Professional Documents
Culture Documents
Electrical With HVAC
Electrical With HVAC
Electrical With HVAC
A B B' C D E E' F G
6500 5500 3650 4700 7500
2# 250x250 ED
SJ: Luminaires are
@ 75 L/s EACH (ED-01)
B1/LPDB-02 clashing with the Ex-
UPW-LPDB-02
DRAIN PIPE-25NB haust Air Diffuser
Y1/LPDB-02 DRAIN PIPE-25NB
TO NEAREST DRAIN PIPE 2# 150x150 EAD
TO NEAREST DRAIN PIPE
11
77 AC AC FRESH AIR CUTOUT
Y1/LPDB-06
7.0 m2 MIN. REQUIRED
66 88 55 IDU-EB-CR-01
44 WASH B2/LPDB-02 IDU-EB-CEB-01A FRESH AIR CUTOUT ABOVE
R3/LPDB-02
200x150 EAD ROOM
REFRIGERANT
150 L/s B2/LPDB-02 WASH ROOM
R1/LPDB-06 +1.65 FFL IN/OUTPIPE TO & FROM
Y2/LPDB-02 DRAIN PIPE-25NB B2/LPDB-02
O.D.U AT TERRACE
TO NEAREST DRAIN PIPE AREA FOR
5500
R1/LPDB-06
mend to install these S(5)
1000
B1/LPDB-06 S(5)
UPW-LPDB-06 ACDB AC 2500x3000
two fittings to the FRESH AIR LOUVER
2' 2' wall.
nearby B1/LPDB-05 Y1/LPDB-05
R1/LPDB-01
FAL-DG-03
+2.00 FFL R1/LPDB-05 2500x4500
5# 600x200 SAG +0.30 FRESH AIR LOUVER
@ 180 L/s (SAG-01)
AC
+0.30
Y3/LPDB-05
IDU-EB-CPCC-01A
300x300 SAD UPW-LPDB-01 IDU-EB-MCC-01 CORRIDOR
R1/LPDB-01
S(6) S(6)
S(6)
IDU-EB-CPCC-01B
550x300 SAD R1/LPDB-05
Y1/LPDB-01
650x300 SAD PW MCC ROOM
AC
PW MCC ROOM
7100
300x300 SAD
@ 280 L/s EACH
5# 600x200 SAG (EAG-01)
Y1/LPDB-01
@ 180 L/s (SAG-01) CORRIDOR
MV SWITCHGEAR ROOM DG
CPCC
B2/LPDB-05
UPW-MLDB-01 MV SWITCHGEAR
DRAIN PIPE-25NB
600x400 SAD IDU-EB-MCC-02 +2.00 FFL ROOM
CPCC DG
400x300 EAD +2.00 FFL ROOM
1600x1000 EAD
BATTERY CHARGER
B2/LPDB-01 Y3/LPDB-05 LPDB-04
1000x400 FAD 63A 2400x1200 BELL MOUTH
UPW-LPDB-05
W/P WITH WIRE MESH
33 2600 L/s
1200x600 FAD
FAF-EB-TF-01
4500