Italian-Thai Development Public Company Limited Dhaka Mass Rapid Transit Development Project

Contract No. CP03& CP04


Method Statement for Quality Control Test

ITALIAN-THAI DEVELOPMENT PUBLIC COMPANY LIMITED Quality Systems ISO


: 9001
THE QUALITY CONTROL PLAN
Project : The Dhaka Mass Rapid Transit Development Project (MRT LINE 6) Document Type Controlled
:
ContracT No. CP-03 & CP-04 FOR ITP No. ITD/CP03-04/MS/ST0030
:
Item Description : N/A Revision 5:
Location/Area : CP-03,CP-04 CONCRETE MATERIALS ,REINFORCEMENT, Sheet 1: of 5
Storage Location : N/A PC. STRAND, ARCHITECTURAL CONCRETE AND Date October
: 17, 2019
Specification No. : Work Requirement Specification -Particular Volume 3-2 EQUIPMENT CALIBRATION Prepared by Mr.
: Suntipap Kemgaew
Part 02, Sub 4 : Concrete Structure, Sub 5. ,Sub 6 and Part 3-2 Section 1.2 Approved : Pairoj Raknganchang
Mr.
Inspection Activity Document
No. Activity Inspection and Tests Required Frequency of ITD QC Form No. Verification/Acceptance Acceptance
Subcont. Vendor Consultant
Inspection/Tests Manager Checklist No. Sign off by Criteria
Cylinder Compressive Strength
7 Check Hardeness Concrete
Dimensions: Diameter 15 cm & Length 30 cm.
Structure Concrete Works - at Early Strength = 3 Nos. N/A N/A H W/O
- at Stressing/Lifting = 3 Nos. Every Structure or N/A N/A H W/O The Engineer
ITD/CP-03-04/MS/ST002/05 Design Criteria in Table 4.1-1
- at Age 7 Days = 3 Nos. Requirement N/A N/A H W/O
- at Age 28 Days = 3 Nos. N/A N/A H W/O
Re-bound Hammer Test Requirement N/A N/A H W/O ITD/CP-03-04/MS/ST002/29 Design Criteria

8 Check Fresh Concrete Properties - Adjust Mixed and Moisture content Every shift N/A N/A H W/O ITD/CP-03-04/MS/ST002/04 Concrete Mix Design
Architectural Concrete Works - Slump Test Every Delivery N/A N/A H W/O Design Criteria
Concrete Under Bed - Sampling of cylinder 9 samples Every Structure N/A N/A H W/O AASHTO T126 or equiv.
- Quantity of Mixed Concrete N/A N/A H W/O The Engineer Records
ITD/CP-03-04/MS/ST002/03
- Time of Starting Mix Concrete N/A N/A H W/O Records
Each Delivery
- Concrete Temperature N/A N/A H W/O < 32 OC,Spec. Part 02,clause 4.3.1(2),(a)5
- Ambient Temperature N/A N/A H W/O Records
Cylinder Compressive Strength
9 Check Hardeness Concrete
Dimensions: Diameter 15 cm & Length 30 cm.
Every Structure
Structure Concrete Works - at Age 7 Days = 3 Nos. N/A N/A H W/O N/A
ITD/CP-03-04/MS/ST002/05
Concrete Under Bed - at Age 28 Days = 3 Nos. N/A N/A H W/O The Engineer > 28 Mpa, Part-3, Clause 1.2.2 (1), (a)2
Crushing Resistance test Category A in Situ Every Structure N/A N/A H W/O Test Report Maximum Depth of indentation 3 mm
BDS/ISO 6935-2:2016
10 Check Reinforcement Tensile Requirements ITD/CP-03-04/MS/ST002/30
G500/500W or equiv.
- Diameter BDS/ISO 6935-2:2016 or equiv.
- Unit weight Every 50 t/ sample N/A N/A H W/O The Engineer BDS/ISO 6935-2:2016 or equiv.
- Tensile Strength Test Report > 550 Mpa, BDS/ISO 6935-2:2016 or equiv.
- Yield Strength > 500 Mpa, BDS/ISO 6935-2:2016 or equiv.
- Elongation > 14 %, BDS/ISO 6935-2:2016 or equiv.
Symbol Legend Symbol Document or Record Required
H Mandatory Hold Point-hold until approved D
W/O Witness Point-optional X Subcontract Inspection
W Witness Point
S/...... Surveillance Point-random ITP/Each Quantity R Review Point

Document No. Revision Page No


ITD/CP03-04/MS/ST0030 No. 05 Date October 17,2019 4/5