Man B&W 4.04: Pto Type: BW Ii/Gcr Pto Type: BW Iv/Gcr

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

MAN B&W 4.

04
Page 1 of 3

PTO type: BW II/GCR PTO type: BW IV/GCR

Power Take Off/Gear Constant Ratio Power Take Off/Gear Constant Ratio

The PTO system type BW II/GCR illustrated in Fig. The shaft generator system, type PTO BW IV/
4.01.01 alternative 5 can generate electrical power GCR, installed in the shaft line (Fig. 4.01.01 al-
on board ships equipped with a controllable pitch ternative 6) can generate power on board ships
propeller, running at constant speed. equipped with a controllable pitch propeller run-
ning at constant speed.
The PTO unit is mounted on the tank top at the
fore end of the engine see Fig. 4.04.01. The PTO The PTO system can be delivered as a tunnel gear
generator is activated at sea, taking over the elec- with hollow flexible coupling or, alternatively, as
trical power production on board when the main a generator stepŽup gear with thrust bearing and
engine speed has stabilised at a level correspond- flexible coupling integrated in the shaft line.
ing to the generator frequency required on board.
The main engine needs no special preparation for
The installation length in front of the engine, and mounting these types of PTO systems as they are
thus the engine room length requirement, natu- connected to the intermediate shaft.
rally exceeds the length of the engine aft end
mounted shaft generator arrangements. However, The PTO system installed in the shaft line can also
there is some scope for limiting the space require- be installed on ships equipped with a fixed pitch
ment, depending on the configuration chosen. propeller or controllable pitch propeller running in

Step-up gear

Generator

Elastic coupling

Support bearing, if required

178 18 225.0

Fig. 4.04.01: Generic outline of Power Take Off (PTO) BW II/GCR

MAN B&W 70-26 engines


MAN Energy Solutions 198 43 16-8.9
MAN B&W 4.04
Page 2 of 3

combinator mode. This will, however, require an Generator stepup gear and flexible coupling
additional Constant Frequency gear (Fig. 4.01.01 integrated in the shaft line
alternative 2) or additional electrical equipment for
maintaining the constant frequency of the gener- For higher power take off loads, a generator
ated electric power. stepŽup gear and flexible coupling integrated in
the shaft line may be chosen due to first costs of
gear and coupling.
Tunnel gear with hollow flexible coupling
The flexible coupling integrated in the shaft line
This PTO system is normally installed on ships will transfer the total engine load for both propul-
with a minor electrical power take off load com- sion and electrical power and must be dimen-
pared to the propulsion power, up to approxi- sioned accordingly.
mately 25% of the engine power.
The flexible coupling cannot transfer the thrust
The hollow flexible coupling is only to be dimensioned from the propeller and it is, therefore, necessary
for the maximum electrical load of the power take off to make the gearŽbox with an integrated thrust
system and this gives an economic advantage for minor bearing.
power take off loads compared to the system with an
ordinary flexible coupling integrated in the shaft line. This type of PTO system is typically installed on
ships with large electrical power consumption,
The hollow flexible coupling consists of flexible e.g. shuttle tankers.
segments and connecting pieces, which allow
replacement of the coupling segments without
dismounting the shaft line, see Fig. 4.04.02.

178 18 250.1

Fig. 4.04.02: Generic outline of BW IV/GCR, tunnel gear

MAN B&W 70-26 engines


MAN Energy Solutions 198 43 16-8.9

You might also like