DATASHEET FOR HIGH PRESSURE DBB VALVE

Appendix 1 - Vendor Response Sheet

Page 11 of 12
VENDOR RESPONSE SHEET
Client : Petroleum Development Oman Project No. : ICO12939 Vendor :

Project : Modular Wellhead Skid – FEED Equipment: High Pressure DBB Valve Purchaser :
Requisition No. Date :

STATUS LEGENDS : VTA = VENDOR TO ADVISE

S.No. DESCRIPTION REQUISITION REQUIREMENTS OFFERED BY VENDOR

A GENERAL

1.1 MESC No. As per Datasheet

1.2 SAP no. As per Datasheet

1.3 QUANTITY As per Sec.I

1.4 MAKE / MANUFACTURER VTA

1.5 COUNTRY OF ORIGIN VTA

1.6 Piping Class 1003834P1

690 Barg. @ Minus 50 DegC


1.7 Design Pressure
690 Barg @ Plus 120 DegC

1.8 Design Temperature, min Minus 50 Deg C

1.9 Design Temperature, max Plus 120 Deg C

1.10 Service Description HP GAS, SOUR


NACE MR-0175 / ISO 15156 ( Latest) ,
1.11 Sour Service - Material Requirements
DEP 39.01.10.12-Gen.

B MECHANICAL DATA

1.1 Pipe Size, Sch DN50, Sch160

1.2 API Size 1 13/16”

Modular Double block and bleed,


1.3 Type of Valve Flanged at both ends, Three Piece
design

1.4 Pressure designation API 6A, 10000# rating

Manufacturer's Standard / EEMUA


1.5 Design spec
Publication No. 182 / API 6A

1.6 Design Spec, end flanges (Inlet / Outlet connection) 1 13/16”, 6BX, API 6A

1.7 Type of end connection (Inlet / Outlet connection) 10000#, Flanged Type 6BX, Weld neck

1.8 Type of Bleed Connection 1/2 inch BSPP Female

1.9 Type of face Ring Joint (RTJ)

1.10 Flange Ring Groove face finish, Ring No. As per API 6A, BX-151

1.11 Product Specification Level PSL 3G

1.12 Performance Requirement level PR 2

1.13 Fugitive Emission class @ 690 barg A(HS)

As per API 6FA / ISO 10497 / BS 6755-


1.14 Fire Safe Design
2 / API 607

1.15 Uni/ bi-directional Bi-Directional

1.16 Bore size, min 14 mm

Manufacturer's Standard (Bidder to


1.17 Length F to F
specify)

D MATERIAL OF CONSTRUCTION, ISOLATION VALVE

Page 1 of 5
VENDOR RESPONSE SHEET
Client : Petroleum Development Oman Project No. : ICO12939 Vendor :

Project : Modular Wellhead Skid – FEED Equipment: High Pressure DBB Valve Purchaser :
Requisition No. Date :

STATUS LEGENDS : VTA = VENDOR TO ADVISE

S.No. DESCRIPTION REQUISITION REQUIREMENTS OFFERED BY VENDOR

1.1 Type of Isolation valve, Primary/ Secondary Ball

1.2 Type of closure member Trunnion Mounted Ball, Side Entry

1.3 Type of Bore Reduced

1.4 Type of Seat Metal

1.5 Type of Piston Single Piston effect with lip seal Design

1.6 Mat, body Inconel UNS N06625

1.7 Mat, trim Inconel UNS N06625

1.8 Mat, seals Thermoplastic / Graphite

1.9 Mat spec, body Inconel UNS N06625

1.10 Mat spec, gland flange Inconel UNS N06625

1.11 Mat spec, gland ring Inconel UNS N06625

1.12 Mat spec, closure member Inconel UNS N06625

1.13 Mat spec, stem Inconel UNS N06625

1.14 Mat spec, trunnion Inconel UNS N06625

1.15 Mat spec, seat Inconel UNS N06625

1.16 Mat spec, closure member, seat hard facing Tungsten Carbide coating

1.17 Mat spec, seals Lip Seal + Eligiloy (UNS R30003)

1.18 Mat spec, packing, stem, gland Graphite

1.19 Mat spec, spring(s) ASTM B637 UNS N07718

1.2 Mat spec, locking pins UNS S31803

1.21 Mat spec, bolts/studs ASTM A1014 UNS 07718

1.22 Mat spec, nuts ASTM A1014 UNS 07718

1.23 Mat spec, all wetted parts Inconel UNS N06625

E MATERIAL OF CONSTRUCTION, BLEED VALVE

1.1 Type of bleed valve Globe / Needle

1.2 Type of Bonnet Bolted

1.3 Type of Stem Outside Screw

1.4 Connection size, type 1/2 inch BSP Female

1.5 Design spec, end connection ASME B1.20.1

1.6 Needle valve, Bleed Outlet bore size, min. 5 MM

1.7 Mat spec, Needle body / bonnet Inconel UNS N06625

1.8 Mat spec, Needle stem Inconel UNS N06625

1.9 Mat spec, Gland/ Gland follower Inconel UNS N06625

Page 2 of 5
VENDOR RESPONSE SHEET
Client : Petroleum Development Oman Project No. : ICO12939 Vendor :

Project : GD Modular Wellhead Skid – FEED Equipment: High Pressure DBB Valve Purchaser :
Requisition No. STD-99-103440-MP-2105-00008-0000-GG1000SR0523 Date :

STATUS LEGENDS : VTA = VENDOR TO ADVISE

S.No. DESCRIPTION REQUISITION REQUIREMENTS OFFERED BY VENDOR

1.10 Mat spec, Gland ring Inconel UNS N06625

1.11 Plug Inconel UNS N06625

1.12 Mat, packing, stem, gland Graphite

1.13 Mat spec, bolts/studs ASTM A1014 UNS 07718

1.14 Mat spec, nuts ASTM A1014 UNS 07718

1.15 Mat spec, all wetted parts Inconel UNS N06625

Page 3 of 5
VENDOR RESPONSE SHEET
Client : Petroleum Development Oman Project No. : ICO12939 Vendor :

Project : Modular Wellhead Skid – FEED Equipment: High Pressure DBB Valve Purchaser :
Requisition No. 0523 Date :

STATUS LEGENDS : VTA = VENDOR TO ADVISE

S.No. DESCRIPTION REQUISITION REQUIREMENTS OFFERED BY VENDOR

F OTHER REQUIREMENT

1.1 Spare Requirement’s Bidder to specify

1.2 Painting Not Applicable

J MANDATORY SP / DEP /SPE REQUIREMENT

1.1 MESC SPE REQUIREMENT (LATEST REVISION)

1.1.1 Alloy and Stainless Steel Forgings to ASTM A182 MESC SPE 76/212

1.1.2 Process-to-instrument valves MESC SPE 77/170

1.1.3 General Requirements for Valves MESC SPE 77/302

1.1.4 Fugitive Emission Production Testing to ISO 15848-2 MESC SPE 77/312

1.1.5 Metal Ring Joint Gaskets to ASME B16.20 MESC SPE 85/112

1.1.6 Graphitic Packing Material to ASTM F2168 MESC SPE 85/203

1.1.7 Packing material, graphite and carbon braided yarn MESC SPE 85/204

1.2 PDO SP'S (LATEST REVISION)

1.2.1 SP-2154 Valves Technical Specification

1.3 DEP (version 42) (LATEST REVISION)


Technical requirements for the supply of components in
1.3.1 6Mo Austenitic, 22Cr Duplex & 25Cr Super Duplex DEP 30.10.02.35-Gen.
Stainless Steel.
Selection of Materials for Life Cycle Performance
(Upstream Equipment) Including H2S Containing
1.3.2 DEP 39.01.10.12-Gen.
Environments (Amendments/Supplements to ISO
15156:2009)

1.3.3 Material Control & Verification for Pressurized Equipment DEP 31.10.00.10-Gen.

INSPECTION & TESTING / CERTIFICATION / SPECIAL


L AS PER VQMR
REQUIREMENT

M QUALITY REQUIREMENTS

CONFIRM FULL COMPLIANCE TO SP-1171


1.1 REQUIRED
IN CONJUNCTION WITH ISO 29001.

1.2 QUALITY CONTROL PLAN REQUIRED

1.3 QUALITY CERTIFICATION REQUIRED

P PREPARATION FOR SHIPMENT


1.1 Material Handling, Packing, Preservation etc. AS PER MATERIAL REQUISITION

Q DELIVERY
1.1 Delivery Period Vendor to specify
1.2 Delivery Location DDP, MUSCAT

Page 4 of 5
VENDOR RESPONSE SHEET
Client : Petroleum Development Oman Project No. : ICO12939 Vendor :

Project : Modular Wellhead Skid – FEED Equipment: High Pressure DBB Valve Purchaser :
Requisition No. Date :

STATUS LEGENDS : VTA = VENDOR TO ADVISE

S.No. DESCRIPTION REQUISITION REQUIREMENTS OFFERED BY VENDOR

12 month after completion of site


commissioning and performance testing
R GUARANTEE/ WARRANTY
or 18 months from the date of shipment,
which ever is earlier

Page 5 of 5