Professional Documents
Culture Documents
50 MW Load Supply Study For DHA-Multan Peak Load Case Summer 2023 Without DHAM Grid #1
50 MW Load Supply Study For DHA-Multan Peak Load Case Summer 2023 Without DHAM Grid #1
50 MW Load Supply Study For DHA-Multan Peak Load Case Summer 2023 Without DHAM Grid #1
DHAM GRID #2
BUCH VILLAS
SURAJ MIANI -12.7 -15.4 MLN-IND MAN-KOT
58.6 -58.3 8.3 -8.3 8.9
13.3 -6.6 16.3 -16.0 3.7 -4.3 2.8
T-4 MN.BS.RD T-2 PNJB HSG T-2 PNJB HSG T-1 T-1 T-2
21.0 29.4 6.8 6.8 16.0 16.0
1 11 1 1 1 1
7.0 -21.0 21.0 29.9 -29.4 15.4 3.6 -6.8 6.8 6.8 -6.8 3.6 6.4 -16.0 16.0 16.0 -16.0 6.4
-2.1 2.3 2.3 -2.1 0.0 -5.0 6.0 6.0 -5.0 0.0
0.0 0.4 1.2 12.8 -9.5 0.0 0.0 0.0 1 -1.4
1
1 1 1 1 -1.4
-7.4 -5.9 -1.5 -1.5 0.985 0.985
1.007 1.007 1.013 1.013 10.8 10.8
11.1 11.1 11.1 11.1
1.015 1.005
134.0 132.6
1.008
133.0