Professional Documents
Culture Documents
50 MW Load Supply Study For DHA-Multan Peak Load Case Summer 2023 Without DHAM Grid #1
50 MW Load Supply Study For DHA-Multan Peak Load Case Summer 2023 Without DHAM Grid #1
DHAM GRID #2
BUCH VILLAS
SURAJ MIANI -10.4 -9.6 9.7 -25.0 MLN-IND MAN-KOT
101.3 -100.3 50.3 -49.8 8.9
8.2 14.9 -15.3 8.7 32.7 -31.0 18.3 -18.0 2.9
T-4 MN.BS.RD T-2 PNJB HSG T-2 PNJB HSG T-1 T-1 T-2
21.0 29.4 6.8 6.8 16.0 16.0
1 11 1 1 1 1
7.0 -21.0 21.0 30.0 -29.4 15.4 3.6 -6.8 6.8 6.8 -6.8 3.6 6.4 -16.0 16.0 16.0 -16.0 6.4
-2.1 2.4 2.4 -2.1 0.0 -5.0 6.1 6.1 -5.0 0.0
0.0 0.3 1.2 12.9 -9.5 0.0 0.0 0.0 1 -1.4
1
1 1 1 1 -1.4
-7.3 -5.9 -1.5 -1.5 0.965 0.965
1.004 1.004 1.012 1.012 10.6 10.6
11.0 11.0 11.1 11.1
1.013 0.985
133.8 130.0
1.005
132.7