Implementations:
Finishing Department:
Inline Inspection:
7-0 system.
Traffic lights control system.
On the spot defect recovery.
5 part ticket system. ( Inspection of every 5th piece by machine operator)
Bundle moving discipline.
Director Office
Sr. Items Required Quan
No tity
1 Air Conditioner 1
2 Carpet 1
3 Chairs 8
4 Insect Killer 1
5 Foot mats 2
Finishing
Sr. Items Required Quan
No tity
1 White Boards For Performance Chart 3
2 Wooden/Plastic Boxes for faults placement 50
3 Cupboard 3
4 Clippers 50
5 Q.C Stickers & Fault Stickers
General Area
Sr. Items Required Quanti
No ty
1 Exhaust Fans 12
2 Dust Bins 5
3 Spitting Baskets (For Stairs) 8
FID
Sr. Items Required Quan
No tity
1 Light Box 1
2 Printer 1
3 Exhaust Fans 1
4 Washing Machine 1
5 Tumble Machine 1
6 Water Heating Rod and hear measurement gadgets 1
9 Printed Pads for 4 point system reports (legal size page) 5