Adjustments Due To Design Coordination Between All Involved Consultants, Trades

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

5 4 3 2 1

Owner:
Al Eqbal Real Estate
Development
1- Adjustments due to design coordination between all involved consultants, trades.
2-Additional details to facilitate production of shop-drawings
3-More details provided in the absence of AR drawings Hotel Operator:
Ritz Carlton Hotel
4-Rectification of structural design H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 H-14 H-15 H-16 H-17 H-18
Company LLC

5-Adjustments to reflect more details for facade fixation. 3100 5900 2400 5800 6000 6000 6000 1300 4700 3000 3000 6000 6200 2800 3000 3000 3000

6-Loading plan reflecting changes in DC8, DC12 & DC13. Owner Representative:
D.G.Jones & Partners
(ME) Ltd./Jordan
800 100
4
D H-R 300
4

350 750

1100
B2

350
B3 B4 B4 B4 B4 B5 Consultant:

300
1000 400
H-Q
4 Dar Al-Handasah
4

B12
(Shair and Partners)

H-P 3 4 4

2300

B117
B12
B157
H-O

200
+59.30

B12
1650
2500
02
T.O.B 5
5 02 2500 1750

1675
H-N B45 B46 (TYP.)

350

300
2700 150 B12 DP THICK. DP THICK. DP THICK. DP THICK. DP THICK. DP THICK. B6 B5
500 850

150 150
450mm 450mm 450mm 450mm 450mm 450mm
H-M 21 5

B12(INV.)
B12(INV.)
555

B124(INV.)
5

(TYP.)
3000
B11
150

750 700
02 100650
H-L
75 SLAB THICK.
270 mm 2 7
21 22 1550

B115
SLAB THICK.
B14(INV.)
3250

150
250mm
1
+59.15 800 300
Notes:

590
DP THICK.

2250
700 700 700 700 500 +59.30
H-K 700 300 700

805 150
CL 450mm
7 (TYP.)

1900
3200
150 1390 150 3360
300 300 9 9 CL 4 4
150 150

22

550

550
725

675

675

675
250
500

1-THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH

100
125

125
02
650 550

H-J DP THICK.
450mm PUNCHING CAMBER 300 700 (TYP.) 02 2 GENERAL NOTES & DETAILS DRAWINGS.

DETAIL "3" 02
8 1.5cm
8 CAMBER 2-THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH

2500
0.5cm TYPICAL FLOOR DETAILS DRAWINGS
20 700 700

1100
300 650 300 3750
H-I SLAB THICK.
300 1500 100 650
PUNCHING
150 150

200700200 860 200 1295 145 265 890 150 3000


250mm 9 9 3-ALL BEAMS ARE CONCENTRIC WITH THEIR RELEVANT AXES
400

100
200 200 300 300 DETAIL "1"

675
3000

650
300 UNLESS OTHERWISE INDICATED.
+59.30 350
560

1450

1450
850
150 150 150
200
300 700
1 700 700 (TYP.) 300 DP THICK.

2250
1500

1500
CL 350 1100 4-ALL DROP PANELS ARE CONCENTRIC WITH COLUMNS

1250
450mm
500 655
19 19
835

750

B114
UNLESS OTHERWISE INDICATED.

2750
H-H

350
150 625 415 635

DP THICK. DP THICK. 5-SLEEVES SHOULD BE INSTALLED IN A MANNER TO BE


1450

450mm 450mm OPENING 350X350 02


200 200

1250 FITTED BETWEEN THE REINFORCING BARS. IT IS NOT

B12
DP THICK. INVERT LEVEL +62.075 02

B12
150 450mm ALLOWED TO CUT AWAY ANY BAR FROM THE REINFORCING
150

H-G +59.30 BARS DURING INSTALLATION.

270
250

150
B12
20 5
1350

T.O.B
5 24 24 150 550
DP THICK.
450mm
DP THICK.
450mm B38
6-CLEAR BAR SPACING ESPECIALLY AT THE LOCATION OF THE
CAMBER SPLICE SHALLL SATISFY THE REQUIREMENT OF CLAUSE
H-F 150

300
350

1.0cm NO. 7.6 IN ACI 318-11.

850
B112 1 02
2500
5 B113 5 1750
7-ALL REINFORCEMENT SPLICES TO BE PLACED STAGGERED IN

B17

B17
HB1
1

1350
02 ALL STRUCTURAL ELEMENTS.

C C 8-DROP PANEL TOP REINFORCEMENT TO BE EXTENDED 500MM


B116
4950

750200 FROM BOTH SIDE IN X,Y DIRECTIONS UNLESS OTHERWISE

B12
SHOWN ON THE DRAWINGS.
02
3650 B157 9-ALL SLABS MARKED WITH SHALL BE GIVEN A POSITIVE

B16

B16

1275 200
UPWARD CAMBER AS SHOWN ON DRAWINGS. METHOD OF
B3 B4 B4
4 B4 B5
950
4 CAMBERING IS TO BE APPROVED BY ENGINEER.

200
H-E
150

700
50

B11 10-PUMP ROOMS STEEL COVER SHALL BE DESIGNED AND

650
SUBMITTED BY THE CONTRACTOR FOR THE ENGINEER’S
1350

190
B11 1750 1600 100 APPROVAL IN ACCORDANCE TO PROJECT SPECIFICATIONS
H-D AND STRUCTURAL STEEL GENERAL NOTES.
4 2
300
4 800

Specific Key Plan:

16th Floor Framing Plan 2


1

H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 H-14 H-15 H-16 H-17 H-18
3
3100 5900 2400 5800 6000 6000 6000 1300 4700 3000 3000 6000 6200 2800 3000 3000 3000

General Key Plan:


H-R 5

ɸ 10 ɑ 150 (ADD.)
1000 400

L=4000
H-Q

B
02 02 5 B
H-P

ɸ 10 ɑ 150 (ADD.)
1500
2300

02

H-O

ɸ 20 ɑ 150 (ADD.)
Project Name:
1650

H-N
Ritz Carlton
ɸ 20 ɑ 150 (ADD.)

L=5000
ɸ 16 ɑ 150 (ADD.)

ɸ 16 ɑ 150 (ADD.)
ɸ 20 ɑ 150 (ADD.)

ɸ 18 ɑ 150 (ADD.)
ɸ 16 ɑ 150 (ADD.)
ɸ 18 ɑ 150 (ADD.)

ɸ 16 ɑ 150 (ADD.)
500 850

L=4000
Hotel & Residences
ɸ 14 ɑ 150 (ADD.)

MESH ɸ 12 @ 150 mm L=4000


H-M
L=5500

TOP AND BOTTOM IN

L=5500

L=5500
ɸ 18 ɑ 150 (ADD.)

L=5500

L=5500
ɸ 25 ɑ 150 (ADD.)

BOTH DIRECTIONS 2485 Amman-Jordan


3450
L=5500
L=4000 600

L=4000 600

ɸ 12 ɑ 150 (ADD.)
L=2000

1900
ɸ 14 ɑ 150 (ADD.)

ɸ 32 ɑ 150 (ADD.)

L=4500
H-L ɸ 14 ɑ 150 (ADD.) ɸ 14 ɑ 150 (ADD.) ɸ 14 ɑ 150 (ADD.) ɸ 20 ɑ 150 (ADD.)
Project Number J17006-0100D
L=4000 L=4000 L=4000 L=4500
3250

1000 1000
L=5000

2500 800 800 3450 1500 1500 1500 1500 1500 1500
H-K PUNCHING 1
1000

ɸ 32 ɑ 150 (ADD.) 02 ɸ 10 ɑ 150 (ADD.)


DETAIL "3" ɸ 10 ɑ 150 (ADD.)
L=5000 L=3000 L=3000
For Construction
ɸ 25 ɑ 150 (ADD.)

1500 1500

ɸ 20 ɑ 150 (ADD.)

ɸ 12 ɑ 150 (ADD.)
650 550

1100 ɸ 14 ɑ 150 (ADD.)


ɸ 16 ɑ 150 (ADD.)

H-J ɸ 32 ɑ 150 (ADD.) MESH ɸ 10 @ 150 mm ɸ 14 ɑ 150 (ADD.)


L=4000 TOP AND BOTTOM IN
L=4000

BOTH DIRECTIONS MAY 2018

L=4000
1200
1100

H-I 900 ɸ 16 ɑ 150 (ADD.)

1250
1000 L=3700
3000

ɸ 18 ɑ 150 (ADD.)
1000

ɸ 20 ɑ 150 (ADD.)

ɸ 25 ɑ 150 (ADD.)
ɸ 16 ɑ 150 (ADD.) ɸ 12 ɑ 150 (ADD.)
ɸ 18 ɑ 150 (ADD.) 2000
L=5500

L=4000

L=5000
ɸ 20 ɑ 150 (ADD.)

ɸ 20 ɑ 150 (ADD.)

H-H
ɸ 20 ɑ 150 (ADD.)

L=5500
ɸ 18 ɑ 150 (ADD.)

ɸ 25 ɑ 150 (ADD.) ɸ 14 ɑ 150 (ADD.)


ɸ 25 ɑ 150 (ADD.)

ɸ 20 ɑ 150 (ADD.)
1450

L=5000 L=4000
1000
ɸ 16 ɑ 150 (ADD.)
L=5500

L=5500

ɸ 14 ɑ 150 (ADD.)
1
L=2000

H-G 02 L=5500 L=4000


L=5500

L=5500

ɸ 20 ɑ 150 (ADD.)
ɸ 10 ɑ 150 (ADD.)
1350

1000

02 ɸ 14 ɑ 150 (ADD.) L=4000


ɸ 20 ɑ 150 (ADD.) L=3700
02 L=4000 L=4000
H-F 1000 1000 02
1000

1000
4 02 PUNCHING 02 FD 27/05/2018 As Clouded M.M.
1000 1000 1000 1000 1000 1000 1000 DETAIL "1" 01 FD 05/11/2017 General Revision M.M.
ɸ 10 ɑ 150 (ADD.) 00 FD 14/08/2017 Approved Issue M.M.
ɸ 16 ɑ 150 (ADD.)

ɸ 10 ɑ 150 (ADD.)

L=1500 Rev Phase Date Description Appr


4950

02 1500 Issue:
02

5
ɸ 10 ɑ 150 (ADD.)

5
ɸ 10 ɑ 150 (ADD.)
ɸ 10 ɑ 150 (ADD.) FILE NAME : RCHR-H-FD-P1-S-132-R02
L=2000
L=4000

A H-E A DRAWN BY:


150

T.Z./ H.A.

DESIGN BY: T.S

CHECKED BY: H.B.


H-D
5
02 APPROVED BY: M.M.

Sheet Title

Ritz Carlton - Hotel


Plans
16th Floor Framing and Reinforcement
Plans
16th Floor Reinforcement Plan
1 : 100 Sheet No.
QIBLA

RCHR-H-FD-P1-S-132
5 4 3 2 PLAN