Professional Documents
Culture Documents
Shelf of Project
Shelf of Project
Shelf of Projects
Power 79
Healthcare 154
Education 204
The proposed site is at distance of 2 km from the Karimganj Railway Station. The Railway line is under gauge
conversion. It connects Karimganj to Badarpur and Silchar and finally intersects with the Trunk Route at
Lumding, which in turn connects it to West Bengal and beyond to rest of India.
3
Inland Water Transport Terminal, Nimati Ghat
The nearest Railway station is at Jorhat, ~ 15.5 kms from the proposed site. The railway line running from
Jorhat Railway station meets at the Trunk Route at Furkating and Mariani. The trunk route in turn connects it
to Guwahati and beyond to West Bengal and Rest of India.
The nearest airport is the Jorhat airport which is ~ 21 km from the proposed site
Project contours The development of terminal involves land development, creation of common infrastructure facilities,
port works such as quays and trestle, bank shore protection, cargo terminal infrastructure, cargo handling
equipment’s, provision of external communication networks.
Investment Develop, operate and maintain the terminal on PPP mode
Opportunities
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam
4
Inland Water Transport Terminal, Silghat
The nearest railway station is the Nagaon Railway station which is ~ 50 km from Silghat. However it is
not the trunk route.
The Guwahati Airport is located at ~ 187 km from Silghat. The nearest Airport is Tezpur Airport which
is ~ 21 km from Silghat
Investment Opportunities Develop, operate and maintain the terminal on PPP mode
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam
5
Development of Greenfield Port Township - Palasbari
Project Location Palasbari (Kamrup Rural District)
Area of the project 500 acres (approx.) of greenfield township development in land to be reclaimed from dredging of
Brahmaputra River
Focus sector Infrastructure
Employment Direct Employment : Subject to DPR
Status of approvals New Project
Project contours Rapid rural to urban migration in the State has stressed the existing urban infrastructure of Assam. This has
necessitated growth of new urban areas with excellent connectivity.
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Palashbari is 15 kms away from NH 37 and 15 kms away from Guwahati Airport. Proximity to proposed IT park
and Chaygaon Industrial Growth centre makes Palashbari an ideal location for development of a new port
based township.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam
6
Development of Greenfield Port township – Bogibeel
7
Development of Greenfield Port Township - Jogighopa
8
Development of Greenfield Port Township – Kurua
With the newly proposed expressway along Brahmaputra and planned usage of the mighty river for logistics
and transportation, there is immense potential for developing land along the river for development of
greenfield township.
Investment Civil work related to construction of:
Opportunities River Port
Road Connectivity and Road Furniture
Market Complex with Parking
Sewage Treatment and Waste Disposal
Parks and Gardens
Residential Apartments
Commercial Hubs/Malls
Community Halls etc
Connectivity Kurua is 20 kms away from NH 52 and 65 kms away from Guwahati Airport. Proximity to Guwahati via ferry
and Dalgaon Industrial Growth centre makes Kurua an ideal location for development of a new port based
township.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam
9
Development of Greenfield Port township - Nimati Ghat
Proximity to the proposed tourist circuit of Majuli makes Nimatighat an ideal location for development of a
new port based township build around a mixed economic model primarily based on tourism.
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam
10
Operation of River Taxi
11
Operation of Freight Ferry
12
Modern IWT terminal with Commercial Complex at Sonaram (Bharalumukh)
Name of Project Modern IWT terminal with Commercial Complex at Sonaram (Bharalumukh)
Connectivity Bharalumukh is well connected by Major District Roads. It is located near the banks of the mighty river
Brahmaputra and is surrounded by commercial places like Fancy bazar and Pan bazar.
The nearest railway station is in Paltan bazar and Kamakhya, which is 3 kms (approx.) and 4 kms (approx.) away
from Bharalumukh.
The nearest airport is the LGBI Guwahati Airport, which is ~ 19 kms from the site.
Nodal agency Inland Waterways Authority of India and Directorate of Inland Water Transport, Assam
13
Riverfront Development Project at Jorhat
Project Location Near By Pass Road, Borigaon, Jorhat (Length – Approximately 1 km along Bhogdoi River)
14
Development of Greenfield Port Township - Lakhipur
15
Riverfront Development Project at Tezpur
16
Development of Greenfield Port Township – Silghat
17
Development of Greenfield Port township – Dikhoumukh
18
Development of Greenfield Port township – Sualkuchi
Proposed Infrastructure Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam
19
Development of Greenfield Port Township – Dhubri
20
Operation of Hovercraft Taxis
21
Inland Water Transport Terminal, North Guwahati
22
Inland Water Transport Terminal, Kurua
23
Inland Water Transport Terminal, Biswanath Ghat
24
Inland Water Transport Terminal, Dhubri
25
Tourism, Hospitality
and Wellness
Tourism: Destination Development
27
Destination Development - Resort / Hotel at Lokhra Buragaon, Chariduar, Sonitpur
28
Destination Development - Resort / Hotel at Chandrapur, Kamprup (M)
29
Destination Development - Resort at Chandubi
30
Luxury Tourist Lodge at Amingaon, Guwahati
31
Luxury Tourist Lodge at Kaliabari, Tezpur, Sonitpur
32
Luxury Heritage Resort at Chariduar, Sonitpur
33
Luxury Resort / Museum / Convention Centre at Kuthari Tea Estate, Kaliabor, Nagaon
Name of Project Luxury Resort / Museum / Convention Centre at Kuthari Tea Estate, Kaliabor, Nagaon
34
Luxury Tourist Lodge, Garmur, Majuli
35
Luxury Tourist Lodge, Sivasagar
36
Tea Museum / Luxury Resort at Barbari, Dibrugarh
37
Luxury Resort at Pobitora, Morigaon
38
Upgradation of Kaliabhomora Island Tourist Recreational Park, Nagaon
39
Upgradation of Rudra Singha Ethnic Village Resort, Sivasagar
40
Mini Film City, Haflong, Dima Hasao
41
5-Star hotel, Samaguri, Nagaon
42
Amusement Park/ Rural / Ethnic Retreat, Samaguri Beel
43
Floating Hotels/ House boats
44
Adventure Tourism - Ziplines (Tezpur, Dima Hasao, Chandrapur, Chandubi)
45
Long Distance Cruise Liners and Speed Boats along Brahmaputra
Name of Project Long Distance Cruise Liners and Speed Boats along Brahmaputra
46
Wellness Zone, Kaliabor
47
Wayside Amenity Centres – Dibrugarh
Investment Design, Develop, Operate and Transfer Star Category Wayside Amenity Centres
Opportunities Refurbishment of existing properties
Connectivity NH 31 connects all these districts to Guwahati
Dhamalgaon, Moranhat,Dibrugarh railway station, Dibrugarh Town railway station and Safrai railway station
are close to Khowang and Rajmai.
Dibrugarh Airport is the nearest airport.
48
Wayside Amenity Centres - Sonitpur
49
Development / Conversion of existing properties into Star Category Hotels / Resorts:
Kaziranga Cluster
Name of Project Development of Star category Hotels / Resorts in the Kaziranga Cluster
Project Location Hotels / Lodges and Resorts near Kaziranga National Park:
Agaratoli, Kaziranga
Aranya Tourist Lodge, Kaziranga
Bonani Tourist Lodge, Kaziranga
Banashree Tourist Lodge, Kaziranga
Kunjabon Tourist Lodge, Kaziranga
Prashaanti Tourism Cottages, Kohora, Kaziranga
Reception Centre at Kaziranga (Jonaki Kareng)
Area of the project Agaratoli, Kaziranga
Land: Freehold - ~11520 sq. ft.
Building: 6 cottages, restaurant, 2 –dormitory rooms, staff block
Aranya Tourist Lodge, Kaziranga
Land: Free Hold – 3.33 Acre
Building: Lodge (Building: RCC (G+2)), 3 Cottages, Facilities: Rooms-29 (deluxe-10, Standard-12,
cottages-6, suite-1), Restaurant, Bar, Conference Hall, souvenir shop etc.
Bonani Tourist Lodge, Kaziranga
Land: Free Hold – 0.33 Acre
Building: Duplex Assam type house
Banashree Tourist Lodge, Kaziranga
Land: Free Hold – 0.67 Acre
Building: Assam type building
Kunjabon Tourist Lodge, Kaziranga
Land:Free Hold – 1 Acre
Building: Assam type building
Facilities: Dormitory
Prashaanti Tourism Cottages, Kohora, Kaziranga
Land: 0.67 Acre Free Hold
Facilities: Cottages, Facilities- 6 cottages, restaurant, 2 –dormitory rooms, staff block
Reception Centre at Kaziranga (Jonaki Kareng)
Land: 8640 sq. ft.
Building: Cottages,
Facilities: 6 cottages, restaurant, 2 –dormitory rooms, staff block
Approx. Project cost Subject to preparation of DPR
Focus sector Tourism
Employment Subject to preparation of DPR
Status of approvals Project identified
Project contours Kaziranga National Park attracts thousands of tourists every year
Investor to develop all 7 Properties in the Cluster
Investment Develop all the properties to Star Category properties
Opportunities Refurbishment of existing rooms and interior
Facilities for conducted tours
50
Development/Conversion of existing properties in Star Category Hotels/Resorts:
Kamrup (M), Kamrup (R) and Morigaon Cluster
Name of Project Development of Star category Hotels / Resorts in the Kamrup (M), Kamrup (R) and Morigaon Cluster
51
Plastics
and
Petrochemicals
Plastic Park at Gelapukuri, Tinsukia
53
Chemical Hub, Chandrapur
Proposed Infrastructure The nearest IWT Terminal is at Pandu, which is ~ 31 km from Chandrapur in addition to the 60MW power plant
nearby
Adequate water will be made available from ground and surface to meet the needs of the units in the proposed
park
The state gas company will extend the existing pipe line to the proposed site
Private as well as public telecom service providers provide extensive service in this region
Nodal agency Assam Industrial Development Corporation (AIDC)
54
Manufacturing of Disposable Syringes
Rubber
Assembling and
Finishing
Sterilization
Packing and
Dispatching
Manufacturing Process
Disposable syringes are moulded using Injection moulding machines and special Hot-Runner moulds,
having 16 – 32 cavity mould.
Polypropylene (PP), from Assam Gas Cracker Project (AGCP), is the raw material required for Injection
Moulding Grade.
Moulding is carried out in chilled condition to get better clarity of the PP used.
The moulded syringes are then assembled with the rubber.
The whole assembly is then sterilized in sterilization plant using ethylene oxide.
The completed syringe is then blister packed in automatic packing machine.
Utilities Electricity (connected Load) : Approximately 88 kW
80 litre/min Water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 21 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)
55
Manufacturing of Plastic Crates
56
Manufacturing of Armed Chair and Armless Chair
Name of Project Facility for Manufacturing of Armed Chair and Armless Chair
Note: The manufacturing process for both Armed Chair and Armless chair is the same.
Utilities Armed Chair
Electricity (connected Load): 223KW
Water: About 200 litre/min
Armless Chair
Electricity (connected Load): 84 KW
Water: About 200 litre/min
Water will be circulated through fixed tank capacity is 15,000-20,000 litre
Manpower Requirement 11 workers for Armed Chair
17 workers for Armless Chair
Nodal Agency Assam Industrial Development Corporation (AIDC)
57
Manufacturing of Rocking Chairs
58
Manufacturing of Battery Case
59
Manufacturing of Tooth Brushes
60
Manufacturing of Lunch Boxes
61
Manufacturing of Buckets
62
Manufacturing of Caps & Closures
63
Manufacturing of Combs
64
Manufacturing of Woven Sack
Name of Project Facility for Manufacturing of Woven Sack
Project Location Gelapukhuri, Tinsukia, Assam
Area Requirement 60,000-70,00 sq ft
Approx. Project cost INR 144 lakh
Project Scale Machine output rate : 110 kg/hr
Process
Rafia Tape of PP is first produced by extruder, which is equipped with a suitable die, cooling ring,
temperature and process controls etc. From the extruder, the tape is taken off by a set of rollers.
The tape then goes to a slitting unit where it slits into tapes of 6 to 12 mm width depending upon
the requirements. The tapes thus made are conveyed to stretching orientation oven in which hot air
circulates at controlled temperature. The tapes are stretched to the desired level.
The oriented tapes are passed through a second godet station and then through the stabilizing oven.
The stabilized tapes are passed through a third gadget station and then to a cheese winder unit where
each tape is wound on a separate cheese.
The monoaxially oriented tapes of PP produced are woven into fabrics in circular looms. The necessary
working machine and prim winders are provided. The woven fabric can then be stitched into bags
in an industrial stitching machine. After converting the fabric into bags, it is printed with suitable ink
wherever necessary
For some cases laminated woven sacks are used. For packaging of fertilizers, it is necessary to
laminate the fabric before making it into bags. Whereas, in woven sacks, for cement packaging,
lamination is not required.
Utilities Power consumption: 3.7 KW-Phase 415V 50 Hz
Power requirement :
Tape line: 48 KW
Cheese winder : 4KWx 120=5.4 KW
Circular Loom: 4 KW x12=48 KW
Stitching and cutting machine: 5KW
Water Cooling tower: 8 KW
Air Compressor 3HP: 5 KW
Manpower Requirement 38 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)
65
Manufacturing of Woven Jumbo Bag/ Flexible Intermediate Bulk Containers
Name of Project Facility for Manufacturing of Woven Jumbo Bag/Flexible Intermediate Bulk Containers
Project Location Gelapukhuri, Tinsukia, Assam
Area Requirement 35,000-40,000 sq ft
Approx. Project cost Machinery Cost : INR 685-720 lakh
Project Scale Machine Output : 500kg/hr
Process Manufacturing Process
Production of FIBC involves the conversion of PP Granules to long tapes and later woven, cut to size, printed
and stitched to be used. The step wise production process is explained below.
Extrusion
Here the mix of virgin and recycled PP(optional) granules are being melted and converted into form of tapes
in a extrusion plant and at the end of the process are wound on bobbins of required size. This is the first
stage of process which determines the tensile strength of the tape.
Weaving
Extruded tape bobbins will be loaded in the Circular weaving machine or Flat weaving machine. Here the
tapes will be woven to fabric of required specification and will be wound in roll form. These fabrics will be-
come the body fabric of the FIBC.
Lamination (Optional)
PP fabric is being laminated with LDPE film for making the fabric moisture proof. This is optional process as
per the requirement of the customer.
Cutting
The woven PP fabric in rolls will be fed in the automatic cutting machine and will be cut in to cut bit of re-
quired size. This Automatic process is adopted to get better accuracy in cut size.
Printing
The cut bits that are the body fabric will be fed into the heavy duty printing machine to make the printing
impression on the fabric. Heavy duty printing machine, gives the best impression with maximum of three
colours.
Webbing
Heavier Polypropylene Tapes are woven in to webbing which forms the lifting loop of the Jumbo bag.
Sewing
Here all the components used to manufacture Jumbo bags are brought together along with the printed
body fabric. All the gathered parts are assembled to a Jumbo bag by highly skilled labours under the super-
vision of technically qualified supervisors.
Packing / Bailing
Here the bags which have been produced will be compressed with the help of the bale press and neatly
packed as per the requirement of the customers.
Storage
Once the bag is baled, it will be immediately shifted to a clean storage room, from where the dispatches are
affected.
Utilities Tape Extrusion Line:
Compressor: Capacity Pressure-165 CFM, 6-7 bar, Separate air tank of capacity 1,000 litres is recommended
for tape line & winders (excluding tape guns
Air Drying Unit: Capacity 165 CFM, Pressure 6-7 bar, Dew point 3 degree Centigrade
Chilled War Requirement: Process Requirement 58 TR, flow rate: 42,686 L/hr, Intel Temp: 18 degree centi-
grade
Water pressure: 4 bar
Filament/Tape Winder : Three phase voltage with mains supply of 3X 415 V/50 Hz or 3X 415V/50 Hz or
3X420V/50 Hz with separate neutral and earth Admissible fluctuations
Voltage- 10% to +5%
Frequency : +/- 2%
Manpower Requirement 38 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)
66
Manufacturing of Non-Woven Fabric
67
Manufacturing of Blown Film (BOPP)
Process
PP is first melted by subjecting it to heat and pressure inside the barrel of an extruder and finally forcing the melt
through a narrow slit in a circular die. The resulting thin film has a form of a tube, also called a “bubble” (blown
film). As the film comes out of the die, it is cooled and then rolled up on a core.
Air is introduced in the center of die to blow up the tube like a balloon.
Air ring blows onto the hot film to cool it from inside and outside of the tube.
The tube passes through nip rolls where it is flattened.
Collapsed tube is taken back down the extrusion tower via more idler rollers.
On winder the tube or film is wound into rolls.
Utilities Power Requirement: 40 mm dia: 30 KW
65mm dia : 50 KW
Manpower Requirement 14 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)
68
Manufacturing of Box Strap
69
Manufacturing of Ropes
Ring Extruder
Twister Twister
Manufacturing Process
Extrusion
Plastic granules are extruded and monofilament is produced from the die-head and drawn in water bath
and subsequently dried by hot air as well as stretched
Yarn Twister
Ring twisters are used to twist the bunched strands for 2 mm to 3.5 mm ropes for getting higher outputs
Extruder twisters are used for twisting the yarns for 4 mm and above rope sizes.
The twisted yarns are converted into rope by a combined strander/ rope making
Machine and coiling in one single operation. The resulting rope is wound into a bundle and packed.
Utilities Electricity: 197 KW
Manpower Requirement 36 workers
Nodal Agency Assam Industrial Development Corporation (AIDC)
70
Manufacturing of Fishing Net
71
Manufacturing of PPR Pipes
Extrusion
Sizing/Calibration unit
Cooling
Printing
Haul-off
Cutting
Stacking
72
Manufacturing of Blow Moulding Containers
73
Manufacturing of Disposable Caps
CLAMPING
HEATING
PRE-STRETCH
VACUUM
PLUG WASTE
74
Pharmaceuticals
and
Medical Equipment
Pharmaceutical Park at Chaygaon, Kamrup Rural
76
Development of Pharmaceutical cluster in Assam
The park is designed with common facilities such as testing centres and R&D labs to facilitate the
industries in advanced manufacturing practices.
The park also contains Incubation Centres to enable budding entrepreneurs in developing their own
biotech industry.
Investment Opportunities The major investment opportunities lie in setting up Biotechnology, Pharmaceuticals, generic drugs
manufacturing and R&D units.
Connectivity Kuruwa is located in Kamrup Rural District.
The site is 14 kms from to NH-31
The nearest railway station is 15 km at Mirza and Guwahati Railway Station is 45 kms away.
The nearest airport is situated at a distance of 25 km at Borjhar, Guwahati
Proposed Infrastructure Government of Assam will assure provision of the required water and uninterrupted power to the
project.
Nodal agency Assam Industrial Development Corporation (AIDC)
77
Development of Pharmaceutical cluster in Assam
The park is designed with common facilities such as testing centres and R&D labs to facilitate the
industries in advanced manufacturing practices.
The park also contains Incubation Centres to enable budding entrepreneurs in developing their own
biotech industry.
Investment Opportunities The major investment opportunities lie in setting up Biotechnology, Pharmaceuticals, generic drugs
manufacturing and R&D units.
Connectivity Balipara is located in Sonitpur District.
The site is 1 kms from to NH-52
The nearest railway station is 23 km at Tezpur
The nearest airport is situated at a distance of 13 km at Tezpur
Proposed Infrastructure Government of Assam will assure provision of the required water and uninterrupted power to the
project.
Nodal agency Assam Industrial Development Corporation (AIDC)
78
Power
220 kV S/C line from Samaguri to Khumtai
Project contours Plan, implement and manage power transmission infrastructure in the state to make available 24x7 hours
uninterrupted power supply to all the 33/11 kV sub-stations in the state of Assam
For efficient transmission of power, the state intends to develop the power infrastructure of the state, in
line with international standards to cater to electricity demand of 13000 MW by FY 2034-35 by adopting
innovative technologies though public private partnership (PPP) initiatives
State Transmission Company (AEGCL) to plan & implement projects so as to have a cumulative transmission
capacity of 12000 MVA by FY 2024-25 and 40000 MVA by FY 2034-35
80
Sonapur Sub-Station
81
20 MW Solar Power Generation units proposed at Dhing, Nagaon
82
20 MW Solar Power Generation units proposed at Balipara, Tezpur
83
20 MW Solar Power Generation units proposed at Goalpara
84
20 MW Solar Power Generation units proposed at CSM campus
85
2 x 800 MW Margherita Thermal Power Station Phase I
86
Silchar Gas based power project (30 MW)
87
Borpani Middle St-II (24 MW)
88
NRPP Ph-II (100 MW)
89
Development of combined Solar Park on sand bars of Brahmaputra, Upper Assam (2000 MW)
Name of Project Development of combined Solar Park on sand bars of Brahmaputra, Upper Assam (2000 MW)
90
Strengthening of Power Distribution System, Assam
91
Augmentation of power transmission system, Assam
92
Micro Solar Power Projects, 10 major cities of Assam
93
Handloom, Textiles
and
Handicrafts
Name of Project Setting up of Handloom Production Unit at HPC, Dhemaji
95
Setting up of Handloom Production Unit at HPC, Patbausi
96
Setting Setting up of Handloom Production Unit at HPC, Jajari
97
Setting Setting up of Handloom Production Unit at HPC, Solmara
98
Handloom Training cum Production Unit, Bamunimaidam, Guwahati
99
Apparel & Garment Making Centre, Paschim Boragaon, Guwahati
Name of Project Apparel & Garment Making Centre, Paschim Boragaon, Guwahati
100
Establishment of Silk Processing and Blending Park, Khanapara, Guwahati
Name of Project Establishment of Silk Processing and Blending Park, Khanapara, Guwahati
101
Silk Value Chain based Cluster Development
Project Location Various locations across the state distributed in four zones (West, Central, East and South)
Approx. Project cost INR 3 crore – 5 crore (~USD 0.46 million – 0.77 million) per zone
Focus sector Sericulture Sector
Employment 300 to 500 approx. (direct and indirect)
Status of approvals Land approved by Govt. of Assam
Project contours Silk based cluster development to enable a planned and focused approach towards developing
backward integration for spinning industry in the state.
The clusters will have access to technology consultancy cells at a zonal level, training centres
providing continual training addressing industry requirements, access to cocoon banks,
warehousing facilities, logistics network, packaging facilities.
Units will be housed in existing spinning & reeling units.
There are 52 existing spinning and reeling centres under directorate of sericulture, government of
Assam. (eri spinning centre -17, muga reeling unit -14, mulberry reeling unit -21)
Development of organized silk market with silk auction facilities.
Investment Opportunities Govt. Share 51%
Private investor share 49%
Partner State Govt. in development of infrastructure and operation and maintenance.
Connectivity All these centres are well connected through roads
Proposed Infrastructure Upgradation of infrastructure like buildings, power etc.
Construction of approach road
Plant & machineries
Godown
Power
Heat/ dry chamber
Carry van ( vehicle)
Nodal agency Directorate of Sericulture, Assam
102
Garment Manufacturing Unit
It will procure orders from various agents of the large multinationals for producing renowned
branded apparels. The unit would be equipped with most modern manufacturing facilities with
state-of-the-art machines, for every activity, from stitching to finishing.
Investment Opportunities Investors are invited for Design Build Operate and Transfer of the project
Proposed Infrastructure The concerned authority will facilitate supply of power and water.
Total connected load of about 21 kW will be required. 0.4 - 0.6 KL of water will be required every
working day.
Nodal agency Directorate of Handlooms and Textiles
103
Manufacturing of Bamboo Mat Board, Bamboo Mat Corrugated Sheets & Bamboo Floor Board
Name of Project Manufacturing of Bamboo Mat Board, Bamboo Mat Corrugated Sheets & Bamboo Floor Board
104
Common Facility Centre (Handicraft), Belsore, Nalbari
105
Cane & Bamboo based Handicrafts Production Unit
106
Milk Processing Plant- Dhekiajuli
The Department envisages augmenting the dairy sector by bringing in private investments for further
organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Dhekiajuli is located along NH 15
The nearest railway station is at Dhekiajuli
The nearest airport is at Tezpur, 33.4 kms from Dhekiajuli
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture
107
Agriculture and Food
Processing including
Organic Cultivation
and Bamboo
Milk Processing Plant- Silchar
The Department envisages augmenting the dairy sector by bringing in private investments for further
organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Silchar is located on NH306
The nearest railway station and airport is at Silchar
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture
109
Milk Processing Plant- Tezpur
The Department envisages augmenting the dairy sector by bringing in private investments for further
organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure waste
disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Tezpur is located on NH52
The nearest Railway Station and airport is at Tezpur
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture
110
Milk Processing Plant- Nagaon
The Department envisages augmenting the dairy sector by bringing in private investments for
further organising the value chain.
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure
waste disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Nagaon is located on NH37
The nearest railway station is at Nagaon and airport is at Guwahati, 140 kms away
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Department of Agriculture
111
Milk Processing Plant - Bajali, Barpeta
Project contours With the rising income level of the growing middle class in Assam, the demand for milk and milk
products is also increasing significantly. Besides traditional milk products which have urban as well
as rural markets, there is also a tremendous scope for marketing of value added milk products
The Department envisages augmenting the dairy sector by bringing in private investments for
further organising the value chain
Investment Opportunities Investors are expected to install appropriate plant and machinery, source raw material, ensure
waste disposal, provide for store facility, refrigeration system and create marketing infrastructure
Connectivity Barpeta is connected by NH 31
Nearest railway station is Pathsala and nearest airport is Lokpriya Gopinath Bordoloi International
Airport, Guwahati.
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned Directorate
Nodal agency Directorate of Dairy Development, Govt. of Assam.
112
Processing unit of medicinal herbs with marketing facilities
Proposed Infrastructure Construction of building, purchasing machineries and creation of marketing infrastructures
Nodal agency Directorate of Horticulture & Food Processing
113
Ginger Processing Unit
114
Modern Rice Processing unit (Specially for Red Rice)
Name of Project Modern Rice Processing unit (Specially for Red Rice)
115
Banana Park
116
Mustard Oil Processing Unit with marketing facilities
117
Tissue Culture Laboratory
118
V Type Nursery
119
Orchid Park
Project Location Guwahati (to be made available with consultation with District Administration)
Area of the project 2.47 acre
Approx. Project cost INR 20 crores (~USD 2.08 mn)
Focus sector Horticulture
Status of approvals Greenfield project
Project contours Commercial cultivation of locally available orchids both open field and protected conditions
To provide primary processing and marketing platform of the Orchids
To initiate commercial cultivation of orchids in the farmers’ field as per market demand with buy back
arrangements
Investment Opportunities Investment is sought in PPP mode
Connectivity The site is within Guwahati city and is connected with rail, road and air with rest of the country
Proposed Infrastructure Construction of protected structures, building, installation of machineries and creation of marketing
infrastructures.
Nodal agency Directorate of Horticulture & Food Processing
120
Spices Park for Ginger and Turmeric Processing
Project Location Horticultural farms at Kathiatholi – owned by Director of Horticulture, Nagaon District, Assam
Area of the project 24 acre
Approx. Project cost INR 10 Crore (~USD 15.38 million)
Focus sector Food Processing
Status of approvals The government of Assam has approved the proposal and Spices Board is in the stage of identifying an
agency for the preparation of a DPR for the project.
Project contours A Spices Park can be defined as an industrial park for processing and value addition of spices and spice
products which offers facilities at par with the international standards.
121
Investment Opportunities The Regional crop specific Spices Park is a well-conceived approach to have an integrated operation for
cultivation, post harvesting, processing for value addition, packaging, storage and exports of spices and
spice products by meeting the quality specifications of the consuming countries.
High exports for ginger and turmeric: Ginger and turmeric are among the spices that are exported in large
quantities from India.
Intrinsic qualities of North eastern ginger and turmeric: The North East grows indigenous varieties of ginger
and turmeric that is not available elsewhere. This gives these North Eastern spices an edge over the same
spices produced elsewhere.
For example, North east produces turmeric if high curcumin content like the lakadong and Megha varieties
with approximately 7.4% curcumin as opposed to regular turmeric which contains curcumin at around 5%.
Connectivity Road
Located a few kilometres off of NH 37, the plot is not far from this major highway.
Rail
The closest railway station of Jamunamukh is 10 KM away. Still further away, a second station of Lanka is at a
40 KM distance.
Airway
The closest airport is the Tezpur airport (Tezpur, Assam) at a distance of 73.8 KM.
Transportation of spices to the park for processing and from the park, after processing can go smoothly
without any hindrance.
122
Tea Park
123
Multi Fruit Juice Production Unit
124
Exotic Pig Germplasm Bank
125
Pig Processing Plant and Farm
Investment Opportunities Opportunity for private sector investment in setting up of pork processing plant and necessary
infrastructure facilities.
Connectivity Jagiroad is well connected with NH-37 and 49 KM away from Guwahati by road
Nearest Airport is Lokapriya Gopinath Bordoloi International Airport, Guwahati
Jagiroad is well connected to other major cities of the country via regular trains. The nearest railway
station is Jagiroad
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.
126
Feed Mill Plant at Dibrugarh
127
Feed Mill Plant at Bongaigaon
Project contours The state has a huge demand for livestock and potential for breeding livestock such as buffalo,
sheep, goat, pig, flow, and duck etc. With rising income level of the growing middle class in Assam,
the demand for meat also increase significantly which has also created higher demand for balanced
concentrate feed. To tap the potential market, department has envisaged creating concentrated feed
mill plants.
Investment Opportunities Opportunity for setting up of feed mill plant with ultra-modern infrastructure and equipped labs
which ensure the best raw materials are utilized to produce quality end products.
Connectivity The nearest domestic and international airport is Lokpriya Gopinath Bordoloi International Airport,
Guwahati
Nearest railway station is at Bongaigaon
Bongaigaon is connected to rest of Assam through NH 31 and NH 37
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.
128
Concentrated feed and feed block manufacturing plant at Bajali, Barpeta
Name of Project Concentrated feed and feed block manufacturing plant at Bajali, Barpeta
129
Concentrated Feed Block Manufacturing Plant at Sonapur
Project contours The proportion of crossbred animals or improved strains of birds increased over the years in Assam.
This has necessitated higher demand for balanced concentrate feed. To tap the potential market,
department has envisaged creating concentrated feed and feed block manufacturing plants.
Investment Opportunities Potential Players are expected to construct of factory building, go-downs for raw materials as well as
for finished products, office, canteen, generator room, essential quarters, etc. Purchase of equipment
such as grinder, feed mixer, pelletizer, elevators, feed packing units, etc. Miscellaneous equipment
such as transformer, generators, weighing scales vehicles etc.
Connectivity Sonapur is located 20 KM from Guwahati City and well connected with roads.
Nearest railway station is in Guwahati and nearest airport is Lokpriya Gopinath Bordoloi International
Airport, Guwahati.
Proposed Infrastructure Developed land with electricity and water source shall be provided by the concerned department.
Nodal agency Department of Animal Husbandry & Veterinary, Govt. of Assam.
130
Organic Milk Production - All Districts
131
Organic Fodder Production – All Districts
132
Bio Gas Plant
133
Setting up of Broiler Parent Breeding Farm at Kamrup and Jorhat District
Name of Project Setting up of Broiler Parent Breeding Farm at Kamrup and Jorhat District
134
Establishment of Commercial Layer Farms
135
Setting up of Multiplier pig farm (500 capacity)
136
Setting up of Veterinary Biologicals Products (Vaccines)
137
Aqua Park at Hajo
138
IT & ITeS
IT Park at Guwahati
140
Electronics Manufacturing Cluster, Guwahati
Investment Opportunities An amount of more than INR 750 Crore (~USD 115.38 million) is estimated to be invested in this
sector over the next 5 years by private investors. Potential industries in this sector are Solar panel
manufacturing, LED, CPE, photonics, optoelectronics etc.
To start manufacturing of existing technology products, consolidating the ecosystem and driving
the technology roadmap, incubation units, SME’s and embedding core design and manufacturing
skills
Evolution to new technologies and establishing a world class centre for innovation and
manufacturing.
Connectivity The project is planned to be setup in Guwahati and is well connected by rail, road and air
Proposed Infrastructure Requirement of water and power will be facilitated by the Government.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)
141
IT Park at Dibrugarh
142
IT Park at Silchar
143
Business Process Outsourcing Centre - Silchar
144
Business Process Outsourcing Centre - Dibrugarh
145
Rural BPO
146
State Wide Connectivity (IT)
At the citizen level, assuming 80 lac households by 2030, and 1 Gbps per household, the bandwidth
requirement is projected at 8 Ptbs, say 10Petabyte/sec.
To provide OFC back-haul for mobile service providers
Creation of redundancy at all level DHQ, BHQ, GP etc.
Augmenting and replacing equipment for vertical connectivity
Operation and maintenance of PoPs, vertical and horizontal connectivity
Provide community Wi-Fi internet service across, hotspots so that entire community has access to high
speed Broadband till 2025
Each last mile connection can have upto 5 cables of 12 core each, as such the bandwidth can be scaled
upto 60 GB. GPON (Gigabyte Ethernet Passive Optical Fiber Network) technology to be used for maxi-
mum utility.
Proposed Infrastructure Requirement of water and power will be facilitated by the Government.
Nodal agency Assam Electronics Development Corporation Ltd. (AMTRON)
147
Assam State Data Centre
148
IT Start-up Incubation Centre
149
Skill Development
Development of Skill City in Guwahati / Sonapur / North Guwahati
151
Advanced Skills Training Institute (ASTI) – Model A
Project Location Locations for Model A: Guwahati, Nagaon, Jorhat, Dibrugarh, Tinsukia, Tezpur, Bongaigaon and
Silchar
Project contours Finishing and Advanced skills linked to employment for youth
Recognition of Prior Learning and Self-Employment for youth
The ASTIs and ITIs to operate in a Hub & Spoke model
Skill fresh entrants and a cadre of 250 Master Trainers
International level quality assurance and benchmarking
Technology enable teaching and learning
Professional management through Assam Skill Development Mission
Mode of Private Participation Training operations of ASTIs (selection through ASTI operations bid)
Civil construction of ASTIs (selection through civil construction bid)
Equipment supply to ASTIs (selection through equipment supply bid)
Quality Assurance Consultants (selection of firm through QAC bid)
Project Management Consultants (selection of firm through PMC bid)
Self-Employment Operator (selection of firm through SEO bid)
Training Capacity ASTIs to target 3000-4000 youth per year as below
ITI pass outs – not in employment, not in training
Unemployed engineers, graduates, polytechnic students/graduates
Customized skill up-gradation of existing workforce
Investment Envisaged ASTIs (Model A)
No Capital Investment
Working Capital Investment for training operations
Revenue generation and payback to ASDM
Infrastructure to be provided by ASTIs (Model A)
Govt. of Assam Ready to use state of the art training institutions (land, building and equipment to be provided
by Govt. of Assam)
Support to be provided by Govt. of Overall Quality Assurance, Assessment & Certification, Benchmarking and Industry Linkages
Assam Mobilization of youth from network institutions
Pre and Post Placement support
Support of spoke ITIs to each ASTI
Nodal agency Assam Skill Development Mission (ASDM)
152
Advanced Skills Training Institute (ASTI) – Model B
Project Location Locations for Model B: Any two locations in Assam as proposed by the private operator where it
holds land and building to operate an ASTI. To avoid coinciding with Model ‘A’ locations
Project contours Finishing and Advanced skills linked to employment for youth
Recognition of Prior Learning and Self-Employment for youth
The ASTIs and ITIs to operate in a Hub & Spoke model
Skill fresh entrants and a cadre of Master Trainers
International level quality assurance and benchmarking
Technology enable teaching and learning
Professional management through Assam Skill Development Mission
Mode of Private Participation Training operations of ASTIs (selection through ASTI operations bid)
Civil construction of ASTIs (selection through civil construction bid)
Equipment supply to ASTIs (selection through equipment supply bid)
Quality Assurance Consultants (selection of firm through QAC bid)
Project Management Consultants (selection of firm through PMC bid)
Self-Employment Operator (selection of firm through SEO bid)
Training Capacity ASTIs to target 3000-4000 youth per year as below
ITI pass outs – not in employment, not in training
Unemployed engineers, graduates, polytechnic students/graduates
Customized skill up-gradation of existing workforce
Investment Envisaged ASTIs (Model B)
Use of existing land and building. Joint Ventures would be allowed.
Working Capital Investment for training operations
Revenue generation and payback to ASDM
Infrastructure to be provided by Govt. ASTIs (Model B)
of Assam Permission to use existing infrastructure of private sector to be used as ASTIs
Full Equipment support to the ASTIs
Support to be provided by Govt. of Overall Quality Assurance, Assessment & Certification, Benchmarking and Industry Linkages
Assam Mobilization of youth from network institutions
Pre and Post Placement support
Support of spoke ITIs to each ASTI
Nodal agency Assam Skill Development Mission
153
Healthcare
Establishment of New Medical College attached with existing District Hospital
Name of Project Establishment of New Medical College attached with existing District Hospital
Project contours Trained and competent human resource is the foundation of an effective healthcare delivery system.
The concerned department envisages mitigating the shortage of doctors by increasing the number
of undergraduate seats in the state by utilising existing infrastructure of district hospitals in a cost
effective manner.
Investment Opportunities Construction, refurbishment, procurement, installation of equipment, commissioning & management
of the Medical College under PPP framework
Connectivity Karimganj is well connected by Road, Railways and Air.
Proposed Infrastructure Supply of power and water will be facilitated by the department
Nodal agency Health and Family Welfare Department, Assam
155
Establishment of New Medical College attached with existing District Hospital
Name of Project Establishment of New Medical College attached with existing District Hospital
Project contours Trained and competent human resource is the foundation of an effective healthcare delivery system.
The concerned department envisages mitigating the shortage of doctors by increasing the number
of undergraduate seats in the state by utilising existing infrastructure of district hospitals in a cost
effective manner.
Investment Opportunities Construction, refurbishment, procurement, installation of equipment commissioning & management
of the Medical College under PPP framework
Connectivity Goalpara is connected by Road, Railways. Nearest Airport, LGBI is 125 kms away.
Proposed Infrastructure Supply of power and water will be facilitated by the department
Nodal agency Health and Family Welfare Department, Assam
156
Establishment of Urban Primary Health Centres (UPHC) in all District Headquarters of Assam
Name of Project Establishment of Urban Primary Health Centres (UPHC) in all District Headquarters of Assam
On one hand, this initiative will help in reducing out of pocket expenditure on healthcare for urban
poor and on the other hand reduce footfall of patients who do not require secondary/tertiary attention
in district hospitals/medical colleges in the urban areas.
Investment Opportunities The bidder/Service Provider will be entrusted to run the UPHC services as per the Standard operating
procedures. This would include provisioning of MBBS doctor along with necessary para-medical and IT
technical staff at each site.
Proposed Infrastructure UPHC infrastructure shall comply with Indian Public Health Standards guidelines.
Nodal agency Health and Family Welfare Department, Assam
157
Setting up and Maintenance of Haemodialysis Units in Medical Colleges
Investment Opportunities Investors would be required to Build, Operate, Maintain and Transfer the Haemodialysis unit at
the space provide by Medical Colleges. They would recruit and manage all the required personnel
including consulting Nephrologists, technicians, nurses, ward boys and other support staff apart
from providing required Electronic Medical Record system.
Proposed Infrastructure Water, Electricity, Space for setup and power backup would be provided by the concerned authority.
Nodal agency Health and Family Welfare Department, Assam
158
Setting up and Management of Cardiac Centres in District Hospitals
There are number of patients who require cardiac treatment on regular basis as well as emergency
interventions. Cardiac treatment in private hospitals is unaffordable for the poor patients.
In this regard, the concerned authority invites interested investors to commission, operate, maintain
and manage the Cardiac Centres across all district hospitals of Assam.
Investment Opportunities
Investors are required to Build, Operate and Transfer the Cardiac Centres at the space provide by
District Hospitals. They would recruit and manage all the required personnel including consulting
cardiologists, technicians, nurses, ward boys and other support staff and provide for Electronic
Medical Record System.
Proposed Infrastructure Water, Electricity, Space for setup and power backup would be provided by the concerned authority.
Nodal agency Health and Family Welfare Department, Assam
159
Engagement of Healthcare Service Provider for Operations and Management of Primary/Secondary
Healthcare Centres
Name of Project Engagement of Healthcare Service Provider for Operations and Management of Primary/
Secondary Healthcare Centres
Project Location 30 Community Health Centres (CHC) across Assam. A cluster based approach will be followed. Each
cluster shall consist of one CHC and its associated PHCs.
Area of the project All associated Primary Health Centres and one Community Health Centre
Focus sector Healthcare
Status of approvals New Project
Project contours The concerned authority invites interested investors to commission, operate, maintain and manage
the Cluster of CHCs and associated PHCs in accordance with IPHS Guidelines
Investment Opportunities Potential Investors would be required to recruit and manage all the required personnel including
consulting physicians, technicians, nurses, ward boys and other support staff and provide Electronic
Medical Record system
Proposed Infrastructure The concerned authority envisages to have state of the art healthcare facilities accessible to public.
The infrastructure and facilities within the CHC and PHC should be compliant with IPHS guidelines
Nodal agency Health and Family Welfare Department, Assam
160
Establishment and operations of Nursing Colleges with 60 seats each
Name of Project Establishment and operations of Nursing Colleges with 60 seats each
The concerned department envisages mitigating the shortage of nurses and paramedics by
increasing the number of undergraduate seats in the state for equitable health care accessibility
across the state.
It also envisages to become a supplier of skilled paramedical human resources across the globe.
161
AYUSH Training Institute cum Wellness Centre
This Training cum wellness center will act as hub for skilling manpower in AYUSH sector and at
the same time act as a wellness and healing center for people of the city as well as for tourists.
This will further promote health seeking behavior amongst people of Guwahati.
Investment Opportunities Investors are invited for set up and operate the centre in PPP mode
Connectivity Nabagraha is located in Guwahati and is connected to rest of city through excellent network of
Roads. Guwahati Railway Station is 4 kilometers from the project site and Guwahati Airport is 22
kilometers away.
Proposed Infrastructure Proposed Infrastructure shall consist of:
Training Institute, Wellness and Healing Zone for people seeking alternative healthcare.
Nodal agency Health & Family Welfare Department, Assam
162
Urban
Infrastructure
Water Supply Project, Bongaigaon
Significant gaps exists between demand and supply of potable piped water in the town and it is
expected to become acute in the years to come when one factors in the industrial development
planned in the region.
To augment water supply and ensure 24x7 piped supply to all consumers, the proposed project has
been conceived. The project covers the entire water supply value chain from source development
to O&M.
Investment Opportunities Development and maintenance of water supply system on PPP mode.
Nodal agency Urban Development Department, Government of Assam
164
Water Supply Project, Dhubri
Currently less than 20% of households are connected with the water supply network. Further the
planned industrial development in the region will add further pressure to the existing water supply
network.
To meet the existing demand and future demand, the proposed project on PPP mode has been
conceived to ensure 24x7 water supply to all the consumers.
The proposed project involves creating and augmenting the water supply network across the water
supply value chain.
Investment Opportunities Development and maintenance of water supply network on PPP mode.
Nodal agency Urban Development Department, Government of Assam.
165
Water Supply Project, Dibrugarh
Currently less than 30% of households are connected with the water supply network. Further the
planned industrial development in the region will add further pressure to the existing water sup-
ply network.
To meet the existing and future demand, the proposed project on PPP mode has been conceived
to ensure 24x7 water supply to all the consumers.
The proposed project involves creating and augmenting the water supply network across the
water supply value chain.
Investment Opportunities Development and maintenance of water supply project on PPP mode.
Nodal agency Urban Development Department, Government of Assam
166
Water Supply Project, Nagaon
Currently less than 30% of households are connected with the water supply network. Further
the planned industrial development in the region will add further pressure to the existing water
supply network.
To meet the existing and future demand, the proposed project on PPP mode has been conceived
to ensure 24x7 water supply to all the consumers. The proposed project involves creating and
augmenting the water supply network across the water supply value chain.
Investment Opportunities Development and maintenance of the proposed water supply project on PPP mode
Nodal agency Urban Development Department, Government of Assam
167
Water Supply Project, Tezpur
Currently less than 75% of households are connected with the water supply network. Further the
planned industrial development in the region will add further pressure to the existing water supply
network.
To meet the existing and future demand, the proposed project on PPP mode has been conceived to
ensure 24x7 water supply to all the consumers.
The proposed project involves creating and augmenting the water supply network across the water
supply value chain.
Investment Opportunities Development and maintenance of water supply project on PPP mode.
Nodal agency Urban Development Department, Government of Assam
168
Solid Waste Management, Dibrugarh
Dibrugarh being a Class I town, the total waste generated is expected to be 83 TPD and 128 TPD
by 2025 and 2035 respectively, and accordingly the treatment capacity will have to be increased.
For 100% coverage, the network will have to cover 49,636 houses and 66,707 houses by 2025 and
2035 respectively.
The project envisages the complete range of activities involved in solid waste management i.e.
from collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam
169
Integrated Solid Waste Management, Guwahati
The total waste generated is expected to be 932 TPD and 1375 TPD by 2025 and 2035
respectively, and accordingly the treatment capacity will have to be increased.
For 100% coverage, the network will have to cover 396,798 houses and 512,914 houses by 2025
and 2035 respectively.
The project envisages the complete range of activities involved in solid waste management i.e.
from collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam
170
Solid Waste Management, Jorhat
Jorhat will transform into a Class I town by 2025, the total waste generated is expected to be 39 TPD
and 58 TPD by 2025 and 2035 respectively, and accordingly the treatment capacity will have to be
increased.
For 100% coverage, the network will have to cover 23,417 houses and 30,271 houses by 2025 and
2035 respectively.
The project envisages the complete range of activities involved in solid waste management i.e. from
collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam
171
Solid Waste Management, Nagaon
Nagaon being a Class I town, the total waste generated is expected to be 62 TPD and 86 TPD by 2025
and 2035 respectively, and accordingly the treatment capacity will have to be increased.
For 100% coverage, the network will have to cover 37,129 houses and 49,773 houses by 2025 and
2035 respectively.
The project envisages the complete range of activities involved in solid waste management i.e. from
collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam
172
Solid Waste Management, Silchar
Silchar being a Class I town, the total waste generated is expected to be 95 TPD and 142 TPD by 2025
and 2035 respectively, and accordingly the treatment capacity will have to be increased.
For 100% coverage, the network will have to cover 56,808 houses and 74,152 houses by 2025 and
2035 respectively.
The project envisages the complete range of activities involved in solid waste management i.e. from
collection to scientific disposal including composting.
Investment Opportunities Creation of solid waste management infrastructure and maintenance of the same on PPP mode
Nodal agency Urban Development Department, Government of Assam
173
Waste water recycling and storm water reuse
Entire water channel to be designed to have solar powered aerators to improve the quality of water
Floating islands shall be created with a variety of plants which feed on the nutrients in the storm
water to keep it clean
The focus of the entire project is to help the city to manage its storm water, and help it to recycle its
waste water.
Investment Opportunities Creation of waste water recycling infrastructure and maintenance of the same in PPP mode
Nodal agency Urban Development Department, Government of Assam
174
Area Based Development Project in Borsola Beel (Lake)
The project will essentially be a flood mitigation plan which will double up as a newly reclaimed
vibrant public realm for walking and cycling.
175
Area Based Development Project in Morabharalu River, 12Km length
The project will essentially be a flood mitigation plan which will double up as a newly reclaimed
vibrant public realm for walking and cycling.
Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes infrastructure for
treatment of the water body, activity areas like art and craft zone, vendor market, water sports and
cycling, organic farming, food court, solar power generation and other tourism activities.
Nodal agency Urban Development Department, Government of Assam
176
Area Based Development Project in Bharalu River, 6km length
Name of Project Area Based Development Project in Bharalu River, 6km length
Use of eco-restoration, bio-remediation techniques is envisaged to transform this degraded water body
into a performing ecological landscape and further into a tourist attractions.
The project will essentially be a flood mitigation plan which will double up as a newly reclaimed vibrant
public realm for walking and cycling.
Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes infrastructure for
treatment of the water body, activity areas like art and craft zone, vendor market, water sports and
cycling, organic farming, food court, solar power generation and other tourism activities.
Nodal agency Urban Development Department, Government of Assam
177
Area Based Development Project in Brahmaputra Riverfront Development, 5km length
Name of Project Area Based Development Project in Brahmaputra Riverfront Development, 5km length
The project will essentially be a flood mitigation plan which will double up as a newly reclaimed
vibrant public realm for walking and cycling.
Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes activity areas
like art and craft zone, vendor market, water sports and cycling, organic farming, food court, solar
power generation and other tourism activities.
Nodal agency Urban Development Department, Government of Assam
178
Area Based Development Project in Deepar Beel (Lake/wetland), 382 acres
Name of Project Area Based Development Project in Deepar Beel (Lake/wetland), 382 acres
Deepar Beel is one of the water body identified by the department as a part of the contiguous area of
696 acres of connected water bodies of the city.
Investment Opportunities Development and O&M of infrastructure by private developers on PPP that includes flood mitigation
mechanism for Deepar Beel.
Activity areas like art and craft zone, vendor market, water sports and cycling, organic farming, food
court, solar power generation and other tourism activities can be clubbed to the project.
Nodal agency Urban Development Department, Government of Assam
179
Ropeway from Kamakhya to Sonaram School area
The project shall connect Kamakhya temple to Sonaram School via a ropeway network.
Investment Opportunities Opportunities for private parties for development and O&M through competitive bidding process
Nodal agency Urban Development Department, Government of Assam
180
Multilevel Car Parking, Ganeshguri, Guwahati
This automatic car parking system will enable the parking of vehicles, floor after floor and thus
reducing the space used. Here any number of cars can be parked according to the requirement.
These makes the system modernized and thus space-saving one.
Investment Opportunities Opportunities for private parties through competitive bidding process
Nodal agency Urban Development Department
181
Multilevel car parking, Panbazar, Guwahati
This automatic car parking system will enable the parking of vehicles, floor after floor and thus
reducing the space used. Here any number of cars can be parked according to the requirement.
These makes the system modernized and thus space-saving one.
Investment Opportunities Opportunities for private parties through competitive bidding process
Nodal agency Urban Development Department, Government of Assam
182
Installation of lifts in Footbridge at Ganeshguri, Bharalumukh and Ulubari
Ancillary works including electrical and mechanical, drainage, landscaping and lighting works
Investment Opportunities Opportunities for private parties through competitive bidding process
Nodal agency Urban Development Department, Government of Assam
183
Development of Bus Bay and Bus Stop
The design and location of the bus bays shall improve the efficiency of transport system. The idea is to
decongest the roads and facilitate the safety and convenience of bus passengers and other road users
Investment Opportunities Investment to private firms on PPP for construction of Bus Stops and Bus Bays
Nodal agency Urban Development Department, Government of Assam
184
Improvement of Footpath, Road Crossing and Roads
Investment Opportunities Investment opportunity includes development and O&M of improvement of Footpaths, Road
Crossings And Roads.
Nodal agency Urban Development Department, Government of Assam
185
Mass Rapid Transit System (MRTS) Phase I, Guwahati
186
Development of Multi level Market Complex at Uzan Bazaar
Government envisages to develop the existing Uzan bazar market into a multilevel complex.
Investment Opportunities Opportunities for private parties through competitive bidding process
Connectivity Uzanbazar is a busy residential colony within Guwahati well connected through buses to rest of
the city.
Proposed Infrastructure The multilevel market complex will have:
Parking facility for 75 vehicles
Parking bay for 2 trucks
Space for 100 shops
Space for 100 open vegetable/fruit vending tuck shops
Public Toilets at each level
Escalators, Lifts
Specially abled friendly access.
Waste Disposal facilities
Concerned Agency shall ensure supply of Electricity and Water at the site
Nodal agency Urban Development Department, Government of Assam
187
Ropeway across Brahmaputra in Guwahati
Project Location Across River Brahmaputra, Guwahati and North Guwahati, Assam
Area of the project
Approx. Project cost INR 12 crores (~USD1.84 mn)
Focus sector Infrastructure
Employment Direct Employment :30
Status of approvals New Project
Project contours With growth of commercial, industrial and institutional activities across both banks of river
Brahmaputra in Guwahati, commuting across the river has increased manifold. Most of the
commuters are presently using country boats and ferries for crossing the river. Country boats are
not the safest means of transport especially during the monsoons and flooding season.
The proposed mass transit ropeway will act as a safe and convenient mode of commuting. Also,
a halt in Umananda will enable hundreds of tourist visiting the temple island daily to use the
ropeway.
Investment Opportunities Investors are invited for Design Build Operate and Transfer of the project
Connectivity North Guwahati is connected with rest of Guwahati through excellent network of Roads and
Ferries, which ply on River Brahmaputra. Guwahati Railway Station, the nearest station, is 7 km
from North Guwahati by ferry and Guwahati Airport is 40 km away.
Proposed Infrastructure Proposed Infrastructure shall consist of a Bi-cable ropeway system with a carrying capacity of
600-700 passengers per hour during peak flow.
188
Development of Adabari land in PPP mode
189
Road
Infrastructure
Construction of bridge over river Brahmaputra connecting Panbazar to North Guwahati
Name of Project Construction of bridge over river Brahmaputra connecting Panbazar to North Guwahati
191
Construction of bridge over river Brahmaputra connecting Sualkuchi to Palashbari
Name of Project Construction of bridge over river Brahmaputra connecting Sualkuchi to Palashbari
192
Amingaon to Chapaguri Road Project
193
Bhilasapuri to Sherfanguri Road project
194
Chamaria to Pancharatna Road project
Project Location Lampara – Goraimari, Goraimari – Goalpara, Chamaria – Nagarbera, Nagarbera – Simlitola, Simlitola
– Matia, Matia – Mornoi, Mornoi – Goalpara, Goalpara - Pancharatna
Length of the project road 101 km
Approx. Project Cost INR 540 crores (~USD 83.08 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study for the stretch has already been done
Investment Opportunities Development of proposed infrastructure on PPP Mode
Nodal agency Public Works Department, Government of Assam
195
Lumding to Umrongso Road project
Project Location Lumding – Lanka, Lanka – Kheroni, Kheroni – Dayangmukh, Dayangmukh - Haflong Tinali,
Haflong Tinali – Umrongso
Length of the project road 64 km
Approx. Project Cost INR 597 crores (~USD 91.85 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of the proposed road stretch on PPP mode
Nodal agency Public Works Department, Government of Assam
196
Rowta to Barpeta Road Stretch
Project Location Rowta – Udalguri, Udalguri – Paneri, Paneri – Tamulpur, Tamulpur – Salbari, Salbari - Manas
National Park, Salabari – Simlaguri, Simlaguri-Barpeta Road
Length of the project road 230 km
Approx. Project Cost INR 980 crores (~USD 150.77 million)
Focus sector Roads & Highways
Status of approvals Pre-feasibility study has already been done
Investment Opportunities Development of project on PPP mode
Nodal agency Public Works Department, Government of Assam
197
Brahmaputra Expressway
198
Kalitakuchi to Nalbari Road Stretch
199
Dhakuwakhana to Garamur Road Stretch
200
Lanka to Garmapani Road Stretch
Name of Project Lanka (from East West Corridor) to Garampani Road Stretch
201
North Lakhimpur to Kamalabari Road Stretch
202
Raha to Hamren Road Stretch
203
Education
Management College at Jorhat
Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Spacious seminar halls with excellent acoustics
Amphi-theater classrooms
Excellent library with unmatched brilliance and aesthetics
Halls of residence for students
Residential accommodation for faculty and staff
food court
Administrative block
Departmental stores
Fitness center
Recreational facilities
Healthcare center
Connectivity Nearest airport is Jorhat airport around 7 kms. South west of Jorhat city
Nearest railway station is at Jorhat town and Mariani
205
Engineering College at Dibrugarh
Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Manufacturing workshops
Specialist welding and fabrication areas
Pneumatics and hydraulics training equipment
3D printers
CAD suites and PLC
Welding bays with TIG, MIG and MMA, grinding bays, and cutting and folding equipment.
Strong floor for testing structural strength
Connectivity Nearest airport is Dibrugah airport
Nearest railway station is at Dibrugarh town and Banipur
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
Nodal agency Directorate of Technical Education, Govt. of Assam
206
Management College at Dibrugarh
Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with
specialized amenities like:
Spacious seminar halls with excellent acoustics
Amphi-theater classrooms
Excellent library with unmatched brilliance and aesthetics
Halls of residence for students
Residential accommodation for faculty and staff
food court
Administrative block
Departmental stores
Fitness center
Recreational facilities
Healthcare center
Connectivity Nearest airport is Dibrugah airport
Nearest railway station is at Dibrugarh town and Banipur
207
Polytechnic Institution at Tezpur
208
Polytechnic Institution at Lakhimpur
209
Polytechnic Institution at Kokrajhar
210
Polytechnic Institution at Dima Hasao
Investment Opportunities Project envisages private investments in PPP mode with infrastructures like:
Water and Power infrastructure
Road infrastructure
Library infrastructure
Hostel infrastructure
Canteen infrastructure
Medical infrastructure
Sports infrastructure
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
211
Setting up of Marine Institute at Jorhat
212
Setting up of Job facilitation cells in Govt. Polytechnics and Engineering Colleges
Name of Project Setting up of Job facilitation cells in Govt. Polytechnics and Engineering Colleges
213
Setting up Life skills training centres (LSTCs) at 301 nos. Govt. / Provincialized colleges of Assam
Name of Project Setting up Life skills training centres (LSTCs) at 301 nos. Govt. / Provincialized colleges of Assam
214
Setting up polytechnics
Project Location (s) Kamrup - Baihata, Barpeta, Sonitpur - Dhekiajuli, Nalbari - Chandkuchi,
Golaghat - Furkating, Baksa - Belguri Pathar, Karimganj - Maizgaon
Goalpara - Goalpara East, Sibsagar – Dimow, Dhemaji – Silapathar, Tingkhong and Lumding.
Area of the project Suitable space to be provided for each institution as per institution building norms.
Investment Opportunities These projects envisage private investments through an appropriate PPP model. The scope of Private
Partners are as follows , but not limited to;
Design and Construct requisite infrastructure (institute building, laboratories, workshops, drawing
hall, communication lab, conference hall, Hostels etc as per AICTE norms.)
The private partner is expected to frame the curriculum attuned to the prevailing industry require-
ments.
Procurement and Installation of machines and equipment needed for the prescribed curriculum.
Connectivity All the Institutions are at prominent locations with good connectivity to rail and road
215
Engineering College at Bongaigaon
Investment Opportunities These projects envisage private investments through an appropriate PPP model. The scope of Private
Partners are as follows , but not limited to;
Design and Construct requisite infrastructure (institute building, laboratories, workshops, drawing hall,
communication lab, conference hall, Hostels etc as per AICTE norms.)
The private partner is expected to frame the curriculum attuned to the prevailing industry requirements.
Procurement and Installation of machines and equipment needed for the prescribed curriculum.
Connectivity The Institute is at prominent locations with good connectivity to rail and road
Nodal agency Directorate of Technical Education, Govt. of Assam
216
Engineering College at Nalbari
Investment Opportunities These projects envisage private investments through an appropriate PPP model. The scope of Private
Partners are as follows , but not limited to;
Design and Construct requisite infrastructure (institute building, laboratories, workshops, drawing hall,
communication lab, conference hall, Hostels etc as per AICTE norms.)
The private partner shall be responsible for recruitment of teachers & staff.
The private partner is expected to frame the curriculum attuned to the prevailing industry
requirements.
Procurement and Installation of machines and equipment needed for the prescribed curriculum.
Connectivity The Institute is at prominent locations with good connectivity to rail and road
Nodal agency Directorate of Technical Education, Govt. of Assam
217
Engineering College at Matia, Goalpara
Investment Opportunities Project envisages private investments in PPP mode with basic infrastructural set up along with spe-
cialized amenities like:
Manufacturing workshops
Specialist welding and fabrication areas
Pneumatics and hydraulics training equipment
3D printers
CAD suites and PLC
Welding bays with TIG, MIG and MMA, grinding bays, and cutting and folding equipment.
Strong floor for testing structural strength
Connectivity Nearest airport is LGB International airport in Borjhar, Guwahati around 135 kms.
Nearest railway station is at Goalpara
Proposed Infrastructure Classrooms/ Laboratory/ Workshops/ Computer Centre/ Drawing Hall/ Library/ Seminar Halls
Installation of dedicated electricity transformers
Roads, Drainage, Sewerage systems, Solid waste management, Drinking water etc.
Boys and Girls hostels
Internet connectivity with WLAN provisions
Staff quarters
Visitors quarters
Nodal agency Directorate of Technical Education, Govt. of Assam
218
Management College at Matia, Goalpara
219
Industrial
Infrastructure
Industrial Growth Centre (IGC) Matia, Goalpara
Area of the project Land (all in acres) Total Allocable Allotted Available
Developed 461.81 74.38 33.92 40.46
Semi Developed 387.43 198.34 189.09
Infrastructure Facilities Available Plot size: 21528 Sqft , 43056 Sqft , 86111 Sqft and above
Developed plots of 0.25 acres and above with internal road of 6 km, water supply distribution
network with 2,50,000 litres capacity, overhead reservoir, power supply system with 5 MVA
substation, internal drainage system, street lighting, guest house etc.
Medium & Large Industries in vicinity Eveready India Ltd.
VLCC
Cavinkare
Connectivity National Highway 37 passes through the site;
Nearest Railway station is at Goalpara and Dudhnoi. Railway siding facility available at Jogig-
hopa Railway Station
Nearest River including River Port : Brahmaputra River – 3 km;
Nearest Town/City: Goalpara - 15 km, Bongaigaon - approx. 50 km, Jogighopa -35 km.
221
Industrial Growth Centre (IGC), Balipara, Sonitpur
Area of the project Land (all in acres) Total Allocable Allotted Available
Developed 396.36 69.42 42.31 27
Semi Developed 196.46 177.85 18.61
Infrastructure Facilities Available Plot size: 2153 Sqft , 10764 Sqft , 21528 Sqft , 43056 Sqft , 86111 Sqft and above
117 acres of land with all infrastructure facilities like approach road of approx. 2 km from NH-15,
internal road, storm water drains, water supply network, underground and overhead water tank,
street light, 132/33 kV, 2x16 MVA substation for dedicated power line, administrative building and
other common facilities etc.
Medium & Large Industries in Patanjali
vicinity Dabur India Ltd.
Surya Taap
Innovative Tech Park
Connectivity National Highway 15 is two km from the site
Nearest Railway is at station Dekargaon -5 km
Nearest Town/ Cities/ District: Tezpur - 15 km, Balipara -9 km, Dhekiajuli - 34 km, Nagaon - 53 km
approx .
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
222
North East Mega Food Park, Tihu, Nalbari
223
Integrated Infrastructure Development Centre (IIDC), Demow, Sibasagar
224
Integrated Infrastructure Development Centre (IIDC), Titabor, Jorhat
Medium & Large Industries in vicinity OIL India Ltd (Navaratna Company)
ONGC (Navaratna Company)
225
Integrated Infrastructure Development Centre (IIDC), Silapathar, Dhemaji
Medium & Large Industries in vicinity OIL India Ltd (Navaratna Company)
ONGC (Navaratna Company)
Connectivity NH 15 passes through Silapathar
Nearest Railway station Silapathar is at a distance of 5km
Nearest River including River Port: Brahmaputra, Bagibeel Ghat which is at a distance of ~15 km
Nearest Town/ Cities/ District: Dibrugarh (24 km), North Lakhimpur (56 km), Tinsukia (70 km)
226
Integrated Infrastructure Development Centre (IIDC), Naltali/Bhomoraguri, Nagaon
227
Infrastructure Development Project, IDP Pathsala, Barpeta
228
Integrated Infrastructure Development Centre (IIDC), Malinibeel, Cachar
229
Food Park, Chaygaon, Kamrup (R)
230
Bamboo Technology Park, Chaygaon, Kamrup (R)
Project Location Bamboo Technology Park, Industrial Growth Centre, Jambari -II, Chaygaon, Kamrup (R), Assam
About the Location Chaygaon is located at Chatabari in the Kamrup (R) district. The site, comprising of 20 acres of
land has been developed to provide standard infrastructural facilities for Bamboo Processing
Industrial units.
Area of the project Total Land: 20 acres
Total Allocable Area: 6.61 acres
Infrastructure Facilities Available Bamboo Technology Park (BTP) offers wide array of common processing facilities like:
Facilities for Bamboo Stick Manufacturing: Cross cutting Machine, Splitting Machine, Slicing
Machine, Sticking Making Machine, and Sizing Machine, Polishing Machine.
Facilities for Bamboo plastic composite (BPC): Bamboo Crusher Machine, Powder Milling
Machine or Pulverizer, Dryer Machine, Mixing Unit, Granulator or Palletizing Machine, Extruder
Machines with Mould Profiles, Brushing and Sanding machine, Embossing Machine, Recycle
Crusher Machine.
Strand Woven Block facility
Vacuum Pressure Treatment Plant facility
Resin Plant facility
Bamboo Charcoal Making Facility
Administrative Cum Marketing Centre
BTP facilities are available to all bamboo enterprises against user charge as fixed by BTP from
time to time.
231
Medium & Large Industries in vicinity Bhogali Food Products
KDG Food products
Asian Thai Foods India Pvt Ltd
Uma Polymers Pvt Ltd
Sigma Spice Industries Pvt Ltd
Oja Trade and Industry
Sigma Food Industries.
Connectivity Bamboo Technology Park is located in Jambari Industrial Growth Centre in Kamrup Rural
district, its nearest town is 13 km away in Chaygaon and is 80 km from Central Guwahati. The
international airport is 50 km from the location and the railway station at 78 km. It is connect-
ed by motor able road from NH 31.
Investment Opportunity Investment Opportunity lies in setting up of manufacturing unit for Bamboo based materials
like:
Bamboo Flooring
Affordable Housing Material
Mat Board and Mat Sheets
Bio-plastics
Charcoal
Medium Density Fibreboard (MDF)
Nodal agency Bamboo Technology Park and Assam Industrial Development Corporation Ltd. (AIDC)
232
Bamboo Furniture Production Unit, Bamboo Technology Park
Project Location Bamboo Technology Park, Industrial Growth Centre, Jambari -II, Chaygaon, Kamrup (R), Assam
233
Integrated Infrastructure Development Centre (IIDC), Banderdewa, Lakhimpur
234
Integrated Infrastructure Development Centre (IIDC), Serfunguri
235
Integrated Infrastructure Development Centre (IIDC), Parbatipur, Tinsukia
236
Prag Jyoti Textile Park Pvt. Ltd., Bijulibari, Sipajhar, Darrang
Name of Project Prag Jyoti Textile Park Pvt. Ltd., Bijulibari, Sipajhar, Darrang
237
Tea Park, Chaygaon
238
Multi Sector Industrial Park, Bongaigaon
Project contours The proposed site is in the district of Bongaigaon, which is in close proximity to Bhutan,
Bangladesh, Guwahati and West Bengal
The district of Bongaigaon is one the most industrialized districts in lower Assam
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
A new power generation plant of 750 MW is coming up at Salakati, Kokrajhar, which is at a
distance of ~ 2.3 km from the proposed site.
There are plans to extend the Duliajan-Numaligarh pipeline till Guwahati and then subsequently
till Bongaigaon. At present the company has to capacity to transport 5.5 Million Metric Standard
Cubic Meter Per Day of natural gas.
Investment Opportunities Given the proximity of the location to international borders and to the adjoining states, huge
investment opportunities exists in diverse sectors as petrochemicals, plastics, food & agro
processing etc
Connectivity The district is well connected by NH31C which connects it to West Bengal and rest of India and
NH31
There are two major railway stations in the vicinity of the site – the New Bongaigaon Railway
Junction and Bongaigaon Railway Station
The nearest airport is the Lokpriya Gopinath Bordoloi International Airport at Guwahati which is
179 km away from Bongaigaon.
The nearest IWT Terminal is at Jogighopa, which is at a distance of ~44.5 km from the proposed
site. 25 Acres of land has already been acquired to develop the terminal as a permanent terminal.
239
Multi Sector Industrial Park, Tinsukia
240
Multi Sector Industrial Park, Jagiroad
Project Location Jagiroad Town, Morigaon District, (at the property previously belonging to Assam Spun Silk
Mills Ltd)
Area of the site 18.33 acres
Approx. Project cost INR 5.8 crores (~USD 0.90mn)
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Morigaon, which is in close proximity to Guwahati
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Project site is situated near to NH 37, a strategic location which is well accessible by both road
and rail
Distance to Guwahati, the largest market in North East, is ~60 km.
Investment Opportunities Based on the economic scenario of the state, its proximity to neighbouring countries, availability
of raw materials provides ample investment opportunities in the sector identified for the
proposed site
Connectivity The site is located in the heart of Jagiroad Town, and is well connected by road and rail network.
Jagiroad has a railway station. Guwahati Airport is 77 kilometres away. NH 37 connects Jagiroad
to rest of Assam.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
241
Women Entrepreneurship Hub, Guwahati
Project Location Bamunimaidam, Guwahati (at the property previously belonging to Assam Conductors and Tubes Ltd.)
Area of the Project 1.5 acres
Project cost ~ USD 1.7 mn (INR 110 Cr.)
Status of Approval Pre-feasibility report completed and approved
Focus Sector Industrial Infrastructure
Project Contours Involvement of Women entrepreneurs can bolster the economy of Assam
Empowerment of women through establishment of entrepreneurship facility.
Encourage participation of women to boost start up environment in the state
Connectivity The site is located in the heart of Guwahati city, and is well connected by road and rail network.
Guwahati Railway Station is 5 kilometres away and LGBI Airport is 30 kilometres away
Investment Opportunity Development of Entrepreneurship units for individual Entrepreneurs.
Establishment of an incubation centre for new product design, and R&D.
Establishment of a training hall, crèche, conference hall, information cell and PoS.
Construction of a 7 storey RCC state-of-the-art building of approximate 65000 sq ft with Automated
Car Parking facility
Nodal agency Assam Small Industries Development Corporation, Government of Assam.
242
Establishment of Transformers Manufacturing Unit, Nalbari
Project Location Nathkuchi, Tihu, District: Nalbari (at the property previously belonging to Assam Syntex Ltd.)
Area of the Project 23 Acres
Focus sector Power
Status of approvals Greenfield Project
Project contours This project envisages in establishing a facility for transformer manufacturing unit which will man-
ufacture different kinds of transformer for a variety of applications.
The types of transformer will be based on their application, such as
Power transformer (Ranging from 400 kV to 33kV),
Distribution transformer (Ranging from 11kV to 3.3 kV, whereas 440 V and 220 V for domestic users)
and
Others (e.g. Rectifier transformer, Furnace transformer, specialty transformer, reactor and reactors
and inductors.)
Investment Opportunities This project shall be developed through appropriate PPP model.
Connectivity The site is near National Highway 31
Nearest Railway station Tihu – 4.5 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port – 80 km,
Nearest Town/ Cities/ District: Tihu – 3 km, Pathsala – 7 km, Nalbari - 22 km, Barpeta Road - 32 km.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
243
Agro-tech (Textile application in Agriculture)
Project Location Nathkuchi, Tihu, District: Nalbari (at the property previously belonging to Assam Syntex Ltd.)
Focus sector Textile
Status of approvals Greenfield Project
Project contours This proposed project involves setting up of an agrotech textile facility which, with the help of
some latest techniques, such as wrap knitting, will produce end products like shading nets used in
Agriculture, Horticulture and fisheries.
Connectivity The site is near National Highway 31
Nearest Railway station Tihu – 4.5 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port – 80 km,
Nearest Town/ Cities: Tihu – 3 km, Pathsala – 7 km, Nalbari - 22 km, Barpeta Road - 32 km.
Investment Opportunities The entire value chain of project shall be developed through PPP mode.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
244
Multi Sector Industrial Park, Nagaon
Project Location Katimari Pathar, Nagaon (at the property previously belonging to Assam State Weaving &
Manufacturing Co. Ltd.)
Area of the Project 23 acres
Project cost 74,666,050 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Nagaon, which is in close proximity to Guwahati
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Nagaon is situated on the southern bank of the mighty Brahmaputra, a strategic location which is well
accessible by both road and river.
NH 37 passes through the project site providing it all weather accessibility
Distance to Guwahati, the largest market in North East, is ~150 km.
Investment Opportunities Based on the economic scenario of the state, its proximity to neighbouring countries, availability of raw
materials provides ample investment opportunities in the sector identified for the proposed site
Connectivity Nearest Railway station is at Silghat- 10km
Nearest River including River Port : Brahmaputra, Silghat
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
245
Manufacturing of Technical Textiles for Defence Sector
Project Location Jabjakuchi, Ghagrapar, Nalbari (at the property previously belonging to Assam State Weaving &
Manufacturing Co. Ltd.)
Area of the Project 15.5 Acres
Focus sector Textile
246
Multi Sector Industrial Park, Bonda, Guwahati
Project Location Bonda, Narengi, Guwahati (at the property previously belonging to Fertichem Ltd.)
Area of the Project 15.5 Acres
Project cost 50332762.50 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours Chandrapur Thermal Powet Plant is situated at 10km from the project site.
Industrial Estate, Bamunimaidam is situated at a distance of `10kms from the project site.
The output generated from this industrial park can cater the growing demand of consumption and
export.
Project site is equally accessible by road, rail and river.
Investment Opportunities This project shall be developed through appropriate PPP model.
Connectivity Nearest Railway station is Guwahati Railway station – 10 km
Nearest River including River Port: Brahmaputra River - Brahmaputra and Pandu Port
Nearest Airport is LGBI Airport, Guwahati.
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
247
Multi Sector Industrial Park, Bijni
Project Location Noapara, Bijni, Chirang District, (previously property of Assam State Textile Corporation Ltd.)
Area of the Project 78.3 acres
248
Setting up of Cold Chain Units in 10 Districts of Assam (1500 MT each)
Name of Project Setting up of Cold Chain Units in 10 Districts of Assam (1500 MT each)
Project Location 10 districts of Assam - Nagaon, Silchar, Dhubri, Baksa (Tamulpur), Sonitpur (Balipara), Lakhimpur, Tinsukia,
Jorhat (Titabar), Nalbari, Dima Hasao (Haflong)
Area of the Project 2 Acres per unit
Focus sector Industrial Infrastructure
Status of approvals Greenfield Project
Project contours The cold chain industry is expected to grow at a CAGR of 28-30% and would be valued at more than
INR 600 bn globally. The cold chain sector is being observed as the sunrise sector with high investment
potential.
Investment Opportunities The project shall be developed through PPP model.
Each cold chain unit shall have a capacity of 1500 MT with provision of extension in future
2 State-of-the-Art collection centre per Cold Chain
Multi-chamber facility with dynamic temperature and humidity control systems along with ambient
storage within the same premises
2 Refrigerated vans in each unit
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
249
Integrated Sugar Manufacturing Mills with capacity of 3000 TCD each
Name of Project Integrated Sugar Manufacturing Mills with capacity of 3000 TCD each
Project Location Goalpara, Karbi Anglong (Bokajan), Dhubri (Gauripur), Biswanath, Baksa (Mushalpur)
Area of the Project 30 Acres per Manufacturing Mill
Focus sector Heavy Industry
Status of approvals Greenfield Project
Project contours With the cropping area of sugarcane increasing steadily over the last five years, the production in the
state maintains an average of 1059 thousand tonnes.
There are numerous manufacturing units in Assam which are directly dependent on raw sugar such as
dairy processing units, bakery units, sweet meet vendors, restaurants etc.
Bagasse, a by-product of sugar cane can be used as fuel source which also has huge revenue potential for
industries.
Molasses, a by-product of sugarcane can also be utilized in preparation of alcohol which can tap the local
as well as markets of neighbouring states
Investment Opportunities The project shall be developed through PPP model.
Each integrated sugar manufacturing mill shall have an installed capacity of 3000 tonne Crushing per Day
(TCD)
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
250
Multi-sector Industrial Park, Karimganj
Investment Opportunities The identified focus sector for this zone offers large investment opportunities based on the given
economic conditions, raw materials availability
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
251
Multi-sector Industrial Park, Dhing, Nagaon
Project Location Dhing, Nagaon {at the property previously belonging to Industrial Papers (Assam) Ltd.}
Area of the Project 151.33 Acre
Project cost 486,456,775 INR
Focus sector Industrial Infrastructure
Status of approvals Pre-feasibility report completed and approved
Project contours The proposed site is in the district of Nagaon, which is in close proximity to Guwahati
Proposed site is expected to have a good base for industrial development with adequate social
infrastructure thereby creating an ideal situation for an integrated industrial and urban infra
development.
Nagaon is situated on the southern bank of the mighty Brahmaputra, a strategic location which is well
accessible by both road and river.
NH 37 passes through the project site providing it all weather accessibility
Distance to Guwahati, the largest market in North East, is ~115 km
Project site is located on the bank of the mighty Brahmaputra river, allowing the accessibility by river
route.
SH 47 connects the project site to NH 37 which passes through Nagaon.
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
252
Multi-Sector Industrial Park, Nagarbera, Kamrup (R)
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
253
Multi-Sector Industrial Park, Goalpara
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
254
Multi-Sector Industrial park, Sadiya
255
Industrial Park for Sugar Mills, Golaghat & Nagaon
Project Location Dergaon, Golaghat (at the property previously belonging to Cooperative Sugar Mills Ltd., Dergaon)
Dergaon, Golaghat (at the property previously belonging to Swahid Kushal Konowar Spinning Mill,
Dergaon)
Kampur, Nagaon (at the property previously belonging to Cooperative Sugar Mills Ltd., Kampur)
Area of the project 183 acres, 216 acres and 531 acres respectively.
Focus sector Heavy Industry
Status of approvals Green Field
Project contours With the cropping area of sugarcane increasing steadily over the last five years, the production in the
state maintains an average of 1059 thousand tonnes.
There are numerous manufacturing units in Assam which are directly dependent on raw sugar such as
dairy processing units, bakery units, sweet meet vendors, restaurants etc.
Bagasse, a by-product of sugar cane can be used as fuel source which also has huge revenue potential
for industries.
Molasses, a by-product of sugarcane can also be utilized in preparation of alcohol which can tap the
local as well as markets of neighbouring states
Investment Opportunities The project shall be developed through PPP model.
Each integrated sugar manufacturing mill shall have an installed capacity of 3000 tonne Crushing per
Day (TCD)
Connectivity The proposed project districts are well connected by roads and railways
Nodal agency Assam Industrial Development Corporation Ltd. (AIDC)
256