Professional Documents
Culture Documents
Schedule 2
Schedule 2
Plan of Action
Plan of Action
Prepare for Make sure I At 9:00am I I will use I will use my I will be
the online prepare will review basic colour footage of reviewing
interview myself for footage. Cut correction if the two my
with Myrtle the out all the needed angles and production
on Tuesday interview at unnecessary within the incorporate itand I will
5pm on parts. And I interview to with my continue to
Tuesday. will make make it look production edit it. And
Look through sure I split visually by using a make sure
questions and I will need my presentable. split screen. the
be familiar to do a test interview structure
with what I run with into the 4 I will then I will add my of my
will be asking.the zoom acts to make sure piece to production
recorder make it the audio camera at the is to a high
and make easier for quality is up start of my standard.
Check sure the me to edit. to a high documentary.
through lighting is standard by And will see
equipment I correct and I will look at using the files what I will I will show
will be using. all what from the need to cut my rough
Making sure equipment section is zoom out to make edit of my
everything is set up best to go in recorder. sure my production
functions. and what order, production is to my
functioning. so that the In the between 10 family,
structure is afternoon I to 15 minutes teachers,
Charge the At 5:00pm I complete. will add the long. and peers
camera, will start relevant for
phone and recording And I will archive I will add feedback
light so it is the write a note footage. And music from and will
ready for interview of what this is where my sound list continue to
tomorrow online and archive my editing and music edit to
making footage is skills come in research make my
sure my relevant to to make my where production
cameras what she production relevant in to the best
are rolling talks about. engaging. my interview. quality
too. possible.
Week 4: 19/04/21 - 25/04/21
Plan of Action