Contactor: Stage: Completion Date:: Page 1 of 2
Contactor: Stage: Completion Date:: Page 1 of 2
Cat: 3
Besides the information discussed in the following, it is assumed that 2 = Approved with comments / reviewed as noted
subjects and the document itself are at least in accordance with the
Contract specification. Approval or comment will not relieve the 3 = Not approved, rejected / returned for correction
Contractor from fulfilling his contractual obligations. 4 = For information only
Com. Doc. Revi- Predec Owner’s / Owner’s Engineer’s Comments Contractor’s Response / Conclusion
ID: Rev. ewer essor [Abbreviations: KE=K-Electric Ltd. (Owner); TEG = Tractebel Engineering GmbH (Owner’s Action
Engineer); NES = NESPAK (Owner’s Engineer); RE2 = Renewable Resources Ltd. (To be submitted together with
(Owner’s Engineer)] the revised/completed
documents)
1. 0 KE NIL Gantry elevation (1560mm Width) in E113S-LAN-T0303- Noted
06(1)_GZ-2(1)(R0)_A1 is wrongly marked as 3000m between
centre & top instead of 6000mm. HEI to rectify.
E113S-LAN-T0303-06(1)_GZ-2(1)(R0)_A1 中的龙门标高
(宽度 1560mm)被错误地标记为中心与顶部之间的 3000m 而不
是 6000mm。 HEI 整改。
2. 0 KE NIL Bolts / metal parts shall conform KE specifications in all aspects Noted and
including coating & protection. incorporated
3. 0 NES NIL Please refer to our comments on design calculation E113S-LAN- Noted
T0303-CS-01.
4. 0 NES NIL Please refer to comments on drawing # E113S-LAN-T0303-03. noted
5. 1 KE 1,2 Noted, closed
6. 1 NES 3 Please refer to our comments on design calculation E113S-LAN- Noted
T0303-CS-01.
2 NES 6 Please refer to our comments on design calculation E113S-LAN-
T0303-CS-01.
Page 1 of 2
900 MW BQPS-III Combined Cycle & Associated Projects, Pakistan
One behalf of the Owner On behalf of the Owner’s Engineer On behalf of the Contractor
Name:
Signature
:
Date: