Sl Route Name Ring Priority

51 GDR015_DevgadhBaria & GDR015_DevgadhBaria Ring-2 P-1


52 GDR028_Piplod-GDR008_Santrod Ring-2 P-1
53 GDR008_Santrod-GDR067_Chabanpur Ring-2 P-1
54 GDR067_Chabanpur-GDR002_GodhraMain Ring-2 P-1
55 GDR002_GodhraMain-GDR191_Vejalpur Ring-2 P-2
56 GDR191_Vejalpur-GDR093_Adadara Ring-2 P-2
57 GDR093_Adadara-GDR021_Gogamba Ring-2 P-2
58 GDR021_Gogamba-GDR142_Ranjitnagar Ring-2 P-2
59 GDR142_Ranjitnagar-GDR038_Shivraj Ring-2 P-2
60 GDR038_Shivraj-GDR018_Jambughoda Ring-2 P-1
61 GDR018_Jambughoda-GDR036_Rameshra & GDR0Ring-2 P-1
62 GDR036_Rameshra & GDR036_Rameshra_Second Ring-2 P-2
63 GDR003_Halol-GDR012_Derol Ring-2 P-2
64 GDR012_Derol-GDR084_Sansoli Ring-2 P-2
65 GDR084_Sansoli-GDR061_TimbaRoad Ring-2 P-2
66 GDR061_TimbaRoad-GDR089_MorvaRena Ring-2 P-2
67 GDR089_MorvaRena-GDR030_Kothamba Ring-2 P-2
68 GDR030_Kothamba-NAD022_Balasinor Ring-2 P-2
69 NAD022_Balasinor-GDR069_Untadi Ring-2 P-2
70 GDR069_Untadi-GDR106_Sadakpur Ring-2 P-2
71 GDR106_Sadakpur-HMT019_Sathamba Ring-2 P-2
72 HMT019_Sathamba-HMT003_Demai Ring-2 P-2
73 HMT003_Demai-HMT047_Ambliyara Ring-2 P-2
74 HMT047_Ambliyara-HMT067_Akrund Ring-2 P-2
75 HMT067_Akrund-HMT002_Dhansura Ring-2 P-2
76 HMT002_Dhansura-HMT064_Limbhoi Ring-2 P-2
77 HMT064_Limbhoi-HMT082_ModasaRSU Ring-2 P-2
78 HMT082_ModasaRSU (Limbhoi InOUT)-HMT192_DRing-2 P-1
79 HMT192_Dadhaliya-HMT033_Sardoi Ring-2 P-2
OSP Partner A
OLT Name A End OLT Name B End
End

R015_DevgadhBaria & GDR015_DevgadhBaria_Second


Karvy OLT GDR028_Piplod
GDR028_Piplod Karvy GDR008_Santrod
GDR008_Santrod Karvy GDR067_Chabanpur
GDR067_Chabanpur Mangal GDR002_GodhraMain
GDR002_GodhraMain Mangal GDR191_Vejalpur
GDR191_Vejalpur Shivranjani GDR093_Adadara
GDR093_Adadara Mangal GDR021_Gogamba
GDR021_Gogamba Karvy GDR142_Ranjitnagar
GDR142_Ranjitnagar Karvy GDR038_Shivraj
GDR038_Shivraj Karvy GDR018_Jambughoda
GDR018_Jambughoda Karvy GDR036_Rameshra & GDR036_Rameshra_Second OLT
GDR036_Rameshra & GDR036_Rameshra_Second
Karvy OLT GDR003_Halol
GDR003_Halol Karvy GDR012_Derol
GDR012_Derol Shivranjani GDR084_Sansoli
GDR084_Sansoli Shivranjani GDR061_TimbaRoad
GDR061_TimbaRoad Mangal GDR089_MorvaRena
GDR089_MorvaRena Mangal GDR030_Kothamba
GDR030_Kothamba Mangal NAD022_Balasinor
NAD022_Balasinor Comtech GDR069_Untadi
GDR069_Untadi Mangal GDR106_Sadakpur
GDR106_Sadakpur Mangal HMT019_Sathamba
HMT019_Sathamba Comtech HMT003_Demai
HMT003_Demai Comtech HMT047_Ambliyara
HMT047_Ambliyara Comtech HMT067_Akrund
HMT067_Akrund Comtech HMT002_Dhansura
HMT002_Dhansura Comtech HMT064_Limbhoi
HMT064_Limbhoi Mangal HMT082_ModasaRSU
HMT082_ModasaRSU (Limbhoi I Comtech HMT192_Dadhaliya
HMT192_Dadhaliya Mangal HMT033_Sardoi
T&D Fiber T&D Fiber
OSP Partner B
End pending pending pending pending AEND STATUS B END STATUS
OSP1 OSP 1 OSP2 OSP 2

Karvy 0 13.592 0 0 30.07.2020 Completed


Karvy 12.954 12.954 0 0 30.07.2020 Completed
Mangal 9.742 9.742 4.364 4.364 30.07.2020 30.07.2020
Mangal 1.532 8.582 1.358 6.858 15.07.2020 30.07.2020
Shivranjani 0 0 0 0 Completed Completed
Mangal 0 0 0 0 Completed Completed
Karvy 0 0 0 0 Completed Completed
Karvy 0 0 0 0 Completed Completed
Karvy 0 0 3.93 8.708 Completed 30.07.2020
Karvy 5.443 5.443 0 0 30.07.2020 Completed
Karvy 0 0 0 0 Completed Completed
Karvy 0 0 5.847 10.082 Completed 15.07.2020
Shivranjani 3.013 9.036 0 0 15.07.2020 Completed
Shivranjani 0 0 0 0 Completed Completed
Mangal 0 0 0 0 Completed Completed
Mangal 0 0 0 0 Completed Completed
Mangal 0 2.33 0 0 15.07.2020 Completed
Comtech 0 0 9.761 22.761 Completed 27.07.2020
Mangal 0.848 18.03 0 0 27.07.2020 Completed
Mangal 0 0 0 0 Completed Completed
Comtech 5.88 8.28 0 0 25.07.2020 Completed
Comtech 0 0 0 0 Completed Completed
Comtech 0 0 0 0 Completed Completed
Comtech 0 0 0 0 Completed Completed
Comtech 0 0 0 0 Completed Completed
Mangal 0 0 0 0 Completed Completed
Comtech 5.35 5.35 0 0 15.07.2020 Completed
Mangal 3.5 5.503 -0.15 0 25.07.2020 Completed
Comtech 7.762 7.762 0 0 30.07.2020 Completed
A END B END
OTDR T&D T&D
ATO B COMPLETED
TRACE/LOSS Remarks A end Remarks B end (SUM (SUM
KM) KM)

Pending Resources to deploy from 15/7 to be completed by 12.592 0


Pending NHAI 47 0 0
Pending NHAI 47 NHAI 47, Railway Xng 0 0
Pending NHAI 47, Railway Xng 0.45 0
Completed 0 0
Completed 0 0
Completed 0 0
Completed 20.7.20 0 0
Pending R Forest 0 0
Pending Santury Forest 0 0
Completed 20.7.20 0 0
Pending GRICL 0 0
Pending GSPL parallel, IOCL xng 0 0
Completed 0 0
Completed 0 0
Completed 0 0
Pending 0 0
Pending WIP 0 0
Pending WIP 0.142 0
Completed 0 0
Pending P Forest 0 0
Completed 23.7.20 0 0
Completed 23.7.20 0 0
Completed 23.7.20 0 0
Completed 23.7.20 0 0
Completed 23.7.20 0 0
Pending 0 0
Pending WIP 0.1 0.15
Pending 0 0
10.07 11.07

A END B END
Blow Blow A END T&D B END T&D A END B END A END T&D B END T&D A END
(SUM (SUM (M) (M) Blow (M) Blow (M) (M) (M) Blow (M)
KM) KM)

0 0
0 0
0 0
0 0 197
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 0 150 2000
0 0
07 12.07 13.07

B END A END T&D B END T&D A END B END A END T&D B END T&D A END B END
Blow (M) (M) (M) Blow (M) Blow (M) (M) (M) Blow (M) Blow (M)

0 0 0 0

142

100
14.07 15.07 16.07

A END T&D B END T&D A END B END A END T&D B END T&D A END B END A END
(M) (M) Blow (M) Blow (M) (M) (M) Blow (M) Blow (M) T&D (M)

9753 0 0 0 2839

253
16.07 17.07 18.07

B END A END B END A END B END A END B END A END B END A END
T&D (M) Blow (M) Blow (M) T&D (M) T&D (M) Blow (M) Blow (M) T&D (M) T&D (M) Blow (M)
8.07 19.07 20.07

B END A END B END A END B END A END B END A END B END


Blow (M) T&D (M) T&D (M) Blow (M) Blow (M) T&D (M) T&D (M) Blow (M) Blow (M)
Block OLT OSP T & D pending Blowing Pending
devgadhbariya
devgadhbariya Devgadh Bariya Karvy 0 0
Ghoghamba Karvy 0 0
Ghoghamba Rinchwani karvy 0 0
Jetpur Pavi P T Kher 0 0
Jetpur Pavi Bhikapur P T Kher 0 0
Dhanpur Karvy 17.5 17.5
Dhanpur Dhanpur Karvy 0 0
Dhanpur Karvy 0 0
Dhanpur Bhorva Karvy 0 0
Dahod Mangal 0 0
Dahod Jesawada Mangal 0 0
GARBADA Karvy 0 0
GARBADA Garbada Karvy 0 0
Garbada Mangal 0.2 0.2
Garbada Katwara Mangal 0 0
Dahod Mangal 2.8 2.8
Dahod Rancharda Mangal 0 0
Dahod Mangal 0.8 3
Dahod Dahod Mangal 3.5 5
Limkheda Mangal 1.2 10
Limkheda Kamboi Mangal 0.2 3
Limkheda Mangal 0 0
Limkheda Singapore Mangal 0 0
Dahod Mangal 0 0.3
Dahod Chosala Mangal 0 0
Jhalod Mangal 0 0
Jhalod Limdi Mangal 0 0
Jhalod Mangal 0 0
Jhalod Zalod Mangal 0 0
Limkheda Mangal 0 0
Limkheda Singvad Mangal 0 0
Sanjeli Mangal 0 0
Sanjeli Sanjeli Mangal 2 3.5
Fatepura Mangal 0 0
Fatepura Sukhsar Mangal 0 0
Fatepura Mangal 0 0
Fatepura Fatepur Mangal 0 0
Fatepura Mangal 0 0
Fatepura Balaya Mangal 0 0
Santrampur Comtech 0 0.15
Santrampur Ukhreli Comtech 0 0
Santrampur Comtech 0 0.3
Santrampur Santrampur Comtech 0 0
Kadana Comtech 0 0
Kadana Divda Comtech 0 0
Lunawada Mangal 3 3
Malekpur
Lunawada Malekpur Mangal 2 2
KHANPUR Comtech 0 0
KHANPUR Velanwada Comtech 0 0
Kadana Comtech 0 0
Kadana Ditwas Comtech 0 0
KHANPUR Mangal 0.5 0.5
KHANPUR Beliya Mangal 0 0
Malpur Mangal 5 5
Malpur Helodarl Mangal 6 6
Khanpur Comtech 0 0
Khanpur Limdia Comtech 0 0
Lunawada Mangal 1 5
Lunawada Chavdinamuvada Mangal 0 0
SANTRAMPUR Comtech 0 0
SANTRAMPUR Chuthanamuvada Comtech 0 0
SANTRAMPUR Comtech 0 0
SANTRAMPUR Doli Comtech 0 0
Morvahadaf Karvy 0 0
Morvahadaf Mora Karvy 0 0
Morvahadaf Karvy 0 0
Morvahadaf Morvahadaf Karvy 0 0
Shehera Mangal 0 0
Shehera Sureli Mangal 0 0
Shehera Mangal 0 0
Shehera Shehra Mangal 0 0
Lunawada Mangal 0 0
Lunawada Viraniya Mangal 0 0
Lunawada Mangal 0 0
Lunawada Lunawada Mangal 20 25
Bayad Comtech 0 0
Bayad Gabat Comtech 0 0
Malpur Mangal 0.7 0.7
Malpur Umbhran Mangal 0 0
Malpur Comtech 0 0
Malpur Satarda Comtech 0 0
Malpur Comtech 3 3
Malpur Malpur Comtech 0.05 4
MEGHRAJ Mangal 1 1
MEGHRAJ Meghraj Mangal 1.2 5
MEGHRAJ Mangal 8 15
MEGHRAJ Kasana Mangal 0 0
MEGHRAJ Mangal 0 0
MEGHRAJ Tarakwada Mangal 2.5 2.5
Bhiloda shivranjani 0 0
Bhiloda Degamda shivranjani 0 0
Bhiloda shivranjani 0 0
Bhiloda Palla shivranjani 0 0
Bhiloda shivranjani 0 0
Takatuka
Bhiloda Takatuka shivranjani 0 0
Bhiloda shivranjani 0 0
Bhiloda Kishangadh shivranjani 0 0
Bhiloda shivranjani 0 0
Bhiloda Kheradi shivranjani 0 0
Modasa Comtech 0 0
Modasa Sardoi Comtech
Status Remarks

complete SDC route termination pending


complete complete
complete
complete complete
complete
Pending Santury Forest in (file 4929) GNG, ECO (file 4958) Pending
complete
complete OFC cut due to R & B expansion complete
complete
complete OTDR by 28/9/20 complete
complete
complete complete
complete
Pending City area, by 5/10 complete
complete
Pending NH47, Complete by 30/9/20, NHAI issue off set Pending
complete
Pending 2 Nos. Rly crossing RTM 107 (applied) & RTM 152 ( Pending
Pending NH47, Complete by 30/9/20, NHAI issue
Pending NH47, Complete by 30/9/20, NHAI issue Pending
Pending NH47, 2 Railway crossing permission avl, Complete
complete Pending
complete
Pending due to NHAI 56, complete by 30/9 Pending
complete
complete Pending
complete
complete complete
complete
complete Multiple cuts due to water line 5/10 Pending
complete
complete complete
Pending R Forest issue to start by 30/9, WIP,
complete Pending
complete
complete complete
complete
complete complete
complete
Pending R & B issue, blowing by 20/8/20, 27/9 Pending
complete
Pending City area by mannuual labour, by 26/8, 28/9 Pending
complete
complete complete
complete
Pending R & B road expansion Issue, by 15/10 Pending
Pending R & B road expansion Issue, by 15/10
complete R & B issue road expansion issue, 4.4 Km fiber da Pending
complete
complete complete
complete
Pending R. Forest WIP, completion by 30/9/20 Pending
complete
Pending P. Forest, R Forest application to be done on line 2 Pending
Pending OLT path to change, DWDM plaaning will change 20
complete Pending
complete
Pending WIP, to be completed by 20/8/20, 30/9 Pending
complete
complete Pending
complete
complete complete
complete
complete complete
complete
complete complete
complete
complete Road cross pending complete
complete
complete complete
complete
complete complete
complete
complete complete
Pending lunawada-untadi 10.5 km-umbhran-5 km-gabat, Umb
complete Pending
complete
Pending by 2/10 Pending
complete
complete Pending
complete
Pending GSRDC issue, by 25/8, 4/10 Pending
Pending by 25/8, by 30/9
Pending R Forest, by 30/9 Pending
Pending P Forest, compl by 30/9
Pending compl by 30/9, Farmers Pending
complete
complete OTDR by 12/8/20 Pending
Pending Local Farmer issue 5/10/20
complete Pending
complete
complete complete
complete
complete complete
complete
complete complete
complete
complete complete
complete
complete complete
Mora to Morvahadaf OTDR recd on
14.8.20

Lunawada to untadi road expansion, Untadi to umbhran by 30/9 , Umbhran to Gabat 30/9

OTDR received (Shivranjani)

OTDR received (Shivranjani)

OTDR received (Shivranjani)


OTDR received (Shivranjani)
Block OSP T & D pendinBlowing PendStatus
Modasa
Modasa Sardoi Comtech 0 0 Complete
Modasa Mangal 0.2 5 Pending
Modasa Dadhaliya Mangal 3 5 Pending
Modasa Comtech 0 0 Complete
Modasa Modasa Comtech 0 0 Complete
Modasa Mangal 4 5 Pending
Modasa Limbhoi Mangal 0 0 Complete
Dhansura Comtech 0 0 Complete
Dhansura Dhansura Comtech 0 0 Complete
Dhansura Comtech 0 0 Complete
Dhansura Akrund Comtech 0 0 Complete
Bayad Comtech 0 0 Complete
Bayad Ambaliyara Comtech 0 0 Complete
Bayad Comtech 0 0 Complete
Bayad Demai Comtech 0 0 Complete
Bayad Comtech 0 0 Complete
Bayad Sathamba Comtech 0 0 Complete
Lunawada Mangal 6 8 Pending
Lunawada Sadakpur Mangal 0 0 Complete
Lunawada Mangal 0 0 Complete
Lunawada Untadi Mangal 0 0 Complete
Balasinor Comtech 0 0 Complete
Balasinor Balasinor Comtech 0 0 Complete
Lunawada Mangal 0 0 Complete
Lunawada Kothamba Mangal 0 0 Complete
Shehera Mangal 0 0 Complete
Shehera Morvarena Mangal 0 0 Complete
Godhra Mangal 0 0 Complete
Godhra Timba Road Mangal 0 0 Complete
Kaalol Shivranjani 0 0 Complete
Kaalol Sansoli Shivranjani 0 0 Complete
Kaalol Shivranjani 0 0 Complete
Kaalol Derol Shivranjani 0 0 Complete
Halol Karvy 2 2.2 Pending
Halol Halol Karvy 3.7 4 Pending
Halol Karvy 0 0 Complete
Halol Rameshra Karvy 0 0 Complete
JAMBUGH Karvy 0 0 Complete
JAMBUGH Jambughoda Karvy 0 0 Complete
Halol Karvy 5.5 5.5 Pending
Halol Shivraj Karvy 4 8.5 Pending
Halol Karvy 0 0 Complete
Halol Ranjeetnagar Karvy 0 0 Complete
Ghoghamb Karvy 0 0 Complete
Ghoghamb Goghamba Karvy 0 0 Complete
Ghoghamb Mangal 0 0 Complete
Adadra
Ghoghamb Adadra Mangal 0 0 Complete
Kalol Shivranjani 0 0 Complete
Kalol Vejalpur Shivranjani 0 0 Complete
Godhra Mangal 0 0 Complete
Godhra Godhra Main Mangal 1.3 7 Pending
Godhra Mangal 0 0 Complete
Godhra Chabbanpur Mangal 4.5 4.5 Pending
Godhra Karvy 9 10 Pending
Godhra Santrod Karvy 0 0 Complete
LIMKHEDA Karvy 13 13 Pending
LIMKHEDA Piplod Karvy 0 0 Complete
devgadhbar Karvy 1.5 7 Pending
devgadhbar Devgadhbariya Karvy
Remarks

WIP, completion by 30/9/20 pending


400M GSRDC isssue, power supply cable, Toll issue.
pending

completion by 30/9/20 pending

complete

complete

complete

complete

complete

P. forest. Road expansion By 8/10/20 pending


R & B Road expansion, route damaged
R & B Road expansion, route damaged complete

pending

pending

pending

complete

complete

complete

GSPL parallel work, IOCL xng, survey done 20/10 pending


GRICL 20/10
pending

complete

Santury Forest 10/10/20 pending


Santury Forest 10/10/20
pending

complete

complete
complete

complete
Rly Xng BRC-134, Permission recd 30/9/20
pending
NH47, 30/9/20
NH47, Railway crossing RTM 45, 10/10/20 pending

NH47, RTM 28 Rly crossing, permission pending10/10 pending

NH47 xng to reapply , 10/10/20 pending


Island 2 - SDC route Closure
T&D Blowing
SDC
S No From To Pending Pending
Route (Kms) (Kms)

1 2.1 Chhota Udaipur DC Office Devgadh Baria 4.744 29.354

Chhota Udaipur DC
2 2.1 PaviJetpur -0.217 29.228
Office

3 2.1 Bodeli PaviJetpur 0.104 17.474

4 2.1 Sankheda Bodeli 0.316 21.911

5 2.1 Dabhoi Sankheda 0.4 21.887

6 2.1 Waghodia Dabhoi 0.62 22.77

7 2.1 Savli Waghodia 0.47 -0.737

8 2.1 Desar Savli -0.837 5.146


9 2.1 Galteshwar Desar 0.45 21.029
10 2.1 Thasra Galteshwar 0.451 -2.991
11 2.1 Kapadvanj Thasra 0.961 18.415

12 2.1 Dehgam Kapadvanj 5.101 3.214

13 2.1 Gandhinagar (SDC) Dehgam 6.44 6.49

T&D Blowing
SDC
S No From To Pending Pending
Route
(Kms) (Kms)

1 2.2 HMT033_Sardoi (Modasa) Himmatnagar TC/DC 12.125 37.821

2 2.2 Himmatnagar TC/DC Prantij 1.538 31.03

3 2.2 Prantij Gandhinagar (SDC) 5.579 29.889


ROW
No of Patches of Traget Date of ROW Current
Challenges Affected
Pending T&D Completion YES/NO Status

P.Forest
Verbally
Managed &
Railway crossing permission
work is
available (WR-BRC-2019-126). 3 Km
5 15-Jul-20 Yes going on.
sanctuary Forest permission
Hard copy
awaited.
application is
submitted at
zonal office.

1 15-Jul-20 No

Railway crossing permission


3 15-Jul-20 No
available.   WR-BRC-2019-148
Railway crossing permission
2 15-Jul-20 No
available. (WR-BRC-2019-147)

01 no of
Permission
received and
planning to
execution on
ground. 2nd
Railway crossing permission offline
2 15-Jul-20 Yes
available. (WR-BRC-2019-151) permission
& JV done
with railway
authority
permission
received
shortly.

Survey done
Railway crossing permission
1 15-Jul-20 Yes & Permission
Pending. (WR-BRC-2019-153) is awaited. 

Survey done
Railway crossing permission
1 15-Jul-20 Yes & Permission
Pending. WR-BRC-2019-136 is awaited. 

1 15-Jul-20 No
Railway crossing permission
1 15-Jul-20 No
received. (WR-BRC-2019-137)
0 15-Jul-20 No
Railway crossing permission Pending. wr-brc-2019-
1 15-Jul-20 (WR-BRC-2019-138). 1 Railway crossing Yes 138, Survey
pending & its Survey pending. Pending.

Dehgam NP
Dehgam Nagarpalika permission
1 15-Jul-20 Yes Verbally
pending.
managed.
Gandhinaga
Protected forest in Gandhinagar. r Route
Applied. Forest Permission required. survey
2 15-Jul-20 Yes
Dehgam NagarPalika permission aligned, Plan
reqd to joint
survey.

ROW
No of Patches of Traget Date of ROW Current
Challenges Affected
Pending T&D Completion Status
YES/NO
Himatnagar Intracity , P. Forest, RW
3 30-Jul-20 will be apply pending due to route OSP raise
Yesmail tomorrow for route changes.
changes.
Himatngar Intracity, RW will be apply
2 30-Jul-20 pending due to route changes. Yes

P. Forest & Bridge, Gandhinagar


2 30-Jul-20 ROW GandhinagarYes
Route survey aligned, Plan to joint survey.
Projected ROW
clearance
Projected ROW
clearance

morrow for route changes.

vey aligned, Plan to joint survey.


T&D Blowing Traget Date of Projected ROW
S No SDC Route From To Pending Pending ROW Current Status Bridge crossing status T&D Blowing Bridges In building Splicing OTDR
Completion clearance
(Kms) (Kms)

Gandhinagar Protected Forest permission recd., NHAI 147 road in


13 2.1 Gandhinagar (SDC) Dehgam 0 0 Complete Shyam
Gandhinagar
1 Bridge (600M), 300M aerial done, brodge clamping pendi 16.8 17.8 18.8 17.8 20.8 300M aerial, Bridge clamping pending. OTDR given

Dehgam Nagar Palika Verbally managed. Diesel line crossing will be


12 2.1 Dehgam Kapadvanj 0 0 Complete Vinod
managed
Bridge crossing done, splicer reqd., in building 17.8 18.8.20 19.8.20 Complete , OTDR given

WR-BRC-2019-138, Survey done. Permission Pending. Railway


11 2.1 Kapadvanj Thasra 0 0 Complete Vinod
crossing pending, crossing done
1 Bridge crossing pending, 3 bridge crossing done 20.2.20 19.8.20 18.8.20 18.8.20 19.8.20-2222.8.20 3 Joint splicing pending OTDR by 29/8

10 2.1 Thasra Galteshwar 0 0 Complete Vinod


2 bridge, 1 bridge crossing done. 1 bridge pending. 20.8.20 19.8.20 24.8.20 25.8.20 4 Joint pending due to water logging. OTDR by 30/8

9 2.1 Galteshwar Desar 0 0 Complete WR-BRC-2019-137 railway crossing permission recd. Crossing done Sanjay
2 bridge crossing pending, JIO issue 24.8.20 26.8.20 600M desar city area with multiple utilities T & D pending.

8 2.1 Desar Savli 0 0 Complete Jio issue, multiple cut sanjay


3 bridge crossing pending, JIO issue. by 20/8/20, Desar in building done 28.8.20
Survey done & Permission is awaited.WR-BRC-2019-136 Railway crossing
7 2.1 Savli Waghodia 0.5 1.6 25-Sep-20 pending. 1 deisel line crossing done. 2 diesel line crossing pending, Power Sanjay
line crossing.
3 bridge crossing done, inbuilding in waghodiya on 14/9, splicing wip 30.8.20

6 2.1 Waghodia Dabhoi 0 0 Complete WR-BRC-2019-153 Survey Pending, crossing done. Gas line crossing. Rohit
3 bridge clamping done. Splicing WIP, 5/9/20, in building wip
3 Railway crossing. Railway permission recd. Drg pending Railway
5 2.1 Dabhoi Sankheda 0 0 Complete road inside the city. City area 2 Km railway property. 3 railway Rohit
crossing done
Bridge crossing done. HDD WIP by 5/9/20 30.8.20

Railway permission recd. Crossing pending. Drg pending. Crossing


4 2.1 Sankheda Bodeli 0 0 Complete Rohit
done. Hard area 0.5Km pending
1 Bridge crossing done. HDD WIP 30.8.20

Railway permission recd. Crossing pending. Drg pending,crossing


3 2.1 Bodeli PaviJetpur 0 0 Complete Rohit
done. Splicing pending
3 bridge crossing by 3/9, by 10/9, splicing pending, IBD pending 30.8.20

Chhota Udaipur DC
2 2.1 PaviJetpur 0 0 Complete Intercity work, Nagarpalika area. Vernier HDD m/c required Vinod
Office
1 bridge crossing, HDD wip

P.Forest Verbally Managed & work is going on. Hard copy application
1 2.1 Chhota Udaipur DC Office Devgadh Baria 0 0 22-Sep-20 shyam
is submitted at zonal office. Railway crossing done. Farmer issue
6 Bridge, 6 crossing done. blowing by 23.8.20, splicing wipdone 2 mcs, 21.8.20 19.8.20 20.8.20 19.8.20 to 23.8.20
T&D
S No SDC Route From To Route Scope
Length
(Kms)

3 2.2 Gandhinagar (SDC) Prantij 46.377 46.377

2 2.2 Prantij Himmatnagar TC/DC 31.03 31.03

1 2.2 Himmatnagar TC/DC HMT033_Sardoi (Modasa) 44.617 37.821

Prantij to sardoi direct


No of
T&D T&D Blowing Traget Date
Completed Pending Pending Patches of of Challenges
Pending
(Kms) (Kms) (Kms) Completion
T&D
P. Forest & Bridge, Gandhinagar ROW,
Sabarmati Gas line crossing. Gas line
40.798 0 0 complete 14-Sep-20
Survey done, NH crossing pending,

Himatngar Intracity, 3 RW applied & survey


letter recd.2 NH crossing. 2 rly crossing
29.492 5.5 8 2 10-Oct-20
done crossing done. R & B issue

Himatnagar Intracity , P. Forest, 1 RW


applied & survey letter recd..
25.696 8 15 3 30-Sep-20

T & D by 25.9.20, 2JCB, 2HDD, 1 breaker,


4.5 5.5 1 blowing m/c
ROW Affected ROW Current Status Projected ROW
YES/NO clearance

otected
ar T & Dforest
by 2/9,
permission
Yes
2HDD WIP,
recd,
blowing
Plan to4/9,
joint
1 blowing
survey. Sabarmati
m/c Naresh/
wip, inGas
building
Kishan
line managed,
pending, splicing
2HDD working
wip, 500 M protected forest in anodiy

tij city 1 HDD, 2 Yes


HDD expected by 3/9,T & D, blowing by 8.9.20,
Mangal
complete
HDD could
by 15.9.20
not successful due

2 JCB,Yes
1 HDD wip, T & D by 10/9/20 and complete
3 JCB,by1 10/9/20
Breaker, 1 HDD. Forest has stopped the work
otected forest in anodiya, 6 Bridge, 300 M Sabarmati Gas crossing. By 5/9/20.
T&D Blowing Traget Date
S No SDC Route From To Pending Pending of
(Kms) (Kms) Completion

1 2.1 Gandhinagar (SDC) Dehgam 3.4 4.5 15-Aug-20

2 2.1 Dehgam Kapadvanj 0 2 10-Aug-20

3 2.1 Kapadvanj Thasra 0.1 1.5 12-Aug-20

4 2.1 Thasra Galteshwar 0 0 10-Aug-20


5 2.1 Galteshwar Desar 0.1 17 20-Aug-20
6 2.1 Desar Savli 0 0 12-Aug-20

7 2.1 Savli Waghodia 0.3 3 20-Aug-20

8 2.1 Waghodia Dabhoi 0.15 5 20-Aug-20

9 2.1 Dabhoi Sankheda 0.1 1 15-Aug-20

10 2.1 Sankheda Bodeli 0.5 1.3 12-Aug-20

11 2.1 Bodeli PaviJetpur 0.1 1.7 15-Aug-20

Chhota
12 2.1 PaviJetpur Udaipur DC 3 3 20-Aug-20
Office

13 2.1 Chhota Udaipur DC Office Devgadh Baria 0.8 18 16-Aug-20


Challenges ROW Current Status

Protected forest in Gandhinagar.


Gandhinagar Protected Forest permission recd. Dehgam
Applied. Forest Permission required.
Nagar Palika Verbally managed.
Dehgam NagarPalika permission reqd
Dehgam Nagarpalika permission Dehgam Nagar Palika Verbally managed. Diesel line
pending. Deisel line crossing will be managed
Railway crossing permission Pending. (WR-
BRC-2019-138). 1 Railway crossing pending WR-BRC-2019-138, Survey Pending. Survey to be done
& its Survey pending. on 10/8/20. Railway crossing pending

Railway crossing permission received. WR-BRC-2019-137 railway crossing permission recd.


(WR-BRC-2019-137) Crossing done

Survey done & Permission is awaited.WR-BRC-2019-


Railway crossing permission Pending. 136 Railway crossing done. 1 deisel line crossing done. 2 diesel
WR-BRC-2019-136, 3 deisel line line crossing pending
Railway crossing permission Pending. WR-BRC-2019-153 Survey done & Permission is awaited. 
(WR-BRC-2019-153)
Railway crossing permission available. (WR-BRC-2019-151) Railway permission recd. Crossing
(WR-BRC-2019-151) pending. Drg pending
Railway crossing permission available. (WR-BRC-2019-147) Railway permission recd. Crossing
(WR-BRC-2019-147) pending. Drg pending
Railway crossing permission available.   (WR-BRC-2019-148) Railway permission recd. Crossing
WR-BRC-2019-148 pending. Drg pending

Railway crossing permission available P.Forest & ECO zone Verbally Managed & work is going
(WR-BRC-2019-126). 3 Km sanctuary on. Hard copy application is submitted at zonal office.
Forest permission awaited. 6 Bridge (WR-(BRC-2019-126) Railway crossing done.
Bridge crossing status

6 Bridge. 2 done. 4 pending

Bridge crossing done

4 Bridge crossing pending


1 bridge crossing done

2 bridge crossing pending, JIO issue


3 bridge crossing pending

3 bridge crossing pending

5 bridge crossing pending

2 bridge crossing pending

2 bridge crossing pending

3 bridge crossing pending

1 bridge crossing pending

4 bridge crossing pending.


T&D Blowing
S No SDC Route From To Pending Pending
(Kms) (Kms)

1 2.2 Gandhinagar (SDC) Prantij 5.5 6.5

2 2.2 Prantij Himmatnagar TC/DC 0.7 8

3 2.2 Himmatnagar TC/DC HMT033_Sardoi (Modasa) 7.7 37.821


No of
Patches of Traget Date of ROW Current Status Bridge crossing status
Pending Completion
T&D

Gandhinagar Protected forest permission recd,


2 15-Aug-20 6 Bridge crossing pending
Plan to joint survey. Sabarmati Gas line managed

2 30-Aug-20 Route to finalise due to Railway under pass.

3 30-Aug-20 Route to finalise due to Railway under pass.


Row Labels Count of Ring Count of ATO B COMPLETED Pending Path Connnected OLTs
Island 2 79 34 45 84
Ring-1 50 20 30 53
Ring-2 29 14 15 31
Grand Total 79 34 45 84
OLT-OLT Path Connectivity Mahisagar
OLT NamFrom GP To GP ( O Dist inCompleted
mtr Any
or Not
ROW issue
Remarks
Beliya OLNavagam-1 Mor Khakh 2743
Ditwas OLVelanwada Amthani G 4019 Completed
VelanwadBhagaliyaVaghjibar 4457 Completed Cable cut in road widening R&B State
Malekpur Mal GP( DDadhaliya 2934
Divda OL Rengaiya Kelamul G 2005 Santrampur end Splicing pending
SantrampSantrampu Vanjiya Kh 894 T&D is in progress
Ukhreli O Kotra GP B
T atakwada 1941 1 Road crossing & CP pending
Doli OLT Padedi AdDoli OLT 10 Splicing pending
Mora OLTSuliyat GPLimdi GP T 3465
ChuthanaGuvaliya ChatakaBe 3640 1 chamber pending & Splicing pending
Chavdiba Madhvas G Dolariya G 3810
Limdia OLBabliya GPAmbaliya 3056 Splicing Pending
Untadi OLVirpur TC Ubhran OL 10492
Untadi OLHadod T PHardaspur 3653
Untadi OLVakhatpurKidia GP 440
SadakpurHathipuraJalampura 1240
LunawadaKhoda Amb Viraniya O 1624
Viraniya Bhotava GHanselav 1164
MorvaRenGuneli GPKauchiya 2353
KothambaAgarwadaNamnar GP2490 Namnar end Splicing Pending
Balasinor Patadiya Kadachhal 2047
dening R&B State

licing pending

CP pending

& Splicing pending

g Pending
Block Block No. OLT Ring OSP T & D pending Blowing Pending Status Remarks ALL GP lit OLT AT status
devgadhbariya
devgadhbariya 1 done done Devgadh Bariya Karvy 0 0 complete SDC route termination pending
Ghoghamba Karvy 0 0 complete complete
Ghoghamba 2 done done Rinchwani 1.50 karvy 0 0 complete
Jetpur Pavi P T Kher 0 0 complete complete
Jetpur Pavi 3 done done Bhikapur 1.49 P T Kher 0 0 complete Y
Dhanpur Karvy 1.5 4.5 Pending Santury Forest in (file 4929) GNG, ECO (file 4958) Pending 15 days after getting per
Dhanpur 4 31.12.20 8.1.21 7.1.20 Dhanpur 1.48 Karvy 0 0 complete Y Offered
Dhanpur Karvy 0 0 complete OFC cut due to R & B expansion 15 cut, complete
Dhanpur 4 1.1.21 8.1.21 10.1.21 Bhorva 1.47 Karvy 0 0 complete
Dahod Mangal 0 0 complete ok complete
Dahod 5 1.1.21 7.1.21 Jesawada 1.46 Mangal 0 0 complete ok
GARBADA Karvy 0 0 complete complete
GARBADA 6 2.11.20 7.1.21 Garbada 1.45 Karvy 0 0 complete Offered
Garbada Mangal 0 0 complete ok complete
Garbada 6 3.11.20 7.1.21 Katwara 1.44 Mangal 0 0 complete Ok OTDR by 17/1 Y Offered
Dahod Mangal 0 0 complete Ok OTDR by 17/1 Pending
Dahod 5 4.11.20 6.1.21 Rancharda 1.43 Mangal 0 0 complete ok
Dahod 10.1.20 Mangal 0.2 2.2 Pending 2 Nos. Rly crossing RTM 107 (applied, survey lette Pending 25.12.20
Dahod 5 5.11.20 6.1.21 8.1.20 Dahod 1.42 Mangal 0.6 1.2 Pending NH47, Complete by 20/10/20, NHAI issue, 30/10/20,
Limkheda Mangal 0 0 complete ok Pending
Limkheda 7 6.11.20 6.1.21 Kamboi 1.41 Mangal 0 0 complete ok 25.12.20
Limkheda Mangal 0 0 complete Splicing pending by 16/1 Pending
Limkheda 7 7.11.20 5.1.21 Singapore 1.40 Mangal 0 0 complete ok, OTDR by 15/1 Y
Dahod Mangal 0 0 complete ok, OTDR by 15/1 Pending
Dahod 5 8.11.20 5.1.21 Chosala 1.39 Mangal 0 0 complete ok
Jhalod Mangal 0 0 complete 50M damage by culvert expansion. 48OFC damagedPending
Jhalod 8 8.11.20 5.1.21 Limdi 1.38 Mangal 0 0 complete ok, OTDR by 12/1 Y
Jhalod Mangal 0 0 complete ok, OTDR by 12/1 complete
Jhalod 8 9.11.20 4.1.20 Zalod 1.37 Mangal 0 0 complete Y
Limkheda Mangal 0 0 complete Multiple cuts due to water line 10/10 Pending
Limkheda 7 10.11.20 4.1.20 Singvad 1.36 Mangal 0 0 complete
Sanjeli Mangal 0 0 complete complete
Sanjeli 9 11.11.20 4.1.20 Sanjeli 1.35 Mangal 0 0 complete jointing pending, 22/10, 1200M damage by forest bo
Fatepura Mangal 0 0 complete ok Pending
Fatepura 10 12.11.20 3.1.20 Sukhsar 1.34 Mangal 0 0 complete ok Offered
Fatepura Mangal 0 0 complete cut restoration by 11/1 complete
Fatepura 10 13.11.20 3.1.20 Fatepur 1.33 Mangal 0 0 complete ok Y AT done with PP
Fatepura Mangal 0 0 complete 200M 48OFC damge. By 11/1 complete
Fatepura 10 14.11.20 2.1.21 Balaya 1.32 Mangal 0 0 complete OTDR given Y Offered
Santrampur Comtech 1.7 2.5 Pending R & B issue, blowing by 20/8/20, 27/9. by 15/1/21 Pending
Santrampur 11 15.11.20 2.1.21 10.1.21 Ukhreli 1.31 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd
Santrampur Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd Pending
Santrampur 11 16.11.20 1.1.21 Santrampur 1.30 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd, cut 20M patch 1
Kadana Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd complete
Kadana 12 17.11.20 1.1.21 Divda 1.29 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd
Lunawada Mangal 0 0 complete feeder path R & B road expansion Issue, by 15/10, Pending
Lunawada 13 18.11.20 31.12.20 5.1.20 Malekpur 1.28 Mangal 0 2 complete complete 25.12.20
KHANPUR Comtech 0 0 complete splicing pending after road crossing, by 14/1 Pending
KHANPUR 14 19.11.20 31.12.20 7.1.20 Velanwada 1.27 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd Y
Kadana Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd complete
Kadana 12 20.11.20 30.1.2.20 7.1.20 Ditwas 1.26 Comtech 0 0 complete R & B Road expansion still going on. Again cut 9/1. A Y
KHANPUR Mangal 0 0 complete R & B expansion work in progress. 500 M cut. Pending
KHANPUR 14 21.11.20 30.1.2.20 Beliya 1.25 Mangal 0 0 complete
Malpur 14.1.21 Mangal 3.4 5 Pending P. Forest, R Forest application to be done on line 2 Pending 30,12,20
Malpur 15 22.11.20 29.12.20 6.1.21 Helodarl 1.24 Mangal 0 0 complete 30,12,20
Khanpur Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd, 1 cut Pending
Khanpur 14 23.11.20 29.12.20 Limdia 1.23 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd
Lunawada Mangal 0 0 Pending joint pending by 10/1/21 Pending 20.12.20
Lunawada 13 24.11.20 28.12.20 4.1.21 Chavdinamuvada 1.22 Mangal 0 0 complete OTDR by 10/1
SANTRAMPUR Comtech 0 0 complete splicing in progress. OTDR by 10/1 Pending
SANTRAMPUR 11 25.11.20 28.12.20 Chuthanamuvada 1.21 Comtech 0 0 complete Y
SANTRAMPUR Comtech 0 0 complete complete
SANTRAMPUR 11 26.11.20 28.12.20 Doli 1.20 Comtech 0 0 complete Y
Morvahadaf Karvy 0 0 complete complete
Morvahadaf 16 27.11.20 27.1.2.20 Mora 1.19 Karvy 0 0 complete Mora to Morvahadaf Y
Morvahadaf Karvy 0 0 complete complete OTDR recd on 14.8.20
Morvahadaf 16 28.11.20 27.12.20 Morvahadaf 1.18 Karvy 0 0 complete Y
Shehera Mangal 0 0 complete complete
Shehera 17 29.11.20 27.12.20 1.1.21 Sureli 1.17 Mangal 0 0 complete Offered
Shehera Mangal 0 0 complete complete
Shehera 17 30.11.20 26.12.20 Shehra 1.16 Mangal 0 0 complete
Lunawada Mangal 0 0 complete complete
Lunawada 13 1.12.20 26.12.20 3.1.21 Viraniya 1.15 Mangal 0 0 complete
Lunawada Mangal 0 0 complete Lunawada to viraniya damaged by Nagarpalika wo complete
Lunawada 13 2.12.20 26.12.20 Lunawada 1.14 Mangal 20 25 complete lunawada-untadi 10.5 km-umbhran-5 km-gabat, Umbh Lunawada to untadi road Y
Bayad Comtech 0 0 complete Pending
Bayad 18 11/4/2020 25.12.20 30.12.20 Gabat 1.13 Comtech 0 0 complete Y
Malpur Mangal 0 0 complete 70M affected Pending
Malpur 15 11/3/2020 Umbhran 1.12 Mangal 0 0 complete Y Offered
Malpur Comtech 0 0 complete Pending
Malpur 15 11/2/2020 Satarda 1.11 Comtech 0 0 complete Y
Malpur Comtech 0 0 complete GSRDC issue, by 25/8, 4/10 by 28/10, local person Pending
Malpur 15 11/1/2020 Malpur 1.10 Comtech 0 0 complete by 25/8, by 10/10, by 28/10, 12/11
MEGHRAJ Mangal 0 0 complete R Forest, by 8/10 Pending
MEGHRAJ 19 10/31/2020 Meghraj 1.09 Mangal 0 0 complete P Forest, compl by 13/10, 27/10, Splicing wip 30/10
MEGHRAJ Mangal 0 0 complete compl by 15/10, Farmers, 30/10, 10/11, cut at 2 loca Pending
MEGHRAJ 19 10/30/2020 Kasana 1.08 Mangal 0 0 complete
MEGHRAJ Mangal 0 0 complete OTDR by 12/8/20 Pending
MEGHRAJ 19 10/29/2020 Tarakwada 1.07 Mangal 0 0 complete Local Farmer issue 10/10/20, 27/10, 20/11, 28/11
Bhiloda shivranjani 0 0 complete PendingOTDR received (Shivranjani)
Bhiloda 20 10/26/2020 Degamda 1.06 shivranjani 0 0 complete Y Offered
Bhiloda shivranjani 0 0 complete complete
OTDR received (Shivranjani)
Bhiloda 20 10/25/2020 Palla 1.05 shivranjani 0 0 complete Y Offered
Bhiloda shivranjani 0 0 complete complete
OTDR received (Shivranjani)
Bhiloda 20 10/24/2020 Takatuka 1.04 shivranjani 0 0 complete Y Offered
Bhiloda shivranjani 0 0 complete complete
Bhiloda 20 10/23/2020 Kishangadh 1.03 shivranjani 0 0 complete Y AT done with PP
Bhiloda shivranjani 0 0 complete complete
OTDR received (Shivranjani)
Bhiloda 20 10/22/2020 Kheradi 1.02 shivranjani 0 0 complete Y Offered
Modasa Comtech 0 0 complete complete
Modasa 21 20.10.20 Sardoi 1.01 Comtech Y Offered
Modasa
Modasa 21 Sardoi Comtech 0 0 Complete
Modasa Mangal 0 0 complete pending
Modasa 21 24.10.20 Dadhaliya 2.29 Mangal 3 5 complete
Modasa Comtech 0 0 Complete pending
Modasa 21 25.10.20 Modasa 2.28 Comtech 0 0 Complete
Modasa Mangal 0 0 Complete pending
Modasa 21 26.10.20 Limbhoi 2.27 Mangal 0 0 Complete
Dhansura Comtech 0 0 Complete complete
Dhansura 22 27.10.20 Dhansura 2.26 Comtech 0 0 Complete Y
Dhansura Comtech 0 0 Complete complete
Dhansura 22 28.10.20 Akrund 2.25 Comtech 0 0 Complete Y
Bayad Comtech 0 0 Complete complete
Bayad 18 29.10.20 Ambaliyara 2.24 Comtech 0 0 Complete Y
Bayad Comtech 0 0 Complete complete
Bayad 18 30.10.20 Demai 2.23 Comtech 0 0 Complete Y
Bayad Comtech 0 0 Complete complete
Bayad 18 31.10.20 Sathamba 2.22 Comtech 0 0 Complete Y
Lunawada Mangal 0 0 Complete pending 22.12.20
Lunawada 13 31.12.20 3.1.21 Sadakpur 2.21 Mangal 0 0 Complete R & B Road expansion, route damaged 10/11, 6/1/2 20.12.20
Lunawada Mangal 0 0 Complete R & B Road expansion, route damaged 11/1, 1 fault complete
Lunawada 13 4.11.20 31.12.20 Untadi 2.20 Mangal 0 0 Complete 15M cut at culvert. By 15/1, 7 -8 culvert multiple cut
Balasinor Comtech 0 0 Complete ok pending
Balasinor 23 3.11.20 1.1.21 Balasinor 2.19 Comtech 0 0 Complete ok
Lunawada Mangal 0 0 Complete R & B expansion, JIO. By 20/1, 250 M 96f & 48Fdamapending
Lunawada 13 2.11.20 1.1.21 7.1.20 Kothamba 2.18 Mangal 0 0 Complete restoration by 15/1, 900 M damage, 10M damage by AT done with PP
Shehera Mangal 0 0 Complete pending
Shehera 17 1.11.20 2.1.21 Morvarena 2.17 Mangal 0 0 Complete Y offered
Godhra Mangal 0 0 Complete complete
Godhra 24 31.10.20 2.1.21 Timba Road 2.16 Mangal 0 0 Complete AT done with PP
Kaalol Shivranjani 0 0 Complete Sansoli to timba splicing pending complete
Kaalol 25 1.11.20 3.1.21 Sansoli 2.15 Shivranjani 0 0 Complete Y AT done with PP
Kaalol Shivranjani 0 0 Complete complete
Kaalol 25 2.11.20 3.1.21 Derol 2.14 Shivranjani 0 0 Complete Y AT done with PP
Halol Karvy 0 0 complete ok pending
Halol 26 5.11.20 4.1.21 Halol 2.13 Karvy 0 0 complete ok
Halol Karvy 0 0 Complete ok pending
Halol 26 8.11.20 4.1.21 Rameshra 2.12 Karvy 0 0 Complete ok Y
JAMBUGHODA Karvy 0 0 Complete ok complete
JAMBUGHODA 27 9.11.20 5.1.21 Jambughoda 2.11 Karvy 0 0 Complete ok
Halol Karvy 6.8 7 Pending Santury Forest 10/10/20, 15/1 pending 27.12.20
Halol 26 5.1.21 9.1.20 Shivraj 2.10 Karvy 0 3 Pending Santury Forest 10/10/20, 11/1 27.12.20
Halol Karvy 0 0 Complete ok pending
Halol 26 3.11.20 5.1.21 Ranjeetnagar 2.09 Karvy 0 0 Complete ok Y
Ghoghamba Karvy 0 0 Complete ok complete
Ghoghamba 2 2.11.20 5.1.21 Goghamba 2.08 Karvy 0 0 Complete ok Y
Ghoghamba Mangal 0 0 Complete complete
Ghoghamba 2 1.11.20 6.1.21 Adadra 2.07 Mangal 0 0 Complete Y
Kaalol Shivranjani 0 0 Complete R & B expansion complete
Kalol 25 31.10.20 6.1.21 Vejalpur 2.06 Shivranjani 0 0 Complete Y AT done with PP
Godhra Mangal 0 0 Complete complete
Godhra 24 30.10.20 6.1.21 Godhra Main 2.05 Mangal 0 0 complete Rly Xng BRC-134, Permission recd 10/10/20, conn
Godhra Mangal 0 0 Complete pending
Godhra 24 4.11.20 6.1.21 10.1.21 Chabbanpur 2.04 Mangal 0.5 3 Pending NH47, 30/10/20, Very hard strata 1.5-2 Km, open tre 30.12.20
Godhra Karvy 4 10 Pending NH47, Railway crossing RTM 173, 10/10/20 pending
Godhra 24 7.1.21 10.1.21 Santrod 2.03 Karvy 0 0 Complete
LIMKHEDA Karvy 13 13 Pending NH47, RTM 28 Rly crossing, permission pending10 pending
LIMKHEDA 7 7.1.21 10.1.21 Piplod 2.02 Karvy 0 0 Complete
devgadhbariya Karvy 1.5 7 Pending NH47 xng to reapply , 10/10/20 pending
devgadhbariya 1 Devgadhbariya 2.01 Karvy
Sl. No. From To Approx Distance
1 Devgadhbariya OLT Dhanpur OLT 3.5 Km
(Nanikhajuri GP T point) (Rampur GP)
2 Rinchhwani OLT Godhra Main OLT 5 Km (Rinchwani OLT in Ring 1
(Damanvav GP) (Chariya GP) & Godhra Main OLT in Ring 2)

3 Galteshwar TC Timba Road OLT 100 M


(Kothda T Point)

4 Katwara OLT Path Dahod (Gamla GP) 150 M


5 Kothamba OLT (Palam Viraniya OLT 1.6 Km (Kothamba OLT in Ring
Palla GP) 2 & Viraniya OLT in Ring 1)
Metod of
OLTs Path to avoid Reason to avoid connectivity
Bhikapur OLT to Dhanpur OLT Path in Wildlife Santury Temporary aerial
Second OLT
Devgadhbariya OLT, Piplod OLT, OLT path NHAI 47 crossing & open Temporary aerial
Santrod & Chabbanpur OLT trench permission awaited, Railway
crossing permission awaited.
Shivraj OLT & Sadakpur OLT OLT Path in Wildlife Santury of Shivraj Temporary aerial
OLT, OLT path of Sadakpur OLT
damaged in Road expansion
Rancharda OLT to Dahod OLT Railway Crossing permission pending Temporary aerial
Lunawada OLT path Damaged in Road expansion Temporary aerial
devgadhbar 1
Ghoghamb 2
Jetpur Pavi 3
Dhanpur 4
Dahod 5
GARBADA 6
Limkheda 7
Jhalod 8
Sanjeli 9
Fatepura 10
Santrampu 11
Kadana 12
Lunawada 13
KHANPUR 14
Malpur 15
Morvahada 16
Shehera 17
Bayad 18
MEGHRAJ 19
Bhiloda 20
Modasa 21
Dhansura 22
Balasinor 23
Godhra 24
Kaalol 25
Halol 26
JAMBUGH 27
Kalol 28
T&D Blowing
OLT Ring OSP pending Pending Status
P T Kher 0 0 complete
Bhikapur 1.49 P T Kher 0 0 complete
Karvy Z52 17.5 17.5 Pending
Dhanpur 1.48 Karvy Z52 0 0 complete

T&D Blowing
OLT Ring OSP pending Pending Status

Devgadhbariya 2.01 Karvy 52 1.5 7 Pending


Karvy 52 0 0 Complete

Piplod 2.02 Karvy Z52 13 13 Pending


Karvy Z42 0 0 Complete

Santrod 2.03 Karvy Z42 9 10 Pending

T&D Blowing
OLT Ring OSP pending Pending Status
Karvy 0 0 Complete
Ranjeetnagar 2.09 Karvy 0 0 Complete
Karvy Z42 4 8.5 Pending
Shivraj 2.10 Karvy Z42 5.5 5.5 Pending
Karvy 0 0 Complete
Jambughoda 2.11 Karvy 0 0 Complete
Remarks

Santury Forest & ECO. DN in process at GNG.

Remarks
NH47 xng & open trench permission awaited, file at
GNG

NH47 open trench permission awaited, file at NHAI RO


GNG, RTM 28 Rly crossing pending, permission recd
on 10.12.20

NH47 open trench permission awaited, file at NHAI RO


GNG, RTM 173 crossing pending permission avl

Remarks

Santury Forest & ECO. DN in process at GNG.


Santury Forest & ECO. DN in process at GNG.