BONUS TABLE

no. item Amount (ugx)


1 sag Tension 15kV lot 1 (CET) 200000

2 sag Tension 33kV lot 1 (CET) 200000

3 Pole load calculations 15kV lot 1 200000

4 Pole load calculations 33kV lot 1 200000

5 Soil investigation plan, lot 1 200000

6 Soil investigation plan, lot 2 200000

7 Soil Investigation substations lot 2 200000

8 Pole load calculations 15kV, 6 town project 200000

9 Fence and Gate switch station (Submitted) 100000

10 Point selection report phase 1 200000

11 Point selection report phase 2 200000

12 Founation six towns MV POLES 200000

13 Foundations six towns LV POLES 200000


14 Soil investigation report lot 1 phase 1 200000
15 Foundation calculations 15kv lot 1 200000
Soil investigation report lot 2 200000
16 Foundation calculations 33kv lot 1 200000
18 Foundation calculations 15kv lot 2 200000
19 Foundation calculations 33kv lot 2 200000
20 Soil Investigation report airport 132kV 200000
21 Soil investigation report lot 1 phase 2 200000
22 132kV Underground cable route line design 200000
23 Soil investigation methodology Sierra leone 200000
24
25
26

Total Bonus for all reports 4500000

Bonus Recieved in december 1700000


Bonus Recieved in January 1000000

Bonus Recieved in feb 700000

Current Bonus (To be paid paid)


E
Status current status
Approved 200000

Approved 200000

Approved 200000

Approved 200000

Approved 200000

Approved 200000

Approved 200000

Approved 200000

The civil design of Uganda only


completed the fence part, and needs
to wait for the completion of other 100000
parts before supplementing and
submitting

Approved 200000

Approved 200000

Approved 200000
Approved 200000
Approved 200000
Approved 200000
Approved 200000
Approved 200000
Approved 200000
Approved 200000
Approved 200000
Submitted 100000
Submitted 100000
Submitted 100000

4200000

Paid
Paid

Paid

End march 800000