Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

DETAIL ENGINEERING DESIGN (DED)

TANGKI RESERVOAR 450 M3


PROYEK KERJASAMA PENGADAAN BADAN USAHA
PERBAIKAN, PENINGKATAN, PEMBANGUNAN DAN PENGELOLAAN UNIT
AIR BAKU & UNIT PRODUKSI SPAM CIASEM – BLANAKAN

PERUMDA AIR MINUM TIRTA RANGGA SUBANG


KABUPATEN SUBANG – JAWA BARAT

PT. SYNOPEX AMERTA BAKTI


Ruko CBD Bekasi Town Square (BETOS) Blok G-33
Jl. Raya Cut Mutia, Kel. Margahayu, Kec. Bekasi Timur, Kota Bekasi – Jawa Barat

DESEMBER 2019
SHOP DRAWING
NOTE :

13700

100 13500 100

250 13000 250


INLET ∅8"
B

100
250
13700
13500
13000

OVER FLOW ∅8" 3

REV.
DESCRIPTION SIGN & DATE
NO.

OWNER :

A A
PERUMDA TIRTA RANGGA
KAB. SUBANG - JAWA BARAT

APPROVED DATE :
CHECKED BY : APPROVED BY :

PROJECT NAME :

PROYEK KERJASAMA REHABILITASI,


PEMBANGUNAN DAN PENGELOLAAN
UNIT PRODUKSI
PDAM CIASEM - SUBANG, JAWA BARAT
DRAWING TITLE :
250
100

DENAH RESERVOIR KAP. 450 M3

CONTRACTOR :
DRAIN ∅8"
OUTLET ∅8" OUTLET ∅8"

B PT. SYNOPEX AMERTA BAKTI


DRAWN BY : CHECKED BY : APPROVED BY :

ARZ SANTOSO TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
1 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG
SHOP DRAWING
NOTE :

100 13500 100 OVER FLOW ∅8"


MUKA PLAT RESV. +1.50

200
250
1750 BALOK UTAMA 25/35 BALOK UTAMA 20/25

MUKA TANAH ±0.00

3250
3750

2750
PAS. KERAMIK 40x40 PAS. KERAMIK 40x40
2000

MUKA LANTAI RESV. -1.70

300
MUKA TANAH GALIAN -2.15

200 3063 250 3063 3063 250 3063 200

250 6375 250 6375 250

13900mm Lantai Reservoir

POTONGAN A - A
SKALA 1 : 50

13700 REV.
DESCRIPTION SIGN & DATE
NO.

OWNER :
100 13500 100 OVER FLOW ∅8"
MUKA PLAT RESV. +1.50

200
250

PERUMDA TIRTA RANGGA


1750

KAB. SUBANG - JAWA BARAT

APPROVED DATE :
PAS. KERAMIK 40x40 MUKA TANAH ±0.00 CHECKED BY : APPROVED BY :
3750

3550
2750
2000

PROJECT NAME :

PROYEK KERJASAMA REHABILITASI,


PEMBANGUNAN DAN PENGELOLAAN
UNIT PRODUKSI
MUKA LANTAI RESV. -2.00 PDAM CIASEM - SUBANG, JAWA BARAT

300
DRAWING TITLE :
MUKA TANAH GALIAN -2.45
200 3063 250 3063 3063 250 3063 200
TAMPAK POTONGAN
250 6375 250 6375 250

13900mm Lantai Reservoir CONTRACTOR :

POTONGAN B - B
PT. SYNOPEX AMERTA BAKTI
SKALA 1 : 50
DRAWN BY : CHECKED BY : APPROVED BY :

ARZ SANTOSO TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
2 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG
SHOP DRAWING
NOTE :

13900

200 13500 200

250 13000 250

200
250
SLOOF 25/35

D16-150

D16-150
SLOOF 25/35

2
13900
13500
13000

SLOOF 25/35 1

REV.
DESCRIPTION SIGN & DATE
NO.
D16-150 OWNER :

D16-150
D16-150
D16-150

PERUMDA TIRTA RANGGA


KAB. SUBANG - JAWA BARAT

APPROVED DATE :
CHECKED BY : APPROVED BY :

SLOOF 25/35

PROJECT NAME :

PROYEK KERJASAMA REHABILITASI,


SLOOF 25/35

SLOOF 25/35

SLOOF 25/35

SLOOF 25/35
D16-150

D16-150
SLOOF 25/35

PEMBANGUNAN DAN PENGELOLAAN


UNIT PRODUKSI
PDAM CIASEM - SUBANG, JAWA BARAT
DRAWING TITLE :

DETAIL LANTAI RESERVOIR


250

SLOOF 25/35
CONTRACTOR :
200

DENAH PLAT LANTAI


PT. SYNOPEX AMERTA BAKTI
SKALA 1 : 50
DRAWN BY : CHECKED BY : APPROVED BY :

ARZ SANTOSO TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
3 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG
SHOP DRAWING
NOTE :

13700

BALOK 25/30

DIA 12-150

DIA 12-150
BALOK 25/30

3
13700

BALOK 25/30 2

1
DIA 12-150 REV.
DESCRIPTION SIGN & DATE
NO.

DIA 12-150 OWNER :

PERUMDA TIRTA RANGGA


KAB. SUBANG - JAWA BARAT

APPROVED DATE :

BALOK 25/30 CHECKED BY : APPROVED BY :

PROJECT NAME :
DIA 12-150

DIA 12-150
BALOK 25/30

BALOK 25/30

BALOK 25/30

BALOK 25/30
BALOK 25/30

PROYEK KERJASAMA REHABILITASI,


PEMBANGUNAN DAN PENGELOLAAN
UNIT PRODUKSI
800
PDAM CIASEM - SUBANG, JAWA BARAT
DRAWING TITLE :

1100
800
DETAIL ATAP RESERVOIR
BALOK 25/30

200
CONTRACTOR :
1100 200

DENAH PLAT ATAP PT. SYNOPEX AMERTA BAKTI


SKALA 1 : 50 DRAWN BY : CHECKED BY : APPROVED BY :

ARZ SANTOSO TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
4 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG
SHOP DRAWING
1100 NOTE :

200 150 800 150


DIA. 12-150 DIA. 12-150

100
200

200
1750

4-D16
MUKA TANAH

3000

300
3650
D16-150
∅10-150
D16-150

4-D16
300
2000

DETAIL KOLOM 30/30

SLOOF 25/35 SLOOF 25/35


D16-150 D16-150

300
100 50
LAPISAN PASIR DIPADATKAN LANTAI KERJA 5cm 4-D16

DETAIL PENULANGAN
∅10-150

350
SKALA 1 : 50

4-D16 2

DIA. 12-150 DIA. 12-150


250 1

REV.
200

200
DESCRIPTION SIGN & DATE
NO.

DETAIL SLOOF 25/35 OWNER :

TALI AIR
1750

PERUMDA TIRTA RANGGA


KAB. SUBANG - JAWA BARAT

APPROVED DATE :
CHECKED BY : APPROVED BY :

MUKA TANAH

3000
3-D16 PROJECT NAME :

3650
D16-150 PROYEK KERJASAMA REHABILITASI,
∅10-150 PEMBANGUNAN DAN PENGELOLAAN

250
D16-150
UNIT PRODUKSI
PDAM CIASEM - SUBANG, JAWA BARAT
DRAWING TITLE :
2000

3-D16
200
DETAIL PEMBESIAN

SLOOF 25/35 SLOOF 25/35 DETAIL BALOK 20/25


D16-150 D16-150
CONTRACTOR :
300
100 50

PT. SYNOPEX AMERTA BAKTI


200 250 LAPISAN PASIR DIPADATKAN LANTAI KERJA 5cm
DRAWN BY : CHECKED BY : APPROVED BY :

DETAIL PENULANGAN
ARZ SANTOSO
SKALA 1 : 50 TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
5 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG
SHOP DRAWING
NOTE :

PC1 PC1

3325

PC1 PC1 PC1


3300
13300

3
PC1 PC1
2

1
3300

REV.
DESCRIPTION SIGN & DATE
NO.

OWNER :

PERUMDA TIRTA RANGGA


KAB. SUBANG - JAWA BARAT

APPROVED DATE :
PC1 PC1 PC1
CHECKED BY : APPROVED BY :
3325

PROJECT NAME :

PROYEK KERJASAMA REHABILITASI,


PEMBANGUNAN DAN PENGELOLAAN
PC1 PC1 UNIT PRODUKSI
PDAM CIASEM - SUBANG, JAWA BARAT
DRAWING TITLE :

DENAH BORE PILE

3425 3200 3200 3425


CONTRACTOR :

13250
PT. SYNOPEX AMERTA BAKTI
DENAH BOREPILE / PILE CAP DRAWN BY : CHECKED BY : APPROVED BY :

SKALA 1 : 50

ARZ SANTOSO TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
4 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG
SHOP DRAWING
NOTE :

∅10 SPIRAL
70

1000 8-D16

1000 1000

1000

300
D16-100

450

500
500

200

D16-100

D16-100
1000
D16-100
∅10 SPIRAL

8-D16
1000
3

1000 2

1
COR BETON D16-100 D16-100 D16-100 D16-100 REV.
DESCRIPTION SIGN & DATE
MUTU K-300 NO.

OWNER :
6800

300

500
500

PERUMDA TIRTA RANGGA


200

KAB. SUBANG - JAWA BARAT

APPROVED DATE :
CHECKED BY : APPROVED BY :

DETAIL PENULANGAN PILE CAP


SKALA 1 : 50 PROJECT NAME :

PROYEK KERJASAMA REHABILITASI,


PEMBANGUNAN DAN PENGELOLAAN
UNIT PRODUKSI
PDAM CIASEM - SUBANG, JAWA BARAT
DRAWING TITLE :

DETAIL BOREPILE / PILE CAP


SKALA 1 : 50
DETAIL BORE PILE

CONTRACTOR :

∅600
PT. SYNOPEX AMERTA BAKTI
DRAWN BY : CHECKED BY : APPROVED BY :

ARZ SANTOSO TOTONG RUSMANA

DRAWING No : SCALE : REV :


SAB-1908-CI-001

DRAWING DATE :
17.01.2020
SHEET :
4 OF 5 1
FILE NAME : D/SPAM/BSBK/RESERVOIR BETON SUBANG

You might also like