A END B END
Blow Blow A END T&D B END T&D A END B END A END T&D B END T&D A END
(SUM (SUM (M) (M) Blow (M) Blow (M) (M) (M) Blow (M)
KM) KM)
0 0
0 0
0 0
0 0 197
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
2 0 150 2000
0 0
07 12.07 13.07
B END A END T&D B END T&D A END B END A END T&D B END T&D A END B END
Blow (M) (M) (M) Blow (M) Blow (M) (M) (M) Blow (M) Blow (M)
0 0 0 0
142
100
14.07 15.07 16.07
A END T&D B END T&D A END B END A END T&D B END T&D A END B END A END
(M) (M) Blow (M) Blow (M) (M) (M) Blow (M) Blow (M) T&D (M)
9753 0 0 0 2839
253
16.07 17.07 18.07
B END A END B END A END B END A END B END A END B END A END
T&D (M) Blow (M) Blow (M) T&D (M) T&D (M) Blow (M) Blow (M) T&D (M) T&D (M) Blow (M)
8.07 19.07 20.07
Lunawada to untadi road expansion, Untadi to umbhran by 30/9 , Umbhran to Gabat 30/9
complete
complete
complete
complete
complete
pending
pending
pending
complete
complete
complete
complete
complete
complete
complete
complete
Rly Xng BRC-134, Permission recd 30/9/20
pending
NH47, 30/9/20
NH47, Railway crossing RTM 45, 10/10/20 pending
Chhota Udaipur DC
2 2.1 PaviJetpur -0.217 29.228
Office
T&D Blowing
SDC
S No From To Pending Pending
Route
(Kms) (Kms)
P.Forest
Verbally
Managed &
Railway crossing permission
work is
available (WR-BRC-2019-126). 3 Km
5 15-Jul-20 Yes going on.
sanctuary Forest permission
Hard copy
awaited.
application is
submitted at
zonal office.
1 15-Jul-20 No
01 no of
Permission
received and
planning to
execution on
ground. 2nd
Railway crossing permission offline
2 15-Jul-20 Yes
available. (WR-BRC-2019-151) permission
& JV done
with railway
authority
permission
received
shortly.
Survey done
Railway crossing permission
1 15-Jul-20 Yes & Permission
Pending. (WR-BRC-2019-153) is awaited.
Survey done
Railway crossing permission
1 15-Jul-20 Yes & Permission
Pending. WR-BRC-2019-136 is awaited.
1 15-Jul-20 No
Railway crossing permission
1 15-Jul-20 No
received. (WR-BRC-2019-137)
0 15-Jul-20 No
Railway crossing permission Pending. wr-brc-2019-
1 15-Jul-20 (WR-BRC-2019-138). 1 Railway crossing Yes 138, Survey
pending & its Survey pending. Pending.
Dehgam NP
Dehgam Nagarpalika permission
1 15-Jul-20 Yes Verbally
pending.
managed.
Gandhinaga
Protected forest in Gandhinagar. r Route
Applied. Forest Permission required. survey
2 15-Jul-20 Yes
Dehgam NagarPalika permission aligned, Plan
reqd to joint
survey.
ROW
No of Patches of Traget Date of ROW Current
Challenges Affected
Pending T&D Completion Status
YES/NO
Himatnagar Intracity , P. Forest, RW
3 30-Jul-20 will be apply pending due to route OSP raise
Yesmail tomorrow for route changes.
changes.
Himatngar Intracity, RW will be apply
2 30-Jul-20 pending due to route changes. Yes
9 2.1 Galteshwar Desar 0 0 Complete WR-BRC-2019-137 railway crossing permission recd. Crossing done Sanjay
2 bridge crossing pending, JIO issue 24.8.20 26.8.20 600M desar city area with multiple utilities T & D pending.
6 2.1 Waghodia Dabhoi 0 0 Complete WR-BRC-2019-153 Survey Pending, crossing done. Gas line crossing. Rohit
3 bridge clamping done. Splicing WIP, 5/9/20, in building wip
3 Railway crossing. Railway permission recd. Drg pending Railway
5 2.1 Dabhoi Sankheda 0 0 Complete road inside the city. City area 2 Km railway property. 3 railway Rohit
crossing done
Bridge crossing done. HDD WIP by 5/9/20 30.8.20
Chhota Udaipur DC
2 2.1 PaviJetpur 0 0 Complete Intercity work, Nagarpalika area. Vernier HDD m/c required Vinod
Office
1 bridge crossing, HDD wip
P.Forest Verbally Managed & work is going on. Hard copy application
1 2.1 Chhota Udaipur DC Office Devgadh Baria 0 0 22-Sep-20 shyam
is submitted at zonal office. Railway crossing done. Farmer issue
6 Bridge, 6 crossing done. blowing by 23.8.20, splicing wipdone 2 mcs, 21.8.20 19.8.20 20.8.20 19.8.20 to 23.8.20
T&D
S No SDC Route From To Route Scope
Length
(Kms)
otected
ar T & Dforest
by 2/9,
permission
Yes
2HDD WIP,
recd,
blowing
Plan to4/9,
joint
1 blowing
survey. Sabarmati
m/c Naresh/
wip, inGas
building
Kishan
line managed,
pending, splicing
2HDD working
wip, 500 M protected forest in anodiy
2 JCB,Yes
1 HDD wip, T & D by 10/9/20 and complete
3 JCB,by1 10/9/20
Breaker, 1 HDD. Forest has stopped the work
otected forest in anodiya, 6 Bridge, 300 M Sabarmati Gas crossing. By 5/9/20.
T&D Blowing Traget Date
S No SDC Route From To Pending Pending of
(Kms) (Kms) Completion
Chhota
12 2.1 PaviJetpur Udaipur DC 3 3 20-Aug-20
Office
Railway crossing permission available P.Forest & ECO zone Verbally Managed & work is going
(WR-BRC-2019-126). 3 Km sanctuary on. Hard copy application is submitted at zonal office.
Forest permission awaited. 6 Bridge (WR-(BRC-2019-126) Railway crossing done.
Bridge crossing status
licing pending
CP pending
g Pending
Block Block No. OLT Ring OSP T & D pending Blowing Pending Status Remarks ALL GP lit OLT AT status
devgadhbariya
devgadhbariya 1 done done Devgadh Bariya Karvy 0 0 complete SDC route termination pending
Ghoghamba Karvy 0 0 complete complete
Ghoghamba 2 done done Rinchwani 1.50 karvy 0 0 complete
Jetpur Pavi P T Kher 0 0 complete complete
Jetpur Pavi 3 done done Bhikapur 1.49 P T Kher 0 0 complete Y
Dhanpur Karvy 1.5 4.5 Pending Santury Forest in (file 4929) GNG, ECO (file 4958) Pending 15 days after getting per
Dhanpur 4 31.12.20 8.1.21 7.1.20 Dhanpur 1.48 Karvy 0 0 complete Y Offered
Dhanpur Karvy 0 0 complete OFC cut due to R & B expansion 15 cut, complete
Dhanpur 4 1.1.21 8.1.21 10.1.21 Bhorva 1.47 Karvy 0 0 complete
Dahod Mangal 0 0 complete ok complete
Dahod 5 1.1.21 7.1.21 Jesawada 1.46 Mangal 0 0 complete ok
GARBADA Karvy 0 0 complete complete
GARBADA 6 2.11.20 7.1.21 Garbada 1.45 Karvy 0 0 complete Offered
Garbada Mangal 0 0 complete ok complete
Garbada 6 3.11.20 7.1.21 Katwara 1.44 Mangal 0 0 complete Ok OTDR by 17/1 Y Offered
Dahod Mangal 0 0 complete Ok OTDR by 17/1 Pending
Dahod 5 4.11.20 6.1.21 Rancharda 1.43 Mangal 0 0 complete ok
Dahod 10.1.20 Mangal 0.2 2.2 Pending 2 Nos. Rly crossing RTM 107 (applied, survey lette Pending 25.12.20
Dahod 5 5.11.20 6.1.21 8.1.20 Dahod 1.42 Mangal 0.6 1.2 Pending NH47, Complete by 20/10/20, NHAI issue, 30/10/20,
Limkheda Mangal 0 0 complete ok Pending
Limkheda 7 6.11.20 6.1.21 Kamboi 1.41 Mangal 0 0 complete ok 25.12.20
Limkheda Mangal 0 0 complete Splicing pending by 16/1 Pending
Limkheda 7 7.11.20 5.1.21 Singapore 1.40 Mangal 0 0 complete ok, OTDR by 15/1 Y
Dahod Mangal 0 0 complete ok, OTDR by 15/1 Pending
Dahod 5 8.11.20 5.1.21 Chosala 1.39 Mangal 0 0 complete ok
Jhalod Mangal 0 0 complete 50M damage by culvert expansion. 48OFC damagedPending
Jhalod 8 8.11.20 5.1.21 Limdi 1.38 Mangal 0 0 complete ok, OTDR by 12/1 Y
Jhalod Mangal 0 0 complete ok, OTDR by 12/1 complete
Jhalod 8 9.11.20 4.1.20 Zalod 1.37 Mangal 0 0 complete Y
Limkheda Mangal 0 0 complete Multiple cuts due to water line 10/10 Pending
Limkheda 7 10.11.20 4.1.20 Singvad 1.36 Mangal 0 0 complete
Sanjeli Mangal 0 0 complete complete
Sanjeli 9 11.11.20 4.1.20 Sanjeli 1.35 Mangal 0 0 complete jointing pending, 22/10, 1200M damage by forest bo
Fatepura Mangal 0 0 complete ok Pending
Fatepura 10 12.11.20 3.1.20 Sukhsar 1.34 Mangal 0 0 complete ok Offered
Fatepura Mangal 0 0 complete cut restoration by 11/1 complete
Fatepura 10 13.11.20 3.1.20 Fatepur 1.33 Mangal 0 0 complete ok Y AT done with PP
Fatepura Mangal 0 0 complete 200M 48OFC damge. By 11/1 complete
Fatepura 10 14.11.20 2.1.21 Balaya 1.32 Mangal 0 0 complete OTDR given Y Offered
Santrampur Comtech 1.7 2.5 Pending R & B issue, blowing by 20/8/20, 27/9. by 15/1/21 Pending
Santrampur 11 15.11.20 2.1.21 10.1.21 Ukhreli 1.31 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd
Santrampur Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd Pending
Santrampur 11 16.11.20 1.1.21 Santrampur 1.30 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd, cut 20M patch 1
Kadana Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd complete
Kadana 12 17.11.20 1.1.21 Divda 1.29 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd
Lunawada Mangal 0 0 complete feeder path R & B road expansion Issue, by 15/10, Pending
Lunawada 13 18.11.20 31.12.20 5.1.20 Malekpur 1.28 Mangal 0 2 complete complete 25.12.20
KHANPUR Comtech 0 0 complete splicing pending after road crossing, by 14/1 Pending
KHANPUR 14 19.11.20 31.12.20 7.1.20 Velanwada 1.27 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd Y
Kadana Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd complete
Kadana 12 20.11.20 30.1.2.20 7.1.20 Ditwas 1.26 Comtech 0 0 complete R & B Road expansion still going on. Again cut 9/1. A Y
KHANPUR Mangal 0 0 complete R & B expansion work in progress. 500 M cut. Pending
KHANPUR 14 21.11.20 30.1.2.20 Beliya 1.25 Mangal 0 0 complete
Malpur 14.1.21 Mangal 3.4 5 Pending P. Forest, R Forest application to be done on line 2 Pending 30,12,20
Malpur 15 22.11.20 29.12.20 6.1.21 Helodarl 1.24 Mangal 0 0 complete 30,12,20
Khanpur Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd, 1 cut Pending
Khanpur 14 23.11.20 29.12.20 Limdia 1.23 Comtech 0 0 complete OTDR by 11/1/21, OTDR m/c reqd
Lunawada Mangal 0 0 Pending joint pending by 10/1/21 Pending 20.12.20
Lunawada 13 24.11.20 28.12.20 4.1.21 Chavdinamuvada 1.22 Mangal 0 0 complete OTDR by 10/1
SANTRAMPUR Comtech 0 0 complete splicing in progress. OTDR by 10/1 Pending
SANTRAMPUR 11 25.11.20 28.12.20 Chuthanamuvada 1.21 Comtech 0 0 complete Y
SANTRAMPUR Comtech 0 0 complete complete
SANTRAMPUR 11 26.11.20 28.12.20 Doli 1.20 Comtech 0 0 complete Y
Morvahadaf Karvy 0 0 complete complete
Morvahadaf 16 27.11.20 27.1.2.20 Mora 1.19 Karvy 0 0 complete Mora to Morvahadaf Y
Morvahadaf Karvy 0 0 complete complete OTDR recd on 14.8.20
Morvahadaf 16 28.11.20 27.12.20 Morvahadaf 1.18 Karvy 0 0 complete Y
Shehera Mangal 0 0 complete complete
Shehera 17 29.11.20 27.12.20 1.1.21 Sureli 1.17 Mangal 0 0 complete Offered
Shehera Mangal 0 0 complete complete
Shehera 17 30.11.20 26.12.20 Shehra 1.16 Mangal 0 0 complete
Lunawada Mangal 0 0 complete complete
Lunawada 13 1.12.20 26.12.20 3.1.21 Viraniya 1.15 Mangal 0 0 complete
Lunawada Mangal 0 0 complete Lunawada to viraniya damaged by Nagarpalika wo complete
Lunawada 13 2.12.20 26.12.20 Lunawada 1.14 Mangal 20 25 complete lunawada-untadi 10.5 km-umbhran-5 km-gabat, Umbh Lunawada to untadi road Y
Bayad Comtech 0 0 complete Pending
Bayad 18 11/4/2020 25.12.20 30.12.20 Gabat 1.13 Comtech 0 0 complete Y
Malpur Mangal 0 0 complete 70M affected Pending
Malpur 15 11/3/2020 Umbhran 1.12 Mangal 0 0 complete Y Offered
Malpur Comtech 0 0 complete Pending
Malpur 15 11/2/2020 Satarda 1.11 Comtech 0 0 complete Y
Malpur Comtech 0 0 complete GSRDC issue, by 25/8, 4/10 by 28/10, local person Pending
Malpur 15 11/1/2020 Malpur 1.10 Comtech 0 0 complete by 25/8, by 10/10, by 28/10, 12/11
MEGHRAJ Mangal 0 0 complete R Forest, by 8/10 Pending
MEGHRAJ 19 10/31/2020 Meghraj 1.09 Mangal 0 0 complete P Forest, compl by 13/10, 27/10, Splicing wip 30/10
MEGHRAJ Mangal 0 0 complete compl by 15/10, Farmers, 30/10, 10/11, cut at 2 loca Pending
MEGHRAJ 19 10/30/2020 Kasana 1.08 Mangal 0 0 complete
MEGHRAJ Mangal 0 0 complete OTDR by 12/8/20 Pending
MEGHRAJ 19 10/29/2020 Tarakwada 1.07 Mangal 0 0 complete Local Farmer issue 10/10/20, 27/10, 20/11, 28/11
Bhiloda shivranjani 0 0 complete PendingOTDR received (Shivranjani)
Bhiloda 20 10/26/2020 Degamda 1.06 shivranjani 0 0 complete Y Offered
Bhiloda shivranjani 0 0 complete complete
OTDR received (Shivranjani)
Bhiloda 20 10/25/2020 Palla 1.05 shivranjani 0 0 complete Y Offered
Bhiloda shivranjani 0 0 complete complete
OTDR received (Shivranjani)
Bhiloda 20 10/24/2020 Takatuka 1.04 shivranjani 0 0 complete Y Offered
Bhiloda shivranjani 0 0 complete complete
Bhiloda 20 10/23/2020 Kishangadh 1.03 shivranjani 0 0 complete Y AT done with PP
Bhiloda shivranjani 0 0 complete complete
OTDR received (Shivranjani)
Bhiloda 20 10/22/2020 Kheradi 1.02 shivranjani 0 0 complete Y Offered
Modasa Comtech 0 0 complete complete
Modasa 21 20.10.20 Sardoi 1.01 Comtech Y Offered
Modasa
Modasa 21 Sardoi Comtech 0 0 Complete
Modasa Mangal 0 0 complete pending
Modasa 21 24.10.20 Dadhaliya 2.29 Mangal 3 5 complete
Modasa Comtech 0 0 Complete pending
Modasa 21 25.10.20 Modasa 2.28 Comtech 0 0 Complete
Modasa Mangal 0 0 Complete pending
Modasa 21 26.10.20 Limbhoi 2.27 Mangal 0 0 Complete
Dhansura Comtech 0 0 Complete complete
Dhansura 22 27.10.20 Dhansura 2.26 Comtech 0 0 Complete Y
Dhansura Comtech 0 0 Complete complete
Dhansura 22 28.10.20 Akrund 2.25 Comtech 0 0 Complete Y
Bayad Comtech 0 0 Complete complete
Bayad 18 29.10.20 Ambaliyara 2.24 Comtech 0 0 Complete Y
Bayad Comtech 0 0 Complete complete
Bayad 18 30.10.20 Demai 2.23 Comtech 0 0 Complete Y
Bayad Comtech 0 0 Complete complete
Bayad 18 31.10.20 Sathamba 2.22 Comtech 0 0 Complete Y
Lunawada Mangal 0 0 Complete pending 22.12.20
Lunawada 13 31.12.20 3.1.21 Sadakpur 2.21 Mangal 0 0 Complete R & B Road expansion, route damaged 10/11, 6/1/2 20.12.20
Lunawada Mangal 0 0 Complete R & B Road expansion, route damaged 11/1, 1 fault complete
Lunawada 13 4.11.20 31.12.20 Untadi 2.20 Mangal 0 0 Complete 15M cut at culvert. By 15/1, 7 -8 culvert multiple cut
Balasinor Comtech 0 0 Complete ok pending
Balasinor 23 3.11.20 1.1.21 Balasinor 2.19 Comtech 0 0 Complete ok
Lunawada Mangal 0 0 Complete R & B expansion, JIO. By 20/1, 250 M 96f & 48Fdamapending
Lunawada 13 2.11.20 1.1.21 7.1.20 Kothamba 2.18 Mangal 0 0 Complete restoration by 15/1, 900 M damage, 10M damage by AT done with PP
Shehera Mangal 0 0 Complete pending
Shehera 17 1.11.20 2.1.21 Morvarena 2.17 Mangal 0 0 Complete Y offered
Godhra Mangal 0 0 Complete complete
Godhra 24 31.10.20 2.1.21 Timba Road 2.16 Mangal 0 0 Complete AT done with PP
Kaalol Shivranjani 0 0 Complete Sansoli to timba splicing pending complete
Kaalol 25 1.11.20 3.1.21 Sansoli 2.15 Shivranjani 0 0 Complete Y AT done with PP
Kaalol Shivranjani 0 0 Complete complete
Kaalol 25 2.11.20 3.1.21 Derol 2.14 Shivranjani 0 0 Complete Y AT done with PP
Halol Karvy 0 0 complete ok pending
Halol 26 5.11.20 4.1.21 Halol 2.13 Karvy 0 0 complete ok
Halol Karvy 0 0 Complete ok pending
Halol 26 8.11.20 4.1.21 Rameshra 2.12 Karvy 0 0 Complete ok Y
JAMBUGHODA Karvy 0 0 Complete ok complete
JAMBUGHODA 27 9.11.20 5.1.21 Jambughoda 2.11 Karvy 0 0 Complete ok
Halol Karvy 6.8 7 Pending Santury Forest 10/10/20, 15/1 pending 27.12.20
Halol 26 5.1.21 9.1.20 Shivraj 2.10 Karvy 0 3 Pending Santury Forest 10/10/20, 11/1 27.12.20
Halol Karvy 0 0 Complete ok pending
Halol 26 3.11.20 5.1.21 Ranjeetnagar 2.09 Karvy 0 0 Complete ok Y
Ghoghamba Karvy 0 0 Complete ok complete
Ghoghamba 2 2.11.20 5.1.21 Goghamba 2.08 Karvy 0 0 Complete ok Y
Ghoghamba Mangal 0 0 Complete complete
Ghoghamba 2 1.11.20 6.1.21 Adadra 2.07 Mangal 0 0 Complete Y
Kaalol Shivranjani 0 0 Complete R & B expansion complete
Kalol 25 31.10.20 6.1.21 Vejalpur 2.06 Shivranjani 0 0 Complete Y AT done with PP
Godhra Mangal 0 0 Complete complete
Godhra 24 30.10.20 6.1.21 Godhra Main 2.05 Mangal 0 0 complete Rly Xng BRC-134, Permission recd 10/10/20, conn
Godhra Mangal 0 0 Complete pending
Godhra 24 4.11.20 6.1.21 10.1.21 Chabbanpur 2.04 Mangal 0.5 3 Pending NH47, 30/10/20, Very hard strata 1.5-2 Km, open tre 30.12.20
Godhra Karvy 4 10 Pending NH47, Railway crossing RTM 173, 10/10/20 pending
Godhra 24 7.1.21 10.1.21 Santrod 2.03 Karvy 0 0 Complete
LIMKHEDA Karvy 13 13 Pending NH47, RTM 28 Rly crossing, permission pending10 pending
LIMKHEDA 7 7.1.21 10.1.21 Piplod 2.02 Karvy 0 0 Complete
devgadhbariya Karvy 1.5 7 Pending NH47 xng to reapply , 10/10/20 pending
devgadhbariya 1 Devgadhbariya 2.01 Karvy
Sl. No. From To Approx Distance
1 Devgadhbariya OLT Dhanpur OLT 3.5 Km
(Nanikhajuri GP T point) (Rampur GP)
2 Rinchhwani OLT Godhra Main OLT 5 Km (Rinchwani OLT in Ring 1
(Damanvav GP) (Chariya GP) & Godhra Main OLT in Ring 2)
T&D Blowing
OLT Ring OSP pending Pending Status
T&D Blowing
OLT Ring OSP pending Pending Status
Karvy 0 0 Complete
Ranjeetnagar 2.09 Karvy 0 0 Complete
Karvy Z42 4 8.5 Pending
Shivraj 2.10 Karvy Z42 5.5 5.5 Pending
Karvy 0 0 Complete
Jambughoda 2.11 Karvy 0 0 Complete
Remarks
Remarks
NH47 xng & open trench permission awaited, file at
GNG
Remarks