Daqing Petroleum Iraq Branch HSE-MS record No.

22

Rig: Well:

Associated Permit No.: 工作许可号


Loacation/Area:
位置/区域
Date Of Elaboration:
Work/Job/Project (Contract No. )
合同号:
Crew:
Estimated Time Hours
Brief Descriptión (Work/Operation):BREAK OUT AND LAYING DOWN BHA 预计时间: 小时
工作描述:
N0. Activities Reason Of The Risk Prevention And Control Actions
序号 活动 风险产生原因 预防和控制措施

Gather Needed Handling Subs Dog Collars & Slip Hazards On Rig Floor & Trip Hazards Due To Store All Tools In Safe Area & Clean Floor
1 Tong Jaws If Needed Cluttered Work Area's Prior To Starting Bha Handling Procedure
Determine how BHA should be handled to Unecessary Steps . Crown Out . Discuss Steps & Recheck C.O.M.
2 come out of the hole to handle bit
Set In Slips & Install Collar Clamp - Install Pinch Point's In Tool Joint. Connection Struck By Use Stabbing Guide If Possible - Stay Out Of
Handling Sub & Torque To Proper Spec's Tongs - Snub Line Breaking - Muscle Strains Pinch Red Zone & Know Proper Torque - Use
3 Point On Collar Clamp Tugger To Lift Handling Tools Keep Hands
Clear Of Under Side Of Collar Clamp
Secure Tong's & Hoist Collar Clamp With Dropping Clamp - Muscle Strains While Removing Have Plenty Of Help & Use Proper Handles
4 Collar To Level Comfortable For Floor Crew To Clamp
Remove
Pull Slips & Hoist Stand Bushing's Pulling Up Due To Large Diameter Bha Driller To Know Sequence Of Bha Coming
Tools - Muscle Strains Pulling Slips Through Table Prior To Pulling Stand & Pull
5 At A Safe Speed - Use Three Men To Pull
Set Slips & Continue Sequence Of Tool Same As Above Same As Above
6 Removal Standing Back In Derrick With Mule
Or Winch
Once Bit Is Reached Make Sure Hole Is Full Of Well Control Situation - Muscle Strains Lifting Hole To Be Full - Use Tugger To Install
7 Fluid And Close In Bop Install Bit Breaker To Breaker Or Pinch Point's Between Breaker Handle Breaker If Needed
RotaryBit In Breaker Lock Rotary Install
Install &
BitRotary
could jump from breakers- pinch point tongs Set Adequate Weight On Bit Or Wray Tugger
8 Breakout Tongs & Break Bit Around Stand To Secure @ Rotary
Use Good Communication Between All Floor Keep Feet Clear Of Collar While Setting On Rack Follow Best Practice Procedures For Your
Members Derrickman & Driller. During Mule & Style Of Rig & Use Your Stop Principles
9 Winching Operations During Tool Set Back
Using the crane for rig down the BHA tools. Falling, pinch point, personal injury, Struck by V keep good comunication, use oly the colour
door and cause crash the equipment. cod equipment and inspict the sling and
shackles befor use, mke sure from the SWL
and the load weight, banks man to be stand
10 in the right positon and give the right signal to
the driver.
Using the lifting wire or soft sling Failur and drop Visual inspection for the lifting gare and wire
before use, make sure that its have SWL
lable.Plan every load, avoid anybody standing
or walking under the suspended load.Use tag
line to guide load at all time. Only one
particular signalman is giving signals to the
crane operator.
11

Executor Personnel 执行人员

Name 姓名 Signature Name 姓名 Signature 签字


签字

HSE Supervisor. Rig Manager:


Name: Name:
Signature: ____________
Signature: ____________