BOQ of Ansar Camp - 04 - 31.01.2019
BOQ of Ansar Camp - 04 - 31.01.2019
BOQ of Ansar Camp - 04 - 31.01.2019
31-Jan-19
ABSTRACT
CLIENT: SMCC-ITD JV
A) CIVIL WORKS TK. 989,710.00
B) RCC WORKS TK. 21,130.00
C) FLOOR FINISHINING WORKS TK. 57,960.00
D) PAINTING WORKS TK. 107,700.00
E) CEILING & PANEL WORKS TK. 166,405.00
F) FURNITURE WORKS TK. 3,836,980.00
G) PLUMBING WORKS TK. 111,336.00
I) DOOR & WINDOW WORKS TK. 126,550.00
J) ELECTRICAL WORKS TK. 158,480.00
TOTAL WORK COST TK = 5,576,251.00
In Word: Forteen Lac Thirt Three Thousand Eight Hundred Ninety five Taka Only.
SL. No. Description of Items Quantity Unit Rate (In Tk.) Amount (BDT)
C) FLOOR FINISHINING WORKS
1 TOILET FLOOR TILES WORK: 233.00 Sft 120.00 27,960.00
Supplying, fitting and fixing floor tiles size of 300
mmX300mm (RAK/ Equivalent) placing over
existing floor with required cement mortar [1:3 &
average thickness 3/4"] base and raking out the joints
with same color putty including cutting and laying the
tiles in proper way and finishing with care etc. in all
complete as per design & instruction of the
consulting architect.
SL. No. Description of Items Quantity Unit Rate (In Tk.) Amount (BDT)
D) PAINTING WORKS
1 PLASTIC PAINT WORK (Interior Wall) : 2,000.00 Sft 18.00 36,000.00
Plastic paint of approved best quality color or Using
Berger/equivalent color bank to Interior wall,
minimum 3 coats with lime putty work, cleaning,
sand papering the surfaces in/c.Complete in all
respect as per design & direction of the architect &
engineer-in-charge.
SL. No. Description of Items Quantity Unit Rate (In Tk.) Amount (BDT)
SL. No. Description of Items Quantity Unit Rate (In Tk.) Amount (BDT)
F) FURNITURE WORKS
1 BUNKER COT : 16.00 Set 233,480.00 3,735,680.00
Supply of Bunker cot ( 3-0"X7'-0"X5'-6") made with
1.5"x1.5", 1"X1" MS box, 12mm plywood and other
necessary accessories, finish with polish paint. as per
design & instruction of the consulting architect.
SL. No. Description of Items Quantity Unit Rate (In Tk.) Amount (BDT)
I) DOOR WORKS
1 WOODEN DOOR FRAME:
Supplying fitting and making of Door Frames of best
quality and Chittagong teak wood of section 4.75" X
2 .5 infc. Painting two coats of coaltarlblack enamel
paint to the surface in contract with wall fitted and
fix'ed in position by 6 nos. heavy type iron clamps and
applying French polishing over a coat of priming infc
cleaning, finishing and polishing with sand paper,
putty works etc.as per approved sample.
SL. No. Description of Items Quantity Unit Rate (In Tk.) Amount (BDT)
J) ELECTRICAL WORKS
1 LED DOWN LIGHT :
Supply and Installation of LED Down lighting fixture
with 1x12W LED light ,230V, 50Hz ,Color
temperature : 4000K-7000K(daylight) .Includes 15.00 Nos 850.00 12,750.00
testing/commisioning and all accessories to complete
the work according to drawings and specifications.
7 MIRROR LIGHT :
Supply and Installation of mirror lighting fixture
1.00 Nos 1,500.00 1,500.00
1X11W CFL.Includes testing/commisioning and all
accessories to complete the work according to
drawings and specifications.
9 T5 FLUORESCENT LIGHT: