NAME/LOCATION OF PROJECT :
CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORT COMPLEX), BARANGAY
POBLACION DOS, BANSALAN, DAVAO DEL SUR
Project ID
(Project Component ID – Discription)
PART III CIVIL, ELECTRICAL, MECHANICAL, AND SANITARY/PLUMBING WORKS
PART A - EARTHWORKS
803 (1) a Structure Excavation, Common Soil cu.m. 141 103,348.77 732.97
803 (1) b Embankment, Common Borrow cu.m. 1,152 953,464.32 827.66
804 (4) Gravel fill cu.m. 40 33,408.00 835.2
PART B – PLAIN AND REINFORCED CONCRETE WORK
900 (1) c2 Structural Concrete (Footing and Slab on Fill), Class A, 28 days cu.m. 31 119,746.80 3,862.80
900 (8) Structural Concrete (27.58 Mpa / 4,000 psi, 28 days) cu.m. 68 262,670.40 3,862.80
902 (1) a Reinforcing Steel (Deformed) , Grade 40 kg. 4,568 271,567.60 59.45
902 (1) b Reinforcing Steel (Deformed) , Grade 60 kg. 6,041 359,137.45 59.45
903 (2) Formworks and Falseworks sq.m. 361 94,221.00 261
PART C – FINISHING AND OTHER CIVIL WORKS
I. ESTIMATED COST
A. DIRECT COST
Prepared by:
_____________________________
C.4 Roof Framing and Roofing Works
1014 (1) b2 Prepainted Metal Sheet, above 0.427mm thk, Rib Type, Long Span sq.m. 361.20 135,702.84 375.7
1047 (1) Structural Steel l.s. 1 3,516,283.11 3,516,283.11
1047 (2) b Structural Steel, Purlins kg. 2,616.48 155,549.74 59.45
1047 (6) Metal Structural Accessories, Steel Plates kg. 2,649.45 157,509.80 59.45
1047 (7) a Metal Structure Accessories, Bolts kg. 1,098.33 65,295.72 59.45
TOTAL P 4,030,341.21
I. ESTIMATED COST
A. DIRECT COST
Prepared by:
_____________________________
PROGRAM OF WORK
Date : March 31, 2021
NAME/LOCATION OF PROJECT :
CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORT COMPLEX), BARANGAY
POBLACION DOS, BANSALAN, DAVAO DEL SUR
Project ID
(Project Component ID – Discription)
PART III CIVIL, ELECTRICAL, MECHANICAL, AND SANITARY/PLUMBING WORKS
PART A - EARTHWORKS
803 (1) a Structure Excavation, Common Soil cu.m. 141 103,348.77 732.97
803 (1) b Embankment, Common Borrow cu.m. 1,152 953,464.32 827.66
804 (4) Gravel fill cu.m. 40 33,408.00 835.2
PART B – PLAIN AND REINFORCED CONCRETE WORK
900 (1) c2 Structural Concrete (Footing and Slab on Fill), Class A, 28 days cu.m. 31 119,746.80 3,862.80
900 (8) Structural Concrete (27.58 Mpa / 4,000 psi, 28 days) cu.m. 68 262,670.40 3,862.80
902 (1) a Reinforcing Steel (Deformed) , Grade 40 kg. 4,568 271,567.60 59.45
902 (1) b Reinforcing Steel (Deformed) , Grade 60 kg. 6,041 359,137.45 59.45
903 (2) Formworks and Falseworks sq.m. 361 94,221.00 261
PART C – FINISHING AND OTHER CIVIL WORKS
I. ESTIMATED COST
A. DIRECT COST
Prepared by:
_____________________________