Professional Documents
Culture Documents
Power Distribution Works: Job Safety Analysis
Power Distribution Works: Job Safety Analysis
Power Distribution Works: Job Safety Analysis
2
*Remarks: JSA will be review every 6th month or whenever there are changes in process or
activities
STATION: CENTRAL REGION REFFERENCE NO: JSA -
NEXT REVIEW DATE:
001
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED DATE:
TYPE OF WORK: OVERHEAD CONSTRUCTION. NAZMI ZHARIF BIN SAFETY MANAGER
MOHD NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT
MANAGER
TECHNICIAN
3
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Cut by sharp wire during
3. Sharp objects. First aid injuries. 3 3 M(9)
binding process.
Raining / Lightning day /
Install Pole Mounted 1. Electrical Fatality / Burns / Permanent
Existing Live overhead line /
4. equipment and shock / disability / 4 5 E(20)
Incompetent personnel / Skylift
accessories. Flashover. Damage to property.
touching Live overhead line.
Sling broken/ slipped from the Head and body injury /
2. Falling loads. 3 4 M(12)
hook Damage to property.
3. Slip, trip and Slippery / slope ground /
Head and body injury. 4 3 M(12)
fall. blocked access way.
4. Moving Hit by the material lifted and Serious injury / Damage to
2 4 M(8)
object. transferred. property.
Tools / materials / equipment Serious injury / Damage to
5. Falling object 2 4 M(8)
not properly secured property.
Conductor stringing.
Run out conductor
Hoist up conductor
1. Electrical
Tensioning
shock / Raining / Lightning day / Fatality / Burns / Permanent
conductor
6. Flashover. (if Existing Live overhead line / disability / 4 5 E(20)
Sagging conductor near existing Incompetent personnel. Damage to property.
Retention overhead line)
conductor
Dismantling
conductor / cable.
2. Skylift Unstable foundation / Fatality / Serious injury /
4 5 E(20)
collapse. Malfunction Damage to property.
3. Slip, trip and Slippery / slope ground /
Head and body injury. 4 3 M(12)
fall blocked access way.
4. Falling objects Serious injury / Damage to
Insecure tools / materials. 2 4 M(8)
/ Loose item. property.
Connecting jumper on Improper shutdown of supply /
1. Electrical
7. dead system. (LT & Due to lightning strike at the Fatality / Serious injury. 4 5 E(20)
shock.
HT) overhead line.
4
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
2. Skylift Unstable foundation / Fatality / Serious injury /
4 5 E(20)
collapse. Malfunction Damage to property.
3. Slip, trip and Slippery / slope ground /
Head and body injury. 4 3 M(12)
fall blocked access way.
4. Falling objects Tools / materials not properly Serious injury / Damage to
2 4 M(8)
/ Loose item. secured. property.
Incompetent personnel /
1. Electrical Fatality / Burns / Permanent
Connecting jumper on Condition of the pole (bare
8. shock / disability / 4 5 E(20)
live system (LT only). conductor / section pole and
Flashover. Damage to property.
etc.)
2. Skylift Unstable foundation / Fatality / Serious injury.
4 5 E(20)
collapse Malfunction Damage to property.
3. Slip, trip and Slippery / slope ground /
Head and body injury. 4 3 M(12)
fall. blocked access way.
4. Falling objects Serious injury. Damage to
Insecure tools / materials. 2 4 M(8)
/ Loose item. property.
1. Slip, trip and Slippery / slope ground /
9. Housekeeping. Head and body injury. 4 3 M(12)
fall blocked access way.
2. Sharp object. Sharp debris. Hand and finger injury. 3 1 L(3)
3. Heavy load. Excess of the materials. Muscular strain / back pain. 3 1 L(3)
5
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA- 002 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTE
TYPE OF WORK : INSTALLATION OF UNDERGROUND CABLE NAZMI ZHARIF BIN SAFETY MANAGER D DATE:
MOHD NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
7
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 003 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDU
TYPE OF WORK: STREET LIGHTING CONSTRUCTION NAZMI ZHARIF BIN MOHD NIZAM SAFETY MANAGER CTED
AND MAINTENENCE. PROJECT MANAGER DATE:
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
9
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 004 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCT
TYPE OF WORK: VEGETATION CLEARING. NAZMI ZHARIF BIN MOHD SAFETY MANAGER ED DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
Section B: JSA Details Description
DESCRIPTION
POTENTIAL
NO. OF WORK CAUSE OF HAZARD EFFECTS Liklihood Severity Risk
HAZARD
ACTIVITY
Cutting / 1. Electrical Raining / Lightning day / Existing
Fatality / Burns / Permanent disability /
1. trimming the shock / Live overhead line / Incompetent 4 5 E(20)
Damage to property.
branches / tree. Flashover. personnel.
2. Skylift Fatality / Serious injury /
Unstable foundation / Malfunction 4 5 E(20)
collapse Damage to property.
3. Falling
The trimmed tree / branches / tools Head and body injury / Damage to
object / Loose 3 4 M(12)
falls. property.
item.
4. Slip, trip Slippery / slope ground / blocked
Head and body injury. 4 3 M(12)
and fall. access way.
5. Sharp
Cuts by cutting tool / equipment. Serious injury. 3 4 M(12)
object.
6. Ergonomic. Heavy tool / tree branches Muscular strain / Back pain. 3 1 L(3)
1. Slip, trip Slippery / slope ground / blocked
2. Housekeeping. Head and body injury. 4 3 M(12)
and fall. access way.
2. Sharp
Sharp debris / tool. Hand and finger injury. 3 1 L(3)
object.
3. Ergonomic. Heavy load/ repetitive movements. Muscular strain / Back pain. 3 1 L(3)
10
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 005 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: COMMUTING TO WORKSITE. NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT
MANAGER
TECHNICIAN
12
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 006 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: WORKING AT HEIGHT. NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
13
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA- 007 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: WORKING OUTDOOR. NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
14
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 008 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCT
TYPE OF WORK: GENERAL LIFTING AND LOADING / NAZMI ZHARIF BIN MOHD SAFETY MANAGER ED DATE:
UNLOADING WORKS. NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
16
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 009 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: TRENCHING AND BACKFILLING. NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
TECHNICIAN
17
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 010 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: SUBSTATION EQUIPMENT INSTALLATION NAZMI ZHARIF BIN SAFETY MANAGER DATE:
AND MAINTENANCE MOHD NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
19
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
battery terminals shorted.
3. Electrolyte
spill / lead / nickel Disposal of used battery Environmental impact 2 4 M(8)
cadmium metal.
20
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: HIGH VOLTAGE (HV) EQUIPMENT NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
TESTING NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
21
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 012 NEXT REVIEW DATE:
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: ACCESS / EGRESS TO THE SUBSTATION / NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
WORKSITE. NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
22
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
STATION: CENTRAL REGION REFFERENCE NO: JSA - 013 NEXT REVIEW DATE:
23
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: LV SERVICES AND MAINTENANCE WORK. NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
STATION: CENTRAL REGION REFFERENCE NO: JSA - 014 NEXT REVIEW DATE:
24
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: OFFICE WORK. NAZMI ZHARIF BIN MOHD SAFETY MANAGER DATE:
NIZAM PROJECT MANAGER
CHIEF SUPERVISOR
ASSISTANT MANAGER
TECHNICIAN
STATION: CENTRAL REGION REFFERENCE NO: CR- JSA- 015 NEXT REVIEW DATE:
26
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Section A: Job Information
CONDUCTED BY: DESIGNATION: CONDUCTED
TYPE OF WORK: ALL KIND OF AIR CONTIONING NAZMI ZHARIF BIN MOHD SAFETY DATE:
INSTALLATION AND MAINTAINACE . NIZAM MANAGER
PROJECT
MANAGER
CHIEF
SUPERVISOR
ASSISTANT
MANAGER
TECHNICIAN
27
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Section C: Signatories
28
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Prepared By: ___________________ Reviewed By: ___________________ Approved By: _______________
Name: Name: Name:
Designation: Designation: Designation:
Date: Date: Date:
SUGGESTED CRITERIA
SEVERITY SCORE DAMAGE TO WORKPLACE
HUMAN INJURY / ILL HEALTH DAMAGE TO PROPERTY
ENVIROMENT
Fatality.
Virtually complete loss of plant / Toxic release off-site with
Catastrophic 5 Occupational cancer / permanent
system. detrimental effects.
disability.
Extensive injuries.
Extensive damage to plant / Offsite release with non-
Major 4 Ill health leading to temporary
system. detrimental effects.
discomfort.
29
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities
Medical requirement required.
Significant damage to plant / On-site release contained with
Moderate 3 Ill health leading to temporary
system. outside assistance.
discomfort.
First aid treatment requirement. On-site release immediately
Minor 2 Minor damage to plant / system.
Nuisance / Irritation. contained.
Near miss with no first aid
Insignificant 1 None Minor spillage / leakage.
treatment required.
30
*Remarks: JSA will be review every 6th month or whenever there are changes in process or activities