qty acc qty cost each total acc cost curr cost

MR 1 10 10 50000 500000 500000 50000


MR 2 15 25 50000 750000 1250000 50000
MR 3 5 30 50000 250000 1500000 50000
Reverse MR 2 -15 15 50000 -750000 750000 50000

qty acc qty cost each total landed cost acc cost curr cost
MR 1A 15 15 50000 750000 750000 50000
MR 1B 5 20 50000 250000 5000 1005000 50250
MR 2A 15 35 50000 750000 1755000 50142.85714
MR 2B 5 40 50000 250000 5000 2010000 50250
Reverse MR 1A -15 25 50000 -750000 1260000 50400
MR 1C 5 30 50000 250000 1510000 50333.33333
MR 1A 15 45 50000 750000 2260000 50222.22222

qty acc qty cost each total landed cost acc cost curr cost
MR1A 10 10 15000 150000 150000 15000
MR1B 10 20 17000 170000 10000 330000 16500
MR2A 20 40 15000 300000 630000 15750
Reverse MR1B -10 30 17000 -170000 -10000 450000 15000
MR1C 10 40 15000 150000 15000 615000 15375
MR1B 10 50 17000 170000 10000 795000 15900 POA 15
POB 20

qty acc qty cost total acc cost curr cost orgA qty acc qty cost total landed cost acc cost curr cost orgB qty acc qty cost total landed cost acc cost curr cost
MR A 15 15 10000 150000 150000 10000 MR1 2 2 1500 3000 3000 1500 MR1 2 2 1500 3000 3000 1500
IM1 A -10 5 10000 -100000 50000 10000 MR2 4 6 1600 6400 9400 1566.666667 MR2 4 6 1600 6400 9400 1566.666667
B 10 10 10000 100000 100000 10000 MR3 2 8 1700 3400 12800 1600 MR3 2 8 1700 3400 12800 1600
MR B 20 30 15000 300000 400000 13333.33333 IU -3 5 1600 -4800 8000 1600 4800 MR4 3 11 1000 3000 15800 1436.363636
IM2 B -5 25 13333.33333 -66666.66667 333333.3333 13333.33333 MR5 2 13 1200 2400 18200 1400
A 5 10 13333.33333 66666.66667 116666.6667 11666.66667 MR6 3 16 1100 3300 21500 1343.75
Reverse IM1 B -10 15 10000 -100000 233333.3333 15555.55556 IU -3 5 1343.75 -4031.25 8768.75 1753.75 -4031.25
A 10 20 10000 100000 216666.6667 10833.33333

Org A qty acc qty cost total landed cost acc cost curr cost Org A
MR1 500 500 10000 5000000 5000000 10000 1. PO 1 Qty 500 Price 10000
MR2 200 700 12500 2500000 7500000 10714.28571 2. MR 1 PO 1 Qty 500
IM A-B -100 600 10714.28571 -1071428.571 6428571.429 10714.28571 3. PO 2 Qty 200 Price 12500
IM A-B -50 550 10714.28571 -535714.2857 5892857.143 10714.28571 4. MR 2 PO 2 Qty 200
Rev IM A-B 50 600 10714.28571 535714.2857 6428571.429 10714.28571
Org B
Org B qty acc qty cost total landed cost acc cost curr cost 5. PO 3 Qty 200 Price 12000
MR3 100 100 12000 1200000 1200000 12000 6. MR 3 PO 3 Qty 100
IM A-B 100 200 10714.28571 1071428.571 2271428.571 11357.14286 7. Inventory Move from A to B Qty 100
IU -20 180 11357.14286 -227142.8571 2044285.714 11357.14286 curr cost 8. Internal use -20
MR4 100 280 12000 1200000 3244285.714 11586.73469 9. MR 4 PO 3 Qty 100
IM A-B 50 330 10714.28571 535714.2857 3780000 11454.54545 10. Inventory move A to B Qty 50
Prod -250 80 11454.54545 -2863636.364 916363.6364 11454.54545 curr cost 11. Production Qty -250
Rev IM A-B -50 30 10714.28571 -535714.2857 380649.3506 12688.31169 12. Reverse Inventory move no 10
PI 70 100 12688.31169 888181.8182 1268831.169 12688.31169 curr cost 13. Physical inventory to 100

qty Org 1 qty Org 2


1 1000 1000 1 1200 1200
2 1200 2400 3 1400 4200
sum qty 3 sum cost 3400 1133.333333 sum qty 4 sum cost 5400 1350

client
1257.142857
MR
2 1500 3000 3 1000 3000
4 1600 6400 2 1200 2400
2 1700 5 5400 1080
6 9400 1566.666667 2160
shipment 3 3240
2 cost shipment 1080

client
1345.454545 2690.909091
2272727.273
2500000

Include Pajak qty total DPP PPN PPH PPN + PPH


50000 50 2500000 2272727.273 227272.7273 5681.818182 232954.5455