RFI Summary 04-04-2021

BOQ ITEM Chainage Chainage Date of Date of PRASAD-TTIPL(JV)


S.NO RFI NO Description Side Time Remarks
NO From To Submission Inspection Representative
Retaining wall 1st footing Shuttering
1 - 56+940 56+960 BHS 05-04-2021 06-04-2021 11:00 Harsha
checking
(7989602788)
2 2005 Retaining wall 1st footing (MCC 25) 56+940 56+960 BHS 05-04-2021 06-04-2021 11:30
Retaining wall 1st lift Reinforcement &
3 2076 63+860 63+880 BHS 05-04-2021 06-04-2021 09:30
Shuttering checking
4 2005 Retaining wall 1st lift MCC 25 63+860 63+880 BHS 05-04-2021 06-04-2021 10:00 Shiva
Retaining wall 2nd lift Reinforcement & (9989903088)
5 2076 64+160 64+180 BHS 05-04-2021 06-04-2021 12:30
Shuttering checking
6 2005 Retaining wall 2nd lift MCC 25 64+160 64+180 BHS 05-04-2021 06-04-2021 14:00
7 7005 Earth work Excavation for Retaining wall 74+140 74+180 BHS 05-04-2021 06-04-2021 09:00
8 2004 Retaining wall PCC M20 concrete 74+140 74+180 BHS 05-04-2021 06-04-2021 15:30
Retaining wall 1st footing Shuttering
9 - 74+180 74+220 BHS 05-04-2021 06-04-2021 12:00
checking
VBL-GTLM/STR/263
10 2005 Retaining wall 1st footing (MCC 25) 74+180 74+220 BHS 05-04-2021 06-04-2021 14:00
Saikumar
Retaining wall 2nd footing Shuttering
11 - 74+220 74+240 BHS 05-04-2021 06-04-2021 16:00 (7981735180)
checking
12 2005 Retaining wall 2nd footing (MCC 25) 74+220 74+240 BHS 05-04-2021 06-04-2021 16:30
Retaining wall 3rd footing Reinforcement
13 2076 74+240 74+260 BHS 05-04-2021 06-04-2021 10:00
& Shuttering checking
14 2005 Retaining wall 3rd footing (MCC 25) 74+240 74+260 BHS 05-04-2021 06-04-2021 10:30
Outer Drain Walls Reinforcement &
15 2076 73+580 73+600 BHS 05-04-2021 06-04-2021 10:00
shuttering checking
16 2004 Outer Drain Side walls concrete (M20) 73+580 73+600 BHS 05-04-2021 06-04-2021 10:30
Outer Drain Raft Reinforcement &
17 2076 73+770 73+800 BHS 05-04-2021 06-04-2021 14:00
shuttering checking
Malleswararao
18 2004 Outer Drain Raft concrete (M20) 73+770 73+800 BHS 05-04-2021 06-04-2021 14:30
(8978979103)
19 1002 Sub soil Excavation 72+800 73+960 BHS 05-04-2021 06-04-2021 11:30
20 1001 Embankment 8th layer FDD checking 63+000 63+040 BHS 05-04-2021 06-04-2021 15:00
21 1001 Embankment 6th layer FDD checking 62+920 62+960 BHS 05-04-2021 06-04-2021 15:30
22 1001 Embankment 2nd layer FDD checking 74+840 75+160 BHS 05-04-2021 06-04-2021 11:00
23 VBL-GTLM/EW/264 1001 Embankment 11th layer FDD checking 63+060 63+120 BHS 05-04-2021 06-04-2021 16:00
24 - OGLs recording 92+000 92+500 BHS 05-04-2021 06-04-2021 09:00
25 - OGLs recording 89+060 90+250 BHS 05-04-2021 06-04-2021 11:00 Satya
26 - Dust Filling layer FDD checking 93+560 93+740 BHS 05-04-2021 06-04-2021 10:30 (8309657409)
27 1001 Embankment 6th layer FDD checking 95+160 95+380 BHS 05-04-2021 06-04-2021 16:30
7 days compressive strength checking of
28 - Retaining wall 2nd lift from Ch 64+220 to BHS 05-04-2021 06-04-2021 09:30
64+240 (M25)
7 days compressive strength checking of
29 - Retaining wall 1st lift from Ch 72+340 to BHS 05-04-2021 06-04-2021 10:00
72+360 (M25)
7 days compressive strength checking of
30 - Retaining wall 1st lift from Ch 63+980 to BHS 05-04-2021 06-04-2021 11:00
64+000 (M25)
7 days compressive strength checking of
31 - Outer Drain raft from Ch 73+640 to BHS 05-04-2021 06-04-2021 11:30
73+670 (M25)
7 days compressive strength checking of
32 - Retaining wall 3rd footing from Ch BHS 05-04-2021 06-04-2021 12:00
74+280 to 74+300 (M25)
7 days compressive strength checking of
33 - Retaining wall 2nd footing from Ch BHS 05-04-2021 06-04-2021 12:30
74+260 to 74+280 (M25)
AS Mahapatra
VBL-GTLM/LAB/362 7 days compressive strength checking of Badangi Lab
(7978769448)
34 - Outer Drain wall from Ch 73+460 to BHS 05-04-2021 06-04-2021 14:00
73+485 (M25)
28 days compressive strength checking of
35 - Retaining wall 2nd footing from Ch BHS 05-04-2021 06-04-2021 14:30
72+220 to 72+240 (M25)
28 days compressive strength checking of
36 - Retaining wall 1st footing from Ch BHS 05-04-2021 06-04-2021 15:00
72+260 to 72+280 (M25)
RAIL VIKAS NIGAM LIMITED
Construction of third line track between JIMIDIPETA (INCL) (KM 356.518) – GOTALM (INCL) (KM 462.255) - Construction Of Roadbed, Bridges, Supply of Ballast, Installation of Track (Excluding Supply
of Rails, BG Main Line Sleepers) Service and Residential Buildings including amenities, Passenger amenities at stations, SWS, TSS and related works along with General Electrical Works in Waltair
Division of East Coast Railway in Odisha & Andhra Pradesh States, India.- Package-06
RFI Summary 04-04-2021

BOQ ITEM Chainage Chainage Date of Date of PRASAD-TTIPL(JV)


S.NO RFI NO Description Side Time Remarks
NO From To Submission Inspection Representative
28 days compressive strength checking of
37 - Retaining wall 3rd footing from Ch BHS 05-04-2021 06-04-2021 15:30
64+000 to 64+020 (M25)
28 days compressive strength checking of
38 - Retaining wall 3rd footing from Ch BHS 05-04-2021 06-04-2021 16:00
72+200 to 72+220 (M25)
7 days compressive strength checking of
39 - Sagar OPC 53 Grade Cement Week No BHS 05-04-2021 06-04-2021 16:30
10/2021 (Sample 2 & 3)
40 - CBR Testing of Borrow Area No -23 BHS 05-04-2021 06-04-2021 17:00
87700, 89200-89550, 90640-
Srinivasa Rao
41 - SPT Test 90740, 92300-92500, 93600- BHS 05-04-2021 06-04-2021 12:00
(8019728799)
VBL-GTLM/LAB/363 93700, 93860
03 days Cement Mortar cube test SAGAR Santosh
42 - GPI Lab BHS 05-04-2021 06-04-2021 10:30
OPC 53,Week no- 11 (9348038306)
43 - PCC for RR Masonry at below GPI Station Building BHS 05-04-2021 06-04-2021 09:00
Ganesh
44 VBL-GTLM/BLD/147 - GF Roof Slab Shuttering GTLM Station Building BHS 05-04-2021 06-04-2021 10:00
(9505969549)
45 - Roof Slab Concrete LC-329 Gate Goomty BHS 05-04-2021 06-04-2021 08:00