Planned Capacity: Renault - CSR
Planned Capacity: Renault - CSR
R / N Project: Nissan Important Part Renault - CSR S 1 Doc Ref. No. / Ver.:
A
Doc. Rev. Date:
B C OBD R 2
Doc. Origin Date:
Supplier Name: Supplier Code: E-mail:
Supplier Plant Name: Author: Tel. No:
Part Name: Remark
Part No. & Issue Level:
Design Note No. / DEVO:
Yellow boxes are to be filled, Gray boxes can be either filled or calculated
Planned capacity
(ANPQP : production capacity plan document)
Operation Next Process Machine Name of Ref list of final standard Nb Average This cumulated Effective Nb hours Nb shifts Total Number of Percentage Number of Current
Number operation operation type and the part product cycle time parts/cycl operational operation Downstream capacity per shift per week Weekly machines of part (from Weekly
(see example Identific produced using this [sec] e efficiency scrap rate scraps [%] per hour (same working production this capacity
below or use ation by this Ref. (based on [%] (this op. base as time allocated to operation) (equivalen
flowchert operation production included) OEE thisRenault- used per t final
numbers) results) [%] calculation) Nissan parts final product product)
(not including final product (coefficient)
scraps) [%]
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0.00% 0.0
0 Designation :
Site : Vehicle/Function :
Weekly Capacity Process - Request of RNPO - [parts]
2/9
Copyright (C) Renault-NISSAN All Rights Reserved_Ver.3.0
Updated xx/xx/xx
Ramp-up capacity plan Firm/Plant : Reference/Index : Remarks
0 Designation :
Site : Vehicle/Function :
Period (week) Standard Cycle Planned OEE Planned Planned Planned Planned Renault ACTION PLAN
time (without cumulated scraps Practical working hours production Required Ramp-up Capacity
scraps) (%) (%) capacity per per week capacity per quantity (Parts)
hour week
12
#VALUE!
10
#VALUE!
#VALUE!
parts/w
8
#VALUE!
#VALUE! 6
#VALUE!
#VALUE! 4
#VALUE!
2
#VALUE!
#VALUE!
0
#VALUE!
#VALUE!
Renault Required quantity (Parts) Weeks
Planned production capacity per week
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
<Sample> Working
Working Time
Time :: 8:00
8:00 -- 16:00,
16:00, 20:00
20:00 -- 4:00
4:00 // 960
960 min
min
Lunch
Lunch Time
Time :: 12:00
12:00 -- 12:45,
12:45, 0:00
0:00 -- 0:45
0:45 // 90
90 min
min
[A] Operaton Time per day 830 [minutes/day]
Break
Break Time
Time :: 10:00
10:00 -- 10:10,
10:10, 15:00
15:00 -- 15:10,
15:10, 22:00
22:00 -- 22:10,
22:10, 3:00
3:00 -- 3:10
3:10 // 40
40 min
min
*Excluded Lunch Time and Break Time Operation
Operation Time
Time == 960
960 min
min -- 90
90 min
min -- 40
40 min
min == 830
830 min
min
*YYYY/MM [days/month]
*Average of 20 times
*D = (A - d) / A
[pcs/month]
[F] Production Capacity Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99 Dec-99
per month #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
*F = (3,600 / C * D * E) * (A / 60 * B)
FVC - Bottleneck (upon request) Page 5
YNM
DFL
Nissan Plant 0 0 0 0 0 0 0 0 0 0 0 0
Nissan IPC 0 0 0 0 0 0 0 0 0 0 0 0
Other OEM 0 0 0 0 0 0 0 0 0 0 0 0
[H] Difference #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
*H = F - G
1
1 FVC - Bottleneck (upon request) Page 6
0
Dec-99
【Countermeasure】
Category Take countermeasure items Responsibility Due da
Quality
OK ratio & STR achieve the target
Man
Machine
Special team for Maintenance & Quality
Outsourcing
Method Bank build
FVC - Bottleneck (upon request) Page 7
TOTAL
#DIV/0!
FVC - Bottleneck (upon request) Page 8
TOTAL
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
#DIV/0!
FVC - Bottleneck (upon request) Page 9
Dec-99
Due date