Download as pdf or txt
Download as pdf or txt
You are on page 1of 31

 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
OPERATION: OTHER PARTICULARS:
  Barge orientation (tick one) ramp length = 20.00 ft 6.10 mtr (max 15 axles long)
Over Bow Cargo details:
Over Stern x Weight (i
(incl. tr
trailers) = 1,175.00 mT 2,588.11 KIPS
Over Side Length = 83.20 mtr  272 ft 11.6 inch
Width = 30.00 mtr  98 ft 5.1 inch
  (Un)-Loading operation (tick one) Height (incl. trailers) = 23.00 mtr  75 ft 5.5 inch
Load In / Roll off (Barge to Land) VCG (incl. trailer) = 13.50 mtr  44 ft 3.5 inch
Load Out / Roll on (Land to Barge) x
Barge: Boa 7-8-9

TRANSPORTER INPUT 

Transporter 1
Support 3 TCG ((c center ttrrailer) = 11.0 mtr  35 ft 11.1 inch
LC G ( CC.. L
L.. fifi rs
rs t a xl
xle ) = 0.0 mtr  0 ft 0.0 inch
Weight per axle = 3.5 mT 7.71 KIPS
Weight cargo = 284.0 mT 625.55 KIPS
# of axles = 12 Nos.
Tr
Trai
aile
lerr C
Cononfifigu gurarati
tion
on = s ("S" single, "D" double, "T" triple)
# of axle rows = 12 Nos.
 Axle spacing = 1.4 mtr  4 ft 7.1 inch
W per axle row = 27.17 mT/axle row 59.84 KIPS/axle row
Transporter 2
Support 4 TCG ((c center ttrrailer) = -10.5 mtr  -34 ft -5.4 inch
LC G ( CC.. L
L.. fifi rs
rs t a xl
xle ) = 6.4 mtr  20 ft 12.0 inch
Weight per axle = 3.5 mT 7.71 KIPS
Weight cargo = 294.0 mT 647.58 KIPS
# of axles = 12 Nos.
Tr
Trai
aile
lerr C
Cononfifigu gurarati
tion
on = d ("S" single, "D" double, "T" triple)
# of axle rows = 6 Nos.
 Axle spacing = 1.4 mtr  4 ft 7.1 inch
W per axle row = 56.00 mT/axle row 123.35 KIPS/axle row
Transporter 3

Support 7 TCG ((c center ttrrailer) = 11.0 mtr  36 ft 1.1 inch


LC G ( CC.. L
L.. fifi rs
rs t a xl
xle ) = 35.7 mtr  117 ft 1.5 inch
Weight per axle = 3.5 mT 7.71 KIPS
Weight cargo = 211.0 mT 464.76 KIPS
# of axles = 12 Nos.
Tr
Trai
aile
lerr C
Cononfi figu gurarati
tion
on = s ("S" single, "D" double, "T" triple)
# of axle rows = 12 Nos.
 Axle spacing = 1.4 mtr  4 ft 7.1 inch
W per axle row = 21.08 mT/axle row 46.44 KIPS/axle row
Transporter 4
Support 8 TCG ((c center ttrrailer) = -3.5 mtr  -11 ft -5.8 inch
LC G ( CC.. L
L.. f iirr st
st a xl
xle ) = 41.6 mtr  136 ft 5.8 inch
Weight per axle = 3.5 mT 7.71 KIPS
Weight cargo = 218.0 mT 480.18 KIPS
# of axles = 12 Nos.
Tr
Trai
aile
lerr C
Cononfi figu gurarati
tion
on = d ("S" single, "D" double, "T" triple)
# of axle rows = 6 Nos.
 Axle spacing = 1.4 mtr  4 ft 7.1 inch
W per axle row = 43.33 mT/axle row 95.45 KIPS/axle row
Transporter 5
Not Used TCG ((c center ttrrailer) = 0.0 mtr  0 ft 0.0 inch
LC G ( C
C.. L
L.. f iirr st
st a xl
xle ) = 0.0 mtr  0 ft 0.0 inch
Weight per axle = 0.0 mT 0.00 KIPS
Weight cargo = 0.0 mT 0.00 KIPS
# of axles = 0 Nos.
Tr
Trai
aile
lerr C
Cononfi figu gurarati
tion
on = s ("S" single, "D" double, "T" triple)
# of axle rows = 0 Nos.
 Axle spacing = 1.4 mtr  4 ft 7.1 inch
W per axle row = 0.00 mT/axle row 0.00 KIPS/axle row
Transporter 6
Not Used TCG ((c center ttrrailer) = 0.0 mtr  0 ft 0.0 inch
LC G ( CC.. L
L.. f iirr st
st a xl
xle ) = 0.0 mtr  0 ft 0.0 inch
Weight per axle = 0.0 mT 0.00 KIPS
Weight cargo = 0.0 mT 0.00 KIPS
# of axles = 0 Nos.
Tr
Trai
aile
lerr C
Cononfi figu gurarati
tion
on = s ("S" single, "D" double, "T" triple)
# of axle rows = 0 Nos.
 Axle spacing = 1.4 mtr  4 ft 7.1 inch
W per axle row = 0.00 mT/axle row 0.00 KIPS/axle row

NOTES 
1.) Whi
While
le rolli
rolling
ng o
on
n 0-
0-poi
pointnt is at start
start of
of ram
ramp
p on lland
and sid
side
e
2.) Whi
While
le rolli
rolling
ng o
off
ff 0-
0-poi
pointnt is at start
start of
of ram
ramp
p on bbarg
arge
e si
side
de
3.)
3.) Re
Refe
fere
renc
ncee po
poin
intt is a
att mi
midd ke
keel
el a
att the
the bo
bow
w

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 1, 5/7/2006, MvD
 

Ballast calculations

 AXLE SEQUENCE
SEQUENCE AND LOAD
LOADS 

Load out / Roll on


Tranporter T
Trranporter Tr
Tranporter T
Trranporter T
Trranporter Tranporter Weight Weight Overall Overall
Ballast axle 1 2 3 4 5 6 Weight Summary o n b arar ge
ge on la
lan d Weight Weight Total
steps row # axle pos. axle pos. axle pos. axle pos. axle pos. axle pos. per row distances from ramp from ramp on barge on land OK?
mtr mtr mtr mtr mtr mtr mT mtr mT mT mT mT
1 1 0 - - - - - 27.2 0.0 0.0 0.0 0.0 1,175.0 OK
2 2 1.4 - - - - - 27.2 1.4 6.2 20.9 6.2 1,168.8 OK
3 3 2.8 - - - - - 27.2 2.8 18.7 35.6 18.7 1,156.3 OK
4 4 4.2 - - - - - 27.2 4.2 37.4 44.1 37.4 1,137.6 OK
5 5 5.6 - - - - - 27.2 5.6 62.4 46.3 62.4 1,112.6 OK
6 6 7 6.4 - - - - 83.2 7.0 62.4 46.3 89.6 1,085.4 OK

7 7 8.4 7.8 - - - - 83.2 8.4 75.3 89.4 129.6 1,045.4 OK


8 8 9.8 9.2 - - - - 83.2 9.8 101.0 119.7 182.5 992.5 OK
9 9 11.2 10.6 - - - - 83.2 11.2 139.6 137.1 248.2 926.8 OK
10 10 12.6 12 - - - - 83.2 12.6 191.0 141.7 326.8 848.2 OK
11 11 14 13.4 - - - - 83.2 14.0 191.0 141.7 410.0 765.0 OK
12 12 15.4 -- 35.7 - - - 48.3 15.4 191.0 141.7 493.2 681.8 OK
13 13 -- -- 37.1 - - - 21.1 37.1 0.0 0.0 683.1 491.9 OK
14 14 -- -- 38.5 - - - 21.1 38.5 4.8 16.2 687.9 487.1 OK
15 15 -- -- 39.9 - - - 21.1 39.9 14.5 27.6 697.6 477.4 OK
16 16 -- -- 41.3 - - - 21.1 41.3 29.1 34.2 712.1 462.9 OK
17 17 -- -- 42.7 41.6 0 0 64.4 42.7 48.4 35.9 731.5 443.5 OK
18 18 -- -- 44.1 43 -- -- 64.4 44.1 58.4 69.3 762.5 412.5 OK
19 19 -- -- 45.5 44.4 -- -- 64.4 45.5 78.3 92.7 803.5 371.5 OK
20 20 -- -- 46.9 45.8 -- -- 64.4 46.9 108.1 106.2 854.5 320.5 OK
21 21 -- -- 48.3 47.2 -- -- 64.4 48.3 147.9 109.7 915.4 259.6 OK
22 22 -- -- 49.7 48.6 -- -- 64.4 49.7 147.9 109.7 979.8 195.2 OK
23 23 -- -- 51.1 -- -- -- 21.1 51.1 147.9 109.7 1,044.2 130.8 OK
24 -- -- -- -- -- -- - - - - - - -
25 -- -- -- -- -- -- - - - - - - -
26 -- -- -- -- -- -- - - - - - - -
27 -- -- -- -- -- -- - - - - - - -
28 -- -- -- -- -- -- - - - - - - -
29 -- -- -- -- -- -- - - - - - - -
30 -- -- -- -- -- -- - - - - - - -
31 -- -- -- -- -- -- - - - - - - -
32 -- -- -- -- -- -- - - - - - - -
33 -- -- -- -- -- -- - - - - - - -
34 -- -- -- -- -- -- - - - - - - -
35 -- -- -- -- -- -- - - - - - - -
36 -- -- -- -- -- -- - - - - - - -
37 -- -- -- -- -- -- - - - - - - -
38 -- -- -- -- -- -- - - - - - - -
39 -- -- -- -- -- -- - - - - - - -
40 -- -- -- -- -- -- - - - - - - -
41 -- -- -- -- -- -- - - - - - - -
42 -- -- -- -- -- -- - - - - - - -
43 -- -- -- -- -- -- - - - - - - -
44 -- -- -- -- -- -- - - - - - - -
45 -- -- -- -- -- -- - - - - - - -
46 -- -- -- -- -- -- - - - - - - -
47 -- -- -- -- -- -- - - - - - - -
48 -- -- -- -- -- -- - - - - - - -
49 -- -- -- -- -- -- - - - - - - -
50 -- -- -- -- -- -- - - - - - - -

TIDAL INFORMATION:

 jetty - water distance at mean tide


Tide and jetty heights
7.00 ft 2.13 mtr 
difference between high and low tide
8.0
1.00 ft 0.30 mtr 
7.0
Time for full tidal cycle
6.00 hrs 6.0
   )
  r 5.0
Tidal motion (tick one)    t
  m
   (
mean-high-mean-low-mean 4.0
  e
  c
mean-low-mean-high-mean x   n 3.0
  a
   t
  s
   i
   d 2.0
1.0
0.0
-1.0
0 .0
.0 0 ..3
3 0. 5 0 ..8
8 1. 0 1 .3
.3 1 ..5
5 1 .8
.8 2 ..0
0 2 ..3
3 2 .5
.5 2 ..8
8 3 .0
.0 3 .3
.3 3. 5 3 ..8
8 4. 0 4 ..3
3 4 .5
.5 4 ..8
8 5 .0
.0 5 .3
.3 5 .5
.5 5 .8
.8 6 ..0
0

time (hrs)

t iid
d al
al h eig
eigh
h ts
ts jet
jet ty-
ty-w
w at
at er
er h eig
eigh
h ts
ts

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 2, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Overview
Barge details: Ballasting with:
Name BOA 7-8-9 salt water 1,025
  kg/m^3 63.93 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr  Pump info:
Width (W) 100 ft 1 inch 30.51 mtr Capacity = 1,500 mT/hr  3,303,965 LBS/hr 
Height (H) 24 ft 11 inch 7.59 mtr  Results/output in (Tick one):
Max. draft 11 ft 5 inch 5.79 mtr Metric Imperial x

SUMMARY OF BALLAST STEPS 

Start, time elapsed since mean tide 0.0 hrs

barge time
 jetty Pumped time elapsed average trim heel
distance Quantity Nos. involved since mean draft trim angle heel angle
ft LBS pumps hrs. tide ft ft degrees ft degrees
Pre-ballasting 0.51 24,688,875 10 1.04 1.04 17.50 -1.11 -0.16 0.06 0.03
Step 1 0.51 0 0 0.00 1.04 17.50 -1.11 -0.16 0.06 0.03
Step 2 0.45 125,156 1 0.04 1.07 17.50 -0.99 -0.14 -0.01 -0.01
Step 3 0.39 125,156 1 0.04 1.11 17.50 -0.86 -0.12 -0.09 -0.05
Step 4 0.47 264,468 2 0.04 1.15 17.50 -1.04 -0.15 0.07 0.04
Step 5 0.44 0 0 0.00 1.15 17.50 -0.97 -0.14 0.24 0.14
Step 6 0.41 0 0 0.00 1.15 17.50 -0.91 -0.13 0.08 0.04
Step 7 0.37 0 0 0.00 1.15 17.50 -0.82 -0.12 -0.08 -0.05
Step 8 0.36 125,156 1 0.04 1.19 17.50 -0.80 -0.12 0.00 0.00
Step 9 0.40 264,468 2 0.04 1.23 17.50 -0.88 -0.13 -0.16 -0.09
Step 10 0.31 125,156 1 0.04 1.27 17.50 -0.80 -0.12 -0.08 -0.05
Step 11 0.39 389,624 3 0.04 1.31 17.50 -0.95 -0.14 -0.01 0.00
Step 12 0.36 389,624 3 0.04 1.35 17.50 -0.89 -0.13 0.05 0.03
Step 13 0.36 528,936 2 0.08 1.43 17.50 -0.90 -0.13 0.17 0.10
Step 14 0.32 125,156 1 0.04 1.47 17.50 -0.82 -0.12 0.06 0.04
Step 15 0.32 0 0 0.00 1.47 17.50 -0.82 -0.12 0.19 0.11
Step 16 0.26 125,156 1 0.04 1.50 17.50 -0.71 -0.10 0.08 0.05
Step 17 0.39 264,468 2 0.04 1.54 17.50 -1.00 -0.15 0.12 0.07
Step 18 0.40 0 0 0.00 1.54 17.50 -1.03 -0.15 0.17 0.10
Step 19 0.40 0 0 0.00 1.54 17.50 -1.03 -0.15 0.21 0.12
Step 20 0.35 125,156 1 0.04 1.58 17.50 -0.91 -0.13 0.02 0.01
Step 21 0.33 0 0 0.00 1.58 17.50 -0.87 -0.13 0.06 0.04
Step 22 0.42 264,468 2 0.04 1.62 17.50 -1.07 -0.16 0.11 0.06
Step 23 0.32 125,156 1 0.04 1.66 17.50 -0.84 -0.12 0.00 0.00
Step 24 0.38 0 0 0.00 1.66 17.50 -0.98 -0.14 0.17 0.10
Sailing - 22,072,506 10 1.04 2.70 6.00 0.00 0.00 0.00 0.00
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -

CONCLUSION 

Max. barge-jetty distance 0.51 ft Total pumped water  ###


######
#####
## LBS Time elapsed since pre-ballast 2.70 hrs
Min. barge-jetty distance 0.26 ft Nos. of pumps required 10 Nos. Time elapsed since mean tide 2.70 hrs

Max. Av. Draft 17.50 ft Max. trim 0.00 ft Max. heel 0.24 ft
Min. trim -1.11 ft Min. heel -0.16 ft
Max. trim angle 0.00 degrees Max. heel angle 0.14 degrees
Min. trim angle -0.16 degrees Min. heel angle -0.09 degrees

NOTES 
1.
1.)) Port
Port side
side is +, Star
Starbo
boar
ardd is
is -
2.) Tan
Tank
k% %-fi
-fille
lled
d is never
never lower
lower than
than 5%
5% or
or highe
higherr th
than
an 9
95%
5%
3.) Tank 1 is at bow
4.
4.)) If cap
capac
acit
ity
y is 0, this
this tank
tank is not
not pres
presen
entt
5.
5.)) Re
Refefere
renc
nce e poi
point
nt is at mi
mid d kee
keell at
at the
the bow
bow
6.) Transp
Transportorter
er mov
moveme
ementsnts are assume
assumed d tto
o be
be tim
timele
eless
ss
7.) A nega
negative
tive "barge
"barge-jetty
-jetty"" valu
value
e mean
means s barge
barge bel
below
ow jetty,
jetty, a positive
positive ""barg
barge-jet
e-jetty"
ty" val
value
ue mea
means
ns bar
barge
ge abo
above
ve jetty
jetty

8.) Ove
Overal
ralll time
time exclud
excludes
es pum
pump
p set-
set-up
up and handli
handling
ng tim
time
e
9.) A mi
minum
numum um of
of one
one pump
pump per used
used ba
balla
llast
st ttank
ank is assu
assumed
med

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 3, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: Sailing Last Ballast Step: 24


Barge details: Ballasting with (tick one):
Name BOA 7-8-9 OK! fresh water  1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1,500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 10 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 5.0% 56.82 7.62 16.82 0.12 4,423.37 568.21 0.38
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 5.0% 56.82 -7.62 16.82 0.12 4,423.37 965.95 0.64
9 Tank 3 portside 1678.2 5.0% 86.01 7.62 29.99 0.18 4,423.37 1548.14 1.03
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 5.0% 86.01 -7.62 29.99 0.18 4,423.37 1548.14 1.03
13 Tank 4 portside 1692.0 5.0% 86.72 7.62 44.96 0.19 4,423.37 780.44 0.52
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 44.96 0.19 4,423.37 780.44 0.52
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 5.0% 86.37 7.62 89.92 0.18 4,423.37 1554.60 1.04
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 5.0% 86.37 -7.62 89.92 0.18 4,423.37 1554.60 1.04
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 5.0% 60.03 7.62 97.74 0.25 545.62 360.21 0.24
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 5.0% 60.03 -7.62 97.74 0.25 545.62 360.21 0.24
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Grand Total / System COG 4,609.56 0.00 57.26 3.75 54,475.43 10,020.92 1.04

HYDROSTATICS 

 Average draft Ad = 6.00 ft 1.83 mtr Transverse stability GM=KM-VCG 43.78 mtr  143.64 ft
Long. Cntr. Buoyancy LCB = 187.85 ft 57.26 mtr Correction factor GG' = 11.82 mtr  38.77 ft
Long. Cntr Flotation LCF = 191.87 ft 58.48 mtr Corrected stability G'M = 31.96 mtr  104.87 ft
Moment tto
o change trim MT1 = 1,734.84 ft*tons 472.12 mT*mtr 
Metacentric Height KM = 155.95 ft 47.53 mtr 

Trim = Weight*(LCG-LCB)/MT1 0.00 ft 0.00 mtr Heel = sin(Ha) * W 0.00 mtr  0.00 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 6.00 ft 1.83 mtr Draft Port side =Ad + Heel/2 1.83 mtr  6.00 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 6.00 ft 1.83 mtr Draft Starboard side=Ad - Heel/2 1.83 mtr  6.00 ft
Trim angle (Ta) = 0.00 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.

NOTES BARGE DRAFT   6.


6.00
00 ft
1.) Port side is +, Starboard is - 6.00 ft 6.00 ft
2.) Tank %-filled is between 5% and 95% star board side
Time involved to ballast sailing 1.04 hrs 3.) Tank 1 is at bow 6.00 ft bow stern 6.00 ft
Time elapsed since pre-ballast 2.70 hr
hrs
s 4.)
4.) IfIf cap
capac
acit
ity
y iis
s 0,
0, tthi
his
s tan
tank
k is
is not
not pres
presen
entt
port side
Time elapsed since mean tide 2.70 hr
hrs
s 5.)
5.) Ref
Refer
eren
ence
ce poin
pointt is
is a
att m
mid
id ke
keel
el at the
the bow
bow 6.00 ft 6.00 ft
6.) Overall pump time excludes handling time 6.
6.00
00 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 4, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast st
step: Pre-ballasting
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 10 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 795.49 0.53
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 965.95 0.64
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 1548.14 1.03
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 1548.14 1.03
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 780.44 0.52
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 780.44 0.52
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00

24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 1554.60 1.04
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 1554.60 1.04
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 840.48 0.56
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 840.48 0.56
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50
Grand Total / System COG 16,249.91 0.01 58.14 3.49 69,752.86 11,208.75 1.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.67 mtr  51.40 ft
Long. Cntr. Buoyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.29 mtr  14.08 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr  37.32 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.11 ft -0.34 mtr Heel = sin(Ha) * W 0.02 mtr  0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.08 ft 5.51 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.98 ft 5.17 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.50 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.03 deg.

Freeboard at jetty 7.94 ft 2.42 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.5
17.50
0 ft
Barge - Jetty distance 0.51 ft 0.15 mtr above jetty 18.05 ft 16.95 ft
Time involved to pre-ballast 1.04 hrs star board side
Start, time elapsed since mean tide 0.0 hrs 18.08 ft bow stern 16.98 ft
Time elapsed since mean tide 1.04 hrs port side
18.11 ft 17.00 ft
17.5
17.56
6 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 5, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 1
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 1 0.00 0.00 119.94 13.50
Grand Total / System COG 16,249.91 0.01 58.14 3.49 69,752.86 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.67 mtr  51.40 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.29 mtr  14.08 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr  37.32 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.11 ft -0.34 mtr Heel = sin(Ha) * W 0.02 mtr  0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.08 ft 5.51 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.98 ft 5.17 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.50 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.03 deg.

Freeboard at jetty 7.94 ft 2.42 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.5
17.50
0 ft
Barge - Jetty distance 0.51 ft 0.15 mtr above jetty 18.05 ft 16.95 ft
Time involved ballast step 1 0.00 hrs star board side
Time elapsed since pre-ballast 1.04 hrs 18.08 ft bow stern 16.98 ft
Time elapsed since mean tide 1.04 hrs port side
18.11 ft 17.00 ft
17.5
17.56
6 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 6, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 2
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 2 6.24 47.68 119.94 13.50
Grand Total / System COG 16,199.33 0.00 58.31 3.50 69,752.86 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.66 mtr  51.39 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.31 mtr  14.13 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.36 mtr  37.26 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.99 ft -0.30 mtr Heel = sin(Ha) * W 0.00 mtr  -0.01 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.02 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.34 mtr  17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.03 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr  17.53 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) -0.01 deg.

Freeboard at jetty 7.89 ft 2.40 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.5
17.53
3 ft
Barge - Jetty distance 0.45 ft 0.14 mtr above jetty 18.03 ft 17.04 ft
Time involved ballast step 2 0.04 hrs star board side
Time elapsed since pre-ballast 1.07 hrs 18.02 ft bow stern 17.03 ft
Time elapsed since mean tide 1.07 hrs port side
18.01 ft 17.02 ft
17.5
17.52
2 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 7, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 3
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 3 18.72 31.79 119.94 13.50
Grand Total / System COG 16,154.99 -0.01 58.50 3.50 69,752.86 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.66 mtr  51.36 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.32 mtr  14.17 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.34 mtr  37.20 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.86 ft -0.26 mtr Heel = sin(Ha) * W -0.03 mtr  -0.09 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.95 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.33 mtr  17.48 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.09 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.35 mtr  17.57 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) -0.05 deg.

Freeboard at jetty 7.82 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.5
17.57
7 ft
Barge - Jetty distance 0.39 ft 0.12 mtr above jetty 17.99 ft 17.14 ft
Time involved ballast step 3 0.04 hrs star board side
Time elapsed since pre-ballast 1.11 hrs 17.95 ft bow stern 17.09 ft
Time elapsed since mean tide 1.11 hrs port side
17.91 ft 17.05 ft
17.4
17.48
8 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 8, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 4
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 4 37.43 23.84 119.94 13.50
Grand Total / System COG 16,053.64 0.01 58.22 3.50 68,661.61 120.07 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.66 mtr  51.39 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.28 mtr  14.03 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.39 mtr  37.36 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.04 ft -0.32 mtr Heel = sin(Ha) * W 0.02 mtr  0.07 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.05 ft 5.50 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.01 ft 5.18 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.49 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.

Freeboard at jetty 7.91 ft 2.41 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.4
17.49
9 ft
Barge - Jetty distance 0.47 ft 0.14 mtr above jetty 18.01 ft 16.97 ft
Time involved ballast step 4 0.04 hrs star board side
Time elapsed since pre-ballast 1.15 hrs 18.05 ft bow stern 17.01 ft
Time elapsed since mean tide 1.15 hrs port side
18.08 ft 17.05 ft
17.5
17.56
6 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 9, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 5
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 5 62.39 19.07 119.94 13.50
Grand Total / System COG 16,078.59 0.03 58.32 3.51 68,661.61 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.65 mtr  51.34 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.27 mtr  14.01 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr  37.33 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.97 ft -0.30 mtr Heel = sin(Ha) * W 0.07 mtr  0.24 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.01 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.38 mtr  17.64 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.04 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.31 mtr  17.41 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) 0.14 deg.

Freeboard at jetty 7.88 ft 2.40 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.4
17.41
1 ft
Barge - Jetty distance 0.44 ft 0.14 mtr above jetty 17.89 ft 16.92 ft
Time involved ballast step 5 0.00 hrs star board side
Time elapsed since pre-ballast 1.15 hrs 18.01 ft bow stern 17.04 ft
Time elapsed since mean tide 1.15 hrs port side
18.13 ft 17.16 ft
17.6
17.64
4 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 10, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 6
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 6 89.56 10.04 119.10 13.50
Grand Total / System COG 16,105.76 0.01 58.42 3.53 68,661.61 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.63 mtr  51.28 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.26 mtr  13.99 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.37 mtr  37.30 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.91 ft -0.28 mtr Heel = sin(Ha) * W 0.02 mtr  0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.98 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.07 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.48 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.

Freeboard at jetty 7.85 ft 2.39 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.4
17.48
8 ft
Barge - Jetty distance 0.41 ft 0.13 mtr above jetty 17.94 ft 17.03 ft
Time involved ballast step 6 0.00 hrs star board side
Time elapsed since pre-ballast 1.15 hrs 17.98 ft bow stern 17.07 ft
Time elapsed since mean tide 1.15 hrs port side
18.02 ft 17.11 ft
17.5
17.56
6 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 11, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 7
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 7 129.58 4.70 117.88 13.50
Grand Total / System COG 16,145.79 -0.01 58.56 3.55 68,661.61 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.61 mtr  51.20 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.25 mtr  13.95 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.35 mtr  37.25 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.82 ft -0.25 mtr Heel = sin(Ha) * W -0.02 mtr  -0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.93 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.33 mtr  17.48 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.11 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.35 mtr  17.56 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) -0.05 deg.

Freeboard at jetty 7.80 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.5
17.56
6 ft
Barge - Jetty distance 0.37 ft 0.11 mtr above jetty 17.97 ft 17.15 ft
Time involved ballast step 7 0.00 hrs star board side
Time elapsed since pre-ballast 1.15 hrs 17.93 ft bow stern 17.11 ft
Time elapsed since mean tide 1.15 hrs port side
17.89 ft 17.07 ft
17.4
17.48
8 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 12, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 8
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 8 182.47 1.74 116.79 13.50
Grand Total / System COG 16,255.50 0.00 58.59 3.58 68,661.61 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.58 mtr  51.10 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.22 mtr  13.86 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.35 mtr  37.24 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.80 ft -0.24 mtr Heel = sin(Ha) * W 0.00 mtr  0.00 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.92 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.34 mtr  17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.12 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr  17.52 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.

Freeboard at jetty 7.79 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.5
17.52
2 ft
Barge - Jetty distance 0.36 ft 0.11 mtr above jetty 17.92 ft 17.12 ft
Time involved ballast step 8 0.04 hrs star board side
Time elapsed since pre-ballast 1.19 hrs 17.92 ft bow stern 17.12 ft
Time elapsed since mean tide 1.19 hrs port side
17.92 ft 17.12 ft
17.5
17.52
2 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 13, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 9
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 65.0% 780.45 7.62 102.52 3.03 7,093.09 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 65.0% 780.45 -7.62 102.52 3.03 7,093.09 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 9 248.22 0.11 115.91 13.50
Grand Total / System COG 16,201.18 -0.02 58.47 3.61 67,570.37 120.07 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.55 mtr  51.02 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.17 mtr  13.68 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr  37.34 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.88 ft -0.27 mtr Heel = sin(Ha) * W -0.05 mtr  -0.16 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.96 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.32 mtr  17.44 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.08 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.37 mtr  17.60 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) -0.09 deg.

Freeboard at jetty 7.83 ft 2.39 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  17.6
17.60
0 ft
Barge - Jetty distance 0.40 ft 0.12 mtr above jetty 18.04 ft 17.16 ft
Time involved ballast step 9 0.04 hrs star board side
Time elapsed since pre-ballast 1.23 hrs 17.96 ft bow stern 17.08 ft
Time elapsed since mean tide 1.23 hrs port side
17.88 ft 17.00 ft
17.4
17.44
4 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 14, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 10
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 65.0% 780.45 7.62 102.52 3.03 7,093.09 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 65.0% 780.45 -7.62 102.52 3.03 7,093.09 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 10 326.83 -0.80 115.23 13.50
Grand Total / System COG 16,336.61 -0.01 58.59 3.66 67,570.37 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.50 mtr  50.87 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.14 mtr  13.57 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.37 mtr  37.30 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.80 ft -0.25 mtr Heel = sin(Ha) * W -0.03 mtr  -0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.92 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.33 mtr  17.48 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.12 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.35 mtr  17.56 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) -0.05 deg.

Freeboard at jetty 7.80 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.5
17.56
6 ft
Barge - Jetty distance 0.31 ft 0.10 mtr above jetty 17.96 ft 17.16 ft
Time involved ballast step 10 0.04 hrs star board side
Time elapsed since pre-ballast 1.27 hrs 17.92 ft bow stern 17.12 ft
Time elapsed since mean tide 1.27 hrs port side
17.88 ft 17.08 ft
17.4
17.48
8 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 15, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 11
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 3 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 80.0% 909.13 7.62 16.82 1.94 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 60.0% 720.41 7.62 102.29 2.84 6,547.47 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 60.0% 720.41 -7.62 102.29 2.84 6,547.47 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 11 410.00 -1.35 114.58 13.50
Grand Total / System COG 16,356.53 0.00 58.38 3.69 66,479.12 176.89 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.47 mtr  50.74 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.06 mtr  13.33 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.40 mtr  37.41 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.95 ft -0.29 mtr Heel = sin(Ha) * W 0.00 mtr  -0.01 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.00 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.34 mtr  17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.05 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr  17.53 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.

Freeboard at jetty 7.87 ft 2.40 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.5
17.53
3 ft
Barge - Jetty distance 0.39 ft 0.12 mtr above jetty 18.00 ft 17.05 ft
Time involved ballast step 11 0.04 hrs star board side
Time elapsed since pre-ballast 1.31 hrs 18.00 ft bow stern 17.05 ft
Time elapsed since mean tide 1.31 hrs port side
18.00 ft 17.05 ft
17.5
17.52
2 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 16, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 12
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 3 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 55.0% 660.38 7.62 102.01 2.64 6,001.85 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 55.0% 660.38 -7.62 102.01 2.64 6,001.85 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 12 493.17 -0.05 114.57 13.50
Grand Total / System COG 16,262.81 0.01 58.46 3.73 65,387.88 176.89 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.43 mtr  50.61 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.02 mtr  13.19 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr  37.42 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.89 ft -0.27 mtr Heel = sin(Ha) * W 0.01 mtr  0.05 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.97 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.55 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.08 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.50 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.03 deg.

Freeboard at jetty 7.84 ft 2.39 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.5
17.50
0 ft
Barge - Jetty distance 0.36 ft 0.11 mtr above jetty 17.94 ft 17.06 ft
Time involved ballast step 12 0.04 hrs star board side
Time elapsed since pre-ballast 1.35 hrs 17.97 ft bow stern 17.08 ft
Time elapsed since mean tide 1.35 hrs port side
17.99 ft 17.10 ft
17.5
17.55
5 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 17, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 13
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m
.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 45.0% 540.31 7.62 101.13 2.22 4,910.60 120.07 0.08
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 45.0% 540.31 -7.62 101.13 2.22 4,910.60 120.07 0.08
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 13 683.08 0.30 115.11 13.50
Grand Total / System COG 16,212.59 0.02 58.44 3.84 63,205.39 240.14 0.08

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.32 mtr  50.27 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.90 mtr  12.79 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.43 mtr  37.48 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.90 ft -0.28 mtr Heel = sin(Ha) * W 0.05 mtr  0.17 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.97 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.37 mtr  17.61 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.07 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr  17.44 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.10 deg.

Freeboard at jetty 7.84 ft 2.39 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.4
17.44
4 ft
Barge - Jetty distance 0.36 ft 0.11 mtr above jetty 17.89 ft 16.99 ft
Time involved ballast step 13 0.08 hrs star board side
Time elapsed since pre-ballast 1.43 hrs 17.97 ft bow stern 17.07 ft
Time elapsed since mean tide 1.43 hrs port side
18.06 ft 17.16 ft
17.6
17.61
1 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 18, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 14
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 45.0% 540.31 7.62 101.13 2.22 4,910.60 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 45.0% 540.31 -7.62 101.13 2.22 4,910.60 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 14 687.93 0.64 114.15 13.50
Grand Total / System COG 16,160.61 0.01 58.56 3.84 63,205.39 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.32 mtr  50.26 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.91 mtr  12.83 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr  37.43 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.82 ft -0.25 mtr Heel = sin(Ha) * W 0.02 mtr  0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.93 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.55 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.11 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.49 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.

Freeboard at jetty 7.80 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.4
17.49
9 ft
Barge - Jetty distance 0.32 ft 0.10 mtr above jetty 17.90 ft 17.08 ft
Time involved ballast step 14 0.04 hrs star board side
Time elapsed since pre-ballast 1.47 hrs 17.93 ft bow stern 17.11 ft
Time elapsed since mean tide 1.47 hrs port side
17.96 ft 17.14 ft
17.5
17.55
5 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 19, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 15
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m
.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 45.0% 540.31 7.62 101.13 2.22 4,910.60 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 45.0% 540.31 -7.62 101.13 2.22 4,910.60 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 15 697.61 0.96 113.21 13.50
Grand Total / System COG 16,170.29 0.02 58.55 3.85 63,205.39 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.31 mtr  50.24 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.91 mtr  12.82 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr  37.42 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.82 ft -0.25 mtr Heel = sin(Ha) * W 0.06 mtr  0.19 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.93 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.37 mtr  17.62 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.11 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.31 mtr  17.43 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.11 deg.

Freeboard at jetty 7.81 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.4
17.43
3 ft
Barge - Jetty distance 0.32 ft 0.10 mtr above jetty 17.84 ft 17.02 ft
Time involved ballast step 15 0.00 hrs star board side
Time elapsed since pre-ballast 1.47 hrs 17.93 ft bow stern 17.11 ft
Time elapsed since mean tide 1.47 hrs port side
18.03 ft 17.20 ft
17.6
17.62
2 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 20, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 16
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 45.0% 540.31 7.62 101.13 2.22 4,910.60 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 45.0% 540.31 -7.62 101.13 2.22 4,910.60 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 16 712.14 1.27 112.30 13.50
Grand Total / System COG 16,128.00 0.01 58.71 3.86 63,205.39 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.30 mtr  50.21 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.92 mtr  12.86 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr  37.35 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.71 ft -0.22 mtr Heel = sin(Ha) * W 0.02 mtr  0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.88 ft 5.45 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.16 ft 5.23 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.48 ft
Trim angle (Ta) = -0.10 deg. Heel angle (Ha) = atan(TCG/G'M) 0.05 deg.

Freeboard at jetty 7.76 ft 2.36 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.48
8 ft
Barge - Jetty distance 0.26 ft 0.08 mtr above jetty 17.84 ft 17.12 ft
Time involved ballast step 16 0.04 hrs star board side
Time elapsed since pre-ballast 1.50 hrs 17.88 ft bow stern 17.16 ft
Time elapsed since mean tide 1.50 hrs port side
17.92 ft 17.20 ft
17.5
17.56
6 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 21, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 17
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m
.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 40.0% 480.27 7.62 100.41 2.00 4,364.98 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 40.0% 480.27 -7.62 100.41 2.00 4,364.98 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 17 731.50 1.35 109.28 13.50
Grand Total / System COG 16,027.29 0.01 58.27 3.87 62,114.14 120.07 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.29 mtr  50.17 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.88 mtr  12.71 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.42 mtr  37.46 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.00 ft -0.31 mtr Heel = sin(Ha) * W 0.04 mtr  0.12 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.03 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.36 mtr  17.59 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.03 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr  17.46 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.07 deg.

Freeboard at jetty 7.89 ft 2.41 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.46
6 ft
Barge - Jetty distance 0.39 ft 0.12 mtr above jetty 17.96 ft 16.96 ft
Time involved ballast step 17 0.04 hrs star board side
Time elapsed since pre-ballast 1.54 hrs 18.03 ft bow stern 17.03 ft
Time elapsed since mean tide 1.54 hrs
port side
18.09 ft 17.09 ft
17.5
17.59
9 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 22, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 18
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

1 Tank 1 portside bo bow m ^3


0.0 5.0% 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m
.0T0 hrs
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 40.0% 480.27 7.62 100.41 2.00 4,364.98 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 40.0% 480.27 -7.62 100.41 2.00 4,364.98 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 18 762.54 1.40 106.50 13.50
Grand Total / System COG 16,058.33 0.02 58.24 3.89 62,114.14 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.27 mtr  50.11 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.87 mtr  12.69 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr  37.42 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.03 ft -0.31 mtr Heel = sin(Ha) * W 0.05 mtr  0.17 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.04 ft 5.50 mtr Draft Port side =Ad + Heel/2 5.37 mtr  17.61 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.01 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr  17.44 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.10 deg.

Freeboard at jetty 7.90 ft 2.41 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.44
4 ft
Barge - Jetty distance 0.40 ft 0.12 mtr above jetty 17.96 ft 16.93 ft
Time involved ballast step 18 0.00 hrs star board side
Time elapsed since pre-ballast 1.54 hrs 18.04 ft bow stern 17.01 ft
Time elapsed since mean tide 1.54 hrs
port side
18.12 ft 17.10 ft
17.6
17.61
1 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 23, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 19
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

m^3 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m
.0T0 hrs
1 Tank 1 portside bo bow 0.0 5.0%
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 40.0% 480.27 7.62 100.41 2.00 4,364.98 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 40.0% 480.27 -7.62 100.41 2.00 4,364.98 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 19 803.53 1.42 104.03 13.50
Grand Total / System COG 16,099.32 0.02 58.24 3.91 62,114.14 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.25 mtr  50.03 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.86 mtr  12.66 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.39 mtr  37.37 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.03 ft -0.31 mtr Heel = sin(Ha) * W 0.06 mtr  0.21 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.04 ft 5.50 mtr Draft Port side =Ad + Heel/2 5.37 mtr  17.63 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.01 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.31 mtr  17.42 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.12 deg.

Freeboard at jetty 7.90 ft 2.41 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.42
2 ft
Barge - Jetty distance 0.40 ft 0.12 mtr above jetty 17.94 ft 16.91 ft
Time involved ballast step 19 0.00 hrs star board side
Time elapsed since pre-ballast 1.54 hrs 18.04 ft bow stern 17.01 ft
Time elapsed since mean tide 1.54 hrs
port side
18.15 ft 17.12 ft
17.6
17.63
3 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 24, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 20
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

m^3 mT mtr mtr mtr mT*mtr mT hrs


1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 60.0% 681.85 7.62 16.82 1.46 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 40.0% 480.27 7.62 100.41 2.00 4,364.98 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 40.0% 480.27 -7.62 100.41 2.00 4,364.98 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 20 854.46 1.43 101.90 13.50
Grand Total / System COG 16,093.44 0.00 58.42 3.94 62,114.14 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.22 mtr  49.92 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.86 mtr  12.66 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.36 mtr  37.26 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.91 ft -0.28 mtr Heel = sin(Ha) * W 0.01 mtr  0.02 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.98 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.34 mtr  17.53 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.07 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr  17.51 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.01 deg.

Freeboard at jetty 7.85 ft 2.39 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.5
17.51
1 ft
Barge - Jetty distance 0.35 ft 0.11 mtr above jetty 17.97 ft 17.06 ft
Time involved ballast step 20 0.04 hrs star board side
Time elapsed since pre-ballast 1.58 hrs 17.98 ft bow stern 17.07 ft
Time elapsed since mean tide 1.58 hrs
port side
17.99 ft 17.08 ft
17.5
17.53
3 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 25, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 21
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water  
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

m^3 mT mtr mtr mtr mT*mtr mT hrs


1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 60.0% 681.85 7.62 16.82 1.46 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 40.0% 480.27 7.62 100.41 2.00 4,364.98 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 40.0% 480.27 -7.62 100.41 2.00 4,364.98 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46

47
48
49
50 Ballast step: 21 915.36 1.43 100.13 13.50
Grand Total / System COG 16,154.33 0.01 58.48 3.98 62,114.14 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.18 mtr  49.80 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.85 mtr  12.61 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.33 mtr  37.19 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.87 ft -0.26 mtr Heel = sin(Ha) * W 0.02 mtr  0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.96 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.35 mtr  17.55 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.09 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.49 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.

Freeboard at jetty 7.83 ft 2.39 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.49
9 ft
Barge - Jetty distance 0.33 ft 0.10 mtr above jetty 17.93 ft 17.06 ft
Time involved ballast step 21 0.00 hrs star board side
Time elapsed since pre-ballast 1.58 hrs 17.96 ft bow stern 17.09 ft
Time elapsed since mean tide 1.58 hrs
port side
17.99 ft 17.12 ft
17.5
17.55
5 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 26, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 22
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved

m^3 mT mtr mtr mtr mT*mtr mT hrs


1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 60.0% 681.85 7.62 16.82 1.46 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46

47
48
49
50 Ballast step: 22 979.77 1.41 98.57 13.50
Grand Total / System COG 16,098.67 0.01 58.18 4.02 61,022.90 120.07 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.14 mtr  49.67 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.79 mtr  12.44 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.35 mtr  37.23 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.07 ft -0.33 mtr Heel = sin(Ha) * W 0.03 mtr  0.11 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.06 ft 5.51 mtr Draft Port side =Ad + Heel/2 5.36 mtr  17.58 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.99 ft 5.18 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr  17.47 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.06 deg.

Freeboard at jetty 7.92 ft 2.41 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.47
7 ft
Barge - Jetty distance 0.42 ft 0.13 mtr above jetty 18.01 ft 16.94 ft
Time involved ballast step 22 0.04 hrs star board side
Time elapsed since pre-ballast 1.62 hrs 18.06 ft bow stern 16.99 ft
Time elapsed since mean tide 1.62 hrs
port side
18.12 ft 17.05 ft
17.5
17.58
8 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 27, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 23
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 55.0% 625.03 7.62 16.82 1.33 4,423.37 56.82 0.04
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46

47
48
49
50 Ballast step: 23 1044.19 1.55 98.98 13.50
Grand Total / System COG 16,106.27 0.00 58.52 4.06 61,022.90 56.82 0.04

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.10 mtr  49.53 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.79 mtr  12.43 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.31 mtr  37.10 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.84 ft -0.26 mtr Heel = sin(Ha) * W 0.00 mtr  0.00 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.94 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.34 mtr  17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.10 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr  17.52 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.

Freeboard at jetty 7.82 ft 2.38 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.5
17.52
2 ft
Barge - Jetty distance 0.32 ft 0.10 mtr above jetty 17.95 ft 17.10 ft
Time involved ballast step 23 0.04 hrs star board side
Time elapsed since pre-ballast 1.66 hrs 17.94 ft bow stern 17.10 ft
Time elapsed since mean tide 1.66 hrs
port side
17.94 ft 17.10 ft
17.5
17.52
2 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 28, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 24 C-jacket on barge


Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 55.0% 625.03 7.62 16.82 1.33 4,423.37 0.00
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43 C-ja
C-jack
cket
et sup
suppo
port
rt 7 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 252.96 11.00 111.53 13.50
44 C-ja
C-jack
cket
et sup
suppo
port
rt 8 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 259.98 -3.50 112.93 13.50
45 C-ja
C-jack
cket
et sup
suppo
port
rt 3 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 326.04 11.00 74.95 13.50
46 C-ja
C-jack
cket
et sup
suppo
port
rt 4 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 336.00 -10.50 77.05 13.50

47
48
49
50 Ballast step: 24 C-jacket on barge
Grand Total / System COG 16,237.06 0.02 58.32 4.14 61,022.90 0.00 0.00

HYDROSTATICS 

 Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.02 mtr  49.28 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.76 mtr  12.33 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.26 mtr  36.95 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr 
Metacentric Height KM = 62.86 ft 19.16 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.98 ft -0.30 mtr Heel = sin(Ha) * W 0.05 mtr  0.17 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.02 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.37 mtr  17.61 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.04 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr  17.44 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) 0.10 deg.

Freeboard at jetty 7.88 ft 2.40 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.50 ft 2.29 mtr  17.4
17.44
4 ft
Barge - Jetty distance 0.38 ft 0.12 mtr above jetty 17.93 ft 16.95 ft
Time involved ballast step 24 0.00 hrs star board side
Time elapsed since pre-ballast 1.66 hrs 18.02 ft bow stern 17.04 ft
Time elapsed since mean tide 1.66 hrs
port side
18.10 ft 17.12 ft
17.6
17.61
1 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 29, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 25 C-jacket in final position


Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 15.0% 170.46 7.62 16.82 0.36 4,423.37 454.57 0.30
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43 C-ja
C-jack
cket
et sup
suppo
port
rt 7 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 252.96 13.72 98.14 13.50
44 C-ja
C-jack
cket
et sup
suppo
port
rt 8 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 259.98 -0.76 99.54 13.50
45 C-ja
C-jack
cket
et sup
suppo
port
rt 3 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 326.04 13.72 61.56 13.50
46 C-ja
C-jack
cket
et sup
suppo
port
rt 4 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 336.00 -7.77 63.66 13.50

47
48
49
50 Ballast step: 25 C-jacket in
in fifinal po
position
Grand Total / System COG 15,782.49 0.00 58.52 4.21 61,022.90 454.57 0.30

HYDROSTATICS 

 Average draft Ad = 17.00 ft 5.18 mtr Transverse stability GM=KM-VCG 15.32 mtr  50.26 ft
Long. Cntr. Boyancy LCB = 195.73 ft 59.66 mtr Correction factor GG' = 3.87 mtr  12.69 ft
Long. Cntr Flotation LCF = 206.29 ft 62.88 mtr Corrected stability G'M = 11.45 mtr  37.57 ft
Moment tto
o change trim MT1 = 2,831.62 ft*tons 770.61 mT*mtr 
Metacentric Height KM = 64.07 ft 19.53 mtr 

Trim = Weight*(LCG-LCB)/MT1 -0.76 ft -0.23 mtr Heel = sin(Ha) * W 0.01 mtr  0.03 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.40 ft 5.30 mtr Draft Port side =Ad + Heel/2 5.19 mtr  17.03 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.64 ft 5.07 mtr Draft Starboard side=Ad - Heel/2 5.18 mtr  17.01 ft
Trim angle (Ta) = -0.11 deg. Heel angle (Ha) = atan(TCG/G'M) 0.02 deg.

Freeboard at jetty 8.28 ft 2.52 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.48 ft 2.28 mtr  17.0
17.01
1 ft
Barge - Jetty distance 0.80 ft 0.24 mtr above jetty 17.39 ft 16.62 ft
Time involved ballast step 25 0.30 hrs star board side
Time elapsed since pre-ballast 1.96 hrs 17.40 ft bow stern 16.64 ft
Time elapsed since mean tide 1.96 hrs
port side
17.41 ft 16.65 ft
17.0
17.03
3 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 30, 5/7/2006, MvD
 

Ballast calculations
PROJECT  Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0

Ballast step: 26 C-jacket in final position


Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
  kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water   1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr  Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr  3,303,965 LBS/hr 
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use

BALLAST INFO 
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 25.0% 284.10 7.62 16.82 0.61 4,423.37 113.64 0.08
6 Tank 2 port center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center   0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer  0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43 C-ja
C-jack
cket
et sup
suppo
port
rt 7 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 211.00 13.72 98.14 13.50
44 C-ja
C-jack
cket
et sup
suppo
port
rt 8 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 218.00 -0.76 99.54 13.50
45 C-ja
C-jack
cket
et sup
suppo
port
rt 3 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 284.00 13.72 61.56 13.50
46 C-ja
C-jack
cket
et sup
suppo
port
rt 4 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 294.00 -7.77 63.66 13.50

47
48
49
50 Ballast step: 26 C-jacket in
in fifinal po
position
Grand Total / System COG 15,728.16 0.01 57.98 4.09 61,022.90 113.64 0.08

HYDROSTATICS 

 Average draft Ad = 17.00 ft 5.18 mtr Transverse stability GM=KM-VCG 15.44 mtr  50.66 ft
Long. Cntr. Boyancy LCB = 195.73 ft 59.66 mtr Correction factor GG' = 3.88 mtr  12.73 ft
Long. Cntr Flotation LCF = 206.29 ft 62.88 mtr Corrected stability G'M = 11.56 mtr  37.93 ft
Moment tto
o change trim MT1 = 2,831.62 ft*tons 770.61 mT*mtr 
Metacentric Height KM = 64.07 ft 19.53 mtr 

Trim = Weight*(LCG-LCB)/MT1 -1.12 ft -0.34 mtr Heel = sin(Ha) * W 0.02 mtr  0.07 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.59 ft 5.36 mtr Draft Port side =Ad + Heel/2 5.20 mtr  17.06 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.47 ft 5.02 mtr Draft Starboard side=Ad - Heel/2 5.18 mtr  16.99 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.

Freeboard at jetty 8.45 ft 2.58 mtr  BARGE DRAFT BEHAVIOUR 


Jetty - water distance 7.43 ft 2.27 mtr  16.9
16.99
9 ft
Barge - Jetty distance 1.02 ft 0.31 mtr above jetty 17.55 ft 16.43 ft
Time involved ballast step 26 0.08 hrs star board side
Time elapsed since pre-ballast 2.04 hrs 17.59 ft bow stern 16.47 ft
Time elapsed since mean tide 2.04 hrs
port side
17.62 ft 16.50 ft
17.0
17.06
6 ft

barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 31, 5/7/2006, MvD

You might also like