Vicente T.

Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

DENSITY AND MARSHALL STABILITY TEST


PROJECT: Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Sample: Bituminous Concrete Surface Coarse (Hot Laid) Item No.: 310
Design Criteria: Heavy Traffic No. of Blows on ends: 75 blows
Lab. No. UMTSI -20-MS-0008 Date Tested: October 27, 2020

(Gse) Specific Gravity 2.629


Specific Gravity of Asphalt 1.04
Asphalt Content, % by weight of mix 5.0

30-mins. soaking
TRIAL Nos. A B C AVERAGE SPEC'S.

I. Height of Specimen, cm 6.56 6.57 6.87 6.67


II. Wt. of Sample in Air, g 1245.6 1244.3 1251.2
III. Wt. of Sample in Water, g 710 712 716
IV. Wt. of SSD Sample in Air, g 1251 1250 1256.8
V. Bulk Volume, cm^3 541 538 540.8
VI. Bulk Specific Gravity, Gmb 2.302 2.313 2.314 2.310
VII. Max. Theor. Density, Gmm - - - -
VIII. Air Voids, % - - - 3-5
IX. Stability
Machine Reading, kg. 1039.7554 1060.14 1104.99 1068.298
Correlation Ratio 0.9300 0.9600 0.9600
Stability Adjusted, kg. 966.97 1017.74 1060.80 1015.17 845 min.
X. Flow, mm. 13.6 12.7 14.2 13.50 8-14
XI. Index Retained Strength, %

REMARKS:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

DENSITY AND MARSHALL STABILITY TEST


PROJECT: Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Sample: Bituminous Concrete Surface Coarse (Hot Laid) Item No.: 310
Design Criteria: Heavy Traffic No. of Blows on ends: 75 blows
Lab. No. UMTSI -20-MS-0008 Date Tested: October 27, 2020

(Gse) Specific Gravity 2.629


Specific Gravity of Asphalt 1.04
Asphalt Content, % by weight of mix 5.2

30-mins. soaking
TRIAL Nos. A B C AVERAGE SPEC'S.

I. Height of Specimen, cm 6.73 6.680 6.74 6.72


II. Wt. of Sample in Air, g 1249.4 1245 1250.2
III. Wt. of Sample in Water, g 716 720 724
IV. Wt. of SSD Sample in Air, g 1255 1249.3 1255.1
V. Bulk Volume, cm^3 539 529.3 531.1
VI. Bulk Specific Gravity, Gmb 2.318 2.352 2.354 2.341
VII. Max. Theor. Density, Gmm - - - -
VIII. Air Voids, % - - - 3-5
IX. Stability
Machine Reading, kg. 1151.89 1121.3 1100.92 1124.7
Correlation Ratio 0.9600 0.9600 0.9600
Stability Adjusted, kg. 1105.81 1076.45 1056.88 1079.71 845 min.
X. Flow, mm. 13.7 14.2 12.6 13.50 8-14
XI. Index Retained Strength, %

REMARKS:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

DENSITY AND MARSHALL STABILITY TEST


PROJECT: Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Sample: Bituminous Concrete Surface Coarse (Hot Laid) Item No.: 310
Design Criteria: Heavy Traffic No. of Blows on ends: 75 blows
Lab. No. UMTSI -20-MS-0008 Date Tested: October 27, 2020

(Gse) Specific Gravity 2.629


Specific Gravity of Asphalt 1.04
Asphalt Content, % by weight of mix 5.5

30-mins. soaking
TRIAL Nos. A B C AVERAGE SPEC'S.

I. Height of Specimen, cm 6.79 6.82 6.81 6.81


II. Wt. of Sample in Air, g 1249.4 1253.6 1240.2
III. Wt. of Sample in Water, g 714 710 720
IV. Wt. of SSD Sample in Air, g 1255.3 1257.4 1254.8
V. Bulk Volume, cm^3 541.3 547.4 534.8
VI. Bulk Specific Gravity, Gmb 2.308 2.290 2.319 2.306
VII. Max. Theor. Density, Gmm - - - -
VIII. Air Voids, % - - - 3-5
IX. Stability
Machine Reading, kg. 1112.13 1039.76 1090.72 1080.87
Correlation Ratio 0.9300 0.9300 0.9600
Stability Adjusted, kg. 1034.28 966.97 1047.09 1016.12 845 min.
X. Flow, mm. 13.8 13.2 14.2 13.73 8-14
XI. Index Retained Strength, %

REMARKS:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

DENSITY AND MARSHALL STABILITY TEST


PROJECT: Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Sample: Bituminous Concrete Surface Coarse (Hot Laid) Item No.:
Design Criteria: Heavy Traffic No. of Blows on ends:
Lab. No. UMTSI -20-MS-0008 Date Tested:

(Gse) Specific Gravity 2.629


Specific Gravity of Asphalt 1.04
Asphalt Content, % by weight of mix 6.0

30-mins. soaking
TRIAL Nos. A B C AVERAGE SPEC'S.

I. Height of Specimen, cm 6.7 6.82 6.53 6.68


II. Wt. of Sample in Air, g 1253.7 1239.6 1244.1
III. Wt. of Sample in Water, g 722 708 714
IV. Wt. of SSD Sample in Air, g 1269.2 1258.3 1258.3
V. Bulk Volume, cm^3 547.2 550.3 544.3
VI. Bulk Specific Gravity, Gmb 2.291 2.253 2.286 2.276
VII. Max. Theor. Density, Gmm - - - -
VIII. Air Voids, % - - - 3-5
IX. Stability
Machine Reading, kg. 1067.28 1039.76 1559.63 1222.22
Correlation Ratio 0.9300 0.9300 0.9300
Stability Adjusted, kg. 992.57 966.97 1450.46 1136.67 845 min.
X. Flow, mm. 14.0 13.3 13.4 13.57 8-14
XI. Index Retained Strength, %

REMARKS:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO DPWH-DISTRICT 1
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET ON EXTRACTION AND GRADING


Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Asphalt Cement Spec's Item No. : 310
Sample at : Jobsite Date Sampled : October 24, 2020
Original Source : Termcotank, Shell Phil. Date Tested : October 24, 2020
Sampled by : J.M.Madera Date Computed : October 24, 2020
Tested by : UMTSI Computed by : UMTSI
Laboratory No. : UMTSI-AT-20-00018

A. EXTRACTION

1. Weight of Bituminous Concrete Mix, g 882.00


2. Weight of Aggregates after Extraction, g 828.00
3. Weight of Bitumen Extracted,(1-2)
g 54.00
4. Bitumen Content
a. % by Weight of Aggregate 6.52
( 3 / 2 x 100)
b. % by Weight of Mix 6.12
( 3 / 1 x 100)

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 100.00 100 100
3/4" 0.00 0.00 100.00 100.00 0 95-100 100
1/2" 9.00 9.00 91.00 91.00 9 68-86 78-92
3/8" 5.00 5.00 86.00 86.00 14 56-78 62-76
No. 4 44.00 44.00 42.00 42.00 58 38-60 41-55
No. 8 5.00 5.00 37.00 37.00 63 27-47 28-36
No. 16 8.00 8.00 29.00 29.00 71 18-37 20-28
No. 30 11.00 11.00 18.00 18.00 82 13-28 13-19
No. 50 8.00 8.00 10.00 10.00 90 9-20 10 .-14
No. 200 5.00 5.00 5.00 5.00 95 4-8 4.-7
PAN 0.00
Total

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.# 3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 25
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

TEST REPORT ON ASPHALT CEMENT

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Asphalt Cement Spec's Item No. : 310
Sample at : Jobsite Date Sampled : October 15, 2020
Original Source : Termcotank, Shell Phil. Date Tested : October 16, 2020
Sampled by : E.N.M.Antiolla/B.M.Baranda Jr. Date Computed : October 23, 2020
Tested by : ARG Cons. Mtrls Testing Center Computed by : ARG Cons. Mtrls Testing Center
Laboratory No. : LN-55232-20

TEST RESULT REQUIREMENTS

Original Sample
Penetration 25 ° C, 100g, 5s 64 60 - 70
Flashpoint, Cleveland Open Cup, °C 342 232 Min.
Ductility 25 ° C, 5cm/min., cm 105+ 100 Min.
Solubility in Trichloroethylene, % 99.4 99 Min.
Loss on Heating, % 0.024 0.8 Max.

Residue
Penetration, % of Original 62 54 Min.
Ductility 25 ° C, 5cm/min., cm 105+ 50 Min.

Spot Test, 25% xylene - heptane Negative Negative

Specific Gravity 1.036 -

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : 20KK0132 - Repair/Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/4") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa Date Computed : September 18, 2020
Tested by : E.J. Banadera -LT Computed by : E.J. Banadera -LT
Laboratory No. : CD0-200910-0013

Test No. 3
Dry Unit wt., Loose 1427 kg/mᶟ
Rodded 1460 kg/mᶟ Wt. of Sample in grams: 2,265.00
Moisture Content, % 1.16 Oven Dry Weight 2,239.00
Fineness Modulus - Wash Oven Dry Weight 2,224.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 0.00 0 2239.00 100 100
3/4" 0.00 0.00 2239.00 100 0 95-100
1/2" 1164.00 52.00 1075.00 48 52 68-86
3/8" 739.00 33.00 336.00 15 85 56-78
No. 4 157.00 7.00 179.00 8 92 38-60
No. 8 101.00 5.00 78.00 3 97 27-47
No. 10 4.00 0.00 74.00 3
No. 16 16.00 0.00 51.00 2 98 18-37
No. 30 6.00 0.00 45.00 2 98 13-28
No. 40 14.00 1.00 31.00 1
No. 50 4.00 0.00 27.00 1 99 9-20
No. 100 7.00 0.00 20.00 1
No. 200 4.00 0.00 16.00 1 99 4-8
PAN 1.00
Total 2239.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : 20KK0132 - Repair/Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/4") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa Date Computed : September 18, 2020
Tested by : E.J. Banadera -LT Computed by : E.J. Banadera -LT
Laboratory No. : CD0-200910-0012

Test No. 2
Dry Unit wt., Loose 1427 kg/mᶟ
Rodded 1460 kg/mᶟ Wt. of Sample in grams: 2,252.00
Moisture Content, % 1.12 Oven Dry Weight 2,227.00
Fineness Modulus - Wash Oven Dry Weight 2,212.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 0 0 2227 100 100
3/4" 0 0 2227 100 95-100
1/2" 1047 47 1180 53.00 47 68-86
3/8" 808 36 372 17.00 83 56-78
No. 4 194 9 178 8.00 92 38-60
No. 8 98 4 80 4.00 96 27-47
No. 10 4 0 76 3.00
No. 16 9 0 49 2.00 98 18-37
No. 30 9 0 40 2.00 98 13-28
No. 40 11 0 29 1.00
No. 50 2 0 27 1.00 99 9-20
No. 100 9 0 18 1.00
No. 200 2 0 16 1.00 99 4-8
PAN 1 0 100
Total 2227.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : 20KK0132 - Repair/Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/4") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa Date Computed : September 11, 2020
Tested by : E.J. Banadera -LT Computed by : E.J. Banadera -LT
Laboratory No. : CD0-200910-0006

Test No. 1
Dry Unit wt., Loose 1427 kg/mᶟ
Rodded 1460 kg/mᶟ Wt. of Sample in grams: 2,237.00
Moisture Content, % 1.08 Oven Dry Weight 2,213.00
Fineness Modulus - Wash Oven Dry Weight 2,205.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 0.00 0 2213.00 100 100
3/4" 0.00 0 2213.00 100 0 95-100
1/2" 1064.00 48 1149.00 52 48 68-86
3/8" 779.00 35 370.00 17 83 56-78
No. 4 162.00 7 208.00 9 91 38-60
No. 8 137.00 6 71.00 3 97 27-47
No. 10 5.00 0 66.00 3
No. 16 7.00 0 46.00 2 98 18-37
No. 30 13.00 1 33.00 1 99 13-28
No. 40 6.00 0 27.00 1
No. 50 3.00 0 24.00 1 99 9-20
No. 100 9.00 0 15.00 1
No. 200 6.00 0 9.00 0 100 4-8
PAN 1.00 100
Total 2213.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/8") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 11, 2020
Tested by : E.J. Banadera - LT Computed by : Megatesting Center Inc.
Laboratory No. : CDO-200910-0005

Test No. -
Dry Unit wt., Loose 1438 kg/mᶟ
Rodded 1481 kg/mᶟ Wt. of Sample in grams: 2,105.00
Moisture Content, % 1.54 Oven Dry Weight 2,073.00
Fineness Modulus - Wash Oven Dry Weight 2,033.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 0 0 2073 100 0 100
3/4" 0 0 2073 100 0 95-100
1/2" 0 0 2073 100 0 68-86
3/8" 60 3 2073 97 3 56-78
No. 4 1406 68 607 29 71 38-60
No. 8 172 8 435 21 79 27-47
No. 10 327 16 108 5 95
No. 16 8 0 81 4 96 18-37
No. 30 4 0 77 4 96 13-28
No. 40 11 1 66 3 97
No. 50 2 0 64 3 97 9-20
No. 100 18 1 46 2 98
No. 200 5 0 41 2 98 4-8
PAN 1
Total 2073
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/8") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 18, 2020
Tested by : E.J. Banadera - LT Computed by : Megatesting Center Inc.
Laboratory No. : CDO-200910-0011

Test No. -
Dry Unit wt., Loose 1438 kg/mᶟ
Rodded 1481 kg/mᶟ Wt. of Sample in grams: 2,128.00
Moisture Content, % 1.33 Oven Dry Weight 2,100.00
Fineness Modulus - Wash Oven Dry Weight 7,668.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 0 0 2100.00 100 0 100
3/4" 0 0 2100 100 0 95-100
1/2" 0 0 2100 100 0 68-86
3/8" 105 5 1995 95 5 56-78
No. 4 1399 67 596 28 72 38-60
No. 8 71 3 525 25 75 27-47
No. 10 372 18 153 7 93
No. 16 42 2 88 4 96 18-37
No. 30 10 0 78 4 96 13-28
No. 40 7 0 71 3 97
No. 50 4 0 67 3 97 9-20
No. 100 17 1 50 2 98
No. 200 8 0 42 2 RETAINED 4-8
PAN 1.00
Total 2100.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/8") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 18, 2020
Tested by : E.J. Banadera - LT Computed by : Megatesting Center Inc.
Laboratory No. : CDO-200910-0010

Test No. -
Dry Unit wt., Loose 1438 kg/mᶟ
Rodded 1481 kg/mᶟ Wt. of Sample in grams. 2,146.00
Moisture Content, % 1.27 Oven Dry 2,119.00
Fineness Modulus - Wash Oven Dry 2,082.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 0 0 2,119.00 100 0 100
3/4" 0.00 0 2,119.00 100 0 95-100
1/2" 0.00 0 2,119.00 100 0 68-86
3/8" 85.00 4 2,034.00 96 4 56-78
No. 4 1377.00 65 657.00 31 69 38-60
No. 8 127.00 6 530.00 25 75 27-47
No. 10 411.00 19 119.00 6 94
No. 16 10.00 1 87.00 4 96 18-37
No. 30 4.00 0 83.00 4 96 13-28
No. 40 11.00 1 72.00 3 97
No. 50 6.00 0 66.00 3 97 9-20
No. 100 9.00 0 57.00 3 97
No. 200 19.00 1 38.00 2 RETAINED 4-8
PAN 1.00
Total 2119.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Fine Aggregates Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 11, 2020
Tested by : E.J. Banadera - LT Computed by : Megatesting Center Inc.
Laboratory No. : CDO-200910-0004

Test No. -
Dry Unit wt., Loose 1576 kg/mᶟ
Rodded 1713 kg/mᶟ Wt. of Sample in grams: 458.00
Moisture Content, % 2.46 Oven Dry Weight 447.00
Fineness Modulus 3.48 Wash Oven Dry Weight 439.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 100
3/4" 0.00 0 447.00 100 0 95-100
1/2" 0.00 0.00 447.00 100.00 0 68-86
3/8" 0.00 0.00 447.00 100.00 0.00 56-78
No. 4 33.00 7.00 414.00 93.00 7.00 38-60
No. 8 110.00 25.00 304.00 68.00 32.00 27-47
No. 10 23.00 5.00 281.00 63.00 37.00
No. 16 26.00 6.00 202.00 45.00 55.00 18-37
No. 30 77.00 17.00 125.00 28.00 72.00 13-28
No. 40 11.00 2.00 114.00 26.00 74.00
No. 50 53.00 12.00 61.00 14.00 86.00 9-20
No. 100 42.00 9.00 19.00 4.00 96.00
No. 200 10.00 2.00 9.00 2.00 98.00 4-8
PAN 1.00
Total 447.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Fine Aggregates Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 11, 2020
Tested by : E.J. Banadera - LT Computed by : Megatesting Center Inc.
Laboratory No. : CDO-200910-0009

Test No. -
Dry Unit wt., Loose 1576 kg/mᶟ
Rodded 1713 kg/mᶟ Wt. of Sample in grams: 483.00
Moisture Content, % 2.77 Oven Dry Weight 470.00
Fineness Modulus 3.41 Wash Oven Dry Weight 463.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED Grading C
1" 100
3/4" 0.00 0 470.00 100 0 95-100
1/2" 0.00 0.00 470.00 100.00 0 68-86
3/8" 0.00 0.00 470.00 100.00 0 56-78
No. 4 33.00 7.00 437.00 93.00 7 38-60
No. 8 108.00 23.00 329.00 70.00 30 27-47
No. 10 38.00 8.00 291.00 62.00 38
No. 16 12.00 3.00 230.00 49.00 51 18-37
No. 30 103.00 22.00 127.00 27.00 73 13-28
No. 40 19.00 4.00 108.00 23.00 77
No. 50 37.00 8.00 71.00 15.00 85 9-20
No. 100 47.00 10.00 24.00 5.00 95
No. 200 15.00 3.00 9.00 2.00 98 4-8
PAN 2.00
Total 470.00
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 23
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Fine Aggregates Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 11, 2020
Tested by : E.J. Banadera - LT Computed by : Megatesting Center Inc.
Laboratory No. : CDO-200910-0008

Test No. -
Dry Unit wt., Loose 1576 kg/mᶟ
Rodded 1713 kg/mᶟ Wt. of Sample in grams. 469.00
Moisture Content, % 2.85 Oven Dry 456.00
Fineness Modulus 3.420 Wash Oven Dry 448.00

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED
1" 100
3/4" 0 0 456 100 0 95-100
1/2" 0 0 456 100 0 68-86
3/8" 0 0 456 100 0 56-78
No. 4 27 6 429 94 6 38-60
No. 8 114 25 315 69 31 27-47
No. 10 38 8 277 61 39
No. 16 23 5 219 48 52 18-37
No. 30 91 20 128 28 72 13-28
No. 40 19 4 109 24 76
No. 50 41 9 68 15 85 9-20
No. 100 49 11 19 4 96
No. 200 10 2 9 2 98 4-8
PAN 1
Total 456
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 19
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Mineral Filler (Cement) Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Summit Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 16, 2020
Tested by : E.J. Banadera - LT Computed by : E.J. Banadera - LT
Laboratory No. : CDO-200910-0015

Test No. - Wt. of Sample in grams. -


Moisture Content, % - Oven Dry -
Fineness Modulus - Wash Oven Dry -

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 10
No. 16
No. 30 100.00 100
No. 40 95.00 95-100
No. 50 75.00 70-100
No. 100
No. 200
PAN
Total
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 20
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Mineral Filler (Cement) Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Summit Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 16, 2020
Tested by : E.J. Banadera - LT Computed by : E.J. Banadera - LT
Laboratory No. : CDO-200910-0014

Test No. - Wt. of Sample in grams. -


Moisture Content, % - Oven Dry -
Fineness Modulus - Wash Oven Dry -

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 10
No. 16
No. 30 100.00 100
No. 40 95.00 95-100
No. 50 73.00 70-100
No. 100
No. 200
PAN
Total
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 20
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SIEVE ANALYSIS

Project : Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Mineral Filler (Cement) Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Summit Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa - ME. II Date Computed : September 14, 2020
Tested by : E.J. Banadera - LT Computed by : E.J. Banadera - LT
Laboratory No. : CDO-200910-0007

Test No. - Wt. of Sample in grams. -


Moisture Content, % - Oven Dry -
Fineness Modulus - Wash Oven Dry -

Sieve WEIGHT PERCENTAGE CUMULATIVE SPECS REMARKS


RETAINED RETAINED WT % % REQUIREMENT
(G) PASSING PASSING RETAINED
1"
3/4"
1/2"
3/8"
No. 4
No. 8
No. 10
No. 16
No. 30 100.00 100
No. 40 96.00 95-100
No. 50 74.00 70-100
No. 100
No. 200
PAN
Total
Remarks/ Recommendation:

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 20
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SPECIFIC GRAVITY

Project : Asphalt Overlay Along Davao City Diversion Road ( Brgy. Sasa - Brgy. Communal Section) Davao City,
Km. 1499+132 to Km. 1500+172, Km. 1500+372 to Km. 1502+580
Kind of Materials : Aggregates Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa Date Computed : September 12, 2020
Tested by : E.J. Banadera -LT Computed by : E.J. Banadera -LT
Laboratory No. : -

FINE AGGREGATE - PYCNOMETER METHOD


III.
(Mabuhay Quarry) TRIAL
1 2 AVERAGE
A. WT. OF SAMPLE IN AIR (SSD) 500.00 500.00
B. WT. OF PYCNOMETER FILLED WITH WATER 714.10 714.00
C. WT. OY PYCNOMETER FILLED WITH SAMPLE & H2O 1,021.80 1,021.20
D. WT. OF SAMPLE IN AIR (OVEN DRY) 484.40 484.10
E. APP. SP. GR. - D
2.741 2.737 2.74
D+B-C
F. BULK SP. GR. - A
2.600 2.593 2.60
(SSD) A+B-C
G. ABSORPTION % - A - D X 100
3.220 3.284 3.25
D

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 18
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SPECIFIC GRAVITY

Project : 20KK0132 - Repair/Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/4") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa Date Computed : September 12, 2020
Tested by : E.J. Banadera -LT Computed by : E.J. Banadera -LT
Laboratory No. : CDO-200910-0005

II. FINE AGGREGATE - (3/8") Mabuhay Quarry TRIAL


1 2 AVERAGE
1. WT. OF WIRE BASKET IN AIR
2. WT. OF SAMPLE & WIRE BASKET IN AIR
3. WT. OF SAMPLE IN AIR (SSD) (2-1) 2,175.00 2,247.00
4. WT. OF WIRE BASKET IN WATER
5. WT. OF WIRE BASKET & SAMPLE IN WATER
6. WT. OF SAMPLE IN WATER (5-4) 1,350.00 1,391.00
7. WT. OF SAMPLE IN AIR (OVEN DRY) 2,146.00 2,219.00
7
8. APP. SP. GR. = 2.696 2.680 2.69
7 - 6
BULK SP. GR. = 3
9. 2.636 2.625 2.63
(SSD) 3 - 6
3 - 7
10 . ABSORPTION % = X 100 1.351 1.262 1.31
7

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

WORKSHEET FOR SPECIFIC GRAVITY

Project : 20KK0132 - Repair/Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Kind of Materials : Coarse Aggregates (3/4") Spec's Item No. : 310
Sample at : Jobsite Date Sampled : September 9, 2020
Original Source : Balingasag Crushing Plant Date Tested : September 10, 2020
Sampled by : John Philippe I. Tipa Date Computed : September 12, 2020
Tested by : E.J. Banadera -LT Computed by : E.J. Banadera -LT
Laboratory No. : CD0-200910-0006

I. COARSE AGG.- (3/4") Balingasag TRIAL


1 2 AVERAGE
1. WT. OF WIRE BASKET IN AIR - -
2. WT. OF SAMPLE & WIRE BASKET IN AIR - -
3. WT. OF SAMPLE IN AIR (SSD) (2-1) 907.00 1,142.00
4. WT. OF WIRE BASKET IN WATER - -
5. WT. OF WIRE BASKET & SAMPLE IN WATER - -
6. WT. OF SAMPLE IN WATER (5-4) 564.00 712.00
7. WT. OF SAMPLE IN AIR (OVEN DRY) 896.00 1,129.00
7
8. APP. SP. GR. = 2.699 2.707 2.703
7 - 6
BULK SP. GR. = 3
9. 2.644 2.656 2.650
(SSD) 3 - 6
3 - 7
10 . ABSORPTION % = X 100 1.228 1.151 1.190
7

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

Appendices
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

I) Percent Voids filled with Asphalt in Compacted Mixture (VFA)

VMA - Va
VFA = 100 x
VMA
Where :
VFA = Voids filled with Asphalt Percent of VMA
VMA = Voids in Mineral Aggregates, Percent of Bulk Volume
Va = Air voids in Compacted Mixtures, Percent of Total Volume

At 5.0% Asphalt Content :

13.665 - 5.385
VFA = 100 x
13.665
= 60.594

At 5.5% Asphalt Content :

12.938 - 4.083
VFA = 100 x
12.938
= 68.439

At 6.0% Asphalt Content :

14.717 - 5.273
VFA = 100 x
14.717
= 64.167

At 6.5% Asphalt Content :

16.248 - 6.077
VFA = 100 x
16.248
= 62.597

At 7.0% Asphalt Content :

15.079 - 3.576
VFA = 100 x
15.079
= 76.287

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 17
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

H) Percent Air Voids in Compacted Mixture (Va)

Gmm - Gmb
Va = 100 x
Gmm
Where :
Va = Air Voids in Compacted Mixture, Percent of Total Volume
Gmm = Maximum Specific Gravity of Paving Mixture
Gmb = Bulk Specific Gravity of Compacted Mixtures

At 5.0% Asphalt Content :

2.44106 - 2.310
Va = 100 x
2.441059099
= 5.385

At 5.2% Asphalt Content :

2.44106 - 2.341
Va = 100 x
2.441059099
= 4.083

At 5.5% Asphalt Content:

2.43411 - 2.306
Va = 100 x
2.434109156
= 5.273

At 6.0% Asphalt Content:

2.42376 - 2.276
Va = 100 x
2.423758127
= 6.077

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 16
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

G) Percent VMA in Compacted Paving Mixture (VMA)

Gmb
VMA = 100 - x Ps
Gsb
Where :
VMA = Voids in Mineral Aggregates, Percent of Bulk Volume
Gsb = Bulk Specific Gravity for the Total Aggregates
Gmb = Bulk Specific Gravity of Compacted Mixtures
Ps = Aggregate Content, Percent by Total Weight of Mixture

At 5.0% Asphalt Content ;

2.3096
VMA = 100 - x 95
2.541
= 13.665

At 5.2% Asphalt Content :

2.3414
VMA = 100 - x 94.5
2.54
= 12.938
At 5.5% Asphalt Content :

2.306
VMA = 100 - x 94.0
2.54
= 14.717
At 6.0% Asphalt Content :

2.276
VMA = 100 - x 93.5
2.54
= 16.248

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 15
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

F) Effective Asphalt Content of a paving mixture (Pbe)

Pba
Pbe = Pb - x Ps
100
Where :
Pbe = Effective Asphalt Content, Percent by Total Weight of Mixture
Pb = Asphalt Content, Percent by Total Weight of Mixture
Pba = Absorbed Asphalt, Percent by Weight of Aggregates
Ps = Aggregate Content, Percent by Total Weight of Mixture

At 5.0 % Asphalt Content :

1.320
Pbe = 5.0 - x 95
100
= 3.746

At 5.2% Asphalt Content :

1.320
Pbe = 5.2 - x 94.8
100
= 3.949

At 5.5% Asphalt Content :

1.320
Pbe = 5.5 - x 94.5
100
= 4.253

At 6.0% Asphalt Content :

1.320
Pbe = 6.0 - x 94
100
= 4.760

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 14
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

E) Asphalt Absorption (Pba)

Gse - Gsb
Pba = 100 x x Gb
Gse x Gsb

Where:
Pbe = Absorbed Asphalt, Percent by Weight of Aggregates
Gse = Effective Specific gravity of Aggregates (Virtual Specific Gravity)
Gsb = Bulk Specific Gravity for the Total Aggregates
Gb = Specific Gravity of Asphalt

2.6 - 2.54
Pba = 100 x x 1.01
2.6 x 2.54

= 1.320

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

At 5.0 % Asphalt Content

100.00
Gmm =
95.0 + 5.0
2.6287 1.04
100.00
Gmm =
36.140 + 4.826
Gmm = 2.441

At 5.2 % Asphalt Content

100.00
Gmm =
94.8 5.2
+
2.6287 1.04
100.00
Gmm =
36.063 + 5.019
Gmm = 2.434

At 5.5 % Asphalt Content

100.00
Gmm =
94.5 5.5
+
2.6287 1.04
100.00
Gmm =
35.949 + 5.309
Gmm = 2.424

At 6.0 % Asphalt Content

100.00
Gmm =
94.0 6.0
+
2.6287 1.04
100.00
Gmm =
35.759 + 5.792
Gmm = 2.407

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

Computation:

C.) Effective Specific Gravity of Aggregates (Gse)

Gse = Gsb + Gsa


2
Where:
Gse = Effective Specific Gravity of Aggregates (Gse)

Gse = 2.541 + 2.716


2

Gse = 2.629

D.) Maximum Specific Gravities of Mixtures w/ different Asphalt Content (mm)

Gmm = Pmm
Ps + Pb
Gse Gb
Where:
Gmm = Maximum Specific Gravity of Paving Mixtures (No Air Voids)
Pmm = Percent by Weight of Total Mixtures
Ps = Aggregates Content, Percent by Total Weight of Mixtures
Pb = Asphalt Content, Percent by Total Weight of Mixtures
Gse = Effective Specific Gravity of Aggregates
Gb = Specific Gravity of Asphalt

at 5.0% Asphalt Content

Gmm = 100.00
95.00 + 5
2.629 1.04

Gmm = 100.00
36.140 + 4.826

Gmm = 2.441

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO

Page 11
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX
Computation:
A.) Combine Bulk Specific Gravity of Aggregates (Gsb)

Gsb = P1 + P2 + ... + Pn
P1/G1 + P2/G2 + + Pn/Gn
Where:
Gsb = Bulk Specific Gravity for the Total Aggregates
P1, P2, Pn = Individual Percentage by Weight of Aggregates
G1, G2, Gn = Individual Bulk Specific Gravity of Aggregates

Gsb = 7.00 + 42.00 + 45.00 + 6.00 +


7.00 + 42.00 + 45.00 + 6.00 +
2.597 2.514 2.552 2.60

Gsb = 100.00
39.348
Gsb = 2.5414

B.) Combine Apparent Specific Gravity of Aggregates (Gsa)

Gsa = P1 + P2 + ... + Pn
P1/G1 + P2/G2 + + Pn/Gn

Where:
Gsa = Bulk Specific Gravity for the Total Aggregates
P1, P2, Pn = Individual Percentage by Weight of Aggregates
G1, G2, Gn = Individual Apparent Specific Gravity of Aggregates

Gsa = 7.00 + 42.00 + 45.00 + 6.00


7.00 + 42.00 + 45.00 + 6.00
2.7 2.69 2.74 2.740

Gsa = 100.00
36.819
Gsa = 2.716

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE (Wearing)


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

GRAPHICAL PRESENTATION ON BLENDING PROPORTION

100

80

60
% Passing

40

20

0
0.01 0.1 1 10
Sieve No.

Legend: DPWH Specification - Grading B


Job Mix Formula
Actual Design Mix

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
BLENDING OF ASPHALT AGGREGATES
Aggregates Sieve No.
¾" - 19 mm 1" ¾" ½" ⅜" No. 4 No. 8 No. 16 No. 30 No. 50 No. 200
S-1 100.00 100.00 52.00 17.00 9.00 3.00 2.00 1.00 1.00 0.00
S-2 100.00 100.00 53.00 17.00 8.00 4.00 2.00 2.00 1.00 1.00
S-3 100.00 100.00 48.00 15.00 8.00 3.00 2.00 2.00 1.00 1.00
S-4
Average 100.00 100.00 51.00 16.33 8.33 3.33 2.00 1.67 1.00 0.67
⅜" - 9 mm 1" ¾" ½" ⅜" No. 4 No. 8 No. 16 No. 30 No. 50 No. 200
S-1 100.00 100.00 100.00 97.00 29.00 21.00 4.00 4.00 3.00 2.00
S-2 100.00 100.00 100.00 96.00 31.00 25.00 4.00 4.00 3.00 2.00
S-3 100.00 100.00 100.00 95.00 28.00 25.00 4.00 4.00 3.00 2.00
S-4
Average 100.00 100.00 100.00 96.00 29.33 23.67 4.00 4.00 3.00 2.00
Fine Aggregates 1" ¾" ½" ⅜" No. 4 No. 8 No. 16 No. 30 No. 50 No. 200
S-1 100.00 100.00 100.00 100.00 93.00 68.00 45.00 28.00 14.00 2.00
S-2 100.00 100.00 100.00 100.00 94.00 69.00 48.00 28.00 15.00 2.00
S-3 100.00 100.00 100.00 100.00 93.00 70.00 49.00 27.00 15.00 2.00
S-4
Average 100.00 100.00 100.00 100.00 93.33 69.00 47.33 27.67 14.67 2.00
Filler Material 1" ¾" ½" ⅜" No. 4 No. 8 No. 16 No. 30 No. 50 No. 200
S-1 100 100 100 100 100 100 100 100 95 75
S-2 100 100 100 100 100 100 100 100.00 95.00 73.00
S-3 100 100 100 100 100 100 100 100.00 96.00 74.00
Average 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 95.33 74.00
Combination % 1" ¾" ½" ⅜" No. 4 No. 8 No. 16 No. 30 No. 50 No. 200
¾" - 19 mm 7.00 0.07 7.00 7.00 3.57 1.14 0.58 0.23 0.14 0.12 0.07 0.05
⅜" - 9 mm 42.00 0.42 42.00 42.00 42.00 40.32 12.32 9.94 1.68 1.68 1.26 0.84
Fine Aggregates 45.00 0.45 45.00 45.00 45.00 45.00 42.00 31.05 21.30 12.45 6.60 0.90
Filler Material (Cement) 6.00 0.06 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.72 4.44
Total 100.00 1.00 100.00 100.00 96.57 92.46 60.90 47.22 29.12 20.25 13.65 6.23
JMF 100 95 - 100 75 - 86 63 - 77 42 - 56 30 - 38 22 - 30 12 - 20 6 - 12 3-7
Specifications - B 100 95 - 100 68 - 86 56 - 78 38 - 60 27 - 47 18 - 37 11 - 28 6 - 20 0-8

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

ASPHALT MIX DESIGN : BITUMINOUS CONCRETE SURFACE COURSE


DESIGNED METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

Specification % Passing Gr. B % Passing JMF Tolerance


Class A Specification (Actual)
mm in
25.4 1" 100 100.00 100
19.00 ¾" 95 - 100 100.00 95 - 100
12.50 ½" 68 - 86 96.57 75 - 86 ±7
9.50 ⅜" 56 - 78 92.46 63 - 77 ±7
4.75 No. 4 38 - 60 60.90 42 - 56 ±7
2.36 No. 8 27 - 47 47.22 30 - 38 ±4
1.16 No. 16 18 - 37 29.12 22 - 30 ±4
0.60 No. 30 11 - 28 20.25 12 - 20 ±4
0.30 No. 50 6 - 20 13.65 6 - 12 ±4
0.08 No. 200 0-8 6.23 3-7 ±2

Assume Weight of Aggregates = 1200 g


Weight of Fly Ash (0.5% of Weight Aggregates) = 6 g

Mix Asphalt Weight Weight Total


No. Content, % Aggregates of Asphalt Weight

1 5.0 1200 63.16 1263.16


5.2 1200 65.82 1265.82
2 5.2 1200 65.82 1265.82
3 5.5 1200 69.84 1269.84
4 6.0 1200 76.60 1276.60

Fraction % Passing Used Wt. of Aggregates

1" - ¾" 0.00 0.00


¾" - ½" 3.43 41.16
½" - ⅜" 4.11 49.28
⅜" - No. 4 31.56 378.72
No. 4 - No. 8 13.68 164.16
No. 8 - No. 16 18.10 217.24
No. 16 - No. 30 8.87 106.48
No. 30 - No. 50 6.60 79.16
No. 50 - No. 200 7.42 89.08
No. 200 6.23 74.72

TOTAL 100.00 1200.00

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

DATA 2:
Specific Gravity Percent by wt. of
Materials
Bulk Apparent Total Aggregates

Asphalt Cement 1.036 1.036 5.40


Coarse Aggregates (¾") 2.650 2.700 7.00 P1
Coarse Aggregates (⅜") 2.630 2.690 42.00 P2
Fine Aggregates 2.600 2.740 45.00 P3
Mineral Filler 3.120 3.120 6.00 P4
Hydrated Lime (Fly Ash) - - 0.50

SUMMARY
Mix AC Gmb Gmm VMA Pbe Va VFA Stability Flow
No. Measured Adjusted

1 5.00 2.310 2.441 13.665 3.746 5.385 60.594 1068.298 1015.168 13.500
2 5.20 2.341 2.441 12.938 3.949 4.083 68.439 1124.703 1079.715 13.500
3 5.50 2.306 2.434 14.717 4.253 5.273 64.167 1080.870 1016.116 13.733
4 6.00 2.276 2.424 16.248 4.760 6.077 62.597 1222.222 1136.667 13.567

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

PROJECT NAME: Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
PROJECT LOCATION: : Salay, Misamis Oriental
ASPHALT MIX DESIGN : BITUMINOUS CONCRETE COURSE
DESIGNER METHOD : MARSHALL, BY WEIGHT OF TOTAL MIX

DRY SSD Wt. in Bulk Sp. Gr. Sp. Gr. Stability


VMA Pbe Thickness Ratio Flow,
Wt. in Air, Wt. in Air, Water, Volume, Bulk, Max. Theor. Air Voids Measured Adjusted
g g g cmᶟ g/cmᶟ g/cmᶟ % % cm kgs kgs in.
b c d e f g h m n o q r s t u
Gmb Gmm Va
1245.600 1251.000 710.000 541.000 2.302 6.560 0.930 1039.755 966.97 13.60
5.00 1244.300 1250.000 712.000 538.000 2.313 6.570 0.960 1060.143 1017.74 12.70
1251.200 1256.800 716.000 540.800 2.314 6.870 0.960 1104.995 1060.80 14.20
Ave. 1247.033 1252.600 712.667 539.933 2.310 2.441 5.385 13.665 3.746 6.667 0.950 1068.298 1015.168 13.500
1249.400 1255.000 716.000 539.000 2.318 6.730 0.960 1151.886 1105.81 13.70
5.20 1245.000 1249.300 720.000 529.300 2.352 6.680 0.960 1121.305 1076.45 14.20
1250.200 1255.100 724.000 531.100 2.354 6.740 0.960 1100.917 1056.88 12.60
Ave. 1248.200 1253.133 720.000 533.133 2.341 2.441 4.083 12.938 3.949 6.717 0.960 1124.703 1079.715 13.500
1249.400 1255.300 714.000 541.300 2.308 6.790 0.930 1112.130 1034.28 13.80
5.50 1253.600 1257.400 710.000 547.400 2.290 6.820 0.930 1039.755 966.97 13.20
1240.200 1254.800 720.000 534.800 2.319 6.810 0.960 1090.724 1047.09 14.20
Ave. 1247.733 1255.833 714.667 541.167 2.306 2.434 5.273 14.717 4.253 6.807 0.940 1080.870 1016.116 13.733
1253.700 1269.200 722.000 547.200 2.291 6.700 0.930 1067.278 992.57 14.00
6.00 1239.600 1258.300 708.000 550.300 2.253 6.820 0.930 1039.755 966.97 13.30
1244.100 1258.300 714.000 544.300 2.286 6.530 0.930 1559.633 1450.46 13.40
Ave. 1245.800 1261.933 714.667 547.267 2.276 2.424 6.077 16.248 4.760 6.683 0.930 1222.222 1136.667 13.567

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

MARSHALL DESIGN CRITERIA FOR ASPHALT CONCRETE:

Stability (kgs) 845 kgs/1800 lbs


Flow (0.01 in) 8 - 14
Air Voids (1%) 3-5
Aggregates Void Filled w/ Asphalt Cement (%) 70 - 80
Field Compacted Density
Marshall Specimen Density (%) 97%
% Asphalt Cement of Total Mix by Weight 5.0 - 7.0%
% Hydrated Lime (Fly Ash) of Total Mix by Weight 0.5 - 1.0%
Percent Wear by Los Angeles Abrasion Test (Coarse Aggregates) <40%
Soundness Test <12%
Sand Equivalent >45
Fractured Face for Coarse Aggregates retained on No. 4 sieve >50%
Fractured Face for Fine Aggregates passing No. 4 sieve >50%
Asphalt Cement Shell Philippines
Penetration Grade 60 - 70

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

Graphical Presentation on the Characteristics of Asphalt Mix

Asphalt vs Density Relation Asphalt vs Stability Relation


2.45 1200
2.40

Stability, kgs.
Density, tons/cu.m.

1100
2.35
2.30 1000
2.25
900
2.20
2.15 800
4.5 5.0 5.5 6.0 6.5 7.0 4.5 5.0 5.5 6.0 6.5 7.0
Asphalt Content, % Asphalt Content, %

Asphalt vs Air Voids Relation Asphalt vs VMA Relation


10.0 16

8.0 15
Air Voids, %

14
6.0
VMA

13
4.0
12
2.0 11
0.0 10
4.5 5.0 5.5 6.0 6.5 7.0 4.5 5.0 5.5 6.0 6.5 7.0
Asphalt Content, % Asphalt Content, %

Asphalt vs VFA Relation Asphalt vs Flow Relation


100 18.0

90
16.5
80
VFA

Flow, in.

15.0
70

60 13.5

50 12.0
4.5 5.0 5.5 6.0 6.5 7.0 4.5 5.0 5.5 6.0 6.5 7.0
Asphalt Content, % Asphalt Content, %

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VTLC DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

Graph Analysis:

Optimum Asphalt Content = (Max. density + Air voids @ median + Max. Stability)
3

Asphalt Content @ Maximum Density = 5.20 %


Asphalt Content @ Median Air Voids = 5.00 %
Asphalt Content @ maximum Stability = 6.00 %

Therefore:

Optimum Asphalt Content = 5.40 %


say = 5.40 %

Characteristic of Asphalt Mix @ Optimum Asphalt Content (5.40%): Specs.

Density (Tons/cu.m.) = 2.318 97 %


Stability (Kgs.) = 1,037.32 845 Min.
Air Voids % = 4.88 3-5
VMA % = 14.12 Min. 14 %
VFA % = 70.59 70 - 80
Flow in. = 13.66 8 -14

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

Project Name: Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470
Project Location: : Salay, Misamis Oriental
Asphalt Design Mix : Bituminous Concrete Surface Course
Design Method : MARSHALL , By Weigth of Total Mix

PROPOSED BATCHING PROPORTION


DATA:
Total Wt. of % by wt. of % by wt. of
Materials
Proposed Batching Proportion Mix Total Mix Aggregates
AC ¾" ⅜" Fine Filler Fly Ash

Asphalt Cement 27 27.00 5.1 5.40


Coarse Aggregates (¾") 35 35.00 6.6 7.00 P1
Fine Aggregates (3/8") 210 210.00 39.7 42.00 P2
Fine Aggregates 225 225.00 42.5 45.00 P3
Mineral Filler (Limestone) 30 30.00 5.7 6.00 P4
Hydrated Lime (Fly Ash) 2.5 2.50 0.5 0.50
Total Aggregates 500.00
Total 529.50 100.00

Prepared by: Checked by: Attested by:

EMMA NOREEN ANTIOLLA BENJAMIN BARANDA JR. ROHANISHA S. ALIODEN


Materials Engineer II, Accre.#3101 Materials Engineer II OIC-Chief, Quality Assurance Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

Table of Contents

Page No. Title

1 Summary of Job Mix Design


2 Proposed Batching Proportion
3 Graph Analysis
4 Graph Presentation of Asphalt Mix
5 Marshall Design Criteria for Asphalt Concrete
6 Summary of Test Data 1
7 Summary of Test Data 2
8 Presentation of Blending Proportion
9 Blending Proportion Computation
10 Graphical Presentation of Blending Proportion
11 Computation of Gsb and Gsa
12 Computation of Gse and Gmm
13 Computation of Gmm
14 Computation of Pba
15 Computation of Pbe
16 Computation of VMA
17 Computation of Va
18 Computation of VFA
19 Appendices
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

20KK-0132 - Repair/ Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470

Contractor: Vicente T. Lao Conctruction

I. Grading of Combined Aggregates, (Grading B):

Sieves Sizes 1" ¾" ½" ⅜" No. 4 No. 8 No. 16 No. 30 No. 50 No. 200
¾" - 19 mm 7.0 7.0 3.6 1.1 0.6 0.2 0.1 0.1 0.1 0.0
⅜" - 9 mm 42.0 42.0 42.0 40.3 12.3 9.9 1.7 1.7 1.3 0.8
Fine Aggregates 45.0 45.0 45.0 45.0 42.0 31.1 21.3 12.5 6.6 0.9
Filler Material (Cement) 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 5.7 4.4
% Passing JMF 100.0 100.0 96.6 92.5 60.9 47.2 29.1 20.2 13.7 6.2
Spec's Grading B 100.0 95 - 100 68 - 86 56 - 78 38 - 60 27 - 47 18 - 37 11 - 28 6 - 20 0-8
Job Mix Tolerance 100.0 95 - 100 75 - 86 63 - 77 42 - 56 30 - 38 22 - 30 12 - 20 6 - 12 3-7

II. Optimum Asphalt Content by Weight of Mix, %

Optimum Asphalt Content(Max.


= density + Air voids @ median + Max. Stability)

Asphalt Content @ Maximum Density = 5.20 %


Asphalt Content @ Median Air Voids = 5.00 %
Asphalt Content @ maximum Stability = 6.00 %

Therefore:
Optimum Asphalt Content by Weight of Mix = 5.40 %
say = 5.40 %

III. Optimum Asphalt Content by Weight of Aggregates, %


Optimum Asphalt Content by Weight of
Aggregates = 6.52 %

IV. Temperature
a.) Mixing = 150 ± 10 °C
b.) Laying = 125 ± 10 °C
c.) Rolling = 110 ± 10 °C

V. Source o Materials

Materials to be used Location of source


a.) Course Aggregate (3/4") Mambayaan River
b.) Coarse Aggregate (3/8") Mambayaan River
c.) Fine Aggregates Mambayaan River
d.) Mineral Filler (Cement) Summit, Inc.
e.) Asphalt Cement Penetration 60-70 Temcotank, Phil.
f.) Anti-rutting Additive Hubei Luxiang Chemical Technology Co.,Ltd
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

20KK-0132 - Repair/ Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470

Contractor: Vicente T. Lao Conctruction

VI. Summary
Mix Stability
AC
No. Gmb Gmm VMA Pbe Va VFA Measured Adjusted Flow
1 5.00 2.31 2.44 13.66 3.75 5.38 60.59 1068.30 1015.17 13.50
2 5.20 2.34 2.44 12.94 3.95 4.08 68.44 1124.70 1079.71 13.50
3 5.50 2.31 2.43 14.72 4.25 5.27 64.17 1080.87 1016.12 13.73
4 6.00 2.28 2.42 16.25 4.76 6.08 62.60 1222.22 1136.67 13.57

Legend:
AC = Asphalt Content
Gmb = Bulk Specific Gravity of compacted Paving Mixture
Gmm = Max. Specific Gravity of Paving Mixture (No Air Voids)
Va = Air voids in Compacted Mixture, Percent of Total Volume
Pbe = Effective Asphalt Content, Percentage by Total Weight of Mixture
VMA = Voids in Mineral Aggregates, Percentage of Bulk Volume
VFA = Voids Filled with Asphalt, Percentage of VMA
STY = Marshall Stability of Mix
Flow = Flow of Mix. In 0.25mm.

VII. Batch Weight Per Batch of Mixing

Proposed Batching Proportion % by wt.


Total Wt. % by wt. of of
Materials of Mix Total Mix Aggregat
AC ¾" ⅜" Fine Filler Fly Ash
es

Asphalt Cement 27 27 5.10 5.4


Coarse Aggregates (¾") 35 35 6.61 7
Fine Aggregates (3/8") 210 210 39.66 42
Fine Aggregates 225 225 42.49 45
Mineral Filler (Limestone) 30 30 5.67 6
Hydrated Lime (Fly Ash) 2.5 2.5 0.47 0.5
Total Aggregates 500
Total 529.5 100.00

VIII. Characteristic of Mix @ OMC = 5.40 %

Density = 2.317625416 97%


Stability = 1037.315664 845
Air Voids = 4.87676527 3-5
VMA = 14.12380068 Min. 14%
VFA = 70.59084273 70 - 80
Flow = 13.65555556 8 -14
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

20KK-0132 - Repair/ Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental
Sta. K1376+800 - Sta. K1380+470

Contractor: Vicente T. Lao Conctruction

Prepared by: Attested by:

EMMA NOREEN ATIOLLA MARCELINO O. CABEGUIN, JR.


Materials Engineer II Chief, Construction Section
VICENTE T. LAO CONSTRUCTION DPWH-MOFDEO

Recommending Aprroval:

RONALD T. GEMPISAO
Assistant District Engineer
DPWH-MOFDEO

Checked by: Approved by:

ROHANISHA S. ALIODEN MARIVEL FRANCES L. ONG, A.E.R.


OIC-Chief, Quality Assurance Section District Engineer
DPWH-MOFDEO DPWH-MOFDEO
Vicente T. Lao Construction
CONTRACTOR ∙ BUILDER ∙ ENGINEERS

JOB MIX FORMULA


BITUMINOUS CONCRETE SURFACE COURSE, HOT LAID
( GRADING B )

PROJECT ID NO. 20KK - 0132

Repair / Rehabilitation of Roads (Asphalt Overlay) along BCIR, Misamis Oriental

Sta. K1376+800 - Sta. K1380+470

CONTRACTOR:

VICENTE T. LAO CONSTRUCTION


KM. 12 DIVERSION ROAD PANACAN, DAVAO CITY
TEL. NO. +68-82-2340501; 2340502
FAX NO. +63-82-2340577