Daily Report - Microtunelling Works
Daily Report - Microtunelling Works
D/SHIFT 11 12
PIPE NUMBER
N/SHIFT 13 14
PIPE TYPE Concrete Concrete Concrete Concrete
JACKING PRESSURE (ton) 60 90 90 90
INSTALLED LENGTH 3 3 3 3
GROUTING FROM SHAFT TO SHAFT LENGTH (m) DAY SHIFT QTY. (m3) NIGHT SHIFT QTY (m3) TOTAL (m3)
INSERTION FROM SHAFT TO SHAFT LENGTH(m) DAY SHIFT QTY. (m) NIGHT SHIFT QTY (m) TOTAL (m)
FABRICATION WORKS MOBILIZATION PULL BACK SERVICES EQUIPMENT BREAKDOWNS SHAFT NOT READY SLURRY/SPOIL REMOVAL
SHUTTERING B/WALL SET JACKING FRAME ENTRANCE RING DETAILS DEWATERING ISSUES PIPES ON SITE
LOWER MACHINE / POURING CONCRETE WALL
SLURRY TANK SET UP LAUNCH MACHINE MAINTENANCE OTHER
CONNECT SERVICES
TUNNELLING X X COMPLETED DRIVE TAKE OUT MACHINE Proposed work for next day and comments (include other delay explanation)
TURN AROUND BREAKING B/ WALL DE-MOBILIZATION Day: Tunneling
PIPE RE-JACKING CASTING F/WALL SHUTTERING F/WALL Night: Tunneling