I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi m2 35.00 19,750.00 691,250.00
2 Pengukuran & Pasang Bowplank m1 24.00 66,025.00 1,584,600.00
Sub Total 2,275,850.00
II PEKERJAAN TANAH
1 Galian Tanah Pondasi m3 165.18 86,875.00 14,350,012.50
2 Timbun Kembali Hasil Galian m3 43.34 24,445.00 1,059,446.30
3 Urug Pasir Dibawah Lantai + Pondasi m3 10.32 298,750.00 3,083,100.00
Sub Total 18,492,558.80
- Split 1 - 2 cm M3 1,000,000.00
- Split 2 - 3 cm M3
1,000,000.00
- Split 3 - 5 cm M3
850,000.00
53 Sirtu Timbunan, ex quarry Mile 32 M3
220,000.00
54 Sirtu Timbunan, ex quarry Iwaka M3
180,000.00
55 Sirtu Timbunan, ex quarry Kilo 7,8,14 M3
150,000.00
56 Pasir Pasang, ex quarry Mile 32 M3
400,000.00
57 Pasir Pasang, ex quarry Mile Iwaka M3
400,000.00
58 Tanah Timbunan ex quarry Kilo 7,8,14 M3
175,000.00
59 Kayu Kelas I Besi ( Balok ) M3 3,400,000.00
60 Kayu Kelas II Matoa ( Balok ) M3 2,100,000.00
61 Kayu Kelas I Besi ( Papan ) M3 3,750,000.00
62 Kayu Klas II Matoa ( Papan ) M3 2,000,000.00
63 Bambu Dia. 6 - 8 / 600 cm Batang 20,000.00
64 Bilik Bambu M2
65,000.00
65 Batu Tela Buah 1,900.00
66 Batu Batako Buah 2,000.00
67 Batu Berongga Expose Buah 6,000.00
68 Roster/Terawang Buah 6,000.00
69 Batu Bunga/Loster Buah 8,000.00
70 Batu Tempel Hitam M2
66,500.00
71 Marmer ex lokal M2
340,000.00
72 Tegel Keramik 40 x 40 cm Buah 11,600.00
HARGA SATUAN
NO. HARGA SATUAN PEKERJAAN KOEFISIEN SATUAN
(Rp)
I PEKERJAAN PERSIAPAN
I-1 100 M2 Pekerjaan Pengukuran Gedung
- Pekerja 8.0000 org 110,000.00
- Mandor 2.0000 org 175,000.00
- Pengawas / Ahli Teknik 0.5000 org 354,166.67
- Asisten Ahli Ukur 2.0000 org 110,000.00
- Sewa alat ukur 1.0000 hr 275,000.00
JUMLAH :
Untuk 1m2 Pekerjaan Pengukuran 0 m2 1,902,083
I-2 1 M' Pagar Sementara dari Kayu Tinggi 2 M
- Dolken Kayu Dia. 8-10/400 cm 1.2500 Btg 25,000.00
- Semen Portland 2.5000 Kg 1,700.00
- Pasir Beton 0.0050 M3 400,000.00
- Kerikil Koral 0.0090 M3 450,000.00
- Kayu Kelas II Matoa ( Balok ) 0.0720 M3 2,100,000.00
- Paku Biasa 0.0800 Kg 20,000.00
- Meni 0.4500 Kg 20,000.00
- Pekerja 0.4000 Oh 110,000.00
- Tukang Kayu 0.2000 Oh 130,000.00
- Kep. Tukang 0.0200 Oh 155,000.00
- Mandor 0.0200 Oh 175,000.00
JUMLAH :
I-3 1 M' Pagar Sementara Dari Seng Gelombang Tinggi 2 M
- Dolken Kayu Dia. 8-10/400 cm 1.2500 Btg 25,000.00
- Semen Portland 2.5000 Kg 1,700.00
- Seng Gelombang BLJS 20 1.2000 Lbr 50,000.00
- Pasir Beton 0.0050 M3 400,000.00
- Kerikil Koral 0.0090 M3 450,000.00
- Kayu Kelas II Matoa ( Balok ) 0.0720 M3 2,100,000.00
- Paku Biasa 0.0800 Kg 20,000.00
- Cat Residu 0.4500 Kg 25,000.00
- Pekerja 0.4000 Oh 110,000.00
- Tukang Kayu 0.2000 Oh 130,000.00
- Kep. Tukang 0.0200 Oh 155,000.00
- Mandor 0.0200 Oh 175,000.00
JUMLAH :
I-4 1 M' Pagar Sementara Dari Kawat Duri Tinggi 1,8 M
- Dolken Kayu Dia. 8-10/400 cm 1.2500 Btg 25,000.00
- Semen Portland 2.5000 Kg 1,700.00
- Kawat Duri 2.5000 Kg 28,000.00
- Pasir Beton 0.0050 M3 400,000.00
- Kerikil Koral 0.0090 M3 450,000.00
JUMLAH :
II.12 1 M3 Urugan Sirtu
- Sirtu Timbunan 1.200 M3 220,000.00
- Pekerja 0.250 Oh 110,000.00
- Mandor 0.025 Oh 175,000.00
JUMLAH :
II.13 1 M3 Pembuatan Jalan Sementara, Tebal 25 cm
- Batu belah 15/20 0.275 M3 650,000.00
- Kerikil 0.030 M3 450,000.00
- Pasir pasang 0.050 M3 400,000.00
- Pekerja 1.000 Oh 110,000.00
- Mandor 0.100 Oh 175,000.00
JUMLAH :
III PEKERJAAN PONDASI
III.1 1 M3 Pasangan Pondasi Batu Belah, Campuran 1 PC : 3 PP
- Pasir Pasang 0.485 M3 400,000.00
- Batu Kali 1.200 M3 600,000.00
- Semen Portland 202.000 Kg 1,700.00
- Pekerja 1.500 Oh 110,000.00
- Tukang Batu 0.750 Oh 130,000.00
- Kep. Tukang 0.075 Oh 155,000.00
- Mandor 0.075 Oh 175,000.00
JUMLAH :
III.2 1 M3 Pasangan Pondasi Batu Belah, Campuran 1 PC : 4 PP
- Pasir Pasang 0.520 M3 400,000.00
- Batu Kali 1.200 M3 600,000.00
- Semen Portland 163.000 Kg 1,700.00
- Pekerja 1.500 Oh 110,000.00
- Tukang Batu 0.750 Oh 130,000.00
- Kep. Tukang 0.075 Oh 155,000.00
- Mandor 0.075 Oh 175,000.00
JUMLAH :
III.3 1 M3 Pasangan Pondasi Batu Belah, Campuran 1 PC : 5 PP
- Pasir Pasang 0.544 M3 400,000.00
- Batu Kali 1.200 M3 600,000.00
- Semen Portland 136.000 Kg 1,700.00
- Pekerja 1.500 Oh 110,000.00
- Tukang Batu 0.750 Oh 130,000.00
- Kep. Tukang 0.075 Oh 155,000.00
- Mandor 0.075 Oh 175,000.00
JUMLAH :
III.4 1 M3 Pasangan Pondasi Batu Belah, Campuran 1 PC : 6 PP
- Pasir Pasang 0.561 M3 400,000.00
- Batu Kali 1.200 M3 600,000.00
- Semen Portland 117.000 Kg 1,700.00
- Pekerja 1.500 Oh 110,000.00
- Tukang Batu 0.750 Oh 130,000.00
- Kep. Tukang 0.075 Oh 155,000.00
JUMLAH :
VII.8 Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
- Semen Portland 384.000 Kg 1,700.00
- Pasir beton 0.494 M3 400,000.00
- Koral beton 0.770 M3 450,000.00
- Air 215.000 150.00
- Pekerja 1.650 Oh 110,000.00
- Tukang batu 0.275 Oh 130,000.00
- Kep. Tukang 0.028 Oh 155,000.00
- Mandor 0.083 Oh 175,000.00
JUMLAH :
VII.9 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
- Semen Portland 406.000 Kg 1,700.00
- Pasir beton 0.489 M3 400,000.00
- Koral beton 0.760 M3 450,000.00
- Air 215.000 150.00
- Pekerja 1.650 Oh 110,000.00
- Tukang batu 0.275 Oh 130,000.00
- Kep. Tukang 0.028 Oh 155,000.00
- Mandor 0.083 Oh 175,000.00
JUMLAH :
VII.10 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
- Semen Portland 413.000 Kg 1,700.00
- Pasir beton 0.486 M3 400,000.00
- Koral beton 0.756 M3 450,000.00
- Air 215.000 150.00
- Pekerja 1.650 Oh 110,000.00
- Tukang batu 0.275 Oh 130,000.00
- Kep. Tukang 0.028 Oh 155,000.00
- Mandor 0.083 Oh 175,000.00
JUMLAH :
VII.11 Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
- Semen Portland 439.000 Kg 1,700.00
- Pasir beton 0.479 M3 400,000.00
- Koral beton 0.745 M3 450,000.00
- Air 215.000 150.00
- Pekerja 2.100 Oh 110,000.00
- Tukang batu 0.350 Oh 130,000.00
- Kep. Tukang 0.035 Oh 155,000.00
- Mandor 0.106 Oh 175,000.00
JUMLAH :
VII.12 Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
- Semen Portland 448.000 Kg 1,700.00
- Pasir beton 0.476 M3 400,000.00
- Koral beton 0.741 M3 450,000.00
- Air 215.000 150.00
- Pekerja 2.100 Oh 110,000.00
- Tukang batu 0.350 Oh 130,000.00
JUMLAH :
X.12 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 45 x 45 ) cm Tinggi 50 cm
- Batu Tela (m3) 0.250 M3 659,722.22
- Semen portland 77.000 Kg 1,700.00
- Pasir pasang 0.130 M3 400,000.00
- Kerikil 0.020 M3 450,000.00
- Besi beton 2.600 Kg 19,500.00
- Pasir beton 0.090 M3 400,000.00
- Pekerja 3.200 Oh 110,000.00
- Tukang batu 1.015 Oh 130,000.00
- Kep. Tukang 0.002 Oh 155,000.00
- Mandor 0.016 Oh 175,000.00
JUMLAH :
X.13 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 60 x 60 ) cm Tinggi 65 cm
- Batu Tela (m3) 0.371 Buah 659,722.22
- Semen portland 114.000 Kg 1,700.00
- Pasir pasang 0.184 M3 400,000.00
- Kerikil 0.033 M3 450,000.00
- Besi beton 4.850 Kg 19,500.00
- Pasir beton 0.120 M3 400,000.00
- Pekerja 3.200 Oh 110,000.00
- Tukang batu 1.015 Oh 130,000.00
- Kep. Tukang 0.002 Oh 155,000.00
- Mandor 0.016 Oh 175,000.00
- Tukang gali 0.100 Oh 110,000.00
JUMLAH :
X.14 Memasang 1 Buah Cuci Piring Stainles Steel
- Bak cuci stainless steel 1.000 Bh 450,000.00
- Water drain + asesories 1.000 Set 50,000.00
- Pekerja 0.030 Oh 110,000.00
- Tukang Batu 0.300 Oh 130,000.00
- Kep. Tukang 0.030 Oh 155,000.00
- Mandor 0.002 Oh 175,000.00
JUMLAH :
X.15 Memasang 1 Buah Kran Diameter 3/4" atau 1/2"
- Kran Air Stainless 1.000 Buah 35,000.00
- Seal tape 0.025 Buah 5,000.00
- Pekerja 0.010 Oh 110,000.00
- Tukang Batu 0.100 Oh 130,000.00
- Kep. Tukang 0.010 Oh 155,000.00
- Mandor 0.005 Oh 175,000.00
JUMLAH :
X.16 Memasang 1 Buah Floor Drain
- Floor drain 1.000 Buah 55,000.00
- Pekerja 0.010 Oh 110,000.00
- Tukang Batu 0.100 Oh 130,000.00
- Kep. Tukang 0.010 Oh 155,000.00
- Mandor 0.005 Oh 175,000.00
JUMLAH :
X.17 1 UPEKERJAAN SEPTICTANK & REMBESAN
Galian tanah 21.365 M3 127,225.00
Urugan tanah kembali 6.410 M3 24,445.00
Urugan Pasir 0.380 M3 298,750.00
Pasangan Pondasi Batu Kali 1 : 4 1.219 M3 1,492,350.00
Pasangan Tembok 1 pc : 4 psr 2.224 M3 238,185.00
Cor rabat 1 pc : 3 psr : 5 krl 0.218 M3 1,269,550.71
Sloof, Kolom, Ringbalk 0.550 M3 7,082,340.00
Beton Plat Penutup 0.420 M3 10,462,867.02
Plesteran 1 pc : 2 psr 25.000 M2 82,830.80
Urugan Kerikil 0.448 M3 295,875.00
Pekerjaan Ijuk 0.522 M3 1,250,000.00
Pipa PVC Ø 4 " 4.000 M' 73,832.50
Pipa Udara Gip. Ø 2 " 1.000 m 155,265.00
JUMLAH :
X.18 1 MPEKERJAAN SALURAN KELILING BANGUNAN
Cor Rabat 1 Pc : 3 Psr : 5 Krl 0.1000 m3 1,269,550.71
Plesteran 1 Pc : 3 Psr 2.2000 m2 82,830.80
Acian 2.2000 m2 43,825.00
Jumlah
X.19 1 MPEKERJAAN PIPA GIP Ø ½ "
Pipa Gip Ø ½ " 1.200 M' 25,000.00
Perlengkapan (35 % Harga Pipa) 1.000 Ls 8,750.00
Pekerja 0.054 o/h 110,000.00
Tukang 0.090 o/h 130,000.00
Kep. Tukang 0.009 o/h 155,000.00
Mandor 0.027 o/h 175,000.00
JUMLAH :
X.20 1 MPEKERJAAN PIPA GIP Ø ¾ "
Pipa Gip Ø ¾ " 1.200 M' 29,166.67
Perlengkapan (35 % Harga Pipa) 1.000 Ls 10,208.33
Pekerja 0.054 o/h 110,000.00
Tukang 0.090 o/h 130,000.00
Kep. Tukang 0.009 o/h 155,000.00
Mandor 0.027 o/h 175,000.00
JUMLAH :
X.21 1 MPEKERJAAN PIPA GIP Ø 1 "
Pipa Gip Ø 1 " 1.200 M' 37,500.00
Perlengkapan (35 % Harga Pipa) 1.000 Ls 13,125.00
Pekerja 0.054 o/h 110,000.00
Tukang 0.090 o/h 130,000.00
Kep. Tukang 0.009 o/h 155,000.00
Mandor 0.027 o/h 175,000.00
JUMLAH :
X.22 1 MPEKERJAAN PIPA GIP Ø 1 ¼ "
Pipa Gip Ø 1 ¼ " 1.200 M' 41,666.67
Perlengkapan (35 % Harga Pipa) 1.000 Ls 14,583.33
1,902,083.33
880,000.00
350,000.00
177,083.33
220,000.00
275,000.00
1,902,083.33
19,020.83
279,950.00
31,250.00
4,250.00
2,000.00
4,050.00
151,200.00
1,600.00
9,000.00
44,000.00
26,000.00
3,100.00
3,500.00
279,950.00
342,200.00
31,250.00
4,250.00
60,000.00
2,000.00
4,050.00
151,200.00
1,600.00
11,250.00
44,000.00
26,000.00
3,100.00
3,500.00
342,200.00
189,750.00
31,250.00
4,250.00
70,000.00
2,000.00
4,050.00
1,600.00
44,000.00
26,000.00
3,100.00
3,500.00
189,750.00
66,025.00
25,200.00
14,000.00
400.00
11,000.00
13,000.00
1,550.00
875.00
66,025.00
3,778,923.33
6,090.00
360,000.00
1,785,000.00
17,000.00
8,500.00
60,000.00
67,500.00
20,833.33
350,000.00
12,000.00
22,500.00
210,000.00
165,000.00
97,500.00
65,000.00
23,250.00
8,750.00
500,000.00
3,778,923.33
1,026,600.00
42,500.00
441,000.00
6,000.00
17,850.00
12,000.00
22,500.00
75,000.00
110,000.00
260,000.00
31,000.00
8,750.00
1,026,600.00
1,080,600.00
75,000.00
579,600.00
14,000.00
75,000.00
110,000.00
195,000.00
23,250.00
8,750.00
1,080,600.00
19,750.00
11,000.00
8,750.00
19,750.00
1,059,450.00
31,250.00
390,600.00
6,000.00
17,850.00
12,000.00
22,500.00
75,000.00
94,500.00
110,000.00
260,000.00
31,000.00
8,750.00
1,059,450.00
64,795.00
20,000.00
12,500.00
27,500.00
2,210.00
310.00
2,275.00
64,795.00
283,250.00
97,500.00
63,000.00
4,000.00
110,000.00
8,750.00
283,250.00
791,645.00
733,370.00
58,275.00
791,645.00
739,145.00
733,370.00
5,775.00
739,145.00
86,875.00
82,500.00
4,375.00
86,875.00
106,875.00
99,000.00
7,875.00
106,875.00
127,225.00
115,500.00
11,725.00
127,225.00
115,600.00
110,000.00
5,600.00
115,600.00
175,500.00
165,000.00
10,500.00
175,500.00
139,875.00
132,000.00
7,875.00
139,875.00
6,375.00
5,500.00
875.00
6,375.00
38,050.00
36,300.00
1,750.00
38,050.00
24,445.00
21,120.00
3,325.00
24,445.00
63,750.00
55,000.00
8,750.00
63,750.00
298,750.00
264,000.00
33,000.00
1,750.00
298,750.00
295,875.00
264,000.00
27,500.00
4,375.00
295,875.00
339,750.00
178,750.00
13,500.00
20,000.00
110,000.00
17,500.00
339,750.00
1,544,650.00
194,000.00
720,000.00
343,400.00
165,000.00
97,500.00
11,625.00
13,125.00
1,544,650.00
1,492,350.00
208,000.00
720,000.00
277,100.00
165,000.00
97,500.00
11,625.00
13,125.00
1,492,350.00
1,456,050.00
217,600.00
720,000.00
231,200.00
165,000.00
97,500.00
11,625.00
13,125.00
1,456,050.00
1,430,550.00
224,400.00
720,000.00
198,900.00
165,000.00
97,500.00
11,625.00
13,125.00
1,430,550.00
1,395,550.00
233,600.00
720,000.00
154,700.00
165,000.00
97,500.00
11,625.00
13,125.00
1,395,550.00
1,042,170.00
172,800.00
720,000.00
85,800.00
50,700.00
6,045.00
6,825.00
1,042,170.00
2,950,325.00
288,000.00
1,462,500.00
343,400.00
128,000.00
220,500.00
28,000.00
330,000.00
110,500.00
13,175.00
26,250.00
2,950,325.00
1,569,450.00
292,500.00
476,000.00
180,000.00
301,500.00
261,800.00
39,000.00
4,650.00
14,000.00
1,569,450.00
1,415,035.00
4,180.00
37,600.00
67,500.00
102,850.00
877,500.00
31,500.00
67,200.00
2,400.00
1,350.00
6,720.00
110,000.00
87,100.00
10,385.00
8,750.00
1,415,035.00
1,106,120.00
3,520.00
32,000.00
56,250.00
83,300.00
672,750.00
24,500.00
56,700.00
2,400.00
1,350.00
5,600.00
88,000.00
65,000.00
7,750.00
7,000.00
1,106,120.00
288,301.00
50,000.00
108,851.00
23,600.00
71,500.00
26,000.00
3,100.00
5,250.00
288,301.00
261,800.00
50,000.00
73,950.00
32,000.00
71,500.00
26,000.00
3,100.00
5,250.00
261,800.00
248,265.00
50,000.00
56,015.00
36,400.00
71,500.00
26,000.00
3,100.00
5,250.00
248,265.00
2,482,650.00
238,185.00
50,000.00
45,135.00
37,200.00
71,500.00
26,000.00
3,100.00
5,250.00
238,185.00
234,390.00
50,000.00
37,740.00
40,800.00
71,500.00
26,000.00
3,100.00
5,250.00
234,390.00
266,775.00
180,000.00
23,800.00
12,800.00
33,000.00
13,000.00
1,550.00
2,625.00
266,775.00
262,875.00
180,000.00
18,700.00
14,000.00
33,000.00
13,000.00
1,550.00
2,625.00
262,875.00
514,050.00
420,000.00
23,800.00
12,800.00
33,000.00
19,500.00
2,325.00
2,625.00
514,050.00
389,550.00
60,060.00
21,148.00
10,000.00
4,875.00
143,000.00
84,500.00
10,075.00
11,375.00
734,583.00
367,500.00
19,975.00
14,000.00
79,200.00
49,400.00
5,425.00
5,250.00
540,750.00
393,750.00
19,975.00
14,000.00
79,200.00
49,400.00
5,425.00
5,250.00
567,000.00
367,500.00
19,975.00
14,000.00
79,200.00
49,400.00
5,425.00
5,250.00
540,750.00
341,250.00
19,975.00
14,000.00
79,200.00
49,400.00
5,425.00
5,250.00
514,500.00
393,750.00
19,975.00
14,000.00
79,200.00
49,400.00
5,425.00
5,250.00
567,000.00
399,000.00
19,975.00
14,000.00
79,200.00
49,400.00
5,425.00
5,250.00
572,250.00
189,000.00
19,975.00
14,000.00
55,000.00
49,400.00
5,425.00
5,250.00
338,050.00
90,206.80
26,356.80
6,400.00
33,000.00
19,500.00
2,325.00
2,625.00
90,206.80
82,830.80
17,380.80
8,000.00
33,000.00
19,500.00
2,325.00
2,625.00
82,830.80
79,869.20
13,219.20
9,200.00
33,000.00
19,500.00
2,325.00
2,625.00
79,869.20
77,658.00
10,608.00
9,600.00
33,000.00
19,500.00
2,325.00
2,625.00
77,658.00
76,662.80
8,812.80
10,400.00
33,000.00
19,500.00
2,325.00
2,625.00
76,662.80
75,757.20
7,507.20
10,800.00
33,000.00
19,500.00
2,325.00
2,625.00
75,757.20
82,985.00
15,810.00
7,200.00
28,600.00
26,000.00
3,100.00
2,275.00
82,985.00
80,394.00
12,019.00
8,400.00
28,600.00
26,000.00
3,100.00
2,275.00
80,394.00
73,750.00
850.00
5,200.00
8,800.00
52,000.00
6,200.00
700.00
73,750.00
43,825.00
5,525.00
22,000.00
13,000.00
1,550.00
1,750.00
43,825.00
5,525.00
22,000.00
13,000.00
1,550.00
1,750.00
43,825.00
7,626,750.00
3,740,000.00
770,000.00
2,730,000.00
325,500.00
61,250.00
7,626,750.00
5,851,500.00
2,520,000.00
660,000.00
2,340,000.00
279,000.00
52,500.00
5,851,500.00
345,425.00
150,000.00
1,000.00
38,500.00
136,500.00
16,275.00
3,150.00
345,425.00
705,250.00
150,000.00
110,000.00
390,000.00
46,500.00
8,750.00
705,250.00
795,250.00
240,000.00
110,000.00
390,000.00
46,500.00
8,750.00
795,250.00
538,700.00
90,000.00
4,500.00
88,000.00
312,000.00
37,200.00
7,000.00
538,700.00
516,775.00
50,000.00
600.00
7,500.00
70,000.00
77,000.00
273,000.00
32,550.00
6,125.00
516,775.00
573,500.00
51,200.00
600.00
7,500.00
70,000.00
88,000.00
312,000.00
37,200.00
7,000.00
573,500.00
651,325.00
225,000.00
3,000.00
73,700.00
260,000.00
31,000.00
58,625.00
651,325.00
633,050.00
93,750.00
600.00
4,500.00
90,000.00
88,000.00
312,000.00
37,200.00
7,000.00
633,050.00
674,650.00
50,000.00
600.00
12,000.00
90,000.00
50,000.00
93,500.00
331,500.00
39,525.00
7,525.00
674,650.00
5,018,000.00
2,310,000.00
375,000.00
112,000.00
440,000.00
1,560,000.00
186,000.00
35,000.00
5,018,000.00
8,287,175.00
4,080,000.00
375,000.00
112,000.00
737,000.00
2,613,000.00
311,550.00
58,625.00
8,287,175.00
4,077,600.00
2,310,000.00
375,000.00
60,000.00
264,000.00
936,000.00
111,600.00
21,000.00
4,077,600.00
69,825.00
29,400.00
9,000.00
5,000.00
11,000.00
13,000.00
1,550.00
875.00
69,825.00
78,825.00
29,400.00
18,000.00
5,000.00
11,000.00
13,000.00
1,550.00
875.00
78,825.00
382,210.00
346,500.00
4,000.00
13,200.00
15,600.00
1,860.00
1,050.00
382,210.00
109,615.00
32,340.00
4,000.00
16,500.00
39,000.00
4,650.00
13,125.00
109,615.00
106,630.00
34,230.00
5,000.00
22,000.00
39,000.00
4,650.00
1,750.00
106,630.00
83,475.00
40,500.00
2,000.00
11,000.00
26,000.00
3,100.00
875.00
83,475.00
21,275.00
15,750.00
2,310.00
2,730.00
310.00
175.00
21,275.00
82,475.00
40,500.00
1,000.00
11,000.00
26,000.00
3,100.00
875.00
82,475.00
145,175.00
58,800.00
3,000.00
16,500.00
58,500.00
6,975.00
1,400.00
145,175.00
248,175.00
58,800.00
3,000.00
94,600.00
8,400.00
16,500.00
58,500.00
6,975.00
1,400.00
248,175.00
245,750.00
58,800.00
3,000.00
64,500.00
8,400.00
22,000.00
78,000.00
9,300.00
1,750.00
245,750.00
372,650.00
26,250.00
2,000.00
11,250.00
66,000.00
234,000.00
27,900.00
5,250.00
372,650.00
44,915.00
30,000.00
1,000.00
2,750.00
9,750.00
1,240.00
175.00
44,915.00
146,335.00
97,500.00
29,400.00
240.00
45.00
11,000.00
6,500.00
775.00
875.00
146,335.00
1,144,871.71
962,374.59
4,184.10
178,313.02
1,144,871.71
419,900.00
248,285.71
333,000.00
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,269,550.71
469,200.00
236,571.43
337,333.33
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,311,469.76
1,343,950.71
508,300.00
228,285.71
339,000.00
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,343,950.71
1,192,326.19
391,000.00
255,142.86
342,333.33
32,250.00
132,000.00
26,000.00
3,100.00
10,500.00
1,192,326.19
1,382,707.86
554,200.00
217,142.86
343,000.00
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,382,707.86
1,419,288.81
598,400.00
208,857.14
343,666.67
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,419,288.81
1,447,493.57
630,700.00
199,428.57
349,000.00
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,447,493.57
1,465,212.62
652,800.00
197,714.29
346,333.33
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,465,212.62
1,495,993.57
690,200.00
195,428.57
342,000.00
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,495,993.57
1,505,369.76
702,100.00
194,571.43
340,333.33
32,250.00
181,500.00
35,750.00
4,340.00
14,525.00
1,505,369.76
1,605,786.90
746,300.00
191,428.57
335,333.33
32,250.00
231,000.00
45,500.00
5,425.00
18,550.00
1,605,786.90
1,618,229.76
761,600.00
190,571.43
333,333.33
32,250.00
231,000.00
45,500.00
5,425.00
18,550.00
1,618,229.76
1,563,975.00
680,000.00
192,000.00
360,000.00
31,500.00
231,000.00
45,500.00
5,425.00
18,550.00
1,563,975.00
15,750.00
6,600.00
3,900.00
465.00
525.00
11,490.00
21,000.00
7,700.00
4,550.00
542.50
612.50
34,405.00
26,250.00
8,800.00
5,200.00
620.00
700.00
41,570.00
228,585.00
204,750.00
5,250.00
7,700.00
9,100.00
1,085.00
700.00
228,585.00
22,858.50
221,550.00
204,750.00
3,500.00
5,500.00
6,500.00
775.00
525.00
221,550.00
22,155.00
25,500.00
1,750.00
2,750.00
3,250.00
310.00
175.00
33,735.00
187,080.00
80,000.00
6,000.00
1,500.00
57,200.00
33,800.00
4,030.00
4,550.00
187,080.00
197,080.00
90,000.00
6,000.00
1,500.00
57,200.00
33,800.00
4,030.00
4,550.00
197,080.00
346,140.00
80,000.00
8,000.00
3,000.00
31,500.00
47,250.00
50,000.00
72,600.00
42,900.00
5,115.00
5,775.00
346,140.00
352,440.00
80,000.00
8,000.00
3,000.00
37,800.00
47,250.00
50,000.00
72,600.00
42,900.00
5,115.00
5,775.00
352,440.00
446,140.00
80,000.00
8,000.00
3,000.00
31,500.00
47,250.00
150,000.00
72,600.00
42,900.00
5,115.00
5,775.00
446,140.00
441,640.00
80,000.00
8,000.00
3,000.00
42,000.00
47,250.00
75,000.00
60,000.00
72,600.00
42,900.00
5,115.00
5,775.00
441,640.00
325,390.00
60,000.00
8,000.00
2,250.00
31,500.00
47,250.00
50,000.00
72,600.00
42,900.00
5,115.00
5,775.00
325,390.00
160,975.00
52,800.00
12,000.00
12,500.00
16,500.00
65,000.00
775.00
1,400.00
160,975.00
1,505,369.76
3,778,158.34
725,412.24
55,000.00
6,063,940.35
1,505,369.76
3,956,112.75
883,433.33
55,000.00
6,399,915.85
1,505,369.76
5,197,115.39
1,309,560.00
55,000.00
8,067,045.15
1,505,369.76
2,902,981.40
2,769,120.00
110,000.00
7,287,471.16
1,505,369.76
2,623,392.99
2,433,796.88
110,000.00
6,672,559.62
1,505,369.76
5,551,010.39
4,285,542.86
82,500.00
11,424,423.01
1,505,369.76
4,583,274.40
4,615,200.00
82,500.00
10,786,344.16
1,505,369.76
5,107,741.54
5,192,100.00
82,500.00
11,887,711.30
1,505,369.76
3,968,381.89
6,922,800.00
82,500.00
12,479,051.66
1,382,707.86
8,818,626.43
11,538,000.00
82,500.00
21,821,834.29
1,505,369.76
7,468,618.74
1,313,866.67
82,500.00
10,370,355.17
1,505,369.76
6,223,848.95
1,576,640.00
82,500.00
9,388,358.71
1,505,369.76
5,119,921.28
1,970,800.00
82,500.00
8,678,591.05
1,382,707.86
2,902,981.40
1,576,640.00
82,500.00
5,944,829.25
1,505,369.76
5,668,952.96
3,132,800.00
110,000.00
10,417,122.72
1,505,369.76
5,029,372.89
4,699,200.00
110,000.00
11,343,942.65
1,505,369.76
4,289,894.32
3,132,800.00
110,000.00
9,038,064.08
1,505,369.76
5,444,123.91
4,229,280.00
110,000.00
11,288,773.67
1,505,369.76
5,201,611.68
4,699,200.00
110,000.00
11,516,181.45
1,505,369.76
5,580,537.04
5,404,080.00
110,000.00
12,599,986.80
1,505,369.76
3,963,214.73
4,405,500.00
110,000.00
9,984,084.49
1,505,369.76
12,680,502.95
7,131,727.06
110,000.00
21,427,599.77
1,505,369.76
3,997,596.24
11,890,307.69
110,000.00
17,503,273.70
1,505,369.76
3,720,358.03
4,416,400.00
110,000.00
9,752,127.79
1,505,369.76
5,167,163.93
3,680,333.33
110,000.00
10,462,867.02
400,000.00
30,000.00
6,000.00
2,925,000.00
78,750.00
571,200.00
216,000.00
364,500.00
583,000.00
35,750.00
169,000.00
136,500.00
40,610.00
46,375.00
5,602,685.00
7,082,340.00
540,000.00
40,000.00
9,000.00
4,095,000.00
105,000.00
571,200.00
216,000.00
364,500.00
621,500.00
35,750.00
202,800.00
182,000.00
50,065.00
49,525.00
7,082,340.00
10,995,700.00
800,000.00
80,000.00
30,000.00
5,850,000.00
157,500.00
549,100.00
208,000.00
351,000.00
315,000.00
472,500.00
500,000.00
803,000.00
45,500.00
429,000.00
273,000.00
88,350.00
43,750.00
10,995,700.00
7,325,150.00
640,000.00
64,000.00
24,000.00
2,925,000.00
78,750.00
571,200.00
216,000.00
364,500.00
252,000.00
378,000.00
800,000.00
583,000.00
35,750.00
169,000.00
136,500.00
41,075.00
46,375.00
7,325,150.00
8,141,850.00
500,000.00
64,000.00
24,000.00
3,900,000.00
105,000.00
549,100.00
208,000.00
351,000.00
294,000.00
378,000.00
400,000.00
655,600.00
45,500.00
364,000.00
182,000.00
85,250.00
36,400.00
8,141,850.00
7,391,325.00
480,000.00
64,000.00
24,000.00
2,925,000.00
78,750.00
549,100.00
208,000.00
351,000.00
252,000.00
378,000.00
800,000.00
638,000.00
45,500.00
364,000.00
136,500.00
65,100.00
32,375.00
7,391,325.00
7,026,585.00
480,000.00
64,000.00
24,000.00
2,925,000.00
78,750.00
549,100.00
216,000.00
364,500.00
336,000.00
378,000.00
600,000.00
583,000.00
35,750.00
169,000.00
136,500.00
40,610.00
46,375.00
7,026,585.00
7,762,240.00
500,000.00
60,000.00
18,000.00
3,900,000.00
105,000.00
549,100.00
216,000.00
364,500.00
220,500.00
337,500.00
350,000.00
621,500.00
35,750.00
202,800.00
182,000.00
50,065.00
49,525.00
7,762,240.00
94,125.00
4,000.00
195.00
45,000.00
1,575.00
6,800.00
2,400.00
4,050.00
19,800.00
2,600.00
2,600.00
2,600.00
930.00
1,575.00
94,125.00
131,555.00
6,000.00
390.00
54,000.00
1,750.00
9,350.00
3,600.00
6,750.00
32,670.00
4,290.00
4,290.00
4,290.00
1,550.00
2,625.00
131,555.00
61,880.00
38,500.00
400.00
13,200.00
7,800.00
930.00
1,050.00
61,880.00
147,075.00
78,750.00
4,100.00
22,000.00
26,000.00
3,100.00
13,125.00
147,075.00
291,732.50
225,000.00
40,000.00
307.50
11,000.00
13,000.00
1,550.00
875.00
291,732.50
43,690.00
15,000.00
800.00
16,500.00
9,100.00
1,240.00
1,050.00
43,690.00
34,230.00
5,000.00
22,000.00
39,000.00
4,650.00
1,750.00
106,630.00
172,460.00
139,500.00
1,250.00
13,200.00
15,600.00
1,860.00
1,050.00
172,460.00
297,375.00
269,700.00
1,250.00
11,000.00
13,000.00
1,550.00
875.00
297,375.00
114,862.50
87,187.50
1,250.00
11,000.00
13,000.00
1,550.00
875.00
114,862.50
55,300.00
28,125.00
750.00
11,000.00
13,000.00
1,550.00
875.00
55,300.00
384,400.00
300,000.00
2,000.00
11,000.00
65,000.00
4,650.00
1,750.00
384,400.00
60,160.00
32,760.00
8,250.00
11,000.00
6,500.00
775.00
875.00
60,160.00
51,587.50
28,125.00
600.00
7,700.00
13,000.00
1,550.00
612.50
51,587.50
205,000.00
90,000.00
200.00
3,750.00
22,000.00
78,000.00
9,300.00
1,750.00
205,000.00
163,000.00
48,000.00
200.00
3,750.00
22,000.00
78,000.00
9,300.00
1,750.00
163,000.00
29,250.00
15,750.00
200.00
5,500.00
6,500.00
775.00
525.00
29,250.00
68,996.00
1,000.00
9,900.00
1,950.00
1,395.00
78.75
83,319.75
-
-
32,760.00
5,250.00
36,300.00
54,418.00
7,285.00
2,712.50
138,725.50
1,850,000.00
111,000.00
363,000.00
143,000.00
155.00
28,000.00
2,495,155.00
829,700.00
250,000.00
10,200.00
4,000.00
110,000.00
195,000.00
232,500.00
28,000.00
829,700.00
1,347,250.00
850,000.00
102,000.00
30,000.00
4,000.00
132,000.00
188,500.00
23,250.00
17,500.00
1,347,250.00
1,742,280.00
42,000.00
204,000.00
120,000.00
197,280.00
30,000.00
660,000.00
390,000.00
46,500.00
52,500.00
1,742,280.00
20,178.50
-
1,156.00
5,200.00
2,420.00
6,600.00
3,900.00
465.00
437.50
20,178.50
#N/A
#N/A
#N/A
5,940.00
11,700.00
1,395.00
4,725.00
#N/A
#N/A
#N/A
#N/A
5,940.00
11,700.00
1,395.00
4,725.00
#N/A
#N/A
#N/A
#N/A
5,940.00
11,700.00
1,395.00
4,725.00
#N/A
#N/A
#N/A
#N/A
11,880.00
23,400.00
2,790.00
945.00
#N/A
#N/A
#N/A
#N/A
11,880.00
23,400.00
2,790.00
945.00
#N/A
772,219.72
95,659.72
74,800.00
28,000.00
31,500.00
31,200.00
24,000.00
352,000.00
131,950.00
310.00
2,800.00
772,219.72
930,590.56
164,930.56
130,900.00
52,000.00
9,000.00
50,700.00
36,000.00
352,000.00
131,950.00
310.00
2,800.00
930,590.56
1,167,641.94
244,756.94
193,800.00
73,600.00
14,850.00
94,575.00
48,000.00
352,000.00
131,950.00
310.00
2,800.00
11,000.00
1,167,641.94
547,212.50
450,000.00
50,000.00
3,300.00
39,000.00
4,650.00
262.50
547,212.50
51,650.00
35,000.00
125.00
1,100.00
13,000.00
1,550.00
875.00
51,650.00
71,525.00
55,000.00
1,100.00
13,000.00
1,550.00
875.00
71,525.00
2,718,162.13
156,680.23
113,525.00
1,819,174.65
529,723.44
276,762.06
3,895,287.00
4,394,404.15
2,070,770.00
132,552.00
652,500.00
295,330.00
155,265.00
17,210,135.65
126,955.07
182,227.76
96,415.00
405,597.83
30,000.00
8,750.00
5,940.00
11,700.00
1,395.00
4,725.00
62,510.00
35,000.00
10,208.33
5,940.00
11,700.00
1,395.00
4,725.00
68,968.33
45,000.00
13,125.00
5,940.00
11,700.00
1,395.00
4,725.00
81,885.00
50,000.00
14,583.33
11,880.00
23,400.00
2,790.00
945.00
103,598.33
55,000.00
16,041.67
11,880.00
23,400.00
2,790.00
945.00
110,056.67
-
90,000.00
26,250.00
11,880.00
23,400.00
2,790.00
945.00
155,265.00
190,000.00
55,416.67
11,880.00
23,400.00
2,790.00
945.00
284,431.67
240,000.00
70,000.00
14,850.00
29,250.00
3,487.50
1,190.00
358,777.50
87,000.00
25,375.00
8,910.00
17,550.00
2,092.50
717.50
141,645.00
34,500.00
10,062.50
8,910.00
17,550.00
2,092.50
717.50
73,832.50
24,000.00
7,000.00
8,910.00
17,550.00
2,092.50
717.50
60,270.00
15,000.00
4,375.00
5,940.00
11,700.00
1,395.00
472.50
38,882.50
9,600.00
2,800.00
3,960.00
8,580.00
930.00
315.00
26,185.00
8,100.00
2,362.50
3,960.00
7,800.00
930.00
315.00
23,467.50
344,175.00
192,500.00
400.00
100,000.00
22,000.00
26,000.00
3,100.00
175.00
344,175.00
122,093.75
25,000.00
300.00
19,200.00
5,000.00
16,500.00
52,000.00
3,875.00
218.75
122,093.75
25,000.00
300.00
38,000.00
6,000.00
4,400.00
52,000.00
3,875.00
218.75
129,793.75
120,593.75
15,000.00
2,000.00
38,000.00
12,500.00
16,500.00
32,500.00
3,875.00
218.75
120,593.75
244,425.00
150,000.00
6,600.00
78,000.00
9,300.00
525.00
244,425.00
218,525.00
150,000.00
1,100.00
65,000.00
1,550.00
875.00
218,525.00
46,106.25
22,500.00
1,650.00
19,500.00
2,325.00
131.25
46,106.25
40,737.50
25,000.00
1,100.00
13,000.00
1,550.00
87.50
40,737.50
31,606.25
8,000.00
1,650.00
19,500.00
2,325.00
131.25
31,606.25
133,687.50
55,000.00
5,500.00
65,000.00
7,750.00
437.50
133,687.50
74,343.75
35,000.00
2,750.00
32,500.00
3,875.00
218.75
74,343.75
133,606.25
110,000.00
1,650.00
19,500.00
2,325.00
131.25
133,606.25
223,606.25
200,000.00
1,650.00
19,500.00
2,325.00
131.25
223,606.25
250,962.50
225,000.00
1,815.00
21,450.00
2,557.50
140.00
250,962.50
317,193.33
227,333.33
16,320.00
18,000.00
7,500.00
27,500.00
16,250.00
2,015.00
2,275.00
317,193.33
#N/A
16,660.00
18,000.00
-
27,500.00
16,250.00
2,015.00
2,275.00
#N/A
163,510.00
71,220.00
17,000.00
18,000.00
7,500.00
28,600.00
16,900.00
2,015.00
2,275.00
163,510.00
253,705.00
77,155.00
17,000.00
18,000.00
7,500.00
77,000.00
45,500.00
5,425.00
6,125.00
253,705.00
230,830.00
53,000.00
17,680.00
18,000.00
8,100.00
77,000.00
45,500.00
5,425.00
6,125.00
230,830.00
290,750.00
33,000.00
16,660.00
18,000.00
21,850.00
115,500.00
68,250.00
8,215.00
9,275.00
290,750.00
254,925.00
71,220.00
24,055.00
15,600.00
10,000.00
77,000.00
45,500.00
5,425.00
6,125.00
254,925.00
269,138.00
47,128.00
15,810.00
7,200.00
7,500.00
110,000.00
65,000.00
7,750.00
8,750.00
269,138.00
262,110.00
53,000.00
15,810.00
7,200.00
13,750.00
99,000.00
58,500.00
6,975.00
7,875.00
262,110.00
258,060.00
53,000.00
15,810.00
7,200.00
9,700.00
99,000.00
58,500.00
6,975.00
7,875.00
258,060.00
80,000.00
17,680.00
18,000.00
8,100.00
77,000.00
45,500.00
5,425.00
6,125.00
257,830.00
218,021.00
50,000.00
19,346.00
16,800.00
7,500.00
68,200.00
45,500.00
5,425.00
5,250.00
218,021.00
38,710.00
6,000.00
1,000.00
13,200.00
15,600.00
1,860.00
1,050.00
38,710.00
600.00
100.00
2,200.00
26,000.00
3,100.00
1,750.00
33,750.00
17,937.50
1,000.00
16,500.00
-
-
437.50
17,937.50
17,027.50
90.00
16,500.00
-
-
437.50
17,027.50
12,607.50
1,200.00
500.00
250.00
4,400.00
5,200.00
620.00
437.50
12,607.50
35,800.00
5,700.00
3,400.00
7,650.00
7,700.00
9,750.00
1,162.50
437.50
35,800.00
35,037.50
4,000.00
5,700.00
3,400.00
11,700.00
7,700.00
1,170.00
930.00
437.50
35,037.50
51,257.50
4,000.00
5,700.00
3,400.00
15,750.00
7,700.00
13,650.00
620.00
437.50
51,257.50
33,592.50
10,800.00
4,400.00
8,190.00
9,765.00
437.50
33,592.50
37,207.50
3,750.00
16,740.00
6,000.00
-
7,800.00
2,480.00
437.50
37,207.50
20,800.00
8,750.00
11,000.00
-
-
1,050.00
20,800.00
49,217.50
6,750.00
750.00
300.00
100.00
17,600.00
20,800.00
2,480.00
437.50
49,217.50
30,104.00
2,800.00
2,500.00
13,000.00
2,200.00
8,190.00
976.50
437.50
30,104.00
21,628.50
3,000.00
9,000.00
3,080.00
5,460.00
651.00
437.50
21,628.50
35,150.00
2,000.00
100.00
2,200.00
26,000.00
3,100.00
1,750.00
35,150.00
42,850.00
11,250.00
6,250.00
1,500.00
1,100.00
13,000.00
3,875.00
875.00
5,000.00
42,850.00
- Split 1 - 2 cm M3 1,000,000.00
- Split 2 - 3 cm M3 1,000,000.00
- Split 3 - 5 cm M3 850,000.00
Sirtu Timbunan 220,000.00
Sirtu Timbunan, ex quarry Mile 32 M3 220,000.00
Sirtu Timbunan, ex quarry Iwaka M3 180,000.00
Sirtu Timbunan, ex quarry Kilo 7,8,14 M3 150,000.00
Pasir Pasang M 3
400,000.00
Pasir Beton M3 400,000.00
Pasir Urug 220,000.00
Tanah Timbunan ex quarry Kilo 7,8,14 M3 175,000.00
Kayu kelas I (balok) M3 3,400,000.00
Kayu kelas II (balok) 2,100,000.00
Kayu kelas II (papan) 2,000,000.00
Kayu Kelas II Matoa ( Balok ) M3 2,100,000.00
Kayu kelas I (papan) 3,750,000.00
Kayu Kelas I Besi ( Papan ) M3 3,750,000.00
Kayu Kelas II Matoa ( Papan ) M3 2,000,000.00
Kayu profil m 15,000.00
Reng ( 2 x 3 ) cm M3 2,500,000.00
Bambu Dia. 6 - 8 / 600 cm Batang 20,000.00
Bilik Bambu M2 65,000.00
Batu Tela Buah 1,900.00
Batu Tela (m3) M3 659,722.22
Batu batako 10 x 18 x 24 cm Buah 2,000.00
Bata berongga ekspose Buah 6,000.00
Roster/terawang Buah 6,000.00
Batu Bunga/Loster Buah 8,000.00
Batu Tempel Hitam M2 66,500.00
Batu Apung Kg 25,000.00
Marmer ex lokal M2 340,000.00
Batu alam Palimanan/Batu Candi M2 367,500.00
Batu Andhesit M2 350,000.00
Batu Alam Candi M2 375,000.00
Batu Andhesit M2 350,000.00
Batu Alam Limestone M2 325,000.00
Batu Alam Candi M2 375,000.00
Batu Andhesit Susun Sirih M2 380,000.00
Batu koral sikat M2 180,000.00
Tegel keramik 60x60 Buah 73,333.33
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
Tegel Keramik 40 x 40 cm Buah 11,600.00
Tegel Keramik 30 x 30 cm Buah 6,500.00
Tegel Keramik 20 x 25 cm Buah 4,000.00
Tegel Keramik 20 x 20 cm Buah 2,000.00
Tegel Keramik 10 x 20 cm Buah 1,000.00
Tegel Porselin 11 x 11 cm Buah 548.00
Tegel Mozaik 30 x 30 cm Buah 6,000.00
Tegel Teraso 30 x 30 cm Buah 6,000.00
Tegel PC Abu-Abu 20 x 20 cm Buah 2,400.00
Plint keramik artistik Buah 4,500.00
Batu Alam Palimanan Buah 15,000.00
Pipa PVC Ø 1/2 " Batang 17,000.00
Pipa PVC Ø 3/4 " Batang 22,000.00
Pipa PVC Ø 1 " Batang 27,000.00
Pipa PVC Ø 1 ½ " Batang 32,000.00
Pipa PVC Ø 2 " Batang 50,000.00
Pipa PVC Ø 3 " Batang 80,000.00
Pipa PVC Ø 4 " Batang 115,000.00
Pipa PVC dia 5" - 4m Batang 263,958.00
Pipa PVC Ø 6 " Batang 290,000.00
Koppling PVC dia 2" Buah 15,000.00
Koppling PVC dia 4" Buah 20,000.00
Pipa Gip Ø ½ " Batang 150,000.00
Pipa Gip Ø ¾ " Batang 175,000.00
Pipa Gip Ø 1 " Batang 225,000.00
Pipa Gip Ø 1 ¼ " Batang 250,000.00
Pipa Gip Ø 1 ½ " Batang 275,000.00
Pipa Gip Ø 2 " Batang 450,000.00
Pipa Gip Ø 3 " Batang 950,000.00
Pipa Gip Ø 4 " Batang 1,200,000.00
Kabel ITC 2 x 2 x 0.6 mm2 m 2,500.00
Kabel NYM 2 X 2,5 mm2 m 6,240.00
Kabel NYM 3 X 2,5 mm2 m 10,800.00
Kabel NYM 3 x 4 mm2 m 29,000.00
Kabel NYM 4 x 4 mm2 m 45,000.00
Kabel NYM HY 3 X 2,5 mm2 m 10,800.00
Klem PVC Clipsal m 675.00
Las Dop Legrand 4 mm2 Bh 1,800.00
Pipa Clipsal PVC 3/4 Bh 3,750.00
Pipa PVC Maspion 5/8 Bh 2,800.00
T.Doos PVC 3/4 Bh 5,000.00
Elbo Clipsal PVC 3/4 Bh 5,000.00
Sock PVC Clipsal 3/4 5,000.00
Isolasi Unibel Bh 12,000.00
Kran Leding (Plastik) Buah 15,000.00
Kran Leding (Stainles) Buah 75,000.00
Ijuk Kg 50,000.00
Pompa Air Sanyo PH 100 Unit 1,100,000.00
Pompa Air Honda (Alkon) Unit 3,500,000.00
Permite/Penjaga jarak bekisting/spacer Buah 15,000.00
Seal tape Roll 5,000.00
Minyak Bekesting Liter 15,000.00
Rapidrant Galon 250,000.00
Bak Cuci Stainless Steel Buah 450,000.00
Water Drain + Acesories Set 150,000.00
Floor Drain Buah 55,000.00
Tangki Air fibre Kap. 1000 Liter Buah 1,800,000.00
Kloset jongkok porselen Buah 250,000.00
Kloset Jongkok Biasa Buah 100,000.00
Kloset Duduk Keramik KIA Buah 1,800,000.00
Kloset Duduk Keramik Biasa Buah 500,000.00
Kloset duduk / monoblok 1,850,000.00
HARGA SATUAN
NO. NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
Wastafel lengkap TOTO Buah 850,000.00
Floor Drain Stainless Steel Buah 75,000.00
Kran Air Stainless 35,000.00
Lampu TL 2 x 40 Watt Phillips + Mirror inbow Buah 35,000.00
Lampu TL 2 x 20 Watt Buah 27,000.00
Lampu TL 20 Watt Buah 39,000.00
Lampu Down Light + SL 15 Watt Lengkap Buah 80,000.00
Lampu Baret SL 18 Watt Buah 25,000.00
Lampu Pijar 5 - 100 Watt + Fitting Buah 20,000.00
Kabel Snoor 2 x 0,23 "Supreme" roll 160,200.00
Kabel NYA 2,5 sqmm "Supreme" roll 333,760.00
Kabel NYA 1,5 sqmm "Supreme" roll 211,380.00
Kabel NYA 2,5 sqmm "Supreme" M1 3,337.60
Kabel NYA 1,5 sqmm "Supreme" M1 2,113.80
Kabel NYM 2 x 1,5 sqmm "Supreme" M 1
12,000.00
Kabel NYM 2 x 2,5 mm (eterna) M1 7,500.00
Kabel NYM 2 x 4 sqmm "Supreme" M1 18,750.00
Kabel NYM 3 x 1,5 sqmm "Supreme" M1 18,000.00
Kabel NYM 3 x 2,5 mm M 1
11,000.00
Kabel NYM 4 x 4 mm2 M1 27,000.00
Kabel NYM 3 x 4 sqmm "Supreme" M1 25,000.00
Kabel NYY 3 x 1,5 sqmm "Supreme" M 1
HARGA SATUAN
NO. URAIAN JENIS PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp) KETERANGAN
(Rp.)
1 2 3 4 5 6 7
A PEKERJAAN SITE DEVELOBMENT
1 Pek. Pembersihan Lokasi M2 250,000.00 19,750 4,937,500,000
2 Pek. Penimbunan Lokasi (area Bangunan Utama) m3 10,000.00 275,000 2,750,000,000
3 Pek. Pembuatan Pagar Kelilng m 2,000.00 2,200,000 4,400,000,000
TOTAL. A 12,087,500,000
B. BANGUNAN UTAMA
I PEKERJAAN PERSIAPAN
1 Pek. Mobilisasi/Demobilisasi Ls 1.00 2,550,000,000 2,550,000,000
2 Pek. Gudang / Direksi keet M2 32.00 1,026,600 32,851,200
3 Pek. Pengukuran & Pasang Bowplank M1 200.00 66,025 13,205,000
4 Quality Control Ls 1.00 250,000,000 250,000,000
TOTAL. B1 2,846,056,200
II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi M3 735.87 127,225 93,620,773
2 Pek. Timbun Kembali Hasil Galian M3 245.29 24,445 5,996,096
3 Pek. Urug Sirtu Peninggian Peil Lantai M3 1,554.00 295,875 459,789,750
4 Pek. Urug Pasir dibawah Pondasi M3 53.44 298,750 15,966,236
TOTAL. B2 575,372,854
III PEKERJAAN PONDASI
a Pekerjaan pondasi tiang Pancang
1 Pengadaan Spun Piles Ø 45 : Ttk 105 5,744,108 603,131,288
2 Pemancangan Spun Piles : m 1,260 448,632 565,275,690
3 Sambungan Pemancangan Ttk 105 553,697 58,138,185
4 Pengupasan Kepala Tiang Pancang Ttk 105 1,601,875 168,196,875
Sub Total B3.a 1,394,742,037.50
b Pekerjaan Pondasi Struktur
1 Pek. Pondasi Beton Pile Cap (K300) M3 148.75 6,063,940.35 902,011,127.10
2 Pek. Pondasi Beton Foot Plat (K300) M3 10.24 6,399,915.85 65,535,138.26
3 Pek. Pondasi Beton Tangga (K300) M3 46.52 6,399,915.85 297,724,085.15
4 Pek. Beton Lantai Kerja Pondasi (K125) m3 149.77 1,311,470 196,424,072.12
5 Pek. Beton Lantai Kerja Slof (K125) m3 8.02 1,311,470 10,520,173.27
Sub Total B3.b 1,472,214,595.91
TOTAL. B3 2,866,956,633.41
IV PEKERJAAN BETON
a Pekerjaan Lantai 1
1 Pek. Beton Slof utama uk. 30x60 M3 48.13 10,370,355.17 499,125,194.13
2 Pek. Beton Slof uk. 25x40 M3 12.31 9,388,358.71 115,570,695.71
3 Pek. Beton Slof Praktis uk. 15x20 M3 1.16 5,944,829.25 6,916,655.03
4 Pek. Beton Kolom Utama uk. Ø80 M3 11.29 10,995,700.00 124,093,930.39
5 Pek. Beton Kolom Utama uk. Ø70 M3 30.20 10,995,700.00 332,116,142.42
6 Pek. Beton Kolom Utama uk. 60x60 M3 16.07 10,995,700.00 176,700,899.00
7 Pek. Beton Kolom uk. 40x40 M3 8.34 10,995,700.00 91,704,138.00
8 Pek. Beton Kolom uk. 30x30 M3 2.16 10,995,700.00 23,750,712.00
9 Pek. Beton Kolom Praktis M3 1.39 11,424,423.01 15,834,250.29
10 Pek. Beton Ring Balk Praktis Praktis M3 0.45 11,887,711.30 5,349,470.09
Pek. Beton Tangga Ke Lantai 2 m3 53.16 8,141,850.00 432,820,746.00
Sub Total B4.a 1,823,982,833.05
b Pekerjaan Lantai 2
1 Pek. Beton Balok Utama uk 40x80 M3 120.89 10,417,123 1,259,325,965.25
2 Pek. Beton Balok anak uk30x60 M3 4.50 10,417,123 46,877,052.23
3 Pek. Lisplan Beton M3 2.24 17,503,274 39,207,333.08
4 Pek. Beton Plat Lantai 2 T=15cm M3 87.00 10,462,867 910,269,430.76
5 Pek. Beton Kolom Utama uk. Ø80 M3 7.99 12,095,270.00 96,639,521.01
6 Pek. Beton Kolom Utama uk. Ø70 M3 12.45 12,095,270.00 150,573,769.39
7 Pek. Beton Kolom uk. 30x30 M3 1.44 12,095,270.00 17,417,188.80
8 Pek. Beton Kolom Praktis M3 0.26 12,566,865.31 3,317,652.44
9 Pek. Beton Tangga Ke Lantai 3 M3 2.37 8,956,035.00 21,225,802.95
10 Pek. Beton Tangga luar dari lantai 2 ke Top flour M3 8.53 10,177,312.50 86,832,830.25
Sub Total B4.b 2,631,686,546.17
517211341.xlsx/Nas
1 2 3 4 5 6 7
c Pekerjaan Lantai 3
1 Pek. Beton Balok anak uk30x60 M3 25.50 11,458,835 292,200,292.21
2 Pek. Lisplan Beton M3 0.28 19,253,601 5,391,008.30
3 Pek. Beton Plat Lantai 2 T=12cm M3 12.42 11,509,154 142,932,180.08
4 Pek. Beton Kolom Utama uk. Ø80 M3 7.99 12,095,270.00 96,639,521.01
5 Pek. Beton Kolom Utama uk. Ø70 M3 12.45 12,095,270.00 150,573,769.39
6 Pek. Beton Kolom uk. 30x30 M3 1.44 12,095,270.00 17,417,188.80
7 Pek. Beton Kolom Praktis M3 0.26 12,566,865.31 3,317,652.44
Sub Total B4.c 708,471,612.23
d Pekerjaan Lantai 4
1 Pek. Beton Balok Utama uk 40x80 M3 50.44 12,500,547 630,527,603.81
2 Pek. Beton Balok anak uk30x60 M3 20.88 12,500,547 261,011,426.80
3 Pek. Lisplan Beton M3 15.89 21,003,928 333,752,422.88
4 Pek. Beton Plat Lantai 2 T=12cm M3 32.25 12,555,440 404,912,953.68
5 Pek. Beton Kolom Utama uk. Ø80 M3 3.99 12,095,270.00 48,319,760.51
6 Pek. Beton Kolom Utama uk. Ø70 M3 6.22 12,095,270.00 75,286,884.69
7 Pek. Beton Kolom uk. 30x30 M3 1.44 12,095,270.00 17,417,188.80
8 Pek. Beton Kolom Praktis M3 0.13 12,566,865.31 1,658,826.22
Sub Total B4.d 1,772,887,067.40
e Pekerjaan Top Flour
1 Pek. Beton Balok Utama uk 40x80 M3 13.69 13,021,403 178,263,012.49
2 Pek. Lisplan Beton M3 3.00 21,879,092 65,637,276.37
3 Pek. Beton Plat Lantai 2 T=12cm M3 12.74 13,078,584 166,621,157.30
4 Pek. Beton atap tangga M3 6.56 13,078,584 85,795,509.57
Sub Total B4.e 496,316,955.73
TOTAL. B4 7,433,345,015
V. PEKERJAAN PASANGAN DAN PLESTERAN
a Pekerjaan Lantai I
1 Pek. Pasangan Pondasi Batu Kali 1 :4 M3 8.14 1,544,650.00 12,580,122.17
2 Pek. Batu Kosong M3 6.98 1,042,170.00 7,274,763.47
3 Pek. Pasangan Pondasi Trassraam 1:3 M3 6.87 2,482,650.00 17,064,743.04
4 Pek. Pasangan Dinding Batu Tela 1 :4 m2 467.38 238,185 111,321,714.38
5 Pek. Plesteran Dinding 1:4 M2 934.75 77,658 72,590,815.50
6 Pek. Plesteran Beton 1 : 3 M2 184.66 79,869 14,748,593.43
7 Pek. Acian Dinding Dan Beton M2 1,119.41 43,825 49,058,114.14
8 Pek. Pasangan Keramik Lantai (60x60) M2 937.74 317,193 297,444,876.40
9 Pek. Pasangan Keramik Tangga (60x60) M2 330.54 333,053 110,086,387.04
10 Pek. Pas. Plin Keramik 10x60 m1 746.27 66,611 49,709,685.01
11 Pek. Pasangan Keramik Lantai Km/WC (20x20) M2 26.32 230,830 6,075,445.60
12 Pek. Pasangan Keramik Dinding Km/WC (20x25) M2 30.90 257,830 7,966,947.00
13 Pek. Profilan Kolom Bulat Lot 20.00 1,200,000 24,000,000.00
14 Pek. Penebalan Kaki Kolom Bulat Bh 20.00 850,000 17,000,000.00
Sub Total B5.a 796,922,207.17
b Pekerjaan Lantai 2
1 Pek. Pasangan Dinding Batu Tela 1 :4 m3 111.48 85,424 9,523,045.22
2 Pek. Plesteran Dinding 1:4 M2 222.96 85,424 19,046,090.45
3 Pek. Plesteran Beton 1 : 3 M2 86.69 87,856 7,615,912.67
4 Pek. Acian Dinding Dan Beton M2 309.65 48,208 14,927,268.90
5 Pek. Pasangan Keramik Lantai (60x60) M2 572.36 348,913 199,703,653.89
6 Pek. Pas. Plin Keramik 10x60 m1 57.24 76,761 4,393,480.39
7 Pek. Profilan Kolom Lot 12.00 500,000 6,000,000.00
8 Biaya Lansiran material Ls 1.00 26,120,945 26,120,945.15
Sub Total B5.b 287,330,396.67
c Pekerjaan Lantai 3
1 Pek. Pasangan Dinding Batu Tela 1 :4 m3 126.50 93,190 11,788,484.40
2 Pek. Plesteran Dinding 1:4 M2 253.00 93,190 23,576,968.80
3 Pek. Plesteran Beton 1 : 3 M2 24.14 95,843 2,313,338.16
4 Pek. Acian Dinding Dan Beton M2 277.14 52,590 14,574,620.95
5 Pek. Pasangan Keramik Lantai (60x60) M2 89.38 380,632 34,020,888.16
6 Pek. Pas. Plin Keramik 10x60 m1 55.00 83,739 4,605,647.20
7 Pek. Profilan Kolom Lot 12.00 650,000 7,800,000.00
8 Biaya Lansiran material Ls 1.00 9,867,995 9,867,994.77
Sub Total B5.c 108,547,942.44
517211341.xlsx/Nas
1 2 3 4 5 6 7
d Pekerjaan Lantai 4 dan Top Flour
1 Pek. Pasangan Dinding Batu Tela 1 :4 m3 89.40 97,073 8,678,281.50
2 Pek. Plesteran Dinding 1:4 M2 178.80 97,073 17,356,563.00
3 Pek. Plesteran Beton 1 : 3 M2 35.99 99,837 3,593,115.64
4 Pek. Acian Dinding Dan Beton M2 214.79 54,781 11,766,464.69
5 Pek. Pasangan Keramik Lantai (60x60) M2 251.41 396,492 99,681,969.92
6 Pek. Pas. Plin Keramik 10x60 m1 154.71 87,228 13,494,650.21
7 Pek. Profilan Kolom Lot 12.00 780,000 9,360,000.00
8 Biaya Lansiran material Ls 1.00 16,393,104 16,393,104.50
Sub Total B5.d 180,324,149.45
TOTAL. B5 1,373,124,696
VI. PEKERJAAN KOSEN, PINTU DAN JENDELA (Lantai 1,2 ,3 & 4)
1 Pek. Kosen Pintu Dan Jendela Kayu Kelas I M3 3.21 7,626,750 24,454,411.20
2 Pek. Pintu Panil Kelas I m2 42.56 705,250 30,014,029.50
3 Pek. Daun Pintu Tripleks Lapis Formika m2 3.02 516,775 1,562,727.60
4 Pek. Daun Jendela Kaca Buka m2 62.35 538,700 33,586,436.64
5 Pek. Daun Vetilasi Kaca Buka m2 18.61 538,700 10,026,284.40
6 Pek. Daun Jendela Kaca Mati m2 34.96 223,606 7,817,095.62
TOTAL. B6 107,460,985
VII PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pek. Kunci Pintu Tanan dobel Set 4.00 244,425 977,700.00
2 Pek. Kunci Tanam Set 4.00 218,525 874,100.00
3 Pek. Kunci cilinder Set 4.00 218,525 874,100.00
4 Pek. Tarikan Pintu Dobel Set 4.00 133,688 534,750.00
5 Pek. Engsel Pintu Ps 19.00 46,106 876,018.75
6 Pek. Engsel Jendela Ps 26.00 40,738 1,059,175.00
7 Pek. Grendel Jendela Set 26.00 31,606 821,762.50
8 Pek. Hak Angin jendela dan ventilasi Set 26.00 31,606 821,762.50
TOTAL. B7 6,839,369
VIII. PEKERJAAN PLAFON DAN INTERIOR/EXTERIOR
a Pekerjaan Plafon
1 Pek. Plafon Gysum + Rangka, Lantai 1 m2 629.60 222,045 139,798,801.22
2 Pek. Plafon Triplex + Rangka, Lantai 1 m2 26.32 161,930 4,261,997.60
3 Pek. List Plafon Profil Gysum, Lantai 1 m 944.39 28,685 27,089,941.89
4 Pek. List Plafon Profil Kayu, Lantai 1 m 52.64 34,685 1,825,818.40
5 Pek. Plafon Gysum + Rangka, Lantai 2 m2 80.44 222,045 17,861,764.00
6 Pek. List Plafon Profil Gysum, Lantai 2 m 96.53 28,685 2,768,974.52
Sub Total B8.a 193,607,297.63
b Pekerjaan Exterior dan Interior
1 Pek. Railing tangga Lantai m 273.00 1,144,871.71 312,549,976.61
2 Pek. Railing Selasar Lantai m 135.00 1,144,871.71 154,557,680.74
3 Pek. Dinding Pembukus dan assessoris m2 469.06 594,737.50 278,965,192.80
4 Pek. Pasangan Batu Tempel m2 57.00 567,000.00 32,319,000.00
5 Pek. Saluran Keliling Bangunan m 220.00 405,597.83 89,231,522.91
Sub Total B8.b 867,623,373.07
TOTAL.B 8 1,061,230,671
IX PEKERJAAN MECANIKAL ELECTRICAL
a PEKERJAAN ELECTRICAL
1 Pek. Panel BH 2.00 2,500,000.00 5,000,000.00
2 Pek. Intralasi Penerangan + Armatur Ttk 135.00 515,607.50 69,607,012.50
Pek Instalasi Power Ac Ttk 8.00 1,219,750.00 9,758,000.00
3 Pek. Istalasi Stop Kontak Ttk 30.00 387,500.00 11,625,000.00
Sub Total B9.a 95,990,012.50
b PEKERJAAN MECANIKAL
1 Pek. Intalasi Pipa Air Bersih m 50.00 68,968.33 3,448,416.67
2 Pek. Intalasi Pipa Pembuangan Air Kotor m 24.00 60,270.00 1,446,480.00
3 Pek. Intalasi Pipa Pembuangan Air Hujan Pvc 4 Inc m 65.00 73,832.50 4,799,112.50
4 Pek. Intalasi Pipa Pembuangan Air Tinja Pvc 4 Inc m 24.00 73,832.50 1,771,980.00
5 Pek. Septiptank dan peresapan Unit 1.00 17,210,135.65 17,210,135.65
6 Pek. Klosed Jongkok Bh 4.00 829,700.00 3,318,800.00
7 Pek. Wastaffel Dinding Bh 4.00 1,347,250.00 5,389,000.00
8 Pek. Kran Air bh 4.00 51,650.00 206,600.00
9 Pek. Flour Drain bh 3.00 71,525.00 214,575.00
Pek. Orinoir bh 3.00 1,347,250.00 4,041,750.00
Sub Total B9.b 41,846,849.81
TOTAL B. 9 137,836,862
517211341.xlsx/Nas
1 2 3 4 5 6 7
X PEKERJAAN PENGECATAN
a Cat Tembok :
1 Pek. Cat Bagian Dalam dengan Interior m2 960.49 32,604.00 31,315,852.90
2 Pek. Cat Bagian Luar dengan Exterior (Mowilex) m2 1,200.61 45,604.00 54,752,797.04
3 Pek. Cat Plafon Gysum dan Plafon Triplex m2 736.36 40,907.00 30,122,196.71
Sub Total B10.a 116,190,846.64
b Cat Kayu dan Besi :
1 Pek. Cat Kusen Pintu dan jendela m2 64.13 51,257.50 3,287,040.96
2 Pek. Cat Daun Pintu m2 85.12 51,257.50 4,362,833.37
3 Pek. Cat Daun Jendela m2 80.96 51,257.50 4,149,766.19
4 Pek. Cat Lisplan kayu m2 1.60 51,257.50 82,012.00
5 Pek. Cat List Plafon profil kayu m2 80.96 5,126 414,976.62
6 Pek. Cat Meni Rangka Plafon Kayu m2 52.64 33,750 1,776,600.00
Sub Total B10.b 14,073,229.14
TOTAL. B10 130,264,076
XI PEKERJAAN KHUSUS PATUNG KRISTUS
a Pekerjaan Rangka Baja
1 Pek. Kolom baja HB 400x400 Kg 16,137.92 40,065 646,560,842.73
2 Pek. Balok Baja HB 600X200 Kg 12,122.29 40,065 485,675,700.45
3 Pek. Plat Simpul Aneka Ukuran Kg 1,500.00 40,065 60,097,042.50
4 Pek. Best Plat + Anchor Bolt Set 4.00 5,000,000 20,000,000.00
Sub Total B11.a 1,212,333,585.68
a Pembuatan Patung dengan Material dan Tenaga Khusus
1 Badan Patung m2 839.39 1,500,000 1,259,082,000.00
2 Kepala Patung m2 59.32 1,650,000 97,871,400.00
3 Assesories Ls 1.00 250,000,000 250,000,000.00
Alat Bantu Ls 1.00 250,000,000 250,000,000.00
Sub Total B11.b 1,856,953,400.00
TOTAL. B11 3,069,286,986
XII PEKERJAAN AKHIR
1 Biaya Pelaporan dan dokumentasi Ls 1.00 7,500,000.00 7,500,000.00
2 Biaya Pembersihan Akhir Ls 1.00 5,000,000.00 5,000,000.00
TOTAL. B12 12,500,000
TOTAL. B 19,620,274,346
C. BANGUNAN PENUNJANG
1 Kantor Permanen m2 400.00 8,500,000.00 3,400,000,000.00
2 Pengadaan Tenaga Listrik Ls 1.00 1,500,000,000.00 1,500,000,000.00
3 Pengadaan Air Bersih Ls 1.00 950,000,000.00 950,000,000.00
4 Sarana Olah Raga dan Pendidikan ls 1.00 2,885,000,000 2,885,000,000.00
5 Jalan dan Pelataran Ls 1.00 2,497,269,381 2,497,269,380.93
6 Lanscape ls 1.00 350,000,000 350,000,000.00
TOTAL. C 11,582,269,381
PENANGGUNG JAWAB
AGUSTINUS ANGGAIBAK
517211341.xlsx/Nas
perhitungan Panjang Lebar
1 Galian Pondasi
P1 2 2
P2 1.8 1.8
P3 1.6 1.6
Urugan Pasir
Bawah Bawah Pondasi
P1 2 2
P2 1.8 1.8
P3 1.6 1.6
Pek. Beton
PEKERJAAN PADA ELEVASI (BOC -3,15 S/D TOC. -0,05)
Lantai Kerja
Bawah Bawah Pondasi
P1 2 2
P2 1.8 1.8
P3 1.6 1.6
Pedestal Kolom
K1. Ø 50 (-2,60 s/d. -1,10) 1.5 0.19625
K1. Ø 50 (-2,60 s/d. -0,05) 2.45 0.19625
Slof
S1 (-0,05 & -1,10) 0.25 0.4
S2 (-1,10) 0.2 0.35
S3 0.15 0.2
Tangga beton
Tangga Dalam 2 Unit
Tangga Luar 2 Unit
Profilan Lisplan
Profilan Kolom
B. Pekerjaan Lantai 2
1 Pek. Pasangan Dinding Batu Tela 1 :4 52.111 1
2 Pek. Plesteran Dinding 1:4 521.11 1
3 Pek. Plesteran Beton 1 : 3 208.444 1
4 Pek. Acian Dinding Dan Beton 1250.664 1
5 Pek. Pasangan Keramik Lantai (60x60) 445.7442 1
Pas. Plin Keramik 10x60 164.35 1
6 Pek. Profilan Lisplan
7 Pek. Profilan Kolom
KKB1 6
7,38 KG/M L. 70.70.7 47.447
5,42 KG/M L.60.60.6
Kk.atas 49.518
Skor-datar/tegak 62.543
skor miring 10.608
Meni besi
4,06 KG/M Pek. Gording LIP Cannal 100X50X2X2,3 Kg
37,011
38,922
40,750
42,570
44,406
46,234
48,062
49,890
51,718
53,546
55,374
24,643
24,935
19,548
21,162
22,790
1.07693034684812 24,543
26,431
28,465
30,655
33,013
35,552
68,970
72,729
104% 75,558
78,497
81,550
84,723
88,018
91,442
94,999
98,694
102,533
106,521
110,665
114,969
119,441
Lt
R1 50.40 1
R2 44.67 1
r2 43.79 1
2.15 36 309.60
2.12 28 192.33
2.15 16 88.06
589.99
0.6 1 99.00
0.5 1 46.88
145.88
735.87 m3
0.1 36 14.40
0.1 28 9.07
0.1 16 4.10
27.57
0.1 1 16.50
0.1 1 9.38
25.88
53.44 m3
0.1 1 194.25 m3
0.8 1 1,554.00 m3
0.05 36 7.20
0.05 28 4.54
0.05 16 2.05
13.78
0.05 1 4.69
m3
0.07 1 135.98 m3
35.28
20.02
6.40
61.70 m3
Solid
1 12.00 3.53 3.06
1 16.00 7.69 7.70
10.76
0.35 2.00 0.315 0.32
0.35 28.00 7.203 7.20
7.52
0.6 0 -
0.6 6.00 1.764 1.76
22.43 m3
Solid
1 12.00 11.82 11.95
1 18.00 14.02 14.03
25.98
0.35 2.00 1.054 1.05
0.35 28.00 11.672 11.53
12.58
0.6 0 -
0.6 6.00 2.858 2.86
6.73
11.63
18.36
2.447
1.586
2.65
13.246
19.93
.7.00 S/D +27.92)
15.708
1.00
7.694
1.772
1.08
14.745
0.2 1 33.00 m3
0.8 1 59.40 m3
1 1 69.03 m3
1 1 48.87 m3
1 1 172.57 m2
1 2 977.46 m2
1 1 345.14 m2
1 1 1,322.60 m2
m2
1 1 833.76
1 1 156.18
1 1 50.54
1 1 50.54
1 1 64.87
1 2 119.89
1 2 163.83
1,439.61 m2
1 4 36.04
1 2 5.78
1 1 23.65
1 1 13.11
1 2 44.72
2 2 14.02
2 2 10.46
2 2 121.66
269.44 m2
1 2 6.00 m2
1 2 24.50 m2
1 1 584.79
1 1 52.11
1 1 521.11
1 1 208.44
1 1 1,250.66
1 1 445.74 Area = 2941542.7, Length = 9210.0
1 1 164.35 Area = 1515922.0, Length = 7224.5
0.88 4 10.14 m2
1.52 3 37.39 m2
1.47 2 8.47 m2
1.47 1 4.23 m2
1.47 1 2.12 m2
62.35 m2
0.47 2 3.85 m2
0.47 1 1.54 m2
0.47 2 7.71 m2
0.47 2 2.71 m2
0.47 1 1.35 m2
0.47 1 0.68 m2
0.47 1 0.77 m2
18.61 m2
0.47 8 10.83 m2
0.92 1 7.99
0.62 1 16.14
34.96 m2
1 1 1.00 Ps
1 1 5.00 Ps
1 1 4.00 Ps
10.00 Ps
1 1 4.00 Ps
1 1 2.00 Ps
1 1 10.00 Ps
1 2 3.00 Ps
1 2 15.00 Ps
1 1 6.00 Ps
1 1 3.00 Ps
1 2 12.00 Ps
39.00 Ps
1 4 16.00 Ps
1 2 20.00 Ps
1 3 12.00 Ps
1 1 4.00 Ps
1 1 2.00 Ps
1 1 10.00 Ps
1 1 4.00 Ps
- Ps
1 1 20.00 Ps
1 3 12.00 Ps
1 1 4.00 Ps
1 1 2.00 Ps
1 1 2.00 Ps
108.00 Ps
108.00 Ps
108.00 Ps
Kg/m
5.42 2 536.78
5.42 2 677.97
5.42 2 114.99
1,329.73 0.6 61.87%
32.29 1 119.22 5.55%
2,149.27 kg 100.00% panjang kuda2 kkb1 tampak atas =35,12m
37.011 2 74.022
38.922 2 77.844
40.75 2 81.5
42.57 2 85.14
44.406 2 88.812
46.234 2 92.468
48.062 2 96.124
49.89 2 99.78
51.718 2 103.436
53.546 2 107.092
55.374 2 110.748
24.643 2 49.286
24.935 2 49.87
19.548 2 39.096
21.162 2 42.324
22.79 2 45.58
24.5432426 2 49.08648521
26.43136277 2 52.86272554
28.46473668 2 56.92947335
30.65453874 2 61.30907748
33.01280304 2 66.02560608
35.55248943 2 71.10497886
68.97 1 68.97
72.729 1 72.729
75.558 1 75.558
78.49704195 1 78.49704195
81.55040624 1 81.55040624
84.72253977 1 84.72253977
88.0180624 1 88.0180624
91.44177369 1 91.44177369
94.9986599 1 94.9986599
98.69390126 1 98.69390126
102.5328795 1 102.5328795
106.5211856 1 106.5211856
110.6646282 1 110.6646282
114.9692416 1 114.9692416
119.4412952 1 119.4412952
2,989.75 m 12,138.38 kg
cat meni 1,209.65 m2
1.3 1 227.31 m
cat 181.85 m2
0.1 1 0.65 m3
1 1 63.95 m
1 1 155.45 m
fakt lempeng
1 2 1972.49928
1 1 357.56878
1 6 452.65056
1 2 49.9272
2,832.65 m2
17.03
15.75
22.87
18.22
12.83
86.70 m
35.42
16.74
52.16 m
138.86
50.40 m
44.67 m
43.79 m
0.1 1 0.00209205
0.1 1 0.0041841
0.1 1 0.01
0.1 1 0.112
0.1261841 m3
Slof S1
Slof S2
Slof S1
k1
k2
k3
k4
kp
k5
19.94
15.28
19.30
3.27
3.39
61.20 per m Patokan
1,853.08 kg
1,254.56 kg
2,438.13 kg
1,871.44 kg
941.23 kg
1,854.30 kg
612.29 kg
1,248.44 kg
1,253.34 kg
13,326.79 15,476.06
UKURAN
P L
m m
Bawah 39.918667
atas 33.973333
Bawah 30.8
atas 25.813333
Beton K225 m3 1 1
D19 21.66 m
D16 19.76 m
Ø 12 3.70 m
P3
Ø 10 - m
Ø8 - m
Bawah 21.66
atas 19.76
S1
Beton K225 0.1 m3 1 0.25
D19 7.00 m
S1
D16 - m
Ø 12 2.00 m
Ø 10 12.00 m
Ø8 - m
Beton K225 m3 1 0.2
D19 m
D16 4 m
Ø 12 2 m
S2
Ø 10 10 m
m
UKURAN
P L
m m
Balok
B1
Konsol KB
0.085 8 Bh
Beton K225 m3 1 0.085
D19 15.76 m
D16 m
Ø 12 2.90 m
Ø 10 8.480 m
Ø8 - m
bh/m3
1 0.085 11.765 20.235 203.888 - 37.529 109.741 -
m/m3
0.52 0.042 24.038 26.923 - - 31.731 237.981 -
m/m3
0.12 0.120 8.333 8.333 - - - 366.667 -
m/m3
0.2 0.200 5.000 10.000 - 11.000 11.000 220.000 -
BESI BETON
Berat (Kg/m3)
D19 D16 Ø 12 Ø 10 Ø8 Jumlah
2.225565 1.57824 0.88776 0.6165 0.39456 (kg)
BESI BETON
Berat (Kg/m3)
D19 D16 Ø 12 Ø 10 Ø8 Jumlah
2.225565 1.57824 0.88776 0.6165 0.39456 (kg)
- - - 226.050 - 226.050
RSNI.T-15-2002.2
1 m' Pek. Pengukuran & pemasangan Bowplank
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu Kelas II (Balok) btg 0.012 Rp. 2,000,000.00 Rp. Rp. 24,000.00
Bahan Paku biasa kg 0.020 Rp. 20,000.00 Rp. Rp. 400.00
Kayu Kelas II (Papan) m3 0.007 Rp. 2,200,000.00 Rp. Rp. 15,400.00
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
39,800.00
Jumlah harga =
Pembulatan =
RSNI.T-15-2002.3
1 m2 Pek. Kantor direksi keet dengan lantai plesteran
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu Dolken Ǿ 8-10 m' 5.625 Rp. 25,000.00 Rp. Rp. 140,625.00
Kayu Kelas II (Balok) m3 0.180 Rp. 2,000,000.00 Rp. Rp. 360,000.00
Paku biasa kg 0.850 Rp. 20,000.00 Rp. Rp. 17,000.00
Besi Strip kg 1.100 Rp. 14,800.00 Rp. Rp. 16,280.00
Portland Semen kg 35.000 Rp. 1,700.00 Rp. Rp. 59,500.00
Pasir pasang m3 0.250 Rp. 400,000.00 Rp. Rp. 100,000.00
Bahan Kerikil beton m3 0.150 Rp. 450,000.00 Rp. Rp. 67,500.00
Batu Tela bh 30.000 Rp. 2,300.00 Rp. Rp. 69,000.00
Seng Gelombang BJLS 32 lbr 1.500 Rp. 64,000.00 Rp. Rp. 96,000.00
Kaca Nako Set 0.500 Rp. 175,900.00 Rp. Rp. 87,950.00
Kaca Polos m2 0.080 Rp. 157,800.00 Rp. Rp. 12,624.00
Kunci Tanam Biasa bh 0.150 Rp. 97,900.00 Rp. Rp. 14,685.00
Tripleks 6mm lbr 0.060 Rp. 84,700.00 Rp. Rp. 5,082.00
Pekerja Oh 2.000 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 2.000 Rp. Rp. 110,000.00 Rp.
Tenaga Tukang Batu Oh 1.000 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.300 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.050 Rp. Rp. 150,000.00 Rp.
1,046,246.00
Jumlah harga =
Pembulatan =
RSNI.T-15-2002.4
1 m2 Pembuatan gudang sementara dan alat-alat
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu Dolken Ǿ 8-10 m' 7.650 Rp. 25,000.00 Rp. Rp. 191,250.00
Kayu Kelas II (Balok) m3 0.210 Rp. 2,000,000.00 Rp. Rp. 420,000.00
Paku biasa kg 0.300 Rp. 20,000.00 Rp. Rp. 6,000.00
Bahan Portland Semen kg 10.500 Rp. 1,700.00 Rp. Rp. 17,850.00
Pasir pasang m3 0.030 Rp. 400,000.00 Rp. Rp. 12,000.00
Kerikil beton m3 0.050 Rp. 450,000.00 Rp. Rp. 22,500.00
Seng Gelombang BJLS 32 lbr 1.500 Rp. 64,000.00 Rp. Rp. 96,000.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 2.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.200 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.050 Rp. Rp. 150,000.00 Rp.
765,600.00
Jumlah harga =
Pembulatan =
RSNI.T-15-2002.5
1 m2 Pembuatan rumah jaga konstruksi kayu
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu Dolken Ǿ 8-10 m' 13.500 Rp. 25,000.00 Rp. Rp. 337,500.00
Kayu Kelas II (Balok) m3 0.276 Rp. 2,000,000.00 Rp. Rp. 552,000.00
Bahan
Paku biasa kg 0.700 Rp. 20,000.00 Rp. Rp. 14,000.00
Seng Gelombang BJLS 32 lbr 1.500 Rp. 64,000.00 Rp. Rp. 96,000.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 1.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.150 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.050 Rp. Rp. 150,000.00 Rp.
999,500.00
Jumlah harga =
Pembulatan =
RSNI.T-15-2002.6
1 m2 Membersihkan lapangan dan perataan
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.050 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
RSNI.T-15-2002.7
1 m2 Pembuatan bedeng buruh
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu Dolken Ǿ 8-10 m' 5.625 Rp. 25,000.00 Rp. Rp. 140,625.00
Kayu Kelas II (Balok) m3 0.186 Rp. 2,000,000.00 Rp. Rp. 372,000.00
Paku biasa kg 0.300 Rp. 20,000.00 Rp. Rp. 6,000.00
Bahan Portland Semen kg 18.000 Rp. 1,700.00 Rp. Rp. 30,600.00
Pasir pasang m3 0.030 Rp. 400,000.00 Rp. Rp. 12,000.00
Kerikil beton m3 0.050 Rp. 450,000.00 Rp. Rp. 22,500.00
Seng Gelombang BJLS 32 lbr 1.500 Rp. 64,000.00 Rp. Rp. 96,000.00
Tripleks 6mm lbr 1.350 Rp. 84,700.00 Rp. Rp. 114,345.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 2.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.200 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.050 Rp. Rp. 150,000.00 Rp.
794,070.00
Jumlah harga =
Pembulatan =
PEKERJAAN TANAH
SNI.DT 91-0006-2007.6.1
Menggali 1 m3 tanah biasa sedalam 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 0.750 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.025 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.2
Menggali 1 m3 tanah biasa sedalam 2 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 0.900 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.045 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.3
Menggali 1 m3 tanah biasa sedalam 3 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 1.050 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.067 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.5
Menggali 1 m3 tanah cadas sedalam 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 1.500 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.060 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.6
Menggali 1 m3 tanah lumpur sedalam 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 1.200 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.045 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.7
Mengerjakan 1 m2 stripping tebing setinggi 1 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 0.050 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.8
Membuang 1 m3 tanah sejauh 30 meter
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 0.330 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.9
Mengurug kembali 1 m3 galian
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali upah pekerjaan
Menggali 1 m3 tanah biasa sedalam 3 meter Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.10
Memadatkan 1 m3 tanah (per 20 cm)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pekerja Oh 0.500 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.050 Rp. Rp. 150,000.00 Rp.
0.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.11
Mengurug 1 m3 pasir urug
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pasir Urug m3 1.200 Rp. 226,000.00 Rp. Rp. 271,200.00
Bahan
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
271,200.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.12
Mengurug 1 m3 tanah urug
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Tanah Timbun m3 1.200 Rp. 69,000.00 Rp. Rp. 82,800.00
Bahan
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
82,800.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.14
Memasang 1 m2 lapisan ijuk tebal 10 cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Ijuk kg 6.000 Rp. 27,000.00 Rp. Rp. 162,000.00
Bahan
Pekerja Oh 0.150 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
162,000.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0006-2007.6.15
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Sirtu m3 1.200 Rp. 329,000.00 Rp. Rp. 394,800.00
Bahan
Rp.
Pekerja Oh 0.250 Rp. Rp. 100,000.00 Rp.
Tenaga
Mandor Oh 0.025 Rp. Rp. 150,000.00 Rp.
394,800.00
Jumlah harga =
Pembulatan =
PEKERJAAN PONDASI
SNI.DT 91-0007-2006.6.1
Memasang 1 m3 pondasi batu belah, campuran 1 PC: 3 PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu belah 10-15cm m3 1.200 Rp. 600,000.00 Rp. Rp. 720,000.00
Bahan Portland Semen kg 202.000 Rp. 1,700.00 Rp. Rp. 343,400.00
Pasir pasang m3 0.485 Rp. Rp. Rp. 0.00
Pekerja Oh 1.500 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.750 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.075 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.075 Rp. Rp. 150,000.00 Rp.
1,063,400.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0007-2006.6.2
Memasang 1 m3 pondasi batu belah, campuran 1 PC: 4 PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu belah 10-15cm m3 1.200 Rp. 600,000.00 Rp. Rp. 720,000.00
Bahan Portland Semen kg 163.000 Rp. 1,700.00 Rp. Rp. 277,100.00
Pasir pasang m3 0.520 Rp. 400,000.00 Rp. Rp. 208,000.00
Pekerja Oh 1.500 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.750 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.075 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.075 Rp. Rp. 150,000.00 Rp.
1,205,100.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0007-2006.6.9
Memasang 1 m3 batu kosong (anstamping)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu belah 10-15cm m3 1.200 Rp. 600,000.00 Rp. Rp. 720,000.00
Bahan
Pasir Urug m3 0.432 Rp. 226,060.00 Rp. Rp. 97,657.92
Pekerja Oh 0.780 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.390 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.039 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.039 Rp. Rp. 150,000.00 Rp.
817,657.92
Jumlah harga =
Pembulatan =
SNI.DT 91-0007-2006.6.10
Memasang 1 m3 pondasi siklop campuran 1 PC:2PB:3KR
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu belah 10-15cm m3 0.480 Rp. 600,000.00 Rp. Rp. 288,000.00
Portland Semen kg 194.000 Rp. 1,700.00 Rp. Rp. 329,800.00
Pasir pasang m3 0.312 Rp. 400,000.00 Rp. Rp. 124,800.00
Bahan
Batu pecah 5-7 m3 0.468 Rp. 750,000.00 Rp. Rp. 351,000.00
Besi beton kg 126.000 Rp. 20,000.00 Rp. Rp. 2,520,000.00
Kawat beton kg 1.800 Rp. 18,300.00 Rp. Rp. 32,940.00
Pekerja Oh 3.400 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.850 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.085 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.170 Rp. Rp. 150,000.00 Rp.
3,646,540.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0007-2006.6.11
Memasang 1 m3 pondasi sumuran, diameter 100 cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu belah 10-15cm m3 0.450 Rp. 600,000.00 Rp. Rp. 270,000.00
Portland Semen kg 194.000 Rp. 1,700.00 Rp. Rp. 329,800.00
Bahan
Pasir pasang m3 0.312 Rp. 400,000.00 Rp. Rp. 124,800.00
Batu pecah 5-7 m3 0.468 Rp. 750,000.00 Rp. Rp. 351,000.00
Pekerja Oh 2.400 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.800 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.080 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.119 Rp. Rp. 150,000.00 Rp.
1,075,600.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0008-2007
PEKERJAAN BETON
SNI.DT 91-0008-2007.6.1
Membuat 1 m3 beton mutu K 100
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 247.000 Rp. 1,700.00 Rp. Rp. 419,900.00
Bahan Pasir pasang m3 0.869 Rp. 400,000.00 Rp. Rp. 347,600.00
Batu Pecah 5-7 m3 0.999 Rp. 750,000.00 Rp. Rp. 749,250.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,532,875.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.2
Membuat 1 m3 beton mutu K 125
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 276.000 Rp. 1,700.00 Rp. Rp. 469,200.00
Bahan Pasir pasang m3 0.828 Rp. 400,000.00 Rp. Rp. 331,200.00
Kerikil Beton m3 1.012 Rp. 450,000.00 Rp. Rp. 455,400.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,271,925.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.4
Membuat 1 m3 beton mutu K 150
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 299.000 Rp. 1,700.00 Rp. Rp. 508,300.00
Bahan Pasir pasang m3 0.799 Rp. 400,000.00 Rp. 319,600.00
Kerikil Beton m3 1.017 Rp. 450,000.00 Rp. Rp. 457,650.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,301,675.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.5
Membuat 1 m3 beton mutu K 175
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 326.000 Rp. 1,700.00 Rp. Rp. 554,200.00
Bahan Pasir pasang m3 0.760 Rp. 400,000.00 Rp. Rp. 304,000.00
Kerikil Beton m3 1.029 Rp. 450,000.00 Rp. Rp. 463,050.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,337,375.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.6
Membuat 1 m3 beton mutu f'c = 16.9 Mpa k200
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 352.000 Rp. 1,700.00 Rp. Rp. 598,400.00
Bahan Pasir pasang m3 0.731 Rp. 400,000.00 Rp. Rp. 292,400.00
Kerikil Beton m3 1.031 Rp. 450,000.00 Rp. Rp. 463,950.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,370,875.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.7
Membuat 1 m3 beton mutu K 225
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 371.000 Rp. 1,700.00 Rp. Rp. 630,700.00
Bahan Pasir pasang m3 0.698 Rp. 400,000.00 Rp. Rp. 279,200.00
Kerikil Beton m3 1.047 Rp. 450,000.00 Rp. Rp. 471,150.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,397,175.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.8
Membuat 1 m3 beton mutu K 250
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 384.000 Rp. 1,700.00 Rp. Rp. 652,800.00
Bahan Pasir pasang m3 0.692 Rp. 400,000.00 Rp. Rp. 276,800.00
Kerikil Beton m3 1.039 Rp. 450,000.00 Rp. Rp. 467,550.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,413,275.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.9
Membuat 1 m3 beton mutu K 275
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 406.000 Rp. 1,700.00 Rp. Rp. 690,200.00
Bahan Pasir pasang m3 0.684 Rp. 400,000.00 Rp. Rp. 273,600.00
Kerikil Beton m3 1.026 Rp. 450,000.00 Rp. Rp. 461,700.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,441,625.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.10
Membuat 1 m3 beton mutu K 300
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 413.000 Rp. 1,700.00 Rp. Rp. 702,100.00
Bahan Pasir pasang m3 0.681 Rp. 400,000.00 Rp. Rp. 272,400.00
Kerikil Beton m3 1.021 Rp. 450,000.00 Rp. Rp. 459,450.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 1.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.028 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.083 Rp. Rp. 150,000.00 Rp.
1,450,075.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.11
Membuat 1 m3 beton mutu K 325
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 439.000 Rp. 1,700.00 Rp. Rp. 746,300.00
Bahan Pasir pasang m3 0.670 Rp. 400,000.00 Rp. Rp. 268,000.00
Kerikil Beton m3 1.006 Rp. 450,000.00 Rp. Rp. 452,700.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 2.100 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.105 Rp. Rp. 150,000.00 Rp.
1,483,125.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.12
Membuat 1 m3 beton mutu K 350
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 448.000 Rp. 1,700.00 Rp. Rp. 761,600.00
Bahan Pasir pasang m3 0.667 Rp. 400,000.00 Rp. Rp. 266,800.00
Kerikil Beton m3 1.000 Rp. 450,000.00 Rp. Rp. 450,000.00
Air Liter 215.000 Rp. 75.00 Rp. Rp. 16,125.00
Pekerja Oh 2.100 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.105 Rp. Rp. 150,000.00 Rp.
1,494,525.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.17
Pembesian 10 kg dengan besi polos atau besi ulir
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Besi beton (polos/ulir) kg 10.500 Rp. 20,000.00 Rp. Rp. 210,000.00
Bahan
Kawat beton kg 0.150 Rp. 18,300.00 Rp. Rp. 2,745.00
Pekerja Oh 0.070 Rp. Rp. 100000 Rp.
Tukang batu Oh 0.070 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.007 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.004 Rp. Rp. 150,000.00 Rp.
Rp. 212,745.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.18
Memasang 10 kg kabel pres stressed polos /strands
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Besi beton (polos/ulir) kg 10.500 Rp. 20,000.00 Rp. Rp. 210,000.00
Bahan
Kawat beton kg 0.100 Rp. 18,300.00 Rp. Rp. 1,830.00
Pekerja Oh 0.050 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.050 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
211,830.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.19
Memasang 10 kg jaring kawat baja/wire mest
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Jaring kawat baja kg 10.200 Rp. 30,000.00 Rp. Rp. 306,000.00
Bahan
Kawat beton kg 0.050 Rp. 18,300.00 Rp. Rp. 915.00
Pekerja Oh 0.025 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.025 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.025 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
306,915.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.20
Memasang 1 m2 bekisting untuk pondasi
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.040 Rp. 1,850,000.00 Rp. Rp. 74,000.00
Bahan Paku 5cm-10cm kg 0.300 Rp. 20,000.00 Rp. Rp. 6,000.00
minyak bekisting Ltr 0.100 Rp. 6,900.00 Rp. Rp. 690.00
Pekerja Oh 0.520 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.260 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.026 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.026 Rp. Rp. 150,000.00 Rp.
80,690.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.21
Memasang 1 m2 bekisting untuk sloof
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.045 Rp. 1,850,000.00 Rp. Rp. 83,250.00
Bahan Paku 5cm-10cm kg 0.300 Rp. 20,000.00 Rp. Rp. 6,000.00
minyak bekisting Ltr 0.100 Rp. 6,900.00 Rp. Rp. 690.00
Pekerja Oh 0.520 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.260 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.026 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.026 Rp. Rp. 150,000.00 Rp.
89,940.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.22
Memasang 1 m2 bekisting untuk kolom
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.040 Rp. 1,850,000.00 Rp. Rp. 74,000.00
Bahan Paku 5cm-10cm kg 0.400 Rp. 20,000.00 Rp. Rp. 8,000.00
minyak bekisting Ltr 0.200 Rp. 6,900.00 Rp. Rp. 1,380.00
kayu klas II m3 0.015 Rp. 2,200,000.00 Rp. Rp. 33,000.00
Tripleks tebal 9 mm Lbr 0.350 Rp. 127,000.00 Rp. Rp. 44,450.00
Kayu Bulat O4" K Btg 2.000 Rp. 25,000.00 Rp. Rp. 50,000.00
Pekerja Oh 0.660 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.330 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.033 Rp. Rp. 150,000.00 Rp.
210,830.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.23
Memasang 1 m2 bekisting untuk balok
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.040 Rp. 1,850,000.00 Rp. Rp. 74,000.00
Bahan Paku 5cm-10cm kg 0.400 Rp. 20,000.00 Rp. Rp. 8,000.00
minyak bekisting Ltr 0.200 Rp. 6,900.00 Rp. Rp. 1,380.00
kayu klas II m3 0.018 Rp. 2,200,000.00 Rp. Rp. 39,600.00
Tripleks tebal 9 mm Lbr 0.350 Rp. 127,000.00 Rp. Rp. 44,450.00
Kayu Bulat O4" K Btg 2.000 Rp. 25,000.00 Rp. Rp. 50,000.00
Pekerja Oh 0.660 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.330 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.033 Rp. Rp. 150,000.00 Rp.
217,430.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.24
Memasang 1 m2 bekisting untuk lantai
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.040 Rp. 1,850,000.00 Rp. Rp. 74,000.00
Bahan Paku 5cm-10cm kg 0.400 Rp. 20,000.00 Rp. Rp. 8,000.00
minyak bekisting Ltr 0.200 Rp. 6,900.00 Rp. Rp. 1,380.00
kayu klas II m3 0.015 Rp. 2,200,000.00 Rp. Rp. 33,000.00
Tripleks tebal 9 mm Lbr 0.350 Rp. 127,000.00 Rp. Rp. 44,450.00
Kayu Bulat O4" K Btg 6.000 Rp. 25,000.00 Rp. Rp. 150,000.00
Pekerja Oh 0.660 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.330 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.033 Rp. Rp. 150,000.00 Rp.
310,830.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.25
Memasang 1 m2 bekisting untuk dinding
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.030 Rp. 1,850,000.00 Rp. Rp. 55,500.00
Bahan Paku 5cm-10cm kg 0.400 Rp. 20,000.00 Rp. Rp. 8,000.00
minyak bekisting Ltr 0.200 Rp. 6,900.00 Rp. Rp. 1,380.00
kayu klas II m3 0.020 Rp. 2,200,000.00 Rp. Rp. 44,000.00
Tripleks tebal 9 mm Lbr 0.350 Rp. 127,000.00 Rp. Rp. 44,450.00
Kayu Bulat O4" K Btg 3.000 Rp. 25,000.00 Rp. Rp. 75,000.00
Pekerja Oh 0.660 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.330 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.033 Rp. Rp. 150,000.00 Rp.
228,330.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.26
Memasang 1 m2 bekisting untuk tangga
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.030 Rp. 1,850,000.00 Rp. Rp. 55,500.00
Bahan Paku 5cm-10cm kg 0.400 Rp. 20,000.00 Rp. Rp. 8,000.00
minyak bekisting Ltr 0.150 Rp. 6,900.00 Rp. Rp. 1,035.00
kayu klas II m3 0.015 Rp. 2,200,000.00 Rp. Rp. 33,000.00
Tripleks tebal 9 mm Lbr 0.350 Rp. 127,000.00 Rp. Rp. 44,450.00
Kayu Bulat O4" K Btg 2.000 Rp. 25,000.00 Rp. Rp. 50,000.00
Pekerja Oh 0.660 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.330 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.033 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.033 Rp. Rp. 150,000.00 Rp.
191,985.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.27
Memasang 1 m2 jembatan untuk pengecoran beton
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.026 Rp. 1,850,000.00 Rp. Rp. 48,100.00
Bahan Paku 5cm-10cm kg 0.600 Rp. 20,000.00 Rp. Rp. 12,000.00
Kayu Bulat O4" K Btg 0.500 Rp. 25,000.00 Rp. Rp. 12,500.00
Pekerja Oh 0.150 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.050 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.008 Rp. Rp. 150,000.00 Rp.
72,600.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.28
Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.200 Rp. 1,850,000.00 Rp. Rp. 370,000.00
Paku 5cm-10cm kg 1.500 Rp. 20,000.00 Rp. Rp. 30,000.00
minyak bekisting Ltr 0.400 Rp. 6,900.00 Rp. Rp. 2,760.00
Besi beton polos kg 157.500 Rp. 17,500.00 Rp. Rp. 2,756,250.00
Bahan
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.262 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
4,351,885.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.28A
Membuat 1 m3 pondasi beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.200 Rp. 1,850,000.00 Rp. Rp. 370,000.00
Paku 5cm-10cm kg 1.500 Rp. 20,000.00 Rp. Rp. 30,000.00
minyak bekisting Ltr 0.400 Rp. 6,900.00 Rp. Rp. 2,760.00
Besi beton polos kg 131.250 Rp. 17,500.00 Rp. Rp. 2,296,875.00
Bahan
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.262 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
3,892,510.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.28B
Membuat 1 m3 pondasi beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.200 Rp. 1,850,000.00 Rp. Rp. 370,000.00
Paku 5cm-10cm kg 1.500 Rp. 20,000.00 Rp. Rp. 30,000.00
Bahan
minyak bekisting Ltr 0.400 Rp. 6,900.00 Rp. Rp. 2,760.00
Besi beton polos kg 105.000 Rp. 17,500.00 Rp. Rp. 1,837,500.00
Bahan
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.262 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
3,433,135.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.29
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.270 Rp. 1,850,000.00 Rp. Rp. 499,500.00
Paku 5cm-10cm kg 2.000 Rp. 20,000.00 Rp. Rp. 40,000.00
minyak bekisting Ltr 0.600 Rp. 6,900.00 Rp. Rp. 4,140.00
Besi beton polos kg 210.000 Rp. 17,500.00 Rp. Rp. 3,675,000.00
Bahan Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 3.500 Rp. 127,000.00 Rp. Rp. 444,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.560 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.323 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.283 Rp. Rp. 150,000.00 Rp.
5,869,740.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.29A
Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.270 Rp. 1,850,000.00 Rp. Rp. 499,500.00
Paku 5cm-10cm kg 2.000 Rp. 20,000.00 Rp. Rp. 40,000.00
minyak bekisting Ltr 0.600 Rp. 6,900.00 Rp. Rp. 4,140.00
Besi beton polos kg 157.500 Rp. 17,500.00 Rp. Rp. 2,756,250.00
Bahan Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 3.500 Rp. 127,000.00 Rp. Rp. 444,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.560 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.323 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.283 Rp. Rp. 150,000.00 Rp.
4,950,990.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.29B
Membuat 1 m3 sloof beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.270 Rp. 1,850,000.00 Rp. Rp. 499,500.00
Bahan
Paku 5cm-10cm kg 2.000 Rp. 20,000.00 Rp. Rp. 40,000.00
minyak bekisting Ltr 0.600 Rp. 6,900.00 Rp. Rp. 4,140.00
Besi beton polos kg 131.250 Rp. 17,500.00 Rp. Rp. 2,296,875.00
Bahan Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 3.500 Rp. 127,000.00 Rp. Rp. 444,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.560 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.323 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.283 Rp. Rp. 150,000.00 Rp.
4,491,615.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.29C
Membuat 1 m3 sloof beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.270 Rp. 1,850,000.00 Rp. Rp. 499,500.00
Paku 5cm-10cm kg 2.000 Rp. 20,000.00 Rp. Rp. 40,000.00
minyak bekisting Ltr 0.600 Rp. 6,900.00 Rp. Rp. 4,140.00
Besi beton polos kg 105.000 Rp. 17,500.00 Rp. Rp. 1,837,500.00
Bahan Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 3.500 Rp. 127,000.00 Rp. Rp. 444,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
Pekerja Oh 5.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.560 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.323 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.283 Rp. Rp. 150,000.00 Rp.
4,032,240.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.30
Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.400 Rp. 1,850,000.00 Rp. Rp. 740,000.00
Paku 5cm-10cm kg 4.000 Rp. 20,000.00 Rp. Rp. 80,000.00
minyak bekisting Ltr 2.000 Rp. 6,900.00 Rp. Rp. 13,800.00
Besi beton polos kg 315.000 Rp. 17,500.00 Rp. Rp. 5,512,500.00
Kawat beton kg 4.500 Rp. 18,300.00 Rp. Rp. 82,350.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 3.500 Rp. 127,000.00 Rp. Rp. 444,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.150 Rp. 2,200,000.00 Rp. Rp. 330,000.00
Kayu Bulat O4" K Btg 20.000 Rp. 25,000.00 Rp. Rp. 500,000.00
Pekerja Oh 7.050 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.650 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 2.100 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.403 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.353 Rp. Rp. 150,000.00 Rp.
8,854,850.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.30
Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.400 Rp. 1,850,000.00 Rp. Rp. 740,000.00
Paku 5cm-10cm kg 4.000 Rp. 20,000.00 Rp. Rp. 80,000.00
minyak bekisting Ltr 2.000 Rp. 6,900.00 Rp. Rp. 13,800.00
Besi beton polos kg 210.000 Rp. 17,500.00 Rp. Rp. 3,675,000.00
Kawat beton kg 4.500 Rp. 18,300.00 Rp. Rp. 82,350.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 3.500 Rp. 127,000.00 Rp. Rp. 444,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.150 Rp. 2,200,000.00 Rp. Rp. 330,000.00
Kayu Bulat O4" K Btg 20.000 Rp. 25,000.00 Rp. Rp. 500,000.00
Pekerja Oh 7.050 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.650 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 2.100 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.403 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.353 Rp. Rp. 150,000.00 Rp.
7,017,350.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.31
Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 210.000 Rp. 17,500.00 Rp. Rp. 3,675,000.00
Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.140 Rp. 2,200,000.00 Rp. Rp. 308,000.00
Kayu Bulat O4" K Btg 16.000 Rp. 25,000.00 Rp. Rp. 400,000.00
Pekerja Oh 6.350 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.650 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.333 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.318 Rp. Rp. 150,000.00 Rp.
6,612,240.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.31A
Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 157.500 Rp. 17,500.00 Rp. Rp. 2,756,250.00
Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.140 Rp. 2,200,000.00 Rp. Rp. 308,000.00
Kayu Bulat O4" K Btg 16.000 Rp. 25,000.00 Rp. Rp. 400,000.00
Pekerja Oh 6.350 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang kayu Oh 1.650 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.333 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.318 Rp. Rp. 150,000.00 Rp.
5,693,490.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.31B
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 131.250 Rp. 17,500.00 Rp. Rp. 2,296,875.00
Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.140 Rp. 2,200,000.00 Rp. Rp. 308,000.00
Kayu Bulat O4" K Btg 16.000 Rp. 25,000.00 Rp. Rp. 400,000.00
Pekerja Oh 6.350 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.650 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.333 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.318 Rp. Rp. 150,000.00 Rp.
5,234,115.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.31C
Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 105.000 Rp. 17,500.00 Rp. Rp. 1,837,500.00
Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.140 Rp. 2,200,000.00 Rp. Rp. 308,000.00
Kayu Bulat O4" K Btg 16.000 Rp. 25,000.00 Rp. Rp. 400,000.00
Pekerja Oh 6.350 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.650 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.333 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.318 Rp. Rp. 150,000.00 Rp.
4,774,740.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.32
Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 157.500 Rp. 17,500.00 Rp. Rp. 2,756,250.00
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Bahan
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.120 Rp. 2,200,000.00 Rp. Rp. 264,000.00
Kayu Bulat O4" K Btg 32.000 Rp. 25,000.00 Rp. Rp. 800,000.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.265 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
6,035,765.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.32A
Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 131.250 Rp. 17,500.00 Rp. Rp. 2,296,875.00
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.120 Rp. 2,200,000.00 Rp. Rp. 264,000.00
Kayu Bulat O4" K Btg 32.000 Rp. 25,000.00 Rp. Rp. 800,000.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.265 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
5,576,390.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.32B
Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.320 Rp. 1,850,000.00 Rp. Rp. 592,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 105.000 Rp. 17,500.00 Rp. Rp. 1,837,500.00
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.120 Rp. 2,200,000.00 Rp. Rp. 264,000.00
Kayu Bulat O4" K Btg 32.000 Rp. 25,000.00 Rp. Rp. 800,000.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.265 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
5,117,015.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.33
Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.240 Rp. 1,850,000.00 Rp. Rp. 444,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 157.500 Rp. 17,500.00 Rp. Rp. 2,756,250.00
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.160 Rp. 2,200,000.00 Rp. Rp. 352,000.00
Kayu Bulat O4" K Btg 24.000 Rp. 25,000.00 Rp. Rp. 600,000.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.265 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
5,775,765.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.33A
Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.240 Rp. 1,850,000.00 Rp. Rp. 444,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 131.250 Rp. 17,500.00 Rp. Rp. 2,296,875.00
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.160 Rp. 2,200,000.00 Rp. Rp. 352,000.00
Kayu Bulat O4" K Btg 24.000 Rp. 25,000.00 Rp. Rp. 600,000.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.265 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
5,316,390.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.33B
Membuat 1 m3 dinding beton bertulang (100 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.240 Rp. 1,850,000.00 Rp. Rp. 444,000.00
Paku 5cm-10cm kg 3.200 Rp. 20,000.00 Rp. Rp. 64,000.00
minyak bekisting Ltr 1.600 Rp. 6,900.00 Rp. Rp. 11,040.00
Besi beton polos kg 105.000 Rp. 17,500.00 Rp. Rp. 1,837,500.00
Kawat beton kg 2.250 Rp. 18,300.00 Rp. Rp. 41,175.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.800 Rp. 127,000.00 Rp. Rp. 355,600.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.160 Rp. 2,200,000.00 Rp. Rp. 352,000.00
Kayu Bulat O4" K Btg 24.000 Rp. 25,000.00 Rp. Rp. 600,000.00
Pekerja Oh 5.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang kayu Oh 1.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.050 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.262 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.265 Rp. Rp. 150,000.00 Rp.
4,857,015.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.34
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.250 Rp. 1,850,000.00 Rp. Rp. 462,500.00
Paku 5cm-10cm kg 3.000 Rp. 20,000.00 Rp. Rp. 60,000.00
minyak bekisting Ltr 1.200 Rp. 6,900.00 Rp. Rp. 8,280.00
Besi beton polos kg 210.000 Rp. 17,500.00 Rp. Rp. 3,675,000.00
Kawat beton kg 3.000 Rp. 18,300.00 Rp. Rp. 54,900.00
Bahan Portland Semen kg 336.000 Rp. 1,700.00 Rp. Rp. 571,200.00
Tripleks tebal 9 mm Lbr 2.500 Rp. 127,000.00 Rp. Rp. 317,500.00
Pasir beton m3 0.540 Rp. 400,000.00 Rp. Rp. 216,000.00
Kerikil Beton m3 0.810 Rp. 450,000.00 Rp. Rp. 364,500.00
kayu klas II m3 0.105 Rp. 2,200,000.00 Rp. Rp. 231,000.00
Kayu Bulat O4" K Btg 14.000 Rp. 25,000.00 Rp. Rp. 350,000.00
Pekerja Oh 5.650 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.275 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 1.560 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 1.400 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.323 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.283 Rp. Rp. 150,000.00 Rp.
6,310,880.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.35
Membuat 1 m' kolom praktis beton bertulang (11x11) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.002 Rp. 1,850,000.00 Rp. Rp. 3,700.00
Paku 5cm-10cm kg 0.010 Rp. 20,000.00 Rp. Rp. 200.00
minyak bekisting Ltr 1.200 Rp. 6,900.00 Rp. Rp. 8,280.00
Besi beton polos kg 3.000 Rp. 17,500.00 Rp. Rp. 52,500.00
Bahan
Kawat beton kg 0.450 Rp. 18,300.00 Rp. Rp. 8,235.00
Portland Semen kg 4.000 Rp. 1,700.00 Rp. Rp. 6,800.00
Pasir beton m3 0.006 Rp. 400,000.00 Rp. Rp. 2,400.00
Kerikil Beton m3 0.009 Rp. 450,000.00 Rp. Rp. 4,050.00
Pekerja Oh 0.180 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.020 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 0.020 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 0.020 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.009 Rp. Rp. 150,000.00 Rp.
86,165.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0008-2007.6.36
Membuat 1 m' ring balok beton bertulang (10x15) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.003 Rp. 1,850,000.00 Rp. Rp. 5,550.00
Paku 5cm-10cm kg 0.020 Rp. 20,000.00 Rp. Rp. 400.00
minyak bekisting Ltr 1.200 Rp. 6,900.00 Rp. Rp. 8,280.00
Besi beton polos kg 3.600 Rp. 17,500.00 Rp. Rp. 63,000.00
Bahan
Kawat beton kg 0.050 Rp. 18,300.00 Rp. Rp. 915.00
Portland Semen kg 5.500 Rp. 1,700.00 Rp. Rp. 9,350.00
Pasir beton m3 0.009 Rp. 400,000.00 Rp. Rp. 3,600.00
Kerikil Beton m3 0.015 Rp. 450,000.00 Rp. Rp. 6,750.00
Pekerja Oh 0.297 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.033 Rp. Rp. 110,000.00 Rp.
Tukang kayu Oh 0.033 Rp. Rp. 110,000.00 Rp.
Tenaga
Tukang Besi Oh 0.033 Rp. Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
97,845.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0009-2007
PEKERJAAN DINDING
SNI.DT 91-0009-2007.6.1
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 2PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 140.000 Rp. - Rp. Rp. 0.00
Bahan Portland Semen kg 43.500 Rp. 1,700.00 Rp. Rp. 73,950.00
Pasir pasang m3 0.080 Rp. 400,000.00 Rp. Rp. 32,000.00
Pekerja Oh 0.600 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.030 Rp. Rp. 150,000.00 Rp.
105,950.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0009-2007.6.2
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 3PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 140.000 Rp. - Rp. Rp. 0.00
Bahan Portland Semen kg 32.950 Rp. 1,700.00 Rp. Rp. 56,015.00
Pasir pasang m3 0.091 Rp. 400,000.00 Rp. Rp. 36,400.00
Pekerja Oh 0.600 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.030 Rp. Rp. 150,000.00 Rp.
92,415.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0009-2007.6.3
Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi 1 PC: 4PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 140.000 Rp. - Rp. Rp. 0.00
Bahan Portland Semen kg 26.550 Rp. 1,700.00 Rp. Rp. 45,135.00
Pasir pasang m3 0.093 Rp. 400,000.00 Rp. Rp. 37,200.00
Pekerja Oh 0.600 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.030 Rp. Rp. 150,000.00 Rp.
82,335.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0009-2007.6.7
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 2PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 70.000 Rp. - Rp. Rp. 0.00
Bahan Portland Semen kg 18.950 Rp. 1,700.00 Rp. Rp. 32,215.00
Pasir pasang m3 0.038 Rp. 400,000.00 Rp. Rp. 15,200.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
47,415.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0009-2007.6.8
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 3PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 70.000 Rp. - Rp. Rp. 0.00
Bahan Portland Semen kg 14.370 Rp. 1,700.00 Rp. Rp. 24,429.00
Pasir pasang m3 0.040 Rp. 400,000.00 Rp. Rp. 16,000.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
40,429.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0009-2007.6.9
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC: 4PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 70.000 Rp. - Rp. Rp. 0.00
Bahan Portland Semen kg 11.500 Rp. 1,700.00 Rp. Rp. 19,550.00
Pasir pasang m3 0.043 Rp. 400,000.00 Rp. Rp. 17,200.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
36,750.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0009-2007.6.23
Memasang 1 m2 dinding terawang campuran spesi 1 PC: 4PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu kerawang bh 30.000 Rp. 6,000.00 Rp. Rp. 180,000.00
Bahan Portland Semen kg 11.000 Rp. 1,700.00 Rp. Rp. 18,700.00
Pasir pasang m3 0.035 Rp. 400,000.00 Rp. Rp. 14,000.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
212,700.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0010-2007
PEKERJAAN PLESTERAN
SNI.DT 91-0010-2007.6.1
Memasang 1 m2 plesteran 1 PC: 1PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 15.504 Rp. 1,700.00 Rp. Rp. 26,356.80
Bahan
Pasir pasang m3 0.016 Rp. 400,000.00 Rp. Rp. 6,400.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
32,756.80
Jumlah harga =
Pembulatan =
SNI.DT 91-0010-2007.6.2
Memasang 1 m2 plesteran 1 PC: 2PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 10.224 Rp. 1,700.00 Rp. Rp. 17,380.80
Bahan
Pasir pasang m3 0.020 Rp. 400,000.00 Rp. Rp. 8,000.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
25,380.80
Jumlah harga =
Pembulatan =
SNI.DT 91-0010-2007.6.3
Memasang 1 m2 plesteran 1 PC: 3PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Semen portland kg 7.776 Rp. #N/A Rp. Rp. #N/A
Bahan
Pasir pasang m3 0.023 Rp. 400,000.00 Rp. Rp. 9,200.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0010-2007.6.4
Memasang 1 m2 plesteran 1 PC: 4PP, tebal 15 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 6.240 Rp. 1,700.00 Rp. Rp. 10,608.00
Bahan
Pasir pasang m3 0.024 Rp. 400,000.00 Rp. Rp. 9,600.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
20,208.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0010-2007.6.23
Memasang 1 m2 plesteran ciprat 1 PC: 2PP
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Portland Semen kg 4.320 Rp. 1,700.00 Rp. Rp. 7,344.00
Bahan
Pasir pasang m3 0.006 Rp. 400,000.00 Rp. Rp. 2,400.00
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.015 Rp. Rp. 150,000.00 Rp.
9,744.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0010-2007.6.27
Memasang 1 m2 acian
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Portland Semen kg 3.250 Rp. 1,700.00 Rp. Rp. 5,525.00
Pekerja Oh 0.200 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
5,525.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0012-2007
PEKERJAAN PENUTUP LANTAI DAN DINDING
SNI.DT 91-0012-2007.6.13
Memasang 1 m2 lantai keramik ukuran (60x60) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Lantai keramik 60x60 Bh 3.100 Rp. 75,800.00 Rp. Rp. 234,980.00
Portland Semen kg 9.600 Rp. 1,700.00 Rp. Rp. 16,320.00
Bahan
Pasir pasang m3 0.045 Rp. 400,000.00 Rp. Rp. 18,000.00
Semen warna kg 1.500 Rp. 5,000.00 Rp. Rp. 7,500.00
Pekerja Oh 0.240 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.120 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.012 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.012 Rp. Rp. 150,000.00 Rp.
276,800.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.34
Memasang 1 m2 lantai keramik ukuran (40x40) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Lantai keramik 40x40 Bh 6.500 Rp. 16,900.00 Rp. Rp. 109,850.00
Portland Semen kg 8.190 Rp. 1,700.00 Rp. Rp. 13,923.00
Bahan
Pasir pasang m3 0.045 Rp. 400,000.00 Rp. Rp. 18,000.00
Semen warna kg 1.620 Rp. 5,000.00 Rp. Rp. 8,100.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
149,873.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.35
Memasang 1 m2 lantai keramik ukuran (30x30) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Lantai keramik 30x30 Bh 11.500 Rp. 9,500.00 Rp. Rp. 109,250.00
Portland Semen kg 10.000 Rp. 1,700.00 Rp. Rp. 17,000.00
Bahan
Pasir pasang m3 0.045 Rp. 400,000.00 Rp. Rp. 18,000.00
Semen warna kg 1.500 Rp. 5,000.00 Rp. Rp. 7,500.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
151,750.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.36
Memasang 1 m2 lantai keramik ukuran (20x20) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Lantai keramik 20x20 Bh 25.000 Rp. 3,800.00 Rp. Rp. 95,000.00
Portland Semen kg 10.400 Rp. 1,700.00 Rp. Rp. 17,680.00
Bahan
Pasir pasang m3 0.045 Rp. 400,000.00 Rp. Rp. 18,000.00
Semen warna kg 1.620 Rp. 5,000.00 Rp. Rp. 8,100.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
138,780.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.36.1
Memasang 1 m2 dinding keramik ukuran (20x25) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Keramik 20x25 Bh 20.000 Rp. 4,100.00 Rp. Rp. 82,000.00
Portland Semen kg 10.400 Rp. 1,700.00 Rp. Rp. 17,680.00
Bahan
Pasir pasang m3 0.045 Rp. 400,000.00 Rp. Rp. 18,000.00
Semen warna kg 1.620 Rp. 5,000.00 Rp. Rp. 8,100.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
125,780.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.44
Memasang 1 m2 lantai karpet
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Karpet m2 1.050 Rp. 98,700.00 Rp. Rp. 103,635.00
Bahan
Lem karpet kg 0.350 Rp. 50,000.00 Rp. Rp. 17,500.00
Pekerja Oh 0.170 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.170 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.017 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.009 Rp. Rp. 150,000.00 Rp.
121,135.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.46
Memasang 1 m2 lantai parquet
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Parquet m2 1.050 Rp. 175,000.00 Rp. Rp. 183,750.00
Bahan
Lem Kayu kg 0.600 Rp. 40,700.00 Rp. Rp. 24,420.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
208,170.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.47
Memasang 1 m2 lantai kayu (gym floor)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Gymfloor m2 1.050 Rp. 250,000.00 Rp. Rp. 262,500.00
Bahan
Lem kg 0.600 Rp. 35,000.00 Rp. Rp. 21,000.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
283,500.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.57
Memasang 1 m2 dinding batu paras
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu paras m2 1.100 Rp. 300,000.00 Rp. Rp. 330,000.00
Bahan Portland Semen kg 11.750 Rp. 1,700.00 Rp. Rp. 19,975.00
Pasir pasang m3 0.035 Rp. 400,000.00 Rp. Rp. 14,000.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
363,975.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.58
Memasang 1 m2 dinding batu tempel hitam
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Batu tempel hitam m2 1.100 Rp. 113,600.00 Rp. Rp. 124,960.00
Bahan Portland Semen kg 11.750 Rp. 1,700.00 Rp. Rp. 19,975.00
Pasir pasang m3 0.035 Rp. 400,000.00 Rp. Rp. 14,000.00
Pekerja Oh 0.700 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.350 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.035 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.035 Rp. Rp. 150,000.00 Rp.
158,935.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.60
Memasang 1 m2 wall paper
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Wallpaper m2 2.200 Rp. 33,300.00 Rp. Rp. 73,260.00
Bahan
Lem kg 0.250 Rp. 35,000.00 Rp. Rp. 8,750.00
Pekerja Oh 0.350 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.175 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.017 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00 Rp.
82,010.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.61
Memasang 1 m2 floor hardener
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Floor Hardener kg 5.000 Rp. 150,000.00 Rp. Rp. 750,000.00
Pekerja Oh 0.120 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.120 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.012 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.006 Rp. Rp. 150,000.00 Rp.
750,000.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0012-2007.6.7
Memasang 1 m2 conblok #6 cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Conblok #6cm bh 44.000 Rp. 25,000.00 Rp. Rp. 1,100,000.00
Bahan
Pasir urug m3 0.055 Rp. 226,060.00 Rp. Rp. 12,433.30
Pekerja Oh 0.300 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
1,112,433.30
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0011-2007
PEKERJAAN KAYU
SNI.DT 91-0011-2007.6.1
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu klas I
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Balok kayu kls I m3 1.100 Rp. 3,400,000.00 Rp. Rp. 3,740,000.00
Bahan Paku biasa kg 1.250 Rp. 20,000.00 Rp. Rp. 25,000.00
Lem kayu kg 1.000 Rp. 40,700.00 Rp. Rp. 40,700.00
Pekerja Oh 7.000 Rp. Rp. 100,000.00 Rp.
Tenaga
Tukang Kayu Oh 21.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 2.100 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.350 Rp. Rp. 150,000.00 Rp.
3,805,700.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.2
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Balok kayu kls II m3 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan Paku biasa kg 1.250 Rp. 20,000.00 Rp. Rp. 25,000.00
Lem kayu kg 1.000 Rp. 40,700.00 Rp. Rp. 40,700.00
Pekerja Oh 6.000 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 18.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 1.800 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.300 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.3
Membuat dan memasang 1 m2 daun pintu panel , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Papan kayu kls II m3 0.040 Rp. #N/A Rp. Rp. #N/A
Bahan
Lem kayu kg 0.500 Rp. 40,700.00 Rp. Rp. 20,350.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00Rp.
Tukang Kayu Oh 3.000 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.300 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.050 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.6
Membuat dan memasang 1 m2 pintu dan jendela kaca , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Papan kayu kls II m3 0.024 Rp. #N/A Rp. Rp. #N/A
Bahan
Lem kayu kg 0.300 Rp. 40,700.00 Rp. Rp. 12,210.00
Pekerja Oh 0.800 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 2.400 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.240 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.040 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.7
Membuat dan memasang 1 m2 pintu dan jendela jalusi , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Papan kayu kls II m3 0.064 Rp. #N/A Rp. Rp. #N/A
Bahan
Lem kayu kg 0.500 Rp. 40,700.00 Rp. Rp. 20,350.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00Rp.
Tukang Kayu Oh 3.000 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.300 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.050 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.9
Membuat 1 m2 pintu plywood rangkap rangka expose , kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Papan kayu kls II m3 0.026 Rp. #N/A Rp. Rp. #REF!
Bahan
Bahan Paku Biasa kg 0.030 Rp. 20,000.00 Rp. Rp. 600.00
Lem kayu kg 0.500 Rp. 40,700.00 Rp. Rp. 20,350.00
Tripleks tebal 9 mm lbr 1.000 Rp. 127,000.00 Rp. Rp. 127,000.00
Pekerja Oh 0.800 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 2.400 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.240 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.040 Rp. Rp. 150,000.00 Rp.
#REF!
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.10
Memasang 1 m2 jalusi kusen, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Papan kayu kls II m3 0.060 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku Biasa kg 0.150 Rp. 20,000.00 Rp. Rp. 3,000.00
Pekerja Oh 0.670 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 2.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.200 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.335 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.13
Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas II m3 1.100 Rp. 2,200,000.00 Rp. Rp. 2,420,000.00
Bahan Besi strip kg 15.000 Rp. 14,800.00 Rp. Rp. 222,000.00
Paku Biasa kg 5.600 Rp. 20,000.00 Rp. Rp. 112,000.00
Pekerja Oh 4.000 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 12.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 1.200 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.200 Rp. Rp. 150,000.00 Rp.
2,754,000.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.15
Memasang 1 m3 konstruksi gordeng, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas II m3 1.100 Rp. 2,200,000.00 Rp. Rp. 2,420,000.00
Bahan Besi strip kg 15.000 Rp. 14,800.00 Rp. Rp. 222,000.00
Paku Biasa kg 3.000 Rp. 20,000.00 Rp. Rp. 60,000.00
Pekerja Oh 2.400 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 7.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.720 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.120 Rp. Rp. 150,000.00 Rp.
2,702,000.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.16
Memasang 1 m2 rangka atap genteng keramik, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kaso-kaso (5x5)cm m3 0.014 Rp. 2,300,000.00 Rp. Rp. 32,200.00
Bahan Reng (2x3)cm m3 0.036 Rp. 2,350,000.00 Rp. Rp. 84,600.00
Paku Biasa kg 0.250 Rp. 20,000.00 Rp. Rp. 5,000.00
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
121,800.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.17
Memasang 1 m2 rangka atap genteng beton, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kaso-kaso (5x5)cm m3 0.014 Rp. 2,300,000.00 Rp. Rp. 32,200.00
Bahan Reng (2x3)cm m3 0.057 Rp. 2,350,000.00 Rp. Rp. 133,950.00
Paku Biasa kg 0.250 Rp. 20,000.00 Rp. Rp. 5,000.00
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
171,150.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.18
Memasang 1 m2 rangka atap seng BJLS, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas II m3 0.165 Rp. 2,200,000.00 Rp. Rp. 363,000.00
Bahan
Paku Biasa kg 0.200 Rp. 20,000.00 Rp. Rp. 4,000.00
Pekerja Oh 0.120 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.120 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.012 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.006 Rp. Rp. 150,000.00 Rp.
367,000.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.19
Memasang 1 m2 rangka plafond, kayu klas III
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.015 Rp. 1,850,000.00 Rp. Rp. 28,490.00
Bahan
Paku Biasa kg 0.200 Rp. 20,000.00 Rp. Rp. 4,000.00
Pekerja Oh 0.150 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.030 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.075 Rp. Rp. 150,000.00 Rp.
32,490.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.21
Memasang 1 m' lisplank ukuran ( 1.5"x8") cm, kayu klas II
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas II m3 0.011 Rp. 2,200,000.00 Rp. Rp. 23,760.00
Bahan
Paku Biasa kg 0.100 Rp. 20,000.00 Rp. Rp. 2,000.00
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
25,760.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.23
Memasang 1 m2 dinding pemisah (60x120)cm kayu klasIII
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.028 Rp. 1,850,000.00 Rp. Rp. 51,800.00
Bahan
Paku Biasa kg 0.150 Rp. 20,000.00 Rp. Rp. 3,000.00
Pekerja Oh 0.150 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.450 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.045 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.008 Rp. Rp. 150,000.00 Rp.
54,800.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0011-2007.6.25
Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu klas III
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kayu klas III m3 0.028 Rp. 1,850,000.00 Rp. Rp. 51,800.00
Bahan Paku Biasa kg 0.150 Rp. 20,000.00 Rp. Rp. 3,000.00
Lem kayu kg 0.560 Rp. 40,700.00 Rp. Rp. 22,792.00
Tripleks 6mm lbr 0.860 Rp. 84,700.00 Rp. Rp. 72,842.00
Pekerja Oh 0.200 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.600 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.060 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
150,434.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0013-2007
PEKERJAAN LANGIT-LANGIT
SNI.DT 91-0013-2007.6.1
Memasang 1 m2 langit-langit asbes semen
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Asbes m2 1.100 Rp. 10,200.00 Rp. Rp. 11,220.00
Bahan
Paku tripleks kg 0.010 Rp. 25,000.00 Rp. Rp. 250.00
Pekerja Oh 0.030 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.070 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.007 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.004 Rp. Rp. 150,000.00 Rp.
11,470.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0013-2007.6.5
Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Tripleks 4 mm Lbr 0.375 Rp. 56,400.00 Rp. Rp. 21,150.00
Bahan
Paku tripleks kg 0.030 Rp. 25,000.00 Rp. Rp. 750.00
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
21,900.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0013-2007.6.6
Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Lambersering Lbr 4.000 Rp. 15,000.00 Rp. Rp. 60,000.00
Bahan
Paku tripleks kg 0.010 Rp. 25,000.00 Rp. Rp. 250.00
Pekerja Oh 0.800 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.800 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.080 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.040 Rp. Rp. 150,000.00 Rp.
60,250.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0013-2007.6.7
Memasang 1 m2 langit-langit gypsum board ukuran (120x240x 90)mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Gypsum board lbr 0.364 Rp. 77,900.00 Rp. Rp. 28,355.60
Bahan
Bahan
Paku skrup kg 0.110 Rp. 50,000.00 Rp. Rp. 5,500.00
Pekerja Oh 0.100 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.050 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
33,855.60
Jumlah harga =
Pembulatan =
SNI.DT 91-0013-2007.6.9
Memasang 1 m' list langit-langit kayu profil
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
List kayu profil m' 1.050 Rp. 6,800.00 Rp. Rp. 7,140.00
Bahan
Paku Biasa kg 0.010 Rp. 20,000.00 Rp. Rp. 200.00
Pekerja Oh 0.050 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.050 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
7,340.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
PT. T-38-2000-C
PEKERJAAN PENGECATAN
PT. T-38-2000-C.1
1 m2 pelaburan bidang kayu dengan vernis
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Vernis kg 0.150 Rp. 52,500.00 Rp. Rp. 7,875.00
Dempul kg 0.050 Rp. 12,900.00 Rp. Rp. 645.00
Bahan
Ampelas lbr 0.100 Rp. 2,000.00 Rp. Rp. 200.00
Kuas bh 0.010 Rp. 8,600.00 Rp. Rp. 86.00
Pekerja Oh 0.160 Rp. Rp. 100,000.00 Rp.
Tukang cat Oh 0.160 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.016 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
8,806.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.2
1 m2 pengecatan bidang kayu lama
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Plamur Kayu kg 0.150 Rp. 17,100.00 Rp. Rp. 2,565.00
Bahan Cat dasar kg 0.170 Rp. 17,100.00 Rp. Rp. 2,907.00
Cat Minyak untuk kayu kg 0.170 Rp. 38,800.00 Rp. Rp. 6,596.00
Pekerja Oh 0.070 Rp. Rp. 100,000.00 Rp.
Tukang cat Oh 0.075 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.008 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
12,068.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.3
1 m2 pengecatan bidang kayu baru
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Meni Kayu kg 0.200 Rp. 27,800.00 Rp. Rp. 5,560.00
Plamur Kayu Kg 0.150 Rp. 17,100.00 Rp. Rp. 2,565.00
Bahan
Cat dasar Kg 0.170 Rp. 17,100.00 Rp. Rp. 2,907.00
Cat Minyak untuk kayu Kg 0.260 Rp. 38,800.00 Rp. Rp. 10,088.00
Pekerja Oh 0.070 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 0.009 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
21,120.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.4
1 m2 pengecatan tembok/plafond baru str vinilex (1 lps plamur, 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Plamur Tembok kg 0.100 Rp. 15,000.00 Rp. Rp. 1,500.00
Bahan Cat dasar kg 0.110 Rp. 17,100.00 Rp. Rp. 1,881.00
Cat tembok kg 0.260 Rp. 41,500.00 Rp. Rp. 10,790.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.063 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
14,171.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.4.1
1 m2 pengecatan tembok/plafond lama str vinilex ( 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Cat dasar kg 0.100 Rp. 17,100.00 Rp. Rp. 1,710.00
Bahan
Cat tembok kg 0.260 Rp. 41,500.00 Rp. Rp. 10,790.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.063 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
12,500.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.4.2
1 m2 pengecatan tembok/plafond lama str vinilex ( 2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Cat dasar kg 0.260 Rp. 17,100.00 Rp. Rp. 4,446.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.063 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
4,446.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.5
1 m2 pengecatan tembok/plafond baru str paragon (1 lps plamur, 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Plamur Tembok kg 0.100 Rp. 15,000.00 Rp. Rp. 1,500.00
Bahan Cat dasar kg 0.100 Rp. 17,100.00 Rp. Rp. 1,710.00
Cat tembok kg 0.260 Rp. 41,500.00 Rp. Rp. 10,790.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.063 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
14,000.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.5.1
1 m2 pengecatan tembok/plafond lama str paragon ( 1 lps cat dasar,2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Cat dasar kg 0.100 Rp. 17,100.00 Rp. Rp. 1,710.00
Bahan
Cat tembok kg 0.260 Rp. 41,500.00 Rp. Rp. 10,790.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.063 Rp. Rp. 110,000.00 Rp.
Tenaga
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
12,500.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.5.2
1 m2 pengecatan tembok/plafond lama str paragon (2 lps cat penutup)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Cat tembok kg 0.260 Rp. 41,500.00 Rp. Rp. 10,790.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.063 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
10,790.00
Jumlah harga =
Pembulatan =
PT. T-38-2000-C.6
1 m2 pengecatan permukaan baja dengan meni besi dan perancah
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Meni besi kg 0.100 Rp. 28,900.00 Rp. Rp. 2,890.00
Bahan Kuas bh 0.010 Rp. 8,600.00 Rp. Rp. 86.00
Kayu Kelas II (Balok) m3 0.002 Rp. 2,000,000.00 Rp. Rp. 4,000.00
Pekerja Oh 0.250 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.225 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.023 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.008 Rp. Rp. 150,000.00 Rp.
6,976.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
PT. T-30-2000-C
PEKERJAAN KUNCI DAN KACA
PT. T-30-2000-C.1
1 Buah pasang kunci tanam antik
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kunci Lock KCL biasa 6" (antik) bh 1.000 Rp. 233,100.00 Rp. Rp. 233,100.00
Pekerja Oh 0.060 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.600 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.060 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
233,100.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.2
1 Buah pasang kunci tanam biasa
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kunci tanam biasa bh 1.000 Rp. 97,900.00 Rp. Rp. 97,900.00
Pekerja Oh 0.010 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
97,900.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.3
1 Buah pasang kunci tanam kamar mandi
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kunci tanam kamar mandi bh 1.000 Rp. 59,500.00 Rp. Rp. 59,500.00
Pekerja Oh 0.005 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
59,500.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.4
1 Buah pasang kunci silinder
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kunci silinder bh 1.000 Rp. 37,500.00 Rp. Rp. 37,500.00
Pekerja Oh 0.005 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.005 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.000 Rp. Rp. 150,000.00 Rp.
37,500.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.5
1 Buah pasang engsel pintu
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Engsel pintu Nyilon 4" bh 1.000 Rp. 16,500.00 Rp. Rp. 16,500.00
Pekerja Oh 0.015 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
16,500.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.6
1 Buah pasang ensel jendela
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Engsel jendela Nyilon 3" bh 1.000 Rp. 12,200.00 Rp. Rp. 12,200.00
Pekerja Oh 0.010 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
12,200.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.7
1 Buah pasang hak angin
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Hak angin biasa pasang 1.000 Rp. 27,200.00 Rp. Rp. 27,200.00
Pekerja Oh 0.020 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.010 Rp. Rp. 150,000.00 Rp.
27,200.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.8
1 Buah pasang pegangan jendela
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Handle (pegangan) bh 1.000 Rp. 174,200.00 Rp. Rp. 174,200.00
Pekerja Oh 0.015 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
174,200.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.9
1 Buah pasang door closer
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Door closer bh 1.000 Rp. 119,300.00 Rp. Rp. 119,300.00
Pekerja Oh 0.050 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.050 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
119,300.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.11
1 Buah pasang pegangan pintu/door holder
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Door Holder bh 1.000 Rp. 41,500.00 Rp. Rp. 41,500.00
Pekerja Oh 0.050 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.050 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
41,500.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.12
1 m2 pasang kaca tebal 3 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kaca 3 mm m2 1.100 Rp. 94,700.00 Rp. Rp. 104,170.00
Pekerja Oh 0.015 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
104,170.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.13
1 m2 pasang kaca tebal 5 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kaca 5 mm m2 1.100 Rp. 157,800.00 Rp. Rp. 173,580.00
Pekerja Oh 0.015 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.150 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
173,580.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.14
1 m2 pasang kaca tebal 8 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kaca 8 mm m2 1.100 Rp. 252,500.00 Rp. Rp. 277,750.00
Pekerja Oh 0.017 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.165 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.017 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
277,750.00
Jumlah harga =
Pembulatan =
PT. T-30-2000-C.15
1 m2 pasang kaca buram tebal 12 mm
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kaca 12 mm m2 1.100 Rp. 378,800.00 Rp. Rp. 416,680.00
Pekerja Oh 0.025 Rp. Rp. 100,000.00 Rp.
Tukang kayu Oh 0.250 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.025 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00 Rp.
416,680.00
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
RSNI. T-15-2002
PEKERJAAN SANITASI
RSNI. T-15-2002.1
Memasang 1 buah kloset duduk/monobox
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kloset duduk bh 1.000 Rp. 2,099,200.00 Rp. Rp. 2,099,200.00
Bahan
Perlengkapan 30% Dari bahaRp. 629,760.00 Rp. Rp. 629,760.00
Pekerja Oh 3.300 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 1.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.001 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.160 Rp. Rp. 150,000.00 Rp.
2,728,960.00
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.2
Memasang I buah kloset jongkok porselen
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Kloset jongkok porselin bh 1.000 Rp. 244,900.00 Rp. Rp. 244,900.00
Bahan Portland Semen kg 6.000 Rp. 1,700.00 Rp. Rp. 10,200.00
Pasir pasang m3 0.010 Rp. 400,000.00 Rp. Rp. 4,000.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 1.500 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 1.500 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.160 Rp. Rp. 150,000.00 Rp.
259,100.00
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.3
Memasang i1 buah urinoir
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Urinoir bh 1.000 Rp. 605,900.00 Rp. Rp. 605,900.00
Perlengkapan 30% ari bahan Rp. 181,770.00 Rp. Rp. 181,770.00
Bahan
Portland Semen kg 6.000 Rp. 1,700.00 Rp. Rp. 10,200.00
Pasir pasang m3 0.010 Rp. 400,000.00 Rp. Rp. 4,000.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00 Rp.
Tukang Batu Oh 1.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.100 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.100 Rp. Rp. 150,000.00 Rp.
801,870.00
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.4
Memasang 1 buah wastafel
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Westafel biasa bh 1.000 Rp. 572,000.00 Rp. Rp. 572,000.00
Perlengkapan 30% dari bahanRp. 171,600.00 Rp. Rp. 171,600.00
Bahan
Semen Warna kg 6.000 Rp. 5,000.00 Rp. Rp. 30,000.00
Pasir pasang m3 0.010 Rp. 400,000.00 Rp. Rp. 4,000.00
Pekerja Oh 1.000 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 1.450 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.150 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.100 Rp. Rp. 150,000.00 Rp.
777,600.00
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.6
Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bak fibreglass bh 1.000 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan
Pekerja Oh 1.800 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 2.700 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.540 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.110 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.7
Memasang 1 buah bak mandi batu bata volume 0.3 m3
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bata merah bh 0.400 Rp. - Rp. Rp. 0.00
Semen portland kg 120.000 Rp. #N/A Rp. Rp. #N/A
Bahan Pair pasang m3 0.300 Rp. #N/A Rp. Rp. #N/A
Keramik polos 20x20cm m2 7.200 Rp. #N/A Rp. Rp. #N/A
Semen putih 40 kg kg 6.000 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 6.000 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 3.000 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.300 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.300 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.8
Memasang 1 buah bak cuci piring stainless steel
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Bak cuci stainless steel 2 lobang komplit unit 1.000 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.030 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.300 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.030 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.10
Memasang 1 buah kran Ø 3/4" atau 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Kran air lokal bh 1.000 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.010 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.11
Memasanh 1 buah floor drain
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Floor drain bh 1.000 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.010 Rp. Rp. 100,000.00 Rp.
Tukang batu Oh 0.100 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.12
Memasang 1 m' pipa PVC tipe AW Ø1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC D 1/2" m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.036 Rp. Rp. 100,000.00Rp.
Tukang batu Oh 0.060 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.13
Memasang 1 m' pipa PVC tipe AW Ø3/4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 3/4' m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.036 Rp. Rp. 100,000.00Rp.
Tukang batu Oh 0.060 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.14
Memasang 1 m' pipa PVC tipe AW Ø1 "
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 1' m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.036 Rp. Rp. 100,000.00Rp.
Tukang batu Oh 0.060 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.15
Memasang 1 m' pipa PVC tipe AW Ø 1 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 1 1/2" m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.036 Rp. Rp. 100,000.00Rp.
Tukang batu Oh 0.060 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.16
Memasang 1 m' pipa PVC tipe AW Ø 2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 2" m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.054 Rp. Rp. 100,000.00Rp.
Tukang batu Oh 0.090 Rp. Rp. 110,000.00Rp.
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 125,000.00Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.17
Memasang 1 m' pipa PVC tipe AW Ø 2 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 2 1/2" m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.036 Rp. Rp. 100,000.00
Rp.
Tukang batu Oh 0.060 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.002 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.18
Memasang 1 m' pipa PVC tipe AW Ø 3"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 3" m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.081 Rp. Rp. 100,000.00
Rp.
Tukang kayu Oh 0.135 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.014 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.004 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
RSNI. T-15-2002.19
Memasang 1 m' pipa PVC tipe AW Ø 4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pipa PVC tipe AW Ø 4" m' 1.200 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.081 Rp. Rp. 100,000.00
Rp.
Tukang kayu Oh 0.135 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.014 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.004 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI. 03-3436-1994
PEKERJAAN PENUTUP ATAP
SNI. 03-3436-1994.1
1 m2 pasang atap genteng keramik
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Genteng keramik Lbr 11.000 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku biasa 2"-5" kg 0.030 Rp. 16,300.00 Rp. Rp. 489.00
Pekerja Oh 0.200 Rp. Rp. 100,000.00
Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.010 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.2
1 m' pasang nok genteng keramik
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Rabung genteng keramik lbr 3.500 Rp. #N/A Rp. Rp. #N/A
Paku biasa 2"-5" kg 0.050 Rp. 16,300.00 Rp. Rp. 815.00
Bahan Semen abu-abu kg 10.800 Rp. #N/A Rp. Rp. #N/A
Pasir pasang m3 0.032 Rp. 400,000.00 Rp. Rp. 12,800.00
Semen warna kg 1.000 Rp. 5,000.00 Rp. Rp. 5,000.00
Pekerja Oh 0.400 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.200 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.020 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.3
1 m2 pasang atap genteng beton
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Genteng beton Lbr 11.000 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku biasa 2"-5" kg 0.030 Rp. 16,300.00 Rp. Rp. 489.00
Pekerja Oh 0.200 Rp. Rp. 100,000.00
Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.010 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.4
1 m' pasang nok genteng beton
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Rabung genteng beton lbr 3.500 Rp. #N/A Rp. Rp. #N/A
Paku biasa 2"-5" kg 0.050 Rp. 16,300.00 Rp. Rp. 815.00
Bahan Semen abu-abu kg 10.800 Rp. #N/A Rp. Rp. #N/A
Pasir pasang m3 0.032 Rp. 400,000.00 Rp. Rp. 12,800.00
Semen warna kg 1.000 Rp. 5,000.00 Rp. Rp. 5,000.00
Pekerja Oh 0.400 Rp. Rp. 100,000.00
Rp.
Tukang Kayu Oh 0.200 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.020 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.020 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.5
1 m2 pasang atap genteng metal
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Genteng metal Lbr 1.020 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku biasa 2"-5" kg 0.200 Rp. 16,300.00 Rp. Rp. 3,260.00
Pekerja Oh 0.200 Rp. Rp. 100,000.00
Rp.
Tukang Kayu Oh 0.100 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.010 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.001 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.6
1 m' pasang nok genteng metal
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Rabung genteng metal Lbr 1.100 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku biasa 1/2"-1" kg 0.050 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.250 Rp. Rp. 100,000.00
Rp.
Tukang Kayu Oh 0.150 Rp. Rp. 110,000.00
Rp.
Tenaga
Kepala Tukang Oh 0.015 Rp. Rp. 125,000.00
Rp.
Mandor Oh 0.013 Rp. Rp. 150,000.00
Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.7
1 m2 pasang atap seng gelombang
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Seng gelombang 3"x6" BJLS 32 Lbr 0.700 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku biasa 1/2"-1" kg 0.020 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.120 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.060 Rp. Rp. 110,000.00 Rp.
Tenaga
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.006 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI. 03-3436-1994.8
1 m2 pasang atap nok seng
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Rabung seng Lbr 0.300 Rp. #N/A Rp. Rp. #N/A
Bahan
Paku biasa 1/2"-1" kg 0.040 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.015 Rp. Rp. 100,000.00 Rp.
Tukang Kayu Oh 0.070 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.008 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.006 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
DAFTAR ANALISA PEKERJAAN
SNI.DT 91-0014-2007
PEKERJAAN BESI DAN ALUMINIUM
SNI.DT 91-0014-2007.6.1
Memasang 1 kg besi profil
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Besi Profil kg 1.150 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.060 Rp. Rp. 100,000.00 Rp.
Tukang las Oh 0.060 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.2
Memasang 1 kg rangka kuda-kuda baj IWF
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Besi baja IWF kg 1.150 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.060 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.060 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.006 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.003 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.7
Memasang 1 m2 pintu rollling door besi
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pintu gulung besi m2 1.000 Rp. 899,900.00 Rp. Rp. 899,900.00
Pekerja Oh 1.200 Rp. Rp. 100,000.00 Rp.
Tukang Oh 1.200 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.120 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.006 Rp. Rp. 150,000.00 Rp.
899,900.00
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.8
Memasang 1 m2 pintu lipat (folding door)
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Bahan Pintu lipat m2 1.000 Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.440 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.440 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.044 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.022 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20
Memasang 1 m' pipa galvanis diameter 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pipRp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.054 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.090 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.027 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20A
Memasang 1 m' pipa galvanis diameter 3/4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pip Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.054 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.090 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.027 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20B
Memasang 1 m' pipa galvanis diameter 1"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pip Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.054 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.090 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.009 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.027 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20C
Memasang 1 m' pipa galvanis diameter 1 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pipRp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20D
Memasang 1 m' pipa galvanis diameter 2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pipRp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20E
Memasang 1 m' pipa galvanis diameter 2 1/2"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pipRp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20F
Memasang 1 m' pipa galvanis diameter 3"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pipRp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20G
Memasang 1 m' pipa galvanis diameter 4"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pip Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20H
Memasang 1 m' pipa galvanis diameter 5"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pip Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. 110,000.00 Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
SNI.DT 91-0014-2007.6.20I
Memasang 1 m' pipa galvanis diameter 6"
Kebutuhan Satuan Indeks Harga satuan Harga satuan Jumlah harga bahan
Pipa galvanis m' 1.200 Rp. #N/A Rp. Rp. #N/A
Bahan
Perlengkapan 35% Harga pip Rp. #N/A Rp. Rp. #N/A
Pekerja Oh 0.108 Rp. Rp. 100,000.00 Rp.
Tukang Oh 0.180 Rp. Rp. #N/A Rp.
Tenaga
Kepala Tukang Oh 0.018 Rp. Rp. 125,000.00 Rp.
Tenaga
Mandor Oh 0.005 Rp. Rp. 150,000.00 Rp.
#N/A
Jumlah harga =
Pembulatan =
Jumlah harga upah
Rp. #N/A
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp. 40,000.00
Rp. 22,000.00
Rp. 2,500.00
Rp. 3,000.00
67,500.00
Rp. 884,405.00
Rp. 884,410.00
Rp. 100,000.00
Rp. 220,000.00
Rp. 25,000.00
Rp. 7,500.00
352,500.00
Rp. 1,146,570.00
Rp. 1,146,570.00
Jumlah harga upah
Rp. 75,000.00
Rp. 3,750.00
78,750.00
Rp. 78,750.00
Rp. 78,750.00
Rp. 30,000.00
Rp. 1,500.00
31,500.00
Rp. 302,700.00
Rp. 302,700.00
Rp. 30,000.00
Rp. 1,500.00
31,500.00
Rp. 114,300.00
Rp. 114,300.00
Rp. 15,000.00
Rp. 2,250.00
17,250.00
Rp. 179,250.00
Rp. 179,250.00
Rp. 25,000.00
Rp. 3,750.00
28,750.00
Rp. 423,550.00
Rp. 423,550.00
Rp.
Rp. 0
Rp. 165,000.00
Rp. 30,250.00
Rp. 3,500.00
Rp. 12,450.00
211,200.00
Rp. 1,512,875.00
Rp. 1,512,880.00
Rp.
Rp. 60,000.00
Rp. 22,000.00
Rp. 2,500.00
Rp. 4,500.00
89,000.00
Rp. 171,335.00
Rp. 171,340.00
Rp.
Rp. 30,000.00
Rp. 16,500.00
Rp. 1,875.00
Rp. 2,250.00
50,625.00
Rp. #N/A
Rp. #N/A
Rp. 80,000.00
Rp. 264,000.00
Rp. 30,000.00
Rp. 6,000.00
380,000.00
Rp. #REF!
Rp. #REF!
Rp. 20,000.00
Rp. 66,000.00
Rp. 7,500.00
Rp. 1,500.00
95,000.00
Rp. 245,434.00
Rp. 245,430.00
1 2 3 4
A. RSNI.T-15-2002
PEKERJAAN PERSIAPAN
1 RSNI.T-15-2002.1 1 m' Pagar sementara dari seng gelombang tinggi 2 m Rp. 884,410.00
2 RSNI.T-15-2002.2 1 m' Pek. Pengukuran & pemasangan Bowplank Rp. 62,800.00
3 RSNI.T-15-2002.3 1 m2 Pek. Kantor direksi keet dengan lantai plesteran Rp. 1,621,250.00
4 RSNI.T-15-2002.4 1 m2 Pembuatan gudang sementara dan alat-alat Rp. 1,118,100.00
5 RSNI.T-15-2002.5 1 m2 Pembuatan rumah jaga konstruksi kayu Rp. 1,290,750.00
6 RSNI.T-15-2002.6 1 m2 Membersihkan lapangan dan perataan Rp. 17,500.00
7 RSNI.T-15-2002.7 1 m2 Pembuatan bedeng buruh Rp. 1,146,570.00
B. SNI.DT 91-0006-2007
PEKERJAAN TANAH
1 SNI.DT 91-0006-2007.6.1 Menggali 1 m3 tanah biasa sedalam 1 meter Rp. 78,750.00
2 SNI.DT 91-0006-2007.6.2 Menggali 1 m3 tanah biasa sedalam 2 meter Rp. 96,800.00
3 SNI.DT 91-0006-2007.6.3 Menggali 1 m3 tanah biasa sedalam 3 meter Rp. 115,100.00
4 SNI.DT 91-0006-2007.6.5 Menggali 1 m3 tanah cadas sedalam 1 meter Rp. 159,000.00
5 SNI.DT 91-0006-2007.6.6 Menggali 1 m3 tanah lumpur sedalam 1 meter Rp. 126,800.00
6 SNI.DT 91-0006-2007.6.7 Mengerjakan 1 m2 stripping tebing setinggi 1 meter Rp. 5,750.00
7 SNI.DT 91-0006-2007.6.8 Membuang 1 m3 tanah sejauh 30 meter Rp. 34,500.00
8 SNI.DT 91-0006-2007.6.8 A Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 60 meter
9 SNI.DT 91-0006-2007.6.8 B Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 90 meter
10 SNI.DT 91-0006-2007.6.8 C Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 120 meter
11 SNI.DT 91-0006-2007.6.8 D Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 150 meter
12 SNI.DT 91-0006-2007.6.8 E Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 180 meter
13 SNI.DT 91-0006-2007.6.8 F Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 180 meter
14 SNI.DT 91-0006-2007.6.8 G Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 240 meter
15 SNI.DT 91-0006-2007.6.8 H Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 270 meter
16 SNI.DT 91-0006-2007.6.8 I Membuang 1 m3 tanah /bahan galian/adukan beton/mortar/dll
Rp.
sejauh 300 meter
17 SNI.DT 91-0006-2007.6.9 Mengurug kembali 1 m3 galian Rp. 38,370.00
18 SNI.DT 91-0006-2007.6.10 Memadatkan 1 m3 tanah (per 20 cm) Rp. 57,500.00
19 SNI.DT 91-0006-2007.6.11 Mengurug 1 m3 pasir urug Rp. 302,700.00
20 SNI.DT 91-0006-2007.6.12 Mengurug 1 m3 tanah urug Rp. 114,300.00
22 SNI.DT 91-0006-2007.6.14 Memasang 1 m2 lapisan ijuk tebal 10 cm Rp. 179,250.00
23 SNI.DT 91-0006-2007.6.15 Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan Rp. 423,550.00
C. SNI.DT 91-0007-2006
PEKERJAAN PONDASI
1 SNI.DT 91-0007-2006.6.1 Memasang 1 m3 pondasi batu belah, campuran 1 PC: 3 PP Rp. 1,316,530.00
2 SNI.DT 91-0007-2006.6.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC: 4 PP Rp. 1,458,230.00
3 SNI.DT 91-0007-2006.6.9 Memasang 1 m3 batu kosong (anstamping) Rp. 949,280.00
4 SNI.DT 91-0007-2006.6.10 Memasang 1 m3 pondasi siklop campuran 1 PC:2PB:3KR Rp. 4,116,170.00
5 SNI.DT 91-0007-2006.6.11 Memasang 1 m3 pondasi sumuran, diameter 100 cm Rp. 1,431,450.00
D. SNI.DT 91-0008-2007
PEKERJAAN BETON
1 SNI.DT 91-0008-2007.6.1 Membuat 1 m3 beton mutu K 100 Rp. 1,744,080.00
2 SNI.DT 91-0008-2007.6.2 Membuat 1 m3 beton mutu K 125 Rp. 1,483,130.00
3 SNI.DT 91-0008-2007.6.4 Membuat 1 m3 beton mutu K 150 Rp. 1,512,880.00
4 SNI.DT 91-0008-2007.6.5 Membuat 1 m3 beton mutu K 175 Rp. 1,548,580.00
5 SNI.DT 91-0008-2007.6.6 Membuat 1 m3 beton mutu f'c = 16.9 Mpa k200 Rp. 1,582,080.00
sero ) Pelabuhan Indonesia I
232
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL
1 2 3 4
6 SNI.DT 91-0008-2007.6.7 Membuat 1 m3 beton mutu K 225 Rp. 1,608,380.00
7 SNI.DT 91-0008-2007.6.8 Membuat 1 m3 beton mutu K 250 Rp. 1,624,480.00
8 SNI.DT 91-0008-2007.6.9 Membuat 1 m3 beton mutu K 275 Rp. 1,652,830.00
9 SNI.DT 91-0008-2007.6.10 Membuat 1 m3 beton mutu K 300 Rp. 1,661,280.00
10 SNI.DT 91-0008-2007.6.11 Membuat 1 m3 beton mutu K 325 Rp. 1,751,750.00
11 SNI.DT 91-0008-2007.6.12 Membuat 1 m3 beton mutu K 350 Rp. 1,763,150.00
12 SNI.DT 91-0008-2007.6.17 Pembesian 10 kg dengan besi polos atau besi ulir Rp. 228,900.00
13 SNI.DT 91-0008-2007.6.18 Memasang 10 kg kabel pres stressed polos /strands Rp. 223,400.00
14 SNI.DT 91-0008-2007.6.19 Memasang 10 kg jaring kawat baja/wire mest Rp. 315,500.00
15 SNI.DT 91-0008-2007.6.20 Memasang 1 m2 bekisting untuk pondasi Rp. 168,440.00
16 SNI.DT 91-0008-2007.6.21 Memasang 1 m2 bekisting untuk sloof Rp. 177,690.00
17 SNI.DT 91-0008-2007.6.22 Memasang 1 m2 bekisting untuk kolom Rp. 322,210.00
18 SNI.DT 91-0008-2007.6.23 Memasang 1 m2 bekisting untuk balok Rp. 328,810.00
19 SNI.DT 91-0008-2007.6.24 Memasang 1 m2 bekisting untuk lantai Rp. 422,210.00
20 SNI.DT 91-0008-2007.6.25 Memasang 1 m2 bekisting untuk dinding Rp. 339,710.00
21 SNI.DT 91-0008-2007.6.26 Memasang 1 m2 bekisting untuk tangga Rp. 303,360.00
22 SNI.DT 91-0008-2007.6.27 Memasang 1 m2 jembatan untuk pengecoran beton Rp. 94,930.00
23 SNI.DT 91-0008-2007.6.28 Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Rp. 5,243,140.00
24 SNI.DT 91-0008-2007.6.28A Membuat 1 m3 pondasi beton bertulang (125 kg besi + bekisting) Rp. 4,783,760.00
25 SNI.DT 91-0008-2007.6.28B Membuat 1 m3 pondasi beton bertulang (100 kg besi + bekisting) Rp. 4,324,390.00
26 SNI.DT 91-0008-2007.6.29 Membuat 1 m3 sloof beton bertulang (200 kg besi + bekisting) Rp. 6,873,420.00
27 SNI.DT 91-0008-2007.6.29A Membuat 1 m3 sloof beton bertulang (150 kg besi + bekisting) Rp. 5,954,670.00
28 SNI.DT 91-0008-2007.6.29B Membuat 1 m3 sloof beton bertulang (125 kg besi + bekisting) Rp. 5,495,290.00
29 SNI.DT 91-0008-2007.6.29C Membuat 1 m3 sloof beton bertulang (100 kg besi + bekisting) Rp. 5,035,920.00
30 SNI.DT 91-0008-2007.6.30 Membuat 1 m3 kolom beton bertulang (300 kg besi + bekisting) Rp. 10,105,930.00
31 SNI.DT 91-0008-2007.6.30A Membuat 1 m3 kolom beton bertulang (200 kg besi + bekisting) Rp. 8,268,430.00
32 SNI.DT 91-0008-2007.6.31 Membuat 1 m3 balok beton bertulang (200 kg besi + bekisting) Rp. 7,702,320.00
33 SNI.DT 91-0008-2007.6.31A Membuat 1 m3 balok beton bertulang (150 kg besi + bekisting) Rp. 6,783,570.00
34 SNI.DT 91-0008-2007.6.31B Membuat 1 m3 balok beton bertulang (125 kg besi + bekisting) Rp. 6,324,190.00
35 SNI.DT 91-0008-2007.6.31C Membuat 1 m3 balok beton bertulang (100 kg besi + bekisting) Rp. 5,864,820.00
36 SNI.DT 91-0008-2007.6.32 Membuat 1 m3 kolom beton bertulang (150 kg besi + bekisting) Rp. 6,927,400.00
37 SNI.DT 91-0008-2007.6.32A Membuat 1 m3 kolom beton bertulang (125 kg besi + bekisting) Rp. 6,468,000.00
38 SNI.DT 91-0008-2007.6.32B Membuat 1 m3 kolom beton bertulang (100 kg besi + bekisting) Rp. 6,008,600.00
39 SNI.DT 91-0008-2007.6.33 Membuat 1 m3 dinding beton bertulang (150 kg besi + bekisting) Rp. 6,667,400.00
40 SNI.DT 91-0008-2007.6.33A Membuat 1 m3 dinding beton bertulang (125 kg besi + bekisting) Rp. 6,208,000.00
41 SNI.DT 91-0008-2007.6.33B Membuat 1 m3 dinding beton bertulang (100 kg besi + bekisting) Rp. 5,748,270.00
42 SNI.DT 91-0008-2007.6.34 Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting) Rp. 7,314,560.00
43 SNI.DT 91-0008-2007.6.35 Membuat 1 m' kolom praktis beton bertulang (11x11) cm Rp. 112,870.00
44 SNI.DT 91-0008-2007.6.36 Membuat 1 m' ring balok beton bertulang (10x15) cm Rp. 141,940.00
E. SNI.DT 91-0009-2007
PEKERJAAN DINDING
1 SNI.DT 91-0009-2007.6.1 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi
Rp.
1 PC: 2PP 194,950.00
2 SNI.DT 91-0009-2007.6.2 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi
Rp.
1 PC: 3PP 181,420.00
3 SNI.DT 91-0009-2007.6.3 Memasang 1 m2 dinding bata merah tebal 1 bata, campuran spesi
Rp.
1 PC: 4PP 171,340.00
4 SNI.DT 91-0009-2007.6.7 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran
Rp.
spesi 1 PC: 2PP 91,920.00
5 SNI.DT 91-0009-2007.6.8 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran
Rp.
spesi 1 PC: 3PP 84,930.00
6 SNI.DT 91-0009-2007.6.9 Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran
Rp.
spesi 1 PC: 4PP 81,250.00
7 SNI.DT 91-0009-2007.6.23 Memasang 1 m2 dinding terawang campuran spesi 1 PC: 4PP Rp. 257,200.00
F. SNI.DT 91-0010-2007
PEKERJAAN PLESTERAN
1 SNI.DT 91-0010-2007.6.1 Memasang 1 m2 plesteran 1 PC: 1PP, tebal 15 mm Rp. 83,380.00
2 SNI.DT 91-0010-2007.6.2 Memasang 1 m2 plesteran 1 PC: 2PP, tebal 15 mm Rp. 76,010.00
3 SNI.DT 91-0010-2007.6.3 Memasang 1 m2 plesteran 1 PC: 3PP, tebal 15 mm Rp. #N/A
4 SNI.DT 91-0010-2007.6.4 Memasang 1 m2 plesteran 1 PC: 4PP, tebal 15 mm Rp. 70,830.00
sero ) Pelabuhan Indonesia I
233
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL
1 2 3 4
5 SNI.DT 91-0010-2007.6.23 Memasang 1 m2 plesteran ciprat 1 PC: 2PP Rp. 54,240.00
6 SNI.DT 91-0010-2007.6.27 Memasang 1 m2 acian Rp. 39,280.00
sero ) Pelabuhan Indonesia I
234
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL
1 2 3 4
G. SNI.DT 91-0011-2007
PEKERJAAN KAYU
1 SNI.DT 91-0011-2007.6.1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu
Rp.
klas I 7,130,700.00
2 SNI.DT 91-0011-2007.6.2 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela kayu
Rp.
klas II #N/A
3 SNI.DT 91-0011-2007.6.3 Membuat dan memasang 1 m2 daun pintu panel , kayu klas II Rp. #N/A
4 SNI.DT 91-0011-2007.6.6 Membuat dan memasang 1 m2 pintu dan jendela kaca , kayu klas II
Rp.
#N/A
5 SNI.DT 91-0011-2007.6.7 Membuat dan memasang 1 m2 pintu dan jendela jalusi , kayu klas
Rp.
II #N/A
6 SNI.DT 91-0011-2007.6.9 Membuat 1 m2 pintu plywood rangkap rangka expose , kayu klas II
Rp.
#REF!
7 SNI.DT 91-0011-2007.6.10 Memasang 1 m2 jalusi kusen, kayu klas II Rp. #N/A
8 SNI.DT 91-0011-2007.6.13 Memasang 1 m3 konstruksi kuda-kuda konvensional, kayu klas II
Rp.
4,654,000.00
9 SNI.DT 91-0011-2007.6.15 Memasang 1 m3 konstruksi gordeng, kayu klas II Rp. 3,842,000.00
10 SNI.DT 91-0011-2007.6.16 Memasang 1 m2 rangka atap genteng keramik, kayu klas II Rp. 144,800.00
11 SNI.DT 91-0011-2007.6.17 Memasang 1 m2 rangka atap genteng beton, kayu klas II Rp. 194,150.00
12 SNI.DT 91-0011-2007.6.18 Memasang 1 m2 rangka atap seng BJLS, kayu klas II Rp. 394,600.00
13 SNI.DT 91-0011-2007.6.19 Memasang 1 m2 rangka plafond, kayu klas III Rp. 95,490.00
14 SNI.DT 91-0011-2007.6.21 Memasang 1 m' lisplank ukuran ( 1.5"x8") cm, kayu klas II Rp. 61,010.00
15 SNI.DT 91-0011-2007.6.23 Memasang 1 m2 dinding pemisah (60x120)cm kayu klasIII Rp. 126,130.00
16 SNI.DT 91-0011-2007.6.25 Memasang 1 m2 dinding partisi plywood rangkap, rangka kayu klas
Rp.
III 245,430.00
H. SNI.DT 91-0012-2007
PEKERJAAN PENUTUP LANTAI DAN DINDING
1 SNI.DT 91-0012-2007.6.13 Memasang 1 m2 lantai keramik ukuran (60x60) cm Rp. 317,300.00
2 SNI.DT 91-0012-2007.6.34 Memasang 1 m2 lantai keramik ukuran (40x40) cm Rp. 268,000.00
3 SNI.DT 91-0012-2007.6.35 Memasang 1 m2 lantai keramik ukuran (30x30) cm Rp. 269,880.00
4 SNI.DT 91-0012-2007.6.36 Memasang 1 m2 lantai keramik ukuran (20x20) cm Rp. 256,910.00
5 SNI.DT 91-0012-2007.6.36.1 Memasang 1 m2 dinding keramik ukuran (20x25) cm Rp. 243,910.00
6 SNI.DT 91-0012-2007.6.44 Memasang 1 m2 lantai karpet Rp. 160,310.00
7 SNI.DT 91-0012-2007.6.46 Memasang 1 m2 lantai parquet Rp. 326,300.00
8 SNI.DT 91-0012-2007.6.47 Memasang 1 m2 lantai kayu (gym floor) Rp. 401,630.00
9 SNI.DT 91-0012-2007.6.57 Memasang 1 m2 dinding batu paras Rp. 482,100.00
10 SNI.DT 91-0012-2007.6.58 Memasang 1 m2 dinding batu tempel hitam Rp. 277,060.00
11 SNI.DT 91-0012-2007.6.60 Memasang 1 m2 wall paper Rp. 138,690.00
12 SNI.DT 91-0012-2007.6.61 Memasang 1 m2 floor hardener Rp. 777,600.00
13 SNI.DT 91-0012-2007.6.7 Memasang 1 m2 conblok #6 cm Rp. 1,167,180.00
I. SNI.DT 91-0013-2007
PEKERJAAN LANGIT-LANGIT
1 SNI.DT 91-0013-2007.6.1 Memasang 1 m2 langit-langit asbes semen Rp. 23,650.00
2 SNI.DT 91-0013-2007.6.5 Memasang 1 m2 langit-langit tripleks ukuran (120x240) cm Rp. 44,900.00
3 SNI.DT 91-0013-2007.6.6 Memasang 1 m2 langit-langit lambriziring kayu, tebal 9 mm Rp. 244,250.00
4 SNI.DT 91-0013-2007.6.7 Memasang 1 m2 langit-langit gypsum board ukuran (120x240x
Rp.
90)mm 50,730.00
5 SNI.DT 91-0013-2007.6.9 Memasang 1 m' list langit-langit kayu profil Rp. 18,920.00
J. SNI.DT 91-0014-2007
PEKERJAAN BESI DAN ALUMINIUM
1 SNI.DT 91-0014-2007.6.1 Memasang 1 kg besi profil Rp. #N/A
2 SNI.DT 91-0014-2007.6.2 Memasang 1 kg rangka kuda-kuda baj IWF Rp. #N/A
3 SNI.DT 91-0014-2007.6.7 Memasang 1 m2 pintu rollling door besi Rp. #N/A
4 SNI.DT 91-0014-2007.6.8 Memasang 1 m2 pintu lipat (folding door) Rp. #N/A
sero ) Pelabuhan Indonesia I
235
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL
1 2 3 4
5 SNI.DT 91-0014-2007.6.20 Memasang 1 m' pipa galvanis diameter 1/2" Rp. #N/A
6 SNI.DT 91-0014-2007.6.20A Memasang 1 m' pipa galvanis diameter 3/4" Rp. #N/A
7 SNI.DT 91-0014-2007.6.20B Memasang 1 m' pipa galvanis diameter 1" Rp. #N/A
8 SNI.DT 91-0014-2007.6.20C Memasang 1 m' pipa galvanis diameter 1 1/2" Rp. #N/A
9 SNI.DT 91-0014-2007.6.20D Memasang 1 m' pipa galvanis diameter 2" Rp. #N/A
10 SNI.DT 91-0014-2007.6.20E Memasang 1 m' pipa galvanis diameter 2 1/2" Rp. #N/A
11 SNI.DT 91-0014-2007.6.20F Memasang 1 m' pipa galvanis diameter 3" Rp. #N/A
12 SNI.DT 91-0014-2007.6.20G Memasang 1 m' pipa galvanis diameter 4" Rp. #N/A
13 SNI.DT 91-0014-2007.6.20H Memasang 1 m' pipa galvanis diameter 5" Rp. #N/A
14 SNI.DT 91-0014-2007.6.20I Memasang 1 m' pipa galvanis diameter 6" Rp. #N/A
K. SNI. 03-3436-1994
PEKERJAAN PENUTUP ATAP
1 SNI. 03-3436-1994.1 1 m2 pasang atap genteng keramik Rp. #N/A
2 SNI. 03-3436-1994.2 1 m' pasang nok genteng keramik Rp. #N/A
3 SNI. 03-3436-1994.3 1 m2 pasang atap genteng beton Rp. #N/A
4 SNI. 03-3436-1994.4 1 m' pasang nok genteng beton Rp. #N/A
5 SNI. 03-3436-1994.5 1 m2 pasang atap genteng metal Rp. #N/A
6 SNI. 03-3436-1994.6 1 m' pasang nok genteng metal Rp. #N/A
7 SNI. 03-3436-1994.7 1 m2 pasang atap seng gelombang Rp. #N/A
8 SNI. 03-3436-1994.8 1 m2 pasang atap nok seng Rp. #N/A
L. RSNI. T-15-2002
PEKERJAAN SANITASI
1 RSNI. T-15-2002.1 Memasang 1 buah kloset duduk/monobox Rp. 3,204,090.00
2 RSNI. T-15-2002.2 Memasang I buah kloset jongkok porselen Rp. 735,600.00
3 RSNI. T-15-2002.3 Memasang i1 buah urinoir Rp. 1,039,370.00
4 RSNI. T-15-2002.4 Memasang 1 buah wastafel Rp. 1,070,850.00
5 RSNI. T-15-2002.6 Memasang 1 buah bak mandi fiberglass volume 0.3 m3 Rp. #N/A
6 RSNI. T-15-2002.7 Memasang 1 buah bak mandi batu bata volume 0.3 m3 Rp. #N/A
7 RSNI. T-15-2002.8 Memasang 1 buah bak cuci piring stainless steel Rp. #N/A
8 RSNI. T-15-2002.10 Memasang 1 buah kran Ø 3/4" atau 1/2" Rp. #N/A
9 RSNI. T-15-2002.11 Memasanh 1 buah floor drain Rp. #N/A
10 RSNI. T-15-2002.12 Memasang 1 m' pipa PVC tipe AW Ø1/2" Rp. #N/A
11 RSNI. T-15-2002.13 Memasang 1 m' pipa PVC tipe AW Ø3/4" Rp. #N/A
12 RSNI. T-15-2002.14 Memasang 1 m' pipa PVC tipe AW Ø1 " Rp. #N/A
13 RSNI. T-15-2002.15 Memasang 1 m' pipa PVC tipe AW Ø 1 1/2" Rp. #N/A
14 RSNI. T-15-2002.16 Memasang 1 m' pipa PVC tipe AW Ø 2" Rp. #N/A
15 RSNI. T-15-2002.17 Memasang 1 m' pipa PVC tipe AW Ø 2 1/2" Rp. #N/A
16 RSNI. T-15-2002.18 Memasang 1 m' pipa PVC tipe AW Ø 3" Rp. #N/A
17 RSNI. T-15-2002.19 Memasang 1 m' pipa PVC tipe AW Ø 4" Rp. #N/A
M. PT. T-30-2000-C
PEKERJAAN KUNCI DAN KACA
1 PT. T-30-2000-C.1 1 Buah pasang kunci tanam antik Rp. 313,050.00
2 PT. T-30-2000-C.2 1 Buah pasang kunci tanam biasa Rp. 155,900.00
3 PT. T-30-2000-C.3 1 Buah pasang kunci tanam kamar mandi Rp. 116,000.00
4 PT. T-30-2000-C.4 1 Buah pasang kunci silinder Rp. 93,660.00
5 PT. T-30-2000-C.5 1 Buah pasang engsel pintu Rp. 36,490.00
6 PT. T-30-2000-C.6 1 Buah pasang ensel jendela Rp. 25,530.00
7 PT. T-30-2000-C.7 1 Buah pasang hak angin Rp. 55,200.00
8 PT. T-30-2000-C.8 1 Buah pasang pegangan jendela Rp. 194,190.00
9 PT. T-30-2000-C.9 1 Buah pasang door closer Rp. 185,930.00
10 PT. T-30-2000-C.11 1 Buah pasang pegangan pintu/door holder Rp. 108,130.00
11 PT. T-30-2000-C.12 1 m2 pasang kaca tebal 3 mm Rp. 124,160.00
12 PT. T-30-2000-C.13 1 m2 pasang kaca tebal 5 mm Rp. 193,600.00
13 PT. T-30-2000-C.14 1 m2 pasang kaca tebal 8 mm Rp. 299,700.00
14 PT. T-30-2000-C.15 1 m2 pasang kaca buram tebal 12 mm Rp. 450,000.00
sero ) Pelabuhan Indonesia I
236
REKAPITULASI ANALYSA PEKERJAAN TEKNIK SIPIL
1 2 3 4
N. PT. T-38-2000-C
PEKERJAAN PENGECATAN
1 PT. T-38-2000-C.1 1 m2 pelaburan bidang kayu dengan vernis Rp. 44,780.00
2 PT. T-38-2000-C.2 1 m2 pengecatan bidang kayu lama Rp. 28,630.00
3 PT. T-38-2000-C.3 1 m2 pengecatan bidang kayu baru Rp. 30,240.00
4 PT. T-38-2000-C.4 1 m2 pengecatan tembok/plafond baru str vinilex (1 lps plamur, 1 24,260.00
Rp.
lps cat dasar,2 lps cat penutup)
5 PT. T-38-2000-C.4.1 1 m2 pengecatan tembok/plafond lama str vinilex ( 1 lps cat
Rp.
dasar,2 lps cat penutup) 22,590.00
6 PT. T-38-2000-C.4.2 1 m2 pengecatan tembok/plafond lama str vinilex ( 2 lps cat
Rp.
penutup) 14,540.00
7 PT. T-38-2000-C.5 1 m2 pengecatan tembok/plafond baru str paragon (1 lps plamur, 1
Rp.
lps cat dasar,2 lps cat penutup) 24,090.00
8 PT. T-38-2000-C.5.1 1 m2 pengecatan tembok/plafond lama str paragon ( 1 lps cat
Rp.
dasar,2 lps cat penutup) 22,590.00
9 PT. T-38-2000-C.5.2 1 m2 pengecatan tembok/plafond lama str paragon (2 lps cat
Rp.
penutup) 20,880.00
10 PT. T-38-2000-C.6 1 m2 pengecatan permukaan baja dengan meni besi dan perancah
Rp.
60,660.00
HARGA JUMLAH
NO JENIS PEKERJAAN SATUAN ( Rp) HARGA (Rp)
1 2 3 4
10 1 M3 URUGAN PASIR
1.2000 M3 Pasir urugan 180,000.00 216,000.00
0.3000 o/h Pekerja 80,000.00 24,000.00
0.0100 o/h Mandor 125,000.00 1,250.00
Jumlah 241,250.00
1 2 3 4
20 1 M3 CAMPURAN BETON K. 125 (Beton Kolom, Sloof Praktis)
276.0000 Kg Semen Pc 1,600.00 441,600.00
829.0000 Kg Pasir cor 175.00 145,075.00
1,012.000 Kg Kerikil 185.19 187,407.41
215.0000 Ltr Air 100.00 21,500.00
1.6500 o/h Pekerja 80,000.00 132,000.00
0.2750 o/h Tukang 110,000.00 30,250.00
0.0280 o/h Kepala Tukang 120,000.00 3,360.00
0.0830 o/h Mandor 125,000.00 10,375.00
Jumlah 971,567.41
2 3 4
1 2 3 4
31 1 M3 SLOOF PRAKTIS
0.9800 M3 Beton K.175 1,519,029.44 1,488,648.86
110.0000 Kg Besi beton 22,764.00 2,504,040.00
13.3330 M2 Bekisting 182,170.00 2,428,872.61
0.5000 o/h Tukang bongkar/siram 80,000.00 40,000.00
Jumlah 6,461,561.47
1 2 3 4
1 2 3 4
1 2 3 4
35 1 M3 BETON KOLOM BULAT Ø 50 (GSG)
1.0000 M3 Beton K. 225 1,591,846.11 1,591,846.11
97.4316 Kg Besi beton 22,764.00 2,217,932.94
7.9999 M2 Bekisting 365,635.00 2,925,043.44
0.5000 o/h Tukang bongkar/siram 80,000.00 40,000.00
Jumlah 6,774,822.49
36 1 M3 BETON SLOOF 30/50 (GSG)
1.0000 M3 Beton K. 225 1,591,846.11 1,591,846.11
119.0728 Kg Besi beton 22,764.00 2,710,573.22
1 2 3 4
1 2 3 4
1 2 3 4
56 1 M3 BETON POER PLAT P.1
1.0000 M3 Beton K. 225 1,591,846.11 1,591,846.11
201.1738 Kg Besi beton 22,764.00 4,579,520.38
3.0000 M2 Bekisting 171,270.00 513,810.00
Jumlah 6,685,176.49
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
58 1 M3 COR SPESIE 1 : 5
190.0000 Kg Semen Pc 1,600.00 304,000.00
0.8500 M3 Pasir cor 245,000.00 208,250.00
6.0000 o/h Pekerja 80,000.00 480,000.00
0.5000 o/h Tukang 110,000.00 55,000.00
0.0500 o/h Kepala tukang 120,000.00 6,000.00
0.3000 o/h Mandor 125,000.00 37,500.00
Jumlah 1,090,750.00
59 1 M3 LISTPLANK BETON
1.0000 M3 Beton K.175 1,519,029.44 1,519,029.44
102.3660 Kg Besi beton 22,764.00 2,330,259.62
10.0000 M2 Bekisting 365,635.00 3,656,350.00
0.7500 o/h Tukang bongkar 80,000.00 60,000.00
Jumlah 7,565,639.07
60 1 M3 SIRIP BETON
1.0000 M3 Beton K.175 1519029.4444445 1,519,029.44
125.1854 Kg Besi beton 22764 2,849,720.45
8.3000 M2 Bekisting 365635 3,034,770.50
0.7500 o/h Tukang bongkar 80000 60,000.00
Jumlah 7,463,520.39
60 1 M3 PLAT LANTAI
1.0000 M3 Beton K. 225 1,591,846.11 1,591,846.11
152.4300 Kg Besi beton 22,764.00 3,469,916.52
8.3300 M2 Bekisting 525,635.00 4,378,539.55
0.5000 o/h Tukang bongkar/siram 80,000.00 40,000.00
Jumlah 9,480,302.18
1 2 3 4
1 2 3 4
66 1 M2 ACIAN
3.2500 Kg Semen Pc 1,600.00 5,200.00
0.2000 o/h Pekerja 80,000.00 16,000.00
0.1000 o/h Tukang 110,000.00 11,000.00
0.0100 o/h Kepala tukang 120,000.00 1,200.00
0.0100 o/h Mandor 125,000.00 1,250.00
Jumlah 34,650.00
68 1 M2 WATER PROOFING
2.9000 kg Water proofing 30,000.00 87,000.00
0.3000 o/h Pekerja 80,000.00 24,000.00
0.2000 o/h Tukang batu 110,000.00 22,000.00
0.0200 o/h Kepala tukang 120,000.00 2,400.00
0.0150 o/h Mandor 125,000.00 1,875.00
Jumlah 137,275.00
1 2 3 4.00
1 2 3 4.00
69 1 M' PASANGAN PLINT KERAMIK 10/60
0.6820 Bh Plint Keramik 10/60 cm 128,005.76 87,299.93
1.9200 Kg Semen 1,600.00 3,072.00
0.0090 M3 Pasir 235,000.00 2,115.00
0.3240 Kg Semen Warna 7,500.00 2,430.00
0.1400 o/h Pekerja 80,000.00 11,200.00
0.0700 o/h Tukang batu 110,000.00 7,700.00
0.0070 o/h Kepala tukang 120,000.00 840.00
0.0070 o/h Mandor 125,000.00 875.00
Jumlah Lt 1 x 1.00 115,531.93
70 1 M' PASANGAN BORDER KERAMIK 6/20
5.3000 Bh List Keramik 6/20 cm 15,000.00 79,500.00
1.1400 Kg Semen 1,600.00 1,824.00
0.0030 M3 Pasir 235,000.00 705.00
0.1000 Kg Semen Warna 7,500.00 750.00
0.0900 o/h Pekerja 80,000.00 7,200.00
0.0900 o/h Tukang batu 110,000.00 9,900.00
0.0090 o/h Kepala tukang 120,000.00 1,080.00
0.0050 o/h Mandor 125,000.00 625.00
Jumlah Lt 1 x 1.00 101,584.00
71 1 M2 PASANGAN DINDING KERAMIK 20/25
21.6000 Bh Tegel keramik 20/25 cm 4,700.00 101,520.00
9.3000 Kg Semen 1,600.00 14,880.00
0.0180 M3 Pasir 235,000.00 4,230.00
1.9400 Kg Semen Warna 7,500.00 14,550.00
0.9000 o/h Pekerja 80,000.00 72,000.00
0.4500 o/h Tukang batu 110,000.00 49,500.00
0.0450 o/h Kepala tukang 120,000.00 5,400.00
0.0450 o/h Mandor 125,000.00 5,625.00
Jumlah Lt 1 1.00 267,705.00
1 2 3 4
72 1 M2 PASANGAN LANTAI KERAMIK (Granito) 60/60 (SNI 7395:2008)
3.1000 Bh Keramik 60/60 cm 128,005.76 396,817.85
0.0450 M3 Pasir 235,000.00 10,575.00
9.6000 Kg Semen 1,600.00 15,360.00
1.6200 Kg Semen Warna 7,500.00 12,150.00
0.7000 o/h Pekerja 80,000.00 56,000.00
0.3500 o/h Tukang batu 110,000.00 38,500.00
0.0350 o/h Kepala tukang 120,000.00 4,200.00
0.0350 o/h Mandor 125,000.00 4,375.00
Jumlah Lt 1 1.00 537,977.85
Jumlah Lt 2 X 1.05 564,876.75
1 M 2 PASANG LANTAI GRANITO 60 x 60
1.0500 M2 Granito 60 x 60 cm 128,005.76 134,406.05
2.0000 Bh Pacu Pancing 60 x 230 6,000.00 12,000.00
12.4400 Kg Semen Portland 1,500.00 18,660.00
0.0250 M3 Pasir Pasang 250,000.00 6,250.00
1.5000 Kg Semen Warna 3,000.00 4,500.00
0.5200 h.o Pekerja 75,000.00 39,000.00
1 2 3 4
73 1 M2 PASANG DINDING GRANIT 30/60
1.0600 M2 Granit 2,050,000.00 2,173,000.00
3.0030 Bh Paku 12 1,200.00 3,603.60
0.0250 M3 Pasir 235,000.00 5,875.00
12.4400 Kg Semen 1,600.00 19,904.00
0.6500 Kg Semen Warna 7,500.00 4,875.00
1.3000 o/h Pekerja 80,000.00 104,000.00
0.6500 o/h Tukang batu 110,000.00 71,500.00
0.0650 o/h Kepala tukang 120,000.00 7,800.00
0.0650 o/h Mandor 125,000.00 8,125.00
Jumlah Lt 1 1 2,398,682.60
84 1 M2 CAT PLAFON
0.1100 Kg Cat Plafon 40,000.00 4,400.00
0.0800 o/h Pekerja 80,000.00 6,400.00
0.1100 o/h Tukang cat 110,000.00 12,100.00
0.0110 o/h Kepala tukang 120,000.00 1,320.00
0.0050 o/h Mandor 125,000.00 625.00
Jumlah 24,845.00
1 2 3 4
87 1 M2 CAT DASAR
0.3300 Ltr Cat Dasar / Meni 25,000.00 8,250.00
0.0100 Bh Kuas 7,500.00 75.00
0.0200 o/h Pekerja 80,000.00 1,600.00
0.2000 o/h Tukang cat 110,000.00 22,000.00
0.0200 o/h Kepala tukang 120,000.00 2,400.00
0.0100 o/h Mandor 125,000.00 1,250.00
Jumlah 35,575.00
88 1 M2 MENCAT DUCO
0.3500 Kg Cat Duco (Nippe) 52,000.00 18,200.00
0.2000 Kg Dempul Isamu Plastik 50,000.00 10,000.00
0.1700 Kg Cat Dasar Abu-abu 42,900.00 7,293.00
1.0000 Lbr Kertas Gosok 4,000.00 4,000.00
1.2500 Kg Thinner 49,700.00 62,125.00
0.3000 Kg Clear 49,700.00 14,910.00
1.0000 Ls Alat Bantu (Kompresor) 7,500.00 7,500.00
0.2500 o/h Pekerja 80,000.00 20,000.00
0.3500 o/h Tukang cat 110,000.00 38,500.00
0.0250 o/h Kepala tukang 120,000.00 3,000.00
0.0010 o/h Mandor 125,000.00 125.00
Jumlah 185,653.00
1 2 3 4
89 1 M2 CAT MELAMIN
0.4000 Kg Wood Filler 46,000.00 18,400.00
1.0000 Kg Thinner 49,700.00 49,700.00
0.3000 Kg Sending 49,700.00 14,910.00
0.3000 Kg Clear 49,700.00 14,910.00
0.3000 Kg Pewarna 55,000.00 16,500.00
0.2000 Lbr Kertas gosok 4,000.00 800.00
0.2500 o/h Pekerja 80,000.00 20,000.00
0.2500 o/h Tukang 110,000.00 27,500.00
0.0250 o/h Kepala tukang 120,000.00 3,000.00
0.0010 o/h Mandor 125,000.00 125.00
Jumlah 165,845.00
1 2 3 4
1 2 3 4
1 2 3.00 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4.00
1 2 3 4
1 2 3 4
1 2 3 4
1m2 51,280.00
1 2 3 4
181 All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 1 (Total 210 m)
18.00 m Pipa GIP medium Ø1¼" 128,925.00 2,320,650.00
12.00 m Pipa GIP medium Ø2" 209,525.00 2,514,300.00
25.00 m Pipa GIP medium Ø1" 93,075.00 2,326,875.00
35.00 m Pipa GIP medium ؾ" 89,975.00 3,149,125.00
120.00 m Pipa GIP medium ؽ" 69,825.00 8,379,000.00
12.00 bh Knie GIP Ø1½" 11,000.00 132,000.00
15.00 bh Knie GIP Ø1" 8,500.00 127,500.00
90.00 bh Knie GIP ؽ" 5,000.00 450,000.00
2.00 bh Testik GIP Ø2" 15,000.00 30,000.00
5.00 bh Testik GIP Ø1½" 13,000.00 65,000.00
7.00 bh Testik GIP Ø1½" x ¾" 13,000.00 91,000.00
10.00 bh Testik GIP Ø1" x ½" 8,000.00 80,000.00
35.00 bh Testik GIP ؽ" 5,000.00 175,000.00
7.00 bh Sock GIP Ø1½" 12,000.00 84,000.00
10.00 bh Sock GIP Ø1" 7,000.00 70,000.00
20.00 bh Sock GIP ؽ" 5,000.00 100,000.00
5.00 bh Double Nepple Ø1½" 12,000.00 60,000.00
7.00 bh Double Nepple Ø1" 7,500.00 52,500.00
50.00 bh Double Nepple ؽ" 4,000.00 200,000.00
3.00 bh Over sock GIP Ø1½" x 1" 12,000.00 36,000.00
5.00 bh Over sock GIP Ø1" x ½" 10,000.00 50,000.00
2.00 bh Over sock GIP Ø2" x 1½" 17,500.00 35,000.00
4.00 bh Water Mor Ø2" 45,000.00 180,000.00
4.00 bh Water Mor Ø1½" 32,000.00 128,000.00
5.00 bh Water Mor Ø1" 20,000.00 100,000.00
25.00 bh Water Mor ؽ" 12,000.00 300,000.00
2.00 bh Boult Valve Ø1½" 350,000.00 700,000.00
1.00 bh Boult Valve Ø2" 450,000.00 450,000.00
Jumlah 22,385,950.00
182 All IN PEK. INSTALASI PIPA AIR BERSIH Lantai 2
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
1 2 3 4
C. BANGUNAN PENUNJANG
1 Kantor Permanen 3,400,000,000.00
2 Pengadaan Tenaga Listrik 1,500,000,000.00
3 Pengadaan Air Bersih 950,000,000.00
4 Sarana Olah Raga dan Pendidikan 2,885,000,000.00
5 Jalan dan Pelataran 2,497,269,380.93
6 Lanscape 350,000,000.00
TOTAL. C 11,582,269,381
Pembangunan Monumen
CENTRAL MONUMENT YESUS KRISTUS ALLAH NOL PAPUA
Distrik Agimuga Kabupaten Mimika
PENANGGUNG JAWAB
AGUSTINUS ANGGAIBAK
517211341.xlsx/nas
REKAPITULASI
RENCANA PELAKSANAAN
JUMLAH HARGA KETERANG
NO. JENIS PEKERJAAN BOBOT
(Rp) TAHUN PERTAMA TAHUN KEDUA TAHUN KETIGA TAHUN KEEMPAT AN
Bl ke1 Bl ke2 Bl ke3 Bl ke4 Bl ke5 Bl ke6 Bl ke7 Bl ke8 Bl ke9 Bl ke10 Bl ke11 Bl ke12 Bl ke13 Bl ke14 Bl ke15 Bl ke16 Bl ke17 Bl ke18 Bl ke19 Bl ke20 Bl ke21 Bl ke22 Bl ke23 Bl ke24 Bl ke25 Bl ke26 Bl ke27 Bl ke28 Bl ke29 Bl ke30 Bl ke31 Bl ke32 Bl ke33 Bl ke34 Bl ke35 Bl ke36
c Pekrjaan Beton Pada Elevasi (BOC.+3,92 S/D TOC.+22,25) #NAME? #NAME? ### ### ### ### ### ###
d Pekerjaan Beton Menara Besar Pada Elevasi (TOC.7.00 S/D +27.92) #NAME? #NAME? ### ### ### ###
0.90
e Pekerjaan Beton Menara Kecil Pada Elevasi (TOC.-0.50 S/D +19,32) #NAME? #NAME? ### ### ### ###
#NAME? #NAME?
IV. PEKERJAAN PASANGAN DAN PLESTERAN
a Pekerjaan Lantai I 796,922,207.17 80.00% ### ### ### ### ### ### ### ### ### ### 3.06% 3.06% 3.06% 0.24% 0.24% 0.24% 0.24% 0.24% 1.21%
b Pekerjaan Lantai 2 287,330,396.67 30.25% 0.33% 0.33% 0.33% 0.94% 0.94% 0.94% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36% 2.16% 0.70
c. Pekerjaan Menara Besar 108,547,942.44 #REF! ### ### ### ### 0.22% 0.22% 0.45%
d Pekerjaan Menara Kecil 180,324,149.45 #REF! ### ### ### 0.08% 0.08% 0.08% 0.08% 0.32%
1,373,124,696 #REF!
V. PEKERJAAN KOSEN, PINTU DAN JENDELA (Lt 1,2 & menara) 107,460,985 11.31% 0.86% 0.86% 0.86% 0.13% 0.13% 0.13% 0.13% 0.13% 0.67%
0.50
VI. PEKERJAAN PENGGANTUNG DAN PENGUNCI 6,839,369 0.72% 0.36% 0.36%
VII PEKERJAAN PLAFON DAN ATAP
a PEKERJAAN PLAFON 193,607,297.63 20.38% 3.40% 3.40% 3.40% 3.40% 3.40% 3.40%
b PEKERJAAN ATAP 1,856,953,400.00 127.61% 0.12 0.12 11.60% 11.60% 11.60% 11.60% 11.60% 11.60% 11.60% 11.60% 11.60%
2,050,560,698 147.99% 0.30
VIII. PEKERJAAN INTERIOR/EXTERIOR 1,061,230,671 61.96% 12.39% 12.39% 12.39% 12.39% 12.39%
IX PEKERJAAN MECANIKAL ELECTRICAL
a PEKERJAAN ELECTRICAL 95,990,012.50 10.10% 3.37% 3.37% 3.37%
b PEKERJAAN MECANIKAL 41,846,849.81 3.98% 0.19% 1.26% 1.26% 1.26%
130,264,076 13.71%
(0.10)
XI PEKERJAAN AKHIR 12,500,000 1.32% 1.32%
GRAND TOTAL....... #NAME? #REF!
PPN 10% 4,329,004,373
Biaya Revew Desaign 649,350,656
Biaya Pengelohan dan Pengawasan 1,731,601,749
TOTAL BIAYA 45,670,996,132
PEMBULATAN 50,000,000,000
PERBULAN #REF! 12.17% 28.79% 28.79% ### ### ### 39.07% 22.93% ### ### ### ### ### ### ### ### ### 11.60% 11.60% ### ### ### ### ### ### ### ### ### ### 18.09% 18.09% 21.73% 24.54% 21.29% 6.11%
BOBOT RENCANA
KOMULATIF - #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Batu alam PalimanaM2
Batu Andhesit M2
Batu Alam Candi M2
Batu Andhesit M2
Batu Alam Limeston M2
Batu Alam Candi M2
Batu Andhesit Susun M2
Batu koral sikat M2
367,500.00 -
350,000.00
375,000.00 393,750.00
350,000.00 367,500.00
325,000.00 341,250.00
375,000.00 393,750.00
380,000.00 399,000.00
180,000.00 189,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : Mobilisasi
Satuan : Ls
A. TENAGA
B. BAHAN
C. PERALATAN
D. DEMOBILISASI 0.00
JUMLAH 0.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Pekerjaan : Pengupasan Kepala Tiang Spun Piles dan Sheet Piles Analisa SNI. 6.23
Satuan : 1 Buah
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN