Professional Documents
Culture Documents
HTTPSWWW - Waltons.co - ukwaltonpdf02TUL411411DP V5 PEFC 02POP411411DP V5 PEFC INSTRUCTIONS PDF
HTTPSWWW - Waltons.co - ukwaltonpdf02TUL411411DP V5 PEFC 02POP411411DP V5 PEFC INSTRUCTIONS PDF
HTTPSWWW - Waltons.co - ukwaltonpdf02TUL411411DP V5 PEFC 02POP411411DP V5 PEFC INSTRUCTIONS PDF
!
Poppy Playhouse/Tulip Playhouse To be used under direct supervision of an adult
CAUTION
TIMBER
x2
DO NOT ALLOW
CHILDREN TO ASSIST.
MUST
EN71 tested
ensure all screw heads are
2mm Drill bit countersunk
12mm CSK
POSITIONING YOUR PLAYHOUSE Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products
independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.
**Protim Aquatan T
minimum space of 2m around a playhouse
Aquatan
Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or
any hard surface.
Aquatan undiluted contains:
BUILDING A BASE
In all instances for assistance with your product, please contact customer care on :
01636 880514 or customerservice@merciagp.co.uk
7
Floor Joist - 28x28x1500mm FS2828-1500 QTY x5
1! 2! 3!
8
Veranda Boards - 12x95x1470mm SR1295-1470 QTY x3
9
50kg Ridge Bar - 28x28x1155mm FS2828-1155
Overall Dimensions:
10
Tulip Poppy Cover Trims - 12x45x1155mm S1245-1155 QTY x2
Base Dimensions: 11
Fascia Board - 12x95x980mm FAS1219-980 QTY x4
Before assembly
please make sure you have a
suitable base ready to erect your 12
building
Roof Eave - 28x28x1520mm FS2828-1520 QTY x2
1 2 3
14 Wooden Door Handle 15 Ply Door Stop 20
PI-04-0024
PLY TRIANGLE
16 L Bracket 17
PI-07-0012 T-hinge Window
QTY x2 PI-07-0113
QTY x2 AI-02PHOW-V1
QTY x3
18 Finial QTY x2
19 Window Block
SHED DIAMOND FINIAL PI-07-0011
QTY x6
Door Gable Left Window Side Right Window Side
AI-02PAPDG1410X1491-V2 AI-02PAPWSL1500X1165-V2 AI-02PAPWSR1500X1165-V2
Nail Bag
4 5 6 Felt Tacks x60
10mm Screw x3
Poppy Playhouse
21 22 Window Cross
PI-04-0013
QTY x3 Pre Assembly
23
Door Cross
PI-04-0064
Door
AI-02POPDOOR594X1058-V2
Tulip Playhouse
21
Window Cross
22 PI-04-0013
QTY x3
23 Door Flower
PI-04-0016
Step 1 Step 3
Parts needed - 19 & 20 1! 2! Parts needed - 2 & 4 Pre drill 1! 2!
Pre drill
hole 4 hole
No. 20
2
Do not secure the building to the floor
until the roof is fitted.
(No. 4)
No. 19 No. 2
Step 2 Step 4
Parts needed - 6 & 7 & 8 1! 2! Parts needed - 1 & 3
Pre drill Pre drill 1! 2!
hole hole
(No. 7)
No. 3 (No. 1)
6
(No. 6)
1
8
9x50mm screws
(No. 8)
3
50mm
screw
7
50x30mm screws
30mm
screw
Step 5 Step 7
Parts needed - 9 & 16 Parts needed - 13 1! 2!
Pre drill 1! 2! Pre drill
hole hole
(No. 9) (No. 13)
30mm
screw
16
16
Step 6 Step 8
Parts needed - 5 & 12 Pre drill 1! 2!
Parts needed - 5 & 6 1! 2!
Pre drill
hole hole
(No. 12)
5 5
(No. 5)
20x50mm screws
50mm
screw
6x30mm screws
24x40mm screws
40mm 30mm
screw screw
12
P5
Please retain product label and instructions for future reference
Step 9 Step 11
1! 2! Parts needed - 11 & 18
Pre drill Pre drill 1! 2!
hole hole
(No. 11) (No. 18)
11 18
Step 10 Step 12
Parts needed - 10 Pre drill 1! 2! Parts needed - 22 Pre drill 1! 2!
hole hole
No. 22
(No. 10)
12x20mm screws.
6x30mm screws
20mm
30mm screw
screw 10
22
P6
Please retain product label and instructions for future reference
Step 14
Poppy Playhouse Parts needed - 17 & 21
Pre drill 1! 2! Pre drill 1! 2!
Step 13 hole hole
Parts needed - 21 & 23
(No. 21) 3!
(No. 21)
(No. 17)
(No. 23)
30mm
screw
Step 15
Parts needed - 14 & 15
Pre drill 1! 2!
hole
No. 14
14
No. 15
3x20mm screws.
20mm
screw
154
Please retain product label and instructions for future reference
Tulip Playhouse
Pre drill 1! 2!
Step 13 hole
Parts needed - 17 & 21
3! It is ESSENTIAL that you apply wood treat
-
ment immediately after the building has
(No. 21) been assembled.
(No. 17)
30mm
screw
Step 14
Parts needed - 14 & 15 & 23 & 24 Pre drill 1! 2!
hole
(No. 14)
14 Playhouse Maintenance:
It is recommended that the following checks and maintenance are carried out at the begin-
ning of each season as well as at regular intervals during the usage season.
(No. 15)
- Check all nuts /bolts/ screws for tightness and tighten when required.
15
(No. 24) - Check for movement / opening of wood giving rise to protrusion of nail heads and tips.
10mm 20mm IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TOY COULD BECOME A HAZARD
screw screw