SUPPLIER QUALITY SURVEILLANCE REPORT


ELECTRICAL EQUIPMENT
FILE NO.:
REPORT Nro:E-03

TO: GEORGES VON SENNITZKY P.O. NO.: 600013-01/Q1CO-100515 C/O NO: NA

GE ENERGY COLOMBIA S.A. –


FROM: Javier Laguna ISSUED TO:
SUCURSAL DEL PERU

BRAVO, CAROLINA
GE ENERGY COLOMBIA S.A. –
CONTACTS: Carolina.Bravo@ge.com SUPPLIER:
+57 321 4900512 SUCURSAL DEL PERU

GIS 60kV – GAS INSULATED DIMATIC Plant - Calle Epsilon Nro


ITEM DESCRIPTION: SWITCHGEAR LOCATION:
214, CALLAO

TAG./ITEM: SF6 / N2 GAS BOTTLES REPORT DATE: Jan 28Th, 2020

To be
CURRENT SCHEDULED COMPLETION DATE: confirmed by
Supplier

cc: Alfredo Paiva / Mario Ojeda / Meilin Kong

SURVEILLANCE INFORMATION

NEW NCR’S ISSUED THIS REPORTING PERIOD: YES, NO


0 0
TOTAL NCR’S ISSUED: NCR’S OPEN:
NEW SOR’S ISSUED THIS REPORTING PERIOD: YES: NO

TOTAL SOR’S ISSUED: 4 SOR’S OPEN: 0

ACTION/REPLY REQUIRED TO THIS REPORT: YES NO


INSPECTION RELEASE REPORT ISSUED YES NO
TYPE OF INSPECTION THIS REPORT: INTERIM FINAL
NEXT INSPECTION VISIT DATE: PURPOSE:
TBC TBC

SECTION I: AREAS OF CONCERN / ACTION ITEMS

 Inspector was requested to inspect the (14u) SF6 Gas bottles and (6u) N2 Gas Bottles included in 6
packages (cases):

Copyright © 2011, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Servicios Minería Inc. - Sucursal del Perú. Anglo American Form 000.450.sr2043
Project Name: “Quellaveco Project” Anglo American Quellaveco S.A. Date 08Oct2009
Project N°: Q1CO
Page 2 of 6

SUPPLIER QUALITY SURVEILLANCE REPORT


ELECTRICAL EQUIPMENT
FILE NO.:
REPORT Nro:E-03

 The detailed PL “Packing List SF6 & N2 - Dren e Intermedia” is attached to this report.

 Inspection took place at a DIMATIC Plant - Calle Epsilon Nro 214, CALLAO / Lima – Peru.

 Inspection was attended by Jimmy Orlando AUZA SUNCION (GE), and Evet Meres (Intertek).

 It was performed a quantity verification of the 6 PC (cases) against the Packing List, then the inspector
reviewed randomly inside some packages in order to verify N2 & SF6 gas bottles, finally, inspector
reviewed the general condition of the packages (integrity checks, signs of damages or bumps, etc.); no
deviations or damages were detected.

Vendor Part Material Description


Equipment or Tag # Qty Unit
Number (By Vendor)

4310-SG-001 N/A SF6 INSULATING GAS 3 CYLINDER


4310-SG-001 N/A SF6 INSULATING GAS 1 CYLINDER
4330-SG-001 N/A SF6 INSULATING GAS 9 CYLINDER
4330-SG-001 N/A SF6 INSULATING GAS 1 CYLINDER
4310-SG-001 N/A NITROGEN 4.5 1 CYLINDER
4330-SG-001 N/A NITROGEN 4.5 5 CYLINDER

 Inspection finished with successfully results and the packages are released for transport to site.

SECTION II: SURVEILLANCE ACTIVITY OVERVIEW

DOCUMENTATION REFERENCED DATE / REVISION NUMBER

INSPECTION NOTIFICATION FORM - FAT C&P NA

QUE-PPJ-060-CO-GGA-0200-ID_3-A NA

QUE-PPJ-060-CO-GGA-0202-ID_3-A A

QUE-PPJ-060-CO-GGA-0204-ID_3-A A

QUE-TR1-000-CO-GGA-2005-TD-R1-A 3

QUE-TR1-060-CO-GGA-0206-ID_3-A 3

QUE-TR2-000-CO-GGA-2010-TD-R1-A 1

Copyright © 2011, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Servicios Minería Inc. - Sucursal del Perú. Anglo American Form 000.450.sr2043
Project Name: “Quellaveco Project” Anglo American Quellaveco S.A. Date 08Oct2009
Project N°: Q1CO
Page 3 of 6

SUPPLIER QUALITY SURVEILLANCE REPORT


ELECTRICAL EQUIPMENT
FILE NO.:
REPORT Nro:E-03

QUE-TR2-060-CO-GGA-0208-ID_3-A 1

QUE-DRE-060-CO-GGA-0113-ED_2-A 1

QUE-INT-060-CO-GGA-0115-ED_1-A 1

QUE-INT-060-CO-GGA-0120-ED_1-A 1

QUE-INT-060-CO-GGA-0122-ED_1-A 1

QUE-INT-060-CO-GGA-0124-ED_1-A 1

QUE-INT-060-CO-GGA-0126-ED_1-A 1

QUE-PPJ-060-CO-GGA-0103-ED_1-A 1

QUE-PPJ-060-CO-GGA-0105-ED_1-A 1

QUE-PPJ-060-CO-GGA-0107-ED_1-A 1

QUE-TR1-060-CO-GGA-0109-ED_1-A 1

QUE-TR2-060-CO-GGA-0111-ED_1-A 1

INSPECTION ACTIVITY DESCRIPTION % COMPLETE


I. INSPECTION & TEST PLAN /
PROCEDURE REVIEW
Suppliers Quality Plan 100
Suppliers Inspection & Test Plan Approved 100

II. DOCUMENT REVIEW


Order & Sub-Order(s) N/A      NA
Material Test Reports N/A      NA
Origin of Material / AML N/A      NA
     
III. IN PROCESS
VERIFICATIONS
(VISUAL/DIMENSIONAL)
Measuring & Test Equipment 100
Material as specified 100
Plant Cleanliness 100

IV. NON DESTRUCTIVE /


SPECIAL TESTING
Functional Tests 100
Continuity Tests 100
Megger Tests 100
Hi-pot Test NA
Resistance Test 100
     

Copyright © 2011, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Servicios Minería Inc. - Sucursal del Perú. Anglo American Form 000.450.sr2043
Project Name: “Quellaveco Project” Anglo American Quellaveco S.A. Date 08Oct2009
Project N°: Q1CO
Page 4 of 6

SUPPLIER QUALITY SURVEILLANCE REPORT


ELECTRICAL EQUIPMENT
FILE NO.:
REPORT Nro:E-03

INSPECTION ACTIVITY DESCRIPTION % COMPLETE


V. VISUAL & DIMENSIONAL
INSPECTION
Assembly Arrangement 100
Name Plates 100
Doors 100
Buses 100
Load Terminals 100
Space Heaters 100
Terminal Blocks and Control 100
Wiring
Circuit Breaker / Contactor Cells 100
Current Transformers 100
Potential Transformers 100
Control Power Transformers 100
Fuses 100
Indicating Lights 100
Overcurrent Relays 100
Voltage Relays 100
Voltmeters, Ammeters, and 100
Wattmeter´s
Watt-hour Meters 100
Differential Relays 100
Overload Relays 100
Control Switches 100
Control Relays 100
VI. PAINT, MARKING, &
SHIPPING
PREPARATION
Surface Preparation NA
Coating Appearance & DFT (Dry 100
Film Thickness)
Marking / Tagging 100
Nameplate stamping 100
Ship Loose Items 100
Piece Marking / Tagging 100
Packing & Preparation for 100
Shipment
           
VII. SUPPLEMENTAL
VERIFICATION (as req’d per
P.O./ Specifications)

Copyright © 2011, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Servicios Minería Inc. - Sucursal del Perú. Anglo American Form 000.450.sr2043
Project Name: “Quellaveco Project” Anglo American Quellaveco S.A. Date 08Oct2009
Project N°: Q1CO
Page 5 of 6

SUPPLIER QUALITY SURVEILLANCE REPORT


ELECTRICAL EQUIPMENT
FILE NO.:
REPORT Nro:E-03

INSPECTION ACTIVITY DESCRIPTION % COMPLETE

1. Quantity & Visual inspection

Visual & Quantity checks against Packing List and randomly


(14u) SF6 Gas bottles & inside some packages
(6u) N2 Gas Bottles
included in 6 cases. 2. Mechanical & Structural checks
100%
Visual checks of the general condition of the packages (integrity
checks, signs of damages or bumps, etc.)

NOTE: THE LISTED ACTIVITIES DETAILED ABOVE CORRESPOND TO THE Q&CR FORM THAT WAS ISSUED
FOR THIS ASSIGNMENT.

LEGEND:

Description = Detailed account of inspection activity performed to date.

% Complete = Estimate of the overall percent complete of inspection activities. This is not to be interpreted as supplier
schedule evaluation.

SECTION III: STATUS REPORTING


Testing Attendance
Name Company Title
Mr. Jimmy Orlando GE Project Engineer
Mr. Evert Meres Intertek Moody Inspector

Inspection activity:
Inspector was requested to inspect the (14u) SF6 Gas bottles & (6u) N2 Gas Bottles included in 6 cases

ENGINEERING

100% of advance of the overall engineering of the GIS.

MATERIAL

FABRICATION

Copyright © 2011, Fluor Corporation. All Rights Reserved. Supplier Quality Surveillance
Servicios Minería Inc. - Sucursal del Perú. Anglo American Form 000.450.sr2043
Project Name: “Quellaveco Project” Anglo American Quellaveco S.A. Date 08Oct2009
Project N°: Q1CO
Page 6 of 6

SUPPLIER QUALITY SURVEILLANCE REPORT


ELECTRICAL EQUIPMENT
FILE NO.:
REPORT Nro:E-03

30%
E-rooms and other items in process of fabrication

SHIPPING

0%

SECTION IV: CONCLUSION

 Inspector was requested to inspect (14u) SF6 Gas & (6u) N2 Gas Bottles included in 6 cases.

 It was performed a quantity verification of the 6 PC (cases) against the Packing List, then the
inspector reviewed randomly inside some packages in order to verify N2 & SF6 gas bottles, finally,
inspector reviewed the general condition of the packages (integrity checks, signs of damages or
bumps, etc.); no deviations or damages were detected.

Vendor Part Material Description


Equipment or Tag # Qty Unit
Number (By Vendor)

4310-SG-001 N/A SF6 INSULATING GAS 3 CYLINDER


4310-SG-001 N/A SF6 INSULATING GAS 1 CYLINDER
4330-SG-001 N/A SF6 INSULATING GAS 9 CYLINDER
4330-SG-001 N/A SF6 INSULATING GAS 1 CYLINDER
4310-SG-001 N/A NITROGEN 4.5 1 CYLINDER
4330-SG-001 N/A NITROGEN 4.5 5 CYLINDER

 Inspection finished with successfully results and the packages are released for transport to site.

SURVEYOR AGREES WITH SUPPLIER’S ABILITY TO MEET FABRICATION YES NO


COMPLETION

IF “NO”, COMMENTS REQUIRED:

Attachments:
. PICTURE REPORT-03
. “Packing List SF6 & N2 - Dren e Intermedia”
. Product Inspection Report N2 @
. Certificate of Analysis SF6 @