WHEELS AND TYRES FOR RAILWAYS

1
COMMITTED TO WHEELS

2
Railway wheels and tyres

KLW is the wheels brand of KLW is committed to providing all of the key mechanical and
global steel company Interpipe. the highest quality railway operational properties as well
Interpipe has more than wheels according to the as life cycle costs.
seventy years of experience in specifications and requirements
manufacturing railway wheels of the customer, corresponding Our product portfolio has
at the company’s renowned to strict international standards. developed rapidly over the
Interpipe NTRP mill in Our products are guaranteed years as our business has
Dnepropetrovsk, Ukraine. These by the quality control expanded globally. Now we
wheels are supplied to the and management system provide an extremely wide
customers worldwide through certified by TUV (Germany) range of railway wheels
sales company KLW Wheelco corresponding to the norms of and products to the highest
SA (Switzerland). With annual DIN EN ISO 9002. international requirements,
production of over 600,000 including tyres.
pieces, Interpipe NTRP has Quality control is enforced
a huge portfolio of over 200 at all stages of product
products. All the products have manufacturing – from steel
distinctive KLW stamp insignia. melting to the acceptance test
of wheels and tyres. Our focus
KLW global network is strong on reliability includes a wide
with clients in 60 countries range of measures including
on five continents. Years of reducing residual stress and 3
manufacturing and supply increasing durability as well
experience enable KLW as using mechanical, chemical
to compete successfully and metallographic control
everywhere where there is a measures in the Interpipe NTRP
major railway operation. As Central Laboratory.
our company has evolved we
have gained over forty years High levels of investment
of experience in partnership and R&D continue to bring
with railway operators in significant benefits across
countries as far afield as India the design, development and
and Australia as well as in production of our wheels. This
traditionally large markets like allows us to achieve the best
Germany and Russia. results for our customers across
Range of railway wheels and tyres
Wheels

Outside diam- Inside diameter Width Diameter Height Diameter of Thickness of Mass, kg
eter Ø d1, Ø d2 mm of rim H, mm of hub Ø d, mm of hub L, mm hole in hub Ø disk
Ø D, mm d0, mm t1, t2, mm
650-1269 600-1100 95-160 185-500 90-405 60-200 15-80 165-1050

Tyres

Outside diameter Inside diameter Width of rim Width of flange Mass, kg


Ø D, mm Ø d, mm Ø d, mm Ø h, mm
690-1300 550-1100 80-150 15-50 100-600
List of standards

The railway wheels and tyres are exported according to the


specifications and requirements of the Customer, the norms of
international standards, including:

AAR M 107/208 MOR-M-2001-2 TJZL 02-99


ASTM A504 NF EN 10228-3 TTS 094
ASTM A551 NF F 01-111 TTS 248
ASTM A551-81 NF F 01-115 UIC 810-1
BN 918277 NF F 01-131 UIC 812-1
BS 5892 part 4 NF F 01-33 UIC 812-3
BS 5892, part 3: 92 PN-84 UNI 6102
BS24 PN-84 H84027/06
IRS R 15-95 PN91/K91032
IRS R 3403 PN-92
IRS R 19-93, parts 1-5 PN-92/K91018 pr
ISO 1005 EN 13262
JIS E 5402 RSP #SM-55/2543
KRS 2242-2107 SNCB A-12
M4T 2000 TJZL 01-98
5

Quality Management System


ISO 9001-2000 AAR M-1003

Our approvals
AAR – Freight & Locomotive Wheels DB – Freight Car Wheels
DB – Locomotive Wheels PKP – Freight Car Wheels
Railtrack – Freight Car Wheels SZ - Freight & Locomotive Wheels
ÖBB - Freight Car Wheels BZ - Freight & Locomotive Wheels
Production facility
Interpipe NTRP

Railway wheels shop includes: In 2002 -2007 Interpipe profile line for railway wheels
z Forging-rolling line for invested in increase of machining. The automated line
production of wheels from production capacities by will include four RQQ machines,
650 to 1269 mm building new finishing and the complex of inter-machine
testing lines, mechanical equipment (systems for loading
z Forging-rolling for production
hardening (ultrasonic, magnetic and unloading of wheels).
of tyres
hardness testing, geometry The expected capacity of the
z Mechanical finishing floor control, mechanical operation). automated line, which has self-
z Heat treatment lines As a part of its strategic operated control for full profile
z Shot blasting line investment program, Interpipe railway wheel machining,
z Non-destructive testing has purchased equipment for is 100,000 finally machined
(ultrasonic, magnetic the installation of a new full wheels per year.
and hardness testing)
z Finishing line

Key facts:
1935 - the first railway wheel rolled off the 1979 - the company started to supply wheels
production line in starting one of the across Eastern Europe
most absorbing stories of modern 1987 - new purpose-built railway wheels and
industrial times tyres shop, which started to produce
1970 - Interpipe NTRP wheel shop produced railway tyres
its 10 millionth railway wheel just 35 1991 - the KLW brand entered the Indian
years after the first one had rolled off market
the production line 1996 - the first wheels were supplied in China
Steel Making Process

Steel for the production of finished metal equal to 0.010%


railway wheels and tyres is phosphorus – 0.015% and less,
melted in the open-hearth and uniform distribution of
furnaces with the charge of 250 another elements. Degassing
tons and tapping in two ladles. process is effected by means
High quality characteristics of removing the hydrogen,
of steel are provided by the nitrogen, oxygen dissolved in
subsequent processing at the metal at the vacuum degassing
out-of-furnace complex of steel set simultaneously with argon
treatment. The ladles with blowing. Hydrogen content in
metal are delivered in turn to steel is within the limits up to 2
the unit furnace-ladle, where ppm.
the metal finishing and refining
takes place. Steel blowing in
the ladle by argon along with
the refining process provide
for the sulphur content in the

7
The Technology of the Production of Railway Wheels
1 2 3 4

Open-hearth furnace Ladle Ladle-furnace Vacuum


degassing set
5 6 7 8

Bottom pouring Notching and breaking of Billets inspection Billets heating in the
ingot into initial billets and repairing rotary furnace
9 10 11 12

Hydroscaling of cinder Open forging on the Closed forging on the Punching on the press
press 20MN press 50MN 100MN
13 14 15 16

Wheel rolling on the Wheel calibration on the Intermediate cooling Cooling of the wheel
rolling mill press 35/8 MN and and anti-floking in open air
piercing of central hole isometric holding
17 18 19 20

Machining Wheels heating Rim quenching Tempering in pit in the


8 furnaces
21 22 23 24

Adjustable cooling CNC machining, Automated non-destruc- Wheels inspection and


imbalance checking tive control (ultrasonic measuring, hardness
test, magnetic particle determination
inspection etc)
25 26

Testing of mechanical Storage


and other properties
on the samples
The Technology of the Production of Railway Tyres
1 2 3 4

Open-hearth furnace Ladle Ladle-furnace Vacuum


degassing set
5 6 7 8

Bottom pouring Notching and breaking of Billets inspection Billets heating in the
ingot into initial billets and repairing rotary furnace
9 10 11 12

Hydroscaling of cinder Open forging on the Weighing Punching and


press 20MN closed piercing
13 14 15 16

Piercing Rolling on one Marking Hot dressing


or two mills
17 18 19 20

Thermal treatment Non-destructive control Selection of the samples Inspection and measur-
(anti-flocking, hardening (hardness, ultrasonic and holding of all testing ing
with tempering test) on the samples 9
or normalizing)
21

Storage
Products Quality Control

High quality characteristics of z Control of the chemical z Metal testing for


the products corresponding composition of raw- elongation is realized at the
to the requirements of materials, steel during machine UTS-600-1 with
international standards, are melting process, ready microcomputer control and
guaranteed by the system rolled-stock is effected on automatic registration of
of quality control and the spectrometers “Polyvac parameters and printing-out
management certified by 2000” type of the results
the firm TÜV (Germany) for z Control of hydrogen content z Pendulum testing impact
correspondence to the norms in liquid steel is effected machine Psd 50/15 of “Wpm
of DIN EN ISO 9002. before and after vacuum Werkstoffprufmaschinen
Quality control is effected degassing using sound GmbH” company is used
at all the stages of product determination by “HYDRIS” to determine the impact
manufacturing – from steel device of company “Heraeus strength of steel
melting to the acceptance test Elecro-Nite”
z The determination of steel
of the wheels and tyres: z Control of nitrogen, oxygen, toughness K1C according
hydrogen content is to the ASTM-E 300 is
performed at the devices effected on the universal
PH-402 and TS-236 of the computerized testing
firm “Leco” machine “Hydropuls Sinus
10
z 100% automated Ultrasonic 250” by company “Carl
test as well as magnetic Schenk”
particle of ready products,
z By the request of the
is effected to determine the
customers the testing of
presence of internal defects
wheels and tyres by the
inspection
falling weight or static
z Control of the hardness compression, as well as
on the rim surface of the the control of micro – and
wheels and tyres is realized macro structure and nature
during the production using of stresses are made by the
durometer of “EMCO” up-to-date methods
company
11

Countries supplied to:


Argentina Croatia Kenya Romania Turkey
Armenia Egypt Kirghizstan Russia Turkmenistan
Australia Finland Korea, North South Africa Ukraine
Austria France Korea, South Slovakia United Kingdom
Azerbaijan Georgia Latvia Slovenia Uruguay
Bangladesh Germany Lithuania Spain USA
Belgium Greece Macedonia Sri-Lanka Uzbekistan
Brazil Hungary Malaysia Sweden Vietnam
Bulgaria India Mauritania Switzerland Yugoslavia
Byelorussia Indonesia Moldova Tajikistan Zambia
Canada Iran Poland Tanzania
Chile Italy Netherlands Thailand
China Kazakhstan Norway Tunisia
12

SETTING THE WORLD IN MOTION

12, V i a G e n e r a l e G u i s a n , P.O. B ox 361


C H - 69 02 P a r a d i s o - L u g a n o, Sw i t ze r l a n d
P h o n e +41 91 98 6 5850 Fa x +41 91 98 6 5851
E- m a i l: i n fo @ k l w. b i z
w w w. k l w. b i z