e) Below the verandah level in front verandah Cum 1 92.6 2.4 1.3 288.91
i) Slab above the back side verandah Cum 4 4.65 1.2 0.1 2.23 Taken Below
in IT
Flooring
j) Beam at 3m level Cum 1 246.08 0.3 0.2 14.76
k) Beam bend at 5.5m level Cum 1 246.08 0.3 0.3 22.15
l) Slab at 3m lvl of store rooms Cum 2 4.65 3.4 0.1 3.16
m) Plinth beam for Verandah Cum 0 95.2 0.3 0.5 0.00
n) Gable end top portion beam Cum 2 30.2 0.3 0.3 5.44 550.18
5 M-20 Concrete in C-1 from PL to Top Lvl Cum 4 0.3 0.3 3 1.08
C-2 Cum 44 0.4 0.6 5.5 58.08
C-3 Cum 10 0.4 0.6 5.5 13.20
C-4 Cum 4 0.4 0.6 5.5 5.28
Column of Gable portion Cum 2 0.4 0.6 14.35 6.89 84.53
6 Reinforcement Steel (To rectified) 10mm 12mm 16mm 20mm 8mm
a) Bottom Part of foundation-F1 11 21.12
Bottom Part of foundation-F2 22 55.706667
Bottom Part of foundation-F3 8 56.24
b) Pedestal/Col in foundation upto plinth-C1 11 15.4 18.09
C2 18 23.1 23.1 58.62
C3 8 30.8 45.70
C4 4 23.1 38.5 71.54
c) Plinth Beam-PB1 1 196.52 196.52 475.12
PB-2 1 1260.8 1533.78
Curtain Wall along with PB-2 1 2703 945.60
d)Lintel above door opening 4 20.58 18
e) Lintel above ventilator 22 6.86 7.2
f) Plinth Beam at Floor Level 0 0 0
g) 8mm dia 200mm c/c both ways in floor 79.5892 81.60
h) Beam at 3m level 1 881 900
b) Col in from Plinth to 3m-C1 11 14.4 17.02
C2 18 21.6 21.6 43.01
C3 8 28.8 43.01
PROPOSED WAREHOUSING AT SANKHEDI KALAPIPAL BHOPAL
Estimate For Construction of 5400 MT Capacity Godown (for 28.65mtr. Span)
MEASUREMENT SHEET
Sl No Description of Item Unit No. L B H Qty
C4 4 21.6 36 43.01
i) R/F for Rat Proof Course 1 577.56 342.08
j) Col from foundation level to plinth level 0 56.7 21.15
k) Plinth beam for Verandah 0 757 578.4
4049 4891.1467 3037 0 13174.34
0.617 0.89 1.57 2.47 0.40
2498 4353.1205 4768 0 5203.86
16823.13
TOTAL REINFORCEMENT TAKEN 50776.61
@80KG/Cum of concrete=
7 Shuttering for concrete
a) Bottom most part of Foundation-F1 SqM 22 1 1 0.3 26.40
Bottom most part of Foundation-F2 SqM 44 2.5 1.6 0.25 90.20
Bottom most part of Foundation-F3 SqM 10 2.5 1.6 0.25 20.50
b) Pedestal in foundation-Inclined Portion-F2 SqM 44 1.45 1 0.25 53.90
c) Wing Wall all along the Plinth Protection Cum 1 253.98 0.3 0.9 68.57
PROPOSED WAREHOUSING AT SANKHEDI KALAPIPAL BHOPAL
Estimate For Construction of 5400 MT Capacity Godown (for 28.65mtr. Span)
MEASUREMENT SHEET
Sl No Description of Item Unit No. L B H Qty
d) Brick work in verandah foundation Cum 18 5.05 0.9 0.25 20.45
e) Deductions for Doors Cum -6 2 0.3 2.4 -8.64
f) Deductions for Ventilators Cum -22 0.6 0.3 0.45 -1.78
303.29
9 Rolling Shutters
Doors SqM 10 2 2.4 48.00
48.00
9A Bearings for Rolling Shutter Nos 20 20.00 20.00
9B Springs for Rolling Shutter Nos 20 20.00 20.00
10 Plastering 1:5
a) 300mm thick brick work SqM 2 247.18 5.5 2718.98
b) Brickwork from Plinth Beam to floor SqM 2 247.18 0.9 444.92
c) Wing Wall all along the Plinth Protection SqM 2 255.18 0.9 459.32
d) Brick work in verandah foundation SqM 3 5.05 1.2 18.18
d) Deductions for Doors SqM -6 2 2.4 -28.80
e) Deductions for Ventilators SqM -22 0.6 0.6 -7.92
f)Brickwork 300mm thick above plinth beam Cum 1 248.6 0.3 74.58 3679.27
11 Ventilators
a) Ventilators SqM 40 0.6 0.6 14.40
14.40
12 Cement Paint
a) 300mm thick brick work SqM 2 244.1 5.5 2685.10
b) Brickwork from Plinth Beam to floor SqM 2 244.1 0.9 439.38
c) Wing Wall all along the Plinth Protection SqM 2 252.1 0.9 453.78
d) Brick work in verandah foundation SqM 3 0 1.2 0.00
d) Deductions for Doors SqM -6 2 2.4 -28.80
e) Deductions for Ventilators SqM -22 0.6 0.6 -7.92
f)Brickwork 300mm thick above plinth beam Cum 1 #REF! 0.3 #REF! #REF!
Base plates-6mm thick top and bottom Kg 216 Area= 0.0001 7850 228.91
Holding down bolt 20mm dia 0.3m length Kg 216 Area= 0.0003 0.3 159.73 1616.37
Holding down bolt at at top Kg
PROPOSED WAREHOUSING AT SANKHEDI KALAPIPAL BHOPAL
Estimate For Construction of 5400 MT Capacity Godown (for 28.65mtr. Span)
MEASUREMENT SHEET
Sl No Description of Item Unit No. L B H Qty
16 Profile Sheet in Roof and all along the
periphery
a) Roof SqM 1 95.39 31.7 3023.86
b) vertical sheeting all along the godown SqM 1 248.08 3 744.24
c) Gable portion of the side walls SqM 2 Area= 57.3 114.60
d) Verandah cover sheeting SqM 1 95.39 2.85 271.86
e) Extra sheeting on the back side door shades SqM 3 3 1.5 13.50
4168.06
.