Site : J-802, Godrej Trees, Vikhroli East. Date : 26.12.

2020

QUOTATION
Sr. No. Description UNIT Area

1 Master Bedroom
1.a WALL 01
Providing and applying Duco Paint sqft 49.80
Providing and applying Duco Paint on dhar. Rft 85.80
Veneer Polish on wooden surface sqft 48.60
Veneer Polish on dhar. Rft 212.80

1.b WALL 02
Providing and applying Duco Paint. sqft 66.40
Providing and applying Duco Paint on dhar. Rft 222.90
Veneer Polish on wooden surface sqft -
Veneer Polish on dhar. Rft -

2 Son's Bedroom
2.a Wall 01 Option 01 Option 02 Option 03 Option 04 Option 05
Providing and applying Duco Paint. sqft 82.30 84.80 100.00 103.80 104.00
Providing and applying Duco Paint on dhar. Rft 27.90 59.20 57.00 55.50 80.50
Veneer Polish on wooden surface sqft 11.90
Veneer Polish on dhar. Rft 30.00

TOTAL
Option 01 Option 02 Option 03 Option 04 Option 05
1 TOTAL AREA for DUCO Paint : sqft 198.50 201.00 216.20 220.00 220.20
RATE for DUCO Paint PLAIN: sqft 165.00
RATE for DUCO Paint METALLIC: sqft 330.00
AMOUNT for DUCO Paint PLAIN: 32,752.50 33,165.00 35,673.00 36,300.00 36,333.00
AMOUNT for DUCO Paint METALLIC: 65,505.00 66,330.00 71,346.00 72,600.00 72,666.00

2 TOTAL AREA for DUCO Paint on dhar : Rft 336.60 367.90 365.70 364.20 389.20
RATE for DUCO Paint on dhar : Rft 100.00
AMOUNT for DUCO Paint on dhar : 33,660.00 36,790.00 36,570.00 36,420.00 38,920.00

3 TOTAL AREA for Veneer Polish : sqft 60.50


RATE for Melamine Polish : sqft 100.00
RATE for Melamine GLOSSY Polish : sqft 105.00
AMOUNT for Melamine Polish : 6,050.00
AMOUNT for Melamine GLOSSY Polish : 6,352.50

4 TOTAL AREA for Veneer Polish on dhar : Rft 242.80


RATE for Melamine dhar Polish : Rft 50.00
AMOUNT for Melamine dhar Polish : 12,140.00

Terms & Condition :


1 We will require Min. 10 hours/day for working i.e. between 10.00 am till 9.00 pm.
2 If labors are required to stay at site, Extra Rs. 2000/- will be payable per labor per month as a food expense.
3 We will require a small lock and key storage to store our material.
4 Above BOQ is as per the dwgs shared, billing and measurement will be as Actual execution at site.
5 Payment terms : 60% advance against order. Further payment slot will be every 15 days against running bill.
6 Complete work Front will be provided from your end including removing of Hardwares and other openable
items before start of the work.