PRE-CONSTRUCTION PHASE
- In this building construction process first step. This per construction possesses some
points like plot hiring, planting, budget, consult hiring, contractor, Design process, etc.
Site Clearance.
By removing unwanted grass of the site. Also removing appropriate trees but not all tress
need to removed because there are government agencies that prohibited to removed trees
by its diameter.
Excavation
Process where the land being flattened and if the land is needed to make the cut and fill
method.
Road Construction
Lay-outing and making concrete connecting roads streets and pathways.
Making Firewalls
Serves as the one of the main foundations of the units. This should be done by an
architect or an engineer.
Putting Foundations
To support the housing units from earthquakes and other earth disasters.
Starting to build the treated bamboo walls.
The main materials for the housing units are bamboo where exterior walls and interior
walls are being a bamboo and it is well treated that can last in years.
Bamboo Beams.
Roofing
Finishing exterior and interior of the housing units.
Doors and Windows
Installing wood doors and jalousie windows to front and rear side of the units.
Electrical.
This can be done by a professional electrical engineer to avoid any problems that causes
to fire.
Plumbing
Putting septic tanks, drainage ways for kitchen and toilet.
Landscaping