Cleanouts Handout
Cleanouts Handout
Definition
A pipe fitting with a removable plug which provides
access for inspection or cleaning of the pipe run. 3. Changes of Direction
Also called an access eye or cleaning eye. Types Cleanouts shall be installed at each change
of cleanouts include a removable plug or cap, a of direction of the building drain or of horizontal
removable fixture trap and a water closet. waste or soil lines, which is greater than 45°.
Where more one change of direction occur s in a
Cleanout Material run of piping, only one cleanout shall be required
The body of cleanout ferrules shall be made of for each 40 ft. (12192 rnm) of developed length of
standard pipe sizes shall conform in thickness to the drainage piping. Access shall be provided to
that required for pipe and fittings of the same all cleanouts.
metal, and extended not less than 38 mm above
the hub. The cleanout cap or plug shall be of 4. Building Drain and Building Sewer Junction
heavy red brass of not less than 3.175 mm thick There shall be a cleanout at the junction of the
and must be provided with raised nut or recessed building drain and building sewer. The cleanout
socket for removal. shall be either inside or outside the building wall
and shall be brought up to the finished ground
Locations of Cleanouts level or to the basement floor level. The cleanout
1. At the upper end of every horizontal waste at the junction of the building drain and building
or soil pipe. sewer shall not be require if the cleanout on a 3-
2. At every change in direction of horizontal inch or larger diameter vertical soil stack is located
soil or waste piping when the change of within 10 ft. (3048 mm) of the building drain and
direction is more than twenty-two and one- building sewer connection.
half (22 1/2°) degrees.
3. At a point within 1.5 m inside the property 5. Underground Drainage
line before house sewer connection. Cleanout for an underground drain or sewer shall
4. At the foot of every soil or waste stacks extend to the ground floor or floor level.
unless easily reached conveniently with
sewer rod or wire. 6. Concealed Piping
5. At every 15 m. run of horizontal soil or Cleanout on concealed piping shall extend through
waste piping. and terminate flushed with the finished wall or
6. On top of septic vaults immediately above floor. Pits or chases, sized to permit removal of
the invert of the submerged inlet and cleanout plug and cleaning of the system, shall be
outlet of sanitary tees. incorporated in the wall or floor.
7. On top of every grease trap with no
removable airtight covers. 7. Direction of Flow
8. At the end of the invert of a garage trap. Every cleanout shall be installed to open in the
9. At the bottom of exposed fixture traps direction of the flow of the drainage pipe at right
below the water seal. angles thereto.
10. At openings or outlets and connections
intended for future use. Cleanout clearances
Cleanout on 6-inch and smaller pipes shall have a
Other Specific Applications clearance of not less than 18 inches (457 mm) for
rodding. Cleanouts on 8-inch and larger pipes
1. Horizontal drains within buildings shall have a clearance of not less than 36 inches
All horizontal drains 4 inches in diameter or less (914 mm) for rodding.
shall have cleanouts located not more than 50
ft'(15240 m) apart. All horizontal drains larger than 8. Access to Cleanouts
4 inches in diameter shall have access cleanouts Cleanout plugs shall not be covered with cement,
located not more than 100ft. (30480 mm) apart. plaster or any other permanent finish material.
Where necessary to conceal a cleanout plug, a
2. Building Sewers cover plate or access door shall be provided.
All building sewers shall have cleanouts located
not more 100 ft. (30480 mm) apart. 9. Prohibited Installation
Cleanout openings shall not be utilized for the
installation of new fixtures or floor drains, except
where approved and where another cleanout of
equal access and capacity is provided.