Professional Documents
Culture Documents
Adjustments Due To Design Coordination Between All Involved Consultants, Trades
Adjustments Due To Design Coordination Between All Involved Consultants, Trades
Adjustments Due To Design Coordination Between All Involved Consultants, Trades
Owner:
Al Eqbal Real Estate
Development
1- Adjustments due to design coordination between all involved consultants, trades.
2-Additional details to facilitate production of shop-drawings
3-More details provided in the absence of AR drawings Hotel Operator:
Ritz Carlton Hotel
4-Rectification of structural design H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 H-14 H-15 H-16 H-17 H-18
Company LLC
5-Adjustments to reflect more details for facade fixation. 3100 5900 2400 5800 6000 6000 6000 1300 4700 3000 3000 6000 6200 2800 3000 3000 3000
6-Loading plan reflecting changes in DC8, DC12 & DC13. Owner Representative:
D.G.Jones & Partners
(ME) Ltd./Jordan
800 100
4
D H-R 300
4
350 750
1100
B2
350
B3 B4 B4 B4 B4 B5 Consultant:
300
1000 400
H-Q
4 Dar Al-Handasah
4
B12
(Shair and Partners)
H-P 3 4 4
2300
B117
B12
B157
H-O
200
+59.30
B12
1650
2500
02
T.O.B 5
5 02 2500 1750
1675
H-N B45 B46 (TYP.)
350
300
2700 150 B12 DP THICK. DP THICK. DP THICK. DP THICK. DP THICK. DP THICK. B6 B5
500 850
150 150
450mm 450mm 450mm 450mm 450mm 450mm
H-M 21 5
B12(INV.)
B12(INV.)
555
B124(INV.)
5
(TYP.)
3000
B11
150
750 700
02 100650
H-L
75 SLAB THICK.
270 mm 2 7
21 22 1550
B115
SLAB THICK.
B14(INV.)
3250
150
250mm
1
+59.15 800 300
Notes:
590
DP THICK.
2250
700 700 700 700 500 +59.30
H-K 700 300 700
805 150
CL 450mm
7 (TYP.)
1900
3200
150 1390 150 3360
300 300 9 9 CL 4 4
150 150
22
550
550
725
675
675
675
250
500
100
125
125
02
650 550
H-J DP THICK.
450mm PUNCHING CAMBER 300 700 (TYP.) 02 2 GENERAL NOTES & DETAILS DRAWINGS.
DETAIL "3" 02
8 1.5cm
8 CAMBER 2-THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH
2500
0.5cm TYPICAL FLOOR DETAILS DRAWINGS
20 700 700
1100
300 650 300 3750
H-I SLAB THICK.
300 1500 100 650
PUNCHING
150 150
100
200 200 300 300 DETAIL "1"
675
3000
650
300 UNLESS OTHERWISE INDICATED.
+59.30 350
560
1450
1450
850
150 150 150
200
300 700
1 700 700 (TYP.) 300 DP THICK.
2250
1500
1500
CL 350 1100 4-ALL DROP PANELS ARE CONCENTRIC WITH COLUMNS
1250
450mm
500 655
19 19
835
750
B114
UNLESS OTHERWISE INDICATED.
2750
H-H
350
150 625 415 635
B12
DP THICK. INVERT LEVEL +62.075 02
B12
150 450mm ALLOWED TO CUT AWAY ANY BAR FROM THE REINFORCING
150
270
250
150
B12
20 5
1350
T.O.B
5 24 24 150 550
DP THICK.
450mm
DP THICK.
450mm B38
6-CLEAR BAR SPACING ESPECIALLY AT THE LOCATION OF THE
CAMBER SPLICE SHALLL SATISFY THE REQUIREMENT OF CLAUSE
H-F 150
300
350
850
B112 1 02
2500
5 B113 5 1750
7-ALL REINFORCEMENT SPLICES TO BE PLACED STAGGERED IN
B17
B17
HB1
1
1350
02 ALL STRUCTURAL ELEMENTS.
B12
SHOWN ON THE DRAWINGS.
02
3650 B157 9-ALL SLABS MARKED WITH SHALL BE GIVEN A POSITIVE
B16
B16
1275 200
UPWARD CAMBER AS SHOWN ON DRAWINGS. METHOD OF
B3 B4 B4
4 B4 B5
950
4 CAMBERING IS TO BE APPROVED BY ENGINEER.
200
H-E
150
700
50
650
SUBMITTED BY THE CONTRACTOR FOR THE ENGINEER’S
1350
190
B11 1750 1600 100 APPROVAL IN ACCORDANCE TO PROJECT SPECIFICATIONS
H-D AND STRUCTURAL STEEL GENERAL NOTES.
4 2
300
4 800
H-1 H-2 H-3 H-4 H-5 H-6 H-7 H-8 H-9 H-10 H-11 H-12 H-13 H-14 H-15 H-16 H-17 H-18
3
3100 5900 2400 5800 6000 6000 6000 1300 4700 3000 3000 6000 6200 2800 3000 3000 3000
ɸ 10 ɑ 150 (ADD.)
1000 400
L=4000
H-Q
B
02 02 5 B
H-P
ɸ 10 ɑ 150 (ADD.)
1500
2300
02
H-O
ɸ 20 ɑ 150 (ADD.)
Project Name:
1650
H-N
Ritz Carlton
ɸ 20 ɑ 150 (ADD.)
L=5000
ɸ 16 ɑ 150 (ADD.)
ɸ 16 ɑ 150 (ADD.)
ɸ 20 ɑ 150 (ADD.)
ɸ 18 ɑ 150 (ADD.)
ɸ 16 ɑ 150 (ADD.)
ɸ 18 ɑ 150 (ADD.)
ɸ 16 ɑ 150 (ADD.)
500 850
L=4000
Hotel & Residences
ɸ 14 ɑ 150 (ADD.)
L=5500
L=5500
ɸ 18 ɑ 150 (ADD.)
L=5500
L=5500
ɸ 25 ɑ 150 (ADD.)
L=4000 600
ɸ 12 ɑ 150 (ADD.)
L=2000
1900
ɸ 14 ɑ 150 (ADD.)
ɸ 32 ɑ 150 (ADD.)
L=4500
H-L ɸ 14 ɑ 150 (ADD.) ɸ 14 ɑ 150 (ADD.) ɸ 14 ɑ 150 (ADD.) ɸ 20 ɑ 150 (ADD.)
Project Number J17006-0100D
L=4000 L=4000 L=4000 L=4500
3250
1000 1000
L=5000
2500 800 800 3450 1500 1500 1500 1500 1500 1500
H-K PUNCHING 1
1000
1500 1500
ɸ 20 ɑ 150 (ADD.)
ɸ 12 ɑ 150 (ADD.)
650 550
L=4000
1200
1100
1250
1000 L=3700
3000
ɸ 18 ɑ 150 (ADD.)
1000
ɸ 20 ɑ 150 (ADD.)
ɸ 25 ɑ 150 (ADD.)
ɸ 16 ɑ 150 (ADD.) ɸ 12 ɑ 150 (ADD.)
ɸ 18 ɑ 150 (ADD.) 2000
L=5500
L=4000
L=5000
ɸ 20 ɑ 150 (ADD.)
ɸ 20 ɑ 150 (ADD.)
H-H
ɸ 20 ɑ 150 (ADD.)
L=5500
ɸ 18 ɑ 150 (ADD.)
ɸ 20 ɑ 150 (ADD.)
1450
L=5000 L=4000
1000
ɸ 16 ɑ 150 (ADD.)
L=5500
L=5500
ɸ 14 ɑ 150 (ADD.)
1
L=2000
L=5500
ɸ 20 ɑ 150 (ADD.)
ɸ 10 ɑ 150 (ADD.)
1350
1000
1000
4 02 PUNCHING 02 FD 27/05/2018 As Clouded M.M.
1000 1000 1000 1000 1000 1000 1000 DETAIL "1" 01 FD 05/11/2017 General Revision M.M.
ɸ 10 ɑ 150 (ADD.) 00 FD 14/08/2017 Approved Issue M.M.
ɸ 16 ɑ 150 (ADD.)
ɸ 10 ɑ 150 (ADD.)
02 1500 Issue:
02
5
ɸ 10 ɑ 150 (ADD.)
5
ɸ 10 ɑ 150 (ADD.)
ɸ 10 ɑ 150 (ADD.) FILE NAME : RCHR-H-FD-P1-S-132-R02
L=2000
L=4000
T.Z./ H.A.
Sheet Title
RCHR-H-FD-P1-S-132
5 4 3 2 PLAN
NORTH
Nor t h