Professional Documents
Culture Documents
Barge Stability
Barge Stability
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
OPERATION: OTHER PARTICULARS:
Barge orientation (tick one) ramp length = 20.00 ft 6.10 mtr (max 15 axles long)
Over Bow Cargo details:
Over Stern x Weight (i
(incl. tr
trailers) = 1,175.00 mT 2,588.11 KIPS
Over Side Length = 83.20 mtr 272 ft 11.6 inch
Width = 30.00 mtr 98 ft 5.1 inch
(Un)-Loading operation (tick one) Height (incl. trailers) = 23.00 mtr 75 ft 5.5 inch
Load In / Roll off (Barge to Land) VCG (incl. trailer) = 13.50 mtr 44 ft 3.5 inch
Load Out / Roll on (Land to Barge) x
Barge: Boa 7-8-9
TRANSPORTER INPUT
Transporter 1
Support 3 TCG ((c center ttrrailer) = 11.0 mtr 35 ft 11.1 inch
LC G ( CC.. L
L.. fifi rs
rs t a xl
xle ) = 0.0 mtr 0 ft 0.0 inch
Weight per axle = 3.5 mT 7.71 KIPS
Weight cargo = 284.0 mT 625.55 KIPS
# of axles = 12 Nos.
Tr
Trai
aile
lerr C
Cononfifigu gurarati
tion
on = s ("S" single, "D" double, "T" triple)
# of axle rows = 12 Nos.
Axle spacing = 1.4 mtr 4 ft 7.1 inch
W per axle row = 27.17 mT/axle row 59.84 KIPS/axle row
Transporter 2
Support 4 TCG ((c center ttrrailer) = -10.5 mtr -34 ft -5.4 inch
LC G ( CC.. L
L.. fifi rs
rs t a xl
xle ) = 6.4 mtr 20 ft 12.0 inch
Weight per axle = 3.5 mT 7.71 KIPS
Weight cargo = 294.0 mT 647.58 KIPS
# of axles = 12 Nos.
Tr
Trai
aile
lerr C
Cononfifigu gurarati
tion
on = d ("S" single, "D" double, "T" triple)
# of axle rows = 6 Nos.
Axle spacing = 1.4 mtr 4 ft 7.1 inch
W per axle row = 56.00 mT/axle row 123.35 KIPS/axle row
Transporter 3
NOTES
1.) Whi
While
le rolli
rolling
ng o
on
n 0-
0-poi
pointnt is at start
start of
of ram
ramp
p on lland
and sid
side
e
2.) Whi
While
le rolli
rolling
ng o
off
ff 0-
0-poi
pointnt is at start
start of
of ram
ramp
p on bbarg
arge
e si
side
de
3.)
3.) Re
Refe
fere
renc
ncee po
poin
intt is a
att mi
midd ke
keel
el a
att the
the bo
bow
w
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 1, 5/7/2006, MvD
Ballast calculations
AXLE SEQUENCE
SEQUENCE AND LOAD
LOADS
S
TIDAL INFORMATION:
time (hrs)
t iid
d al
al h eig
eigh
h ts
ts jet
jet ty-
ty-w
w at
at er
er h eig
eigh
h ts
ts
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 2, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Overview
Barge details: Ballasting with:
Name BOA 7-8-9 salt water 1,025
kg/m^3 63.93 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr Pump info:
Width (W) 100 ft 1 inch 30.51 mtr Capacity = 1,500 mT/hr 3,303,965 LBS/hr
Height (H) 24 ft 11 inch 7.59 mtr Results/output in (Tick one):
Max. draft 11 ft 5 inch 5.79 mtr Metric Imperial x
barge time
jetty Pumped time elapsed average trim heel
distance Quantity Nos. involved since mean draft trim angle heel angle
ft LBS pumps hrs. tide ft ft degrees ft degrees
Pre-ballasting 0.51 24,688,875 10 1.04 1.04 17.50 -1.11 -0.16 0.06 0.03
Step 1 0.51 0 0 0.00 1.04 17.50 -1.11 -0.16 0.06 0.03
Step 2 0.45 125,156 1 0.04 1.07 17.50 -0.99 -0.14 -0.01 -0.01
Step 3 0.39 125,156 1 0.04 1.11 17.50 -0.86 -0.12 -0.09 -0.05
Step 4 0.47 264,468 2 0.04 1.15 17.50 -1.04 -0.15 0.07 0.04
Step 5 0.44 0 0 0.00 1.15 17.50 -0.97 -0.14 0.24 0.14
Step 6 0.41 0 0 0.00 1.15 17.50 -0.91 -0.13 0.08 0.04
Step 7 0.37 0 0 0.00 1.15 17.50 -0.82 -0.12 -0.08 -0.05
Step 8 0.36 125,156 1 0.04 1.19 17.50 -0.80 -0.12 0.00 0.00
Step 9 0.40 264,468 2 0.04 1.23 17.50 -0.88 -0.13 -0.16 -0.09
Step 10 0.31 125,156 1 0.04 1.27 17.50 -0.80 -0.12 -0.08 -0.05
Step 11 0.39 389,624 3 0.04 1.31 17.50 -0.95 -0.14 -0.01 0.00
Step 12 0.36 389,624 3 0.04 1.35 17.50 -0.89 -0.13 0.05 0.03
Step 13 0.36 528,936 2 0.08 1.43 17.50 -0.90 -0.13 0.17 0.10
Step 14 0.32 125,156 1 0.04 1.47 17.50 -0.82 -0.12 0.06 0.04
Step 15 0.32 0 0 0.00 1.47 17.50 -0.82 -0.12 0.19 0.11
Step 16 0.26 125,156 1 0.04 1.50 17.50 -0.71 -0.10 0.08 0.05
Step 17 0.39 264,468 2 0.04 1.54 17.50 -1.00 -0.15 0.12 0.07
Step 18 0.40 0 0 0.00 1.54 17.50 -1.03 -0.15 0.17 0.10
Step 19 0.40 0 0 0.00 1.54 17.50 -1.03 -0.15 0.21 0.12
Step 20 0.35 125,156 1 0.04 1.58 17.50 -0.91 -0.13 0.02 0.01
Step 21 0.33 0 0 0.00 1.58 17.50 -0.87 -0.13 0.06 0.04
Step 22 0.42 264,468 2 0.04 1.62 17.50 -1.07 -0.16 0.11 0.06
Step 23 0.32 125,156 1 0.04 1.66 17.50 -0.84 -0.12 0.00 0.00
Step 24 0.38 0 0 0.00 1.66 17.50 -0.98 -0.14 0.17 0.10
Sailing - 22,072,506 10 1.04 2.70 6.00 0.00 0.00 0.00 0.00
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
CONCLUSION
Max. Av. Draft 17.50 ft Max. trim 0.00 ft Max. heel 0.24 ft
Min. trim -1.11 ft Min. heel -0.16 ft
Max. trim angle 0.00 degrees Max. heel angle 0.14 degrees
Min. trim angle -0.16 degrees Min. heel angle -0.09 degrees
NOTES
1.
1.)) Port
Port side
side is +, Star
Starbo
boar
ardd is
is -
2.) Tan
Tank
k% %-fi
-fille
lled
d is never
never lower
lower than
than 5%
5% or
or highe
higherr th
than
an 9
95%
5%
3.) Tank 1 is at bow
4.
4.)) If cap
capac
acit
ity
y is 0, this
this tank
tank is not
not pres
presen
entt
5.
5.)) Re
Refefere
renc
nce e poi
point
nt is at mi
mid d kee
keell at
at the
the bow
bow
6.) Transp
Transportorter
er mov
moveme
ementsnts are assume
assumed d tto
o be
be tim
timele
eless
ss
7.) A nega
negative
tive "barge
"barge-jetty
-jetty"" valu
value
e mean
means s barge
barge bel
below
ow jetty,
jetty, a positive
positive ""barg
barge-jet
e-jetty"
ty" val
value
ue mea
means
ns bar
barge
ge abo
above
ve jetty
jetty
8.) Ove
Overal
ralll time
time exclud
excludes
es pum
pump
p set-
set-up
up and handli
handling
ng tim
time
e
9.) A mi
minum
numum um of
of one
one pump
pump per used
used ba
balla
llast
st ttank
ank is assu
assumed
med
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 3, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 5.0% 56.82 7.62 16.82 0.12 4,423.37 568.21 0.38
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 5.0% 56.82 -7.62 16.82 0.12 4,423.37 965.95 0.64
9 Tank 3 portside 1678.2 5.0% 86.01 7.62 29.99 0.18 4,423.37 1548.14 1.03
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 5.0% 86.01 -7.62 29.99 0.18 4,423.37 1548.14 1.03
13 Tank 4 portside 1692.0 5.0% 86.72 7.62 44.96 0.19 4,423.37 780.44 0.52
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 44.96 0.19 4,423.37 780.44 0.52
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 5.0% 86.37 7.62 89.92 0.18 4,423.37 1554.60 1.04
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 5.0% 86.37 -7.62 89.92 0.18 4,423.37 1554.60 1.04
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 5.0% 60.03 7.62 97.74 0.25 545.62 360.21 0.24
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 5.0% 60.03 -7.62 97.74 0.25 545.62 360.21 0.24
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
Grand Total / System COG 4,609.56 0.00 57.26 3.75 54,475.43 10,020.92 1.04
HYDROSTATICS
Average draft Ad = 6.00 ft 1.83 mtr Transverse stability GM=KM-VCG 43.78 mtr 143.64 ft
Long. Cntr. Buoyancy LCB = 187.85 ft 57.26 mtr Correction factor GG' = 11.82 mtr 38.77 ft
Long. Cntr Flotation LCF = 191.87 ft 58.48 mtr Corrected stability G'M = 31.96 mtr 104.87 ft
Moment tto
o change trim MT1 = 1,734.84 ft*tons 472.12 mT*mtr
Metacentric Height KM = 155.95 ft 47.53 mtr
Trim = Weight*(LCG-LCB)/MT1 0.00 ft 0.00 mtr Heel = sin(Ha) * W 0.00 mtr 0.00 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 6.00 ft 1.83 mtr Draft Port side =Ad + Heel/2 1.83 mtr 6.00 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 6.00 ft 1.83 mtr Draft Starboard side=Ad - Heel/2 1.83 mtr 6.00 ft
Trim angle (Ta) = 0.00 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 4, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast st
step: Pre-ballasting
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 10 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 795.49 0.53
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 965.95 0.64
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 1548.14 1.03
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 1548.14 1.03
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 780.44 0.52
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 780.44 0.52
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 1554.60 1.04
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 1554.60 1.04
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 840.48 0.56
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 840.48 0.56
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50
Grand Total / System COG 16,249.91 0.01 58.14 3.49 69,752.86 11,208.75 1.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.67 mtr 51.40 ft
Long. Cntr. Buoyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.29 mtr 14.08 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr 37.32 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.11 ft -0.34 mtr Heel = sin(Ha) * W 0.02 mtr 0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.08 ft 5.51 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.98 ft 5.17 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.50 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.03 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 5, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 1
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 1 0.00 0.00 119.94 13.50
Grand Total / System COG 16,249.91 0.01 58.14 3.49 69,752.86 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.67 mtr 51.40 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.29 mtr 14.08 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr 37.32 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.11 ft -0.34 mtr Heel = sin(Ha) * W 0.02 mtr 0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.08 ft 5.51 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.98 ft 5.17 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.50 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.03 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 6, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 2
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 56.82 0.04
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 2 6.24 47.68 119.94 13.50
Grand Total / System COG 16,199.33 0.00 58.31 3.50 69,752.86 56.82 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.66 mtr 51.39 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.31 mtr 14.13 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.36 mtr 37.26 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.99 ft -0.30 mtr Heel = sin(Ha) * W 0.00 mtr -0.01 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.02 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.34 mtr 17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.03 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr 17.53 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) -0.01 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 7, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 3
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 56.82 0.04
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 75.0% 900.51 7.62 102.85 3.43 8,184.34 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 75.0% 900.51 -7.62 102.85 3.43 8,184.34 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 3 18.72 31.79 119.94 13.50
Grand Total / System COG 16,154.99 -0.01 58.50 3.50 69,752.86 56.82 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.66 mtr 51.36 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.32 mtr 14.17 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.34 mtr 37.20 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.86 ft -0.26 mtr Heel = sin(Ha) * W -0.03 mtr -0.09 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.95 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.33 mtr 17.48 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.09 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.35 mtr 17.57 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) -0.05 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 8, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 4
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 4 37.43 23.84 119.94 13.50
Grand Total / System COG 16,053.64 0.01 58.22 3.50 68,661.61 120.07 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.66 mtr 51.39 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.28 mtr 14.03 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.39 mtr 37.36 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.04 ft -0.32 mtr Heel = sin(Ha) * W 0.02 mtr 0.07 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.05 ft 5.50 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.01 ft 5.18 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.49 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 9, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 5
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 5 62.39 19.07 119.94 13.50
Grand Total / System COG 16,078.59 0.03 58.32 3.51 68,661.61 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.65 mtr 51.34 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.27 mtr 14.01 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr 37.33 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.97 ft -0.30 mtr Heel = sin(Ha) * W 0.07 mtr 0.24 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.01 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.38 mtr 17.64 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.04 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.31 mtr 17.41 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) 0.14 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 10, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 6
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 6 89.56 10.04 119.10 13.50
Grand Total / System COG 16,105.76 0.01 58.42 3.53 68,661.61 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.63 mtr 51.28 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.26 mtr 13.99 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.37 mtr 37.30 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.91 ft -0.28 mtr Heel = sin(Ha) * W 0.02 mtr 0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.98 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.07 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.48 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 11, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 7
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 7 129.58 4.70 117.88 13.50
Grand Total / System COG 16,145.79 -0.01 58.56 3.55 68,661.61 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.61 mtr 51.20 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.25 mtr 13.95 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.35 mtr 37.25 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.82 ft -0.25 mtr Heel = sin(Ha) * W -0.02 mtr -0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.93 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.33 mtr 17.48 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.11 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.35 mtr 17.56 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) -0.05 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 12, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 8
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 56.82 0.04
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 70.0% 840.48 7.62 102.70 3.23 7,638.72 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 70.0% 840.48 -7.62 102.70 3.23 7,638.72 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 8 182.47 1.74 116.79 13.50
Grand Total / System COG 16,255.50 0.00 58.59 3.58 68,661.61 56.82 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.58 mtr 51.10 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.22 mtr 13.86 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.35 mtr 37.24 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.80 ft -0.24 mtr Heel = sin(Ha) * W 0.00 mtr 0.00 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.92 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.34 mtr 17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.12 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr 17.52 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 13, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 9
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 70.0% 795.49 7.62 16.82 1.70 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 65.0% 780.45 7.62 102.52 3.03 7,093.09 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 65.0% 780.45 -7.62 102.52 3.03 7,093.09 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 9 248.22 0.11 115.91 13.50
Grand Total / System COG 16,201.18 -0.02 58.47 3.61 67,570.37 120.07 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.55 mtr 51.02 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.17 mtr 13.68 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr 37.34 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.88 ft -0.27 mtr Heel = sin(Ha) * W -0.05 mtr -0.16 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.96 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.32 mtr 17.44 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.08 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.37 mtr 17.60 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) -0.09 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 14, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 10
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 75.0% 852.31 7.62 16.82 1.82 4,423.37 56.82 0.04
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 65.0% 780.45 7.62 102.52 3.03 7,093.09 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 65.0% 780.45 -7.62 102.52 3.03 7,093.09 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 10 326.83 -0.80 115.23 13.50
Grand Total / System COG 16,336.61 -0.01 58.59 3.66 67,570.37 56.82 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.50 mtr 50.87 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.14 mtr 13.57 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.37 mtr 37.30 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.80 ft -0.25 mtr Heel = sin(Ha) * W -0.03 mtr -0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.92 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.33 mtr 17.48 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.12 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.35 mtr 17.56 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) -0.05 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 15, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 11
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 3 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 80.0% 909.13 7.62 16.82 1.94 4,423.37 56.82 0.04
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 60.0% 720.41 7.62 102.29 2.84 6,547.47 60.03 0.04
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 60.0% 720.41 -7.62 102.29 2.84 6,547.47 60.03 0.04
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 11 410.00 -1.35 114.58 13.50
Grand Total / System COG 16,356.53 0.00 58.38 3.69 66,479.12 176.89 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.47 mtr 50.74 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.06 mtr 13.33 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.40 mtr 37.41 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.95 ft -0.29 mtr Heel = sin(Ha) * W 0.00 mtr -0.01 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.00 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.34 mtr 17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.05 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr 17.53 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 16, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 12
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 3 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.43 mtr 50.61 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 4.02 mtr 13.19 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr 37.42 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.89 ft -0.27 mtr Heel = sin(Ha) * W 0.01 mtr 0.05 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.97 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.55 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.08 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.50 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.03 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 17, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 13
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.32 mtr 50.27 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.90 mtr 12.79 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.43 mtr 37.48 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.90 ft -0.28 mtr Heel = sin(Ha) * W 0.05 mtr 0.17 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.97 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.37 mtr 17.61 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.07 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr 17.44 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.10 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 18, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 14
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.32 mtr 50.26 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.91 mtr 12.83 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr 37.43 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.82 ft -0.25 mtr Heel = sin(Ha) * W 0.02 mtr 0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.93 ft 5.46 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.55 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.11 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.49 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 19, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 15
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.31 mtr 50.24 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.91 mtr 12.82 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr 37.42 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.82 ft -0.25 mtr Heel = sin(Ha) * W 0.06 mtr 0.19 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.93 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.37 mtr 17.62 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.11 ft 5.22 mtr Draft Starboard side=Ad - Heel/2 5.31 mtr 17.43 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.11 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 20, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 16
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.30 mtr 50.21 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.92 mtr 12.86 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.38 mtr 37.35 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.71 ft -0.22 mtr Heel = sin(Ha) * W 0.02 mtr 0.08 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.88 ft 5.45 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.56 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.16 ft 5.23 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.48 ft
Trim angle (Ta) = -0.10 deg. Heel angle (Ha) = atan(TCG/G'M) 0.05 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 21, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 17
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.29 mtr 50.17 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.88 mtr 12.71 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.42 mtr 37.46 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.00 ft -0.31 mtr Heel = sin(Ha) * W 0.04 mtr 0.12 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.03 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.36 mtr 17.59 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.03 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr 17.46 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.07 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 22, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 18
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.27 mtr 50.11 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.87 mtr 12.69 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.41 mtr 37.42 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.03 ft -0.31 mtr Heel = sin(Ha) * W 0.05 mtr 0.17 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.04 ft 5.50 mtr Draft Port side =Ad + Heel/2 5.37 mtr 17.61 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.01 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr 17.44 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.10 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 23, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 19
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 0m
.0T0 0m.0tr0 0m.0tr0 0m
.0tr0 m0T.*0m
0 tr 0m
.0T0 hrs
1 Tank 1 portside bo bow 0.0 5.0%
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar bo
boa rd
rd c
ce
en tte e r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar bo
boa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 65.0% 738.67 7.62 16.82 1.58 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar bo
boa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tte er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 40.0% 480.27 7.62 100.41 2.00 4,364.98 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nter
er ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
sternn 1171.4 40.0% 480.27 -7.62 100.41 2.00 4,364.98 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 19 803.53 1.42 104.03 13.50
Grand Total / System COG 16,099.32 0.02 58.24 3.91 62,114.14 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.25 mtr 50.03 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.86 mtr 12.66 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.39 mtr 37.37 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.03 ft -0.31 mtr Heel = sin(Ha) * W 0.06 mtr 0.21 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.04 ft 5.50 mtr Draft Port side =Ad + Heel/2 5.37 mtr 17.63 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.01 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.31 mtr 17.42 ft
Trim angle (Ta) = -0.15 deg. Heel angle (Ha) = atan(TCG/G'M) 0.12 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 24, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 20
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.22 mtr 49.92 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.86 mtr 12.66 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.36 mtr 37.26 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.91 ft -0.28 mtr Heel = sin(Ha) * W 0.01 mtr 0.02 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.98 ft 5.48 mtr Draft Port side =Ad + Heel/2 5.34 mtr 17.53 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.07 ft 5.20 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr 17.51 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.01 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 25, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 21
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water
1,000 kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 0 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
47
48
49
50 Ballast step: 21 915.36 1.43 100.13 13.50
Grand Total / System COG 16,154.33 0.01 58.48 3.98 62,114.14 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.18 mtr 49.80 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.85 mtr 12.61 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.33 mtr 37.19 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.87 ft -0.26 mtr Heel = sin(Ha) * W 0.02 mtr 0.06 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.96 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.35 mtr 17.55 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.09 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.49 ft
Trim angle (Ta) = -0.13 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 26, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 22
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 2 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
47
48
49
50 Ballast step: 22 979.77 1.41 98.57 13.50
Grand Total / System COG 16,098.67 0.01 58.18 4.02 61,022.90 120.07 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.14 mtr 49.67 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.79 mtr 12.44 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.35 mtr 37.23 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.07 ft -0.33 mtr Heel = sin(Ha) * W 0.03 mtr 0.11 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.06 ft 5.51 mtr Draft Port side =Ad + Heel/2 5.36 mtr 17.58 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.99 ft 5.18 mtr Draft Starboard side=Ad - Heel/2 5.33 mtr 17.47 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.06 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 27, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
Ballast step: 23
Barge details: Ballasting with (tick one):
Name BOA 7-8-9 fresh water 1,000
kg/m^3 62.37 LBS/ft^3
Length (L) 393 ft 6 inch 119.94 mtr salt water 1,025 kg/m^3 63.93 LBS/ft^3 x
Width (W) 100 ft 1 inch 30.51 mtr Pump info:
Height (H) 24 ft 11 inch 7.59 mtr Capacity = 1500 mT/hr 3,303,965 LBS/hr
Max. draft 19 ft 0 inch 5.79 mtr Pumps = 1 Nos. per tank 1 Nos. tanks in use
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 55.0% 625.03 7.62 16.82 1.33 4,423.37 56.82 0.04
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43
44
45
46
47
48
49
50 Ballast step: 23 1044.19 1.55 98.98 13.50
Grand Total / System COG 16,106.27 0.00 58.52 4.06 61,022.90 56.82 0.04
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.10 mtr 49.53 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.79 mtr 12.43 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.31 mtr 37.10 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.84 ft -0.26 mtr Heel = sin(Ha) * W 0.00 mtr 0.00 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.94 ft 5.47 mtr Draft Port side =Ad + Heel/2 5.34 mtr 17.52 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.10 ft 5.21 mtr Draft Starboard side=Ad - Heel/2 5.34 mtr 17.52 ft
Trim angle (Ta) = -0.12 deg. Heel angle (Ha) = atan(TCG/G'M) 0.00 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 28, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 55.0% 625.03 7.62 16.82 1.33 4,423.37 0.00
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43 C-ja
C-jack
cket
et sup
suppo
port
rt 7 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 252.96 11.00 111.53 13.50
44 C-ja
C-jack
cket
et sup
suppo
port
rt 8 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 259.98 -3.50 112.93 13.50
45 C-ja
C-jack
cket
et sup
suppo
port
rt 3 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 326.04 11.00 74.95 13.50
46 C-ja
C-jack
cket
et sup
suppo
port
rt 4 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 336.00 -10.50 77.05 13.50
47
48
49
50 Ballast step: 24 C-jacket on barge
Grand Total / System COG 16,237.06 0.02 58.32 4.14 61,022.90 0.00 0.00
HYDROSTATICS
Average draft Ad = 17.50 ft 5.33 mtr Transverse stability GM=KM-VCG 15.02 mtr 49.28 ft
Long. Cntr. Boyancy LCB = 196.09 ft 59.77 mtr Correction factor GG' = 3.76 mtr 12.33 ft
Long. Cntr Flotation LCF = 207.01 ft 63.10 mtr Corrected stability G'M = 11.26 mtr 36.95 ft
Moment tto
o change trim MT1 = 2,884.08 ft*tons 784.88 mT*mtr
Metacentric Height KM = 62.86 ft 19.16 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.98 ft -0.30 mtr Heel = sin(Ha) * W 0.05 mtr 0.17 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 18.02 ft 5.49 mtr Draft Port side =Ad + Heel/2 5.37 mtr 17.61 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 17.04 ft 5.19 mtr Draft Starboard side=Ad - Heel/2 5.32 mtr 17.44 ft
Trim angle (Ta) = -0.14 deg. Heel angle (Ha) = atan(TCG/G'M) 0.10 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 29, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 15.0% 170.46 7.62 16.82 0.36 4,423.37 454.57 0.30
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43 C-ja
C-jack
cket
et sup
suppo
port
rt 7 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 252.96 13.72 98.14 13.50
44 C-ja
C-jack
cket
et sup
suppo
port
rt 8 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 259.98 -0.76 99.54 13.50
45 C-ja
C-jack
cket
et sup
suppo
port
rt 3 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 326.04 13.72 61.56 13.50
46 C-ja
C-jack
cket
et sup
suppo
port
rt 4 (wi
(with
th tr
tran
ansp
spor
orte
ters
rs)) 336.00 -7.77 63.66 13.50
47
48
49
50 Ballast step: 25 C-jacket in
in fifinal po
position
Grand Total / System COG 15,782.49 0.00 58.52 4.21 61,022.90 454.57 0.30
HYDROSTATICS
Average draft Ad = 17.00 ft 5.18 mtr Transverse stability GM=KM-VCG 15.32 mtr 50.26 ft
Long. Cntr. Boyancy LCB = 195.73 ft 59.66 mtr Correction factor GG' = 3.87 mtr 12.69 ft
Long. Cntr Flotation LCF = 206.29 ft 62.88 mtr Corrected stability G'M = 11.45 mtr 37.57 ft
Moment tto
o change trim MT1 = 2,831.62 ft*tons 770.61 mT*mtr
Metacentric Height KM = 64.07 ft 19.53 mtr
Trim = Weight*(LCG-LCB)/MT1 -0.76 ft -0.23 mtr Heel = sin(Ha) * W 0.01 mtr 0.03 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.40 ft 5.30 mtr Draft Port side =Ad + Heel/2 5.19 mtr 17.03 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.64 ft 5.07 mtr Draft Starboard side=Ad - Heel/2 5.18 mtr 17.01 ft
Trim angle (Ta) = -0.11 deg. Heel angle (Ha) = atan(TCG/G'M) 0.02 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 30, 5/7/2006, MvD
Ballast calculations
PROJECT Gulf Marine, C-jacket ENG. No. 23e081 Rev. 0
BALLAST INFO
Free Surface Pumped time
No. Description Capacity %-filled Weight TCG LCG VCG Correction Quantity involved
m^3 mT mtr mtr mtr mT*mtr mT hrs
1 Tank 1 portside bo bow 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
2 Tank 1 port ce center bow 168.4 5.0% 8.63 0.00 4.78 0.25 303.69 0.00
3 Ta
an
nk 1 s ta
tar boboa rd
rd cce
en ttee r bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
4 Ta
an
nk 1 s ta
tar boboa rd
rd s id
id e bo w 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
5 Tank 2 portside 1108.7 25.0% 284.10 7.62 16.82 0.61 4,423.37 113.64 0.08
6 Tank 2 port center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
7 Ta
an
nk 2 s ta
tar boboa rd
rd c e
enn tte
er 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
8 Tank 2 st aarrboard s ide 1108.7 90.0% 1022.78 -7.62 16.82 2.18 4,423.37 0.00
9 Tank 3 portside 1678.2 95.0% 1634.15 7.62 29.99 3.49 4,423.37 0.00
10 Tank 3 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
11 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
12 Ta
an
n k 3 st
st ar
ar bo
boa rd
rd s id
id e 1678.2 95.0% 1634.15 -7.62 29.99 3.49 4,423.37 0.00
13 Tank 4 portside 1692.0 50.0% 867.15 7.62 44.96 1.85 4,423.37 0.00
14 Tank 4 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
15 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
16 Ta
an
n k 4 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 50.0% 867.15 -7.62 44.96 1.85 4,423.37 0.00
17 Tank 5 portside 1693.8 5.0% 86.81 7.62 59.95 0.19 4,423.37 0.00
18 Tank 5 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
19 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
20 Ta
an
n k 5 st
st ar
ar bo
boa rd
rd s id
id e 1693.8 5.0% 86.81 -7.62 59.95 0.19 4,423.37 0.00
21 Tank 6 portside 1692.0 5.0% 86.72 7.62 74.95 0.19 4,423.37 0.00
22 Tank 6 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
23 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
24 Ta
an
n k 6 st
st ar
ar bo
boa rd
rd s id
id e 1692.0 5.0% 86.72 -7.62 74.95 0.19 4,423.37 0.00
25 Tank 7 portside 1685.2 95.0% 1640.96 7.62 89.92 3.50 4,423.37 0.00
26 Tank 7 port ce center 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
27 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd ce
cen tteer 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
28 Ta
an
n k 7 st
st ar
ar bo
boa rd
rd s id
id e 1685.2 95.0% 1640.96 -7.62 89.92 3.50 4,423.37 0.00
29 Ta
an
n k 8 po
po rt
rt si
sid e s te
te rn
rn 1171.4 35.0% 420.24 7.62 99.28 1.77 3,819.36 0.00
30 Ta
an
n k 8 po
po rt
rt ce
ce nt
nt er
er st
st er
er n 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
31 Ta
Tank
nk 8 star
starboboarardd ce
cent
nterer ste
stern
rn 0.0 5.0% 0.00 0.00 0.00 0.00 0.00 0.00
32 Ta
Tank
nk 8 sta
starb
rboaoard
rd side
side ster
stern n 1171.4 35.0% 420.24 -7.62 99.28 1.77 3,819.36 0.00
33
34 Light ship 3502.00 0.00 56.64 4.88
35
36 Ramps 7.00 11.00 119.00 7.59
37 Ramps 10.20 -3.50 119.00 7.59
38 Ramps 10.20 -10.50 119.00 7.59
39 P1 ( 4 N o
os
s . a t 4 8.
8. 3 s T)
T) 175.60 7.30 87.90 8.19
40 P2 ( 4 N o
os
s . a t 3 9.
9. 5 s T)
T) 143.60 2.40 77.20 8.19
41 P3 ( 4 N o
os
s . a t 2 3.
3. 5 s T)
T) 85.00 -1.80 62.00 8.29
42
43 C-ja
C-jack
cket
et sup
suppo
port
rt 7 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 211.00 13.72 98.14 13.50
44 C-ja
C-jack
cket
et sup
suppo
port
rt 8 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 218.00 -0.76 99.54 13.50
45 C-ja
C-jack
cket
et sup
suppo
port
rt 3 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 284.00 13.72 61.56 13.50
46 C-ja
C-jack
cket
et sup
suppo
port
rt 4 (w/
(w/o
o tr
tran
ansp
spor
orte
ters
rs)) 294.00 -7.77 63.66 13.50
47
48
49
50 Ballast step: 26 C-jacket in
in fifinal po
position
Grand Total / System COG 15,728.16 0.01 57.98 4.09 61,022.90 113.64 0.08
HYDROSTATICS
Average draft Ad = 17.00 ft 5.18 mtr Transverse stability GM=KM-VCG 15.44 mtr 50.66 ft
Long. Cntr. Boyancy LCB = 195.73 ft 59.66 mtr Correction factor GG' = 3.88 mtr 12.73 ft
Long. Cntr Flotation LCF = 206.29 ft 62.88 mtr Corrected stability G'M = 11.56 mtr 37.93 ft
Moment tto
o change trim MT1 = 2,831.62 ft*tons 770.61 mT*mtr
Metacentric Height KM = 64.07 ft 19.53 mtr
Trim = Weight*(LCG-LCB)/MT1 -1.12 ft -0.34 mtr Heel = sin(Ha) * W 0.02 mtr 0.07 ft
Draft bow (Db) = Ad-(Trim*(LCF/L)) 17.59 ft 5.36 mtr Draft Port side =Ad + Heel/2 5.20 mtr 17.06 ft
Draft stern(Ds)=Ad+(Trim((L-LCF)/L)
stern(Ds)=Ad+(Trim((L-LCF)/L))) 16.47 ft 5.02 mtr Draft Starboard side=Ad - Heel/2 5.18 mtr 16.99 ft
Trim angle (Ta) = -0.16 deg. Heel angle (Ha) = atan(TCG/G'M) 0.04 deg.
barge stab BOA 7-8-9 c-jacket.xls Barge Ballast Calculations Page 31, 5/7/2006, MvD