Method Statement Form
Method Statement Form
MANPOWER /
NO. TASK SEQUENTIAL DIAGRAM MACHINERY / TOOLS REMARKS
LABOUR
1 Setting out Backhoe Surveyor -Excavation in v
shape trench
-crushed stone
foundation, lying
and compaction.
Method Statement Form
TITLE OF PROJECT : Drainage system at faculty estate management
PREPARED BY : _Mohamad zulhafriz bin mohd adi_____________________ DATE : 6/11/2019
ELEMENT : _ 2.1 METHOD / OBJECTIVES PAGE NO : __2__________
MANPOWER /
NO. TASK SEQUENTIAL DIAGRAM MACHINERY / TOOLS REMARKS
LABOUR
2 Leveling mortar laying Shovel labor -lying the mortar
Method Statement Form
TITLE OF PROJECT : Drainage system at faculty estate management
PREPARED BY : _Mohamad zulhafriz bin mohd adi_____________________ DATE : 26/11/2019
ELEMENT : _ 2.1 METHOD / OBJECTIVES PAGE NO : ___3_________
MANPOWER /
NO. TASK SEQUENTIAL DIAGRAM MACHINERY / TOOLS REMARKS
LABOUR
3 Product installation labor -installation the
precast v shape at
the trench
Method Statement Form
TITLE OF PROJECT : Drainage system at faculty estate management
PREPARED BY : _Mohamad zulhafriz bin mohd adi_____________________ DATE : 26/11/2019
ELEMENT : _ 2.1 METHODS / OBJECTIVES PAGE NO : 4
MANPOWER /
NO. TASK SEQUENTIAL DIAGRAM MACHINERY / TOOLS REMARKS
LABOUR
4 Product joint trowel Labor -install the precast
v shape between
another precast
and joint mortar
filling
Method Statement Form
TITLE OF PROJECT : Drainage system at faculty estate management
PREPARED BY : _Mohamad zulhafriz bin mohd adi_____________________ DATE : 26/11/201
ELEMENT : _ 2.1 METHOD / OBJECTIVES PAGE NO : 5___________
MANPOWER /
NO. TASK SEQUENTIAL DIAGRAM MACHINERY / TOOLS REMARKS
LABOUR
5 Completion of -finish installation
installation the precast v
shape drain