Estate, Bamunimaidam is situated at a distance of `10kms from the project site.
The output generated from this industrial park can cater the growing demand of consumption and
export.
Project site is equally accessible by road, rail and river.

Investment Opportunities This project shall be developed through appropriate PPP model.
Connectivity Nearest Railway station is Guwahati Railway station – 10 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port
Nearest Airport is LGBI Airport, Guwahati.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

247
Multi Sector Industrial Park, Bijni

Name of Project Multi Sector Industrial Park

Project Location Noapara, Bijni, Chirang District, (previously property of Assam State Textile Corporation Ltd.)
Area of the Project 78.3 acres

Project cost ~USD 3.915 mn (INR 25.4 Cr.)


Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Chirang, which is in close proximity to Bhutan, Bangladesh,
Guwahati and West Bengal
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
A new power generation plant of 750 MW is coming up at Salakati, Kokrajhar, which is at a distance of ~
48 km from the proposed site.
Investment Opportunities Given the proximity of the location to international borders and to the adjoining states, huge investment
opportunities exists in diverse sectors as petrochemicals, plastics, food & agro processing etc
Connectivity The site is located in the heart of Bijni Town, and is well connected by road and rail network. Bijni has a
railway station. LGBI Airport is 172 kilometres away. NH 31 connects Bijni to rest of Assam.
Nodal agency Assam Industrial Infrastructure Development Corporation, Government of Assam.

248
Setting up of Cold Chain Units in 10 Districts of Assam (1500 MT each)

Name of Project Setting up of Cold Chain Units in 10 Districts of Assam (1500 MT each)

Project Location 10 districts of Assam - Nagaon, Silchar, Dhubri, Baksa (Tamulpur), Sonitpur (Balipara), Lakhimpur, Tinsukia,
Jorhat (Titabar), Nalbari, Dima Hasao (Haflong)
Area of the Project 2 Acres per unit
Focus sector Industrial Infrastructure
Status of approvals Greenfield Project
Project contours The cold chain industry is expected to grow at a CAGR of 28-30% and would be valued at more than
INR 600 bn globally. The cold chain sector is being observed as the sunrise sector with high investment
potential.
Investment Opportunities The project shall be developed through PPP model.
Each cold chain unit shall have a capacity of 1500 MT with provision of extension in future
2 State-of-the-Art collection centre per Cold Chain
Multi-chamber facility with dynamic temperature and humidity control systems along with ambient
storage within the same premises
2 Refrigerated vans in each unit
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

249
Integrated Sugar Manufacturing Mills with capacity of 3000 TCD each

Name of Project Integrated Sugar Manufacturing Mills with capacity of 3000 TCD each

Project Location Goalpara, Karbi Anglong (Bokajan), Dhubri (Gauripur), Biswanath, Baksa (Mushalpur)
Area of the Project 30 Acres per Manufacturing Mill
Focus sector Heavy Industry
Status of approvals Greenfield Project
Project contours With the cropping area of sugarcane increasing steadily over the last five years, the production in the
state maintains an average of 1059 thousand tonnes.
There are numerous manufacturing units in Assam which are directly dependent on raw sugar such as
dairy processing units, bakery units, sweet meet vendors, restaurants etc.
Bagasse, a by-product of sugar cane can be used as fuel source which also has huge revenue potential for
industries.
Molasses, a by-product of sugarcane can also be utilized in preparation of alcohol which can tap the local
as well as markets of neighbouring states
Investment Opportunities The project shall be developed through PPP model.
Each integrated sugar manufacturing mill shall have an installed capacity of 3000 tonne Crushing per Day
(TCD)
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

250
Multi-sector Industrial Park, Karimganj

Name of Project Multi Sector Industrial Park, Karimganj

Project Location Karimganj


Area of the Project 120.33 acre
Project cost 383,190,250 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is located at a distance of ~ 50 km from the Bangladesh border and its proximity to
Manipur makes the location a perfect international gateway
The Motor Vehicles Agreement (MVA) signed by the countries of Bangladesh, Bhutan, India and Nepal
(BBIN) on 15th June, 2015 with the objective of enabling a seamless movement of cargo across their
borders, will further facilitate the development of Karimganj as the gateway to Bangladesh
The proposed site is located at a distance of ~ 55 km from Integrated Infrastructure Development Centre
(IIDC) Malinibeel
The proposed site is located at a distance of ~ 35 km from the industrial estate at Badarpur Ghat.
A new power generation plant of capacity 30 MW is coming up at Cachar, which is at a distance of ~ 65
km from the proposed site in addition to the existing 120 MW plant at Lower Kopili
In the event, natural gas is required at the site, then Assam Gas Company has given in-principal
commitment to extend the nearby pipeline to the proposed site.

Investment Opportunities The identified focus sector for this zone offers large investment opportunities based on the given
economic conditions, raw materials availability
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

251
Multi-sector Industrial Park, Dhing, Nagaon

Name of Project Multi Sector Industrial Park, Dhing, Nagaon

Project Location Dhing, Nagaon {at the property previously belonging to Industrial Papers (Assam) Ltd.}
Area of the Project 151.33 Acre
Project cost 486,456,775 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Nagaon, which is in close proximity to Guwahati
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Nagaon is situated on the southern bank of the mighty Brahmaputra, a strategic location which is well
accessible by both road and river.
NH 37 passes through the project site providing it all weather accessibility
Distance to Guwahati, the largest market in North East, is ~115 km
Project site is located on the bank of the mighty Brahmaputra river, allowing the accessibility by river
route.
SH 47 connects the project site to NH 37 which passes through Nagaon.

Investment Opportunities The project shall be developed through PPP model.

Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

252
Multi-Sector Industrial Park, Nagarbera, Kamrup (R)

Name of Project Multi Sector Industrial Park, Nagarbera, Kamrup (R)

Project Location Nagarbera, Kamrup Rural


Area of the Project 608.33 Acre
Project cost 1955509005 INR
Focus sector Industrial Infrastructure
Status of approvals Greenfield Project
Project contours The proposed site is in the district of Kamrup, which is in close proximity to Bangladesh and Guwahati.
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Industrial Growth Centre, Matia is about 25 km away from the project site.
Industrial Growth Centre, Chaygaon is about 65 km away from the project site.
Project site is located on the bank of the mighty Brahmaputra River, allowing the accessibility by river
route.
Nagarbera is connected to NH 31 which passes through Dhupdhara.

Investment Opportunities The project shall be developed through PPP model.

Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

253
Multi-Sector Industrial Park, Goalpara

Name of Project Multi Sector Industrial Park, Goalpara

Project Location Goalpara


Area of the Project 200 Acre
Project cost 642,980,250 INR
Focus sector Industrial Infrastructure
Status of approvals Greenfield Project
Project contours The proposed site is in the district of Goalpara, which is in close proximity to Bangladesh, Guwahati
and West Bengal.
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Industrial Growth Centre, Matia is about 25 km away from the project site.
Industrial Growth Centre, Chaygaon is about 100 km away from the project site.
Project site is located on the bank of the mighty Brahmaputra River, allowing the accessibility by river
route.
NH 31 passes through the project site.

Investment Opportunities The project shall be developed through PPP model.

Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

254
Multi-Sector Industrial park, Sadiya

Name of Project Multi Sector Industrial Park

Project Location Sadiya, Tinsukia


Area of the project 100 acres
Project cost 321,529,725 INR
Focus sector Industrial Infrastructure
Status of approvals Green Field
Project contours The proposed site is in the district of Tinsukia, which is in the second most industrialized regions of
Assam.
Good base for industrial development with adequate social infrastructure thereby creating the ideal
circumstances for an integrated industrial and urban infra development.
Already a thriving industrial region exists within a radius of 200 kms from the proposed site.
A new power generation plant of 600 MW is coming up at Margherita, which is at a distance of ~ 74 km
from the proposed site.
Investment Opportunities Based on the economic scenario of the state, its proximity to neighbouring countries, availability of raw
materials provides ample investment opportunities in the sector identified for the proposed site
Connectivity Tinsukia is well connected by NH37
Dibrugarh, which is 100 kms away from Sadiya is the originating and terminating station of many
important trains running from & to Assam to & from important destinations such as New Delhi, Kolkata,
Bangalore, Kanyakumari, Amritsar, and Chandigarh.
The nearest airport is the Dibrugarh airport.
The nearest IWT Terminal is the Dibrugarh IWT Terminal.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)

255
Industrial Park for Sugar Mills, Golaghat & Nagaon

Name of Project Industrial Park for Sugar Mills

Project Location Dergaon, Golaghat (at the property previously belonging to Cooperative Sugar Mills Ltd., Dergaon)
Dergaon, Golaghat (at the property previously belonging to Swahid Kushal Konowar Spinning Mill,
Dergaon)
Kampur, Nagaon (at the property previously belonging to Cooperative Sugar Mills Ltd., Kampur)
Area of the project 183 acres, 216 acres and 531 acres respectively.
Focus sector Heavy Industry
Status of approvals Green Field
Project contours With the cropping area of sugarcane increasing steadily over the last five years, the production in the
state maintains an average of 1059 thousand tonnes.
There are numerous manufacturing units in Assam which are directly dependent on raw sugar such as
dairy processing units, bakery units, sweet meet vendors, restaurants etc.
Bagasse, a by-product of sugar cane can be used as fuel source which also has huge revenue potential
for industries.
Molasses, a by-product of sugarcane can also be utilized in preparation of alcohol which can tap the
local as well as markets of neighbouring states
Investment Opportunities The project shall be developed through PPP model.
Each integrated sugar manufacturing mill shall have an installed capacity of 3000 tonne Crushing per
Day (TCD)
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)