Geotechnical Laboratory Tel. 011-557-2416/17 Fax. 011– 557-2415 P.O.Box 101472 A.A.

Ethiopia

Procurement of Plant, Design, Supply, Installation, Test and Commissioning of MV Distribution Lines for Addis Ababa Transmission and Distribution System Rehabilitation and
Upgrading Project (Lot-2)
Project :
Client : Ethiopian Electric Utility
Consultant: Intec Gopa International Energy Consultants
Contractor: China Electric Power Equipment and Technology CO. LTD Contract No. 33.20/157/12
Sampled by : China Electric Power Equipment and Technology CO. LTD
Material Type : Disturbed Soil
Reported Date : January 5, 2021

SUMMARY OF TEST RESULTS OF DISTURBED SOIL


Atterberg Limits (AASHTO-
Wet Sieve Analysis Hydrometer
T89&90)
(Ywet, Unified Soil
Sr No Test Pit No Depth, m Free Swell (%)
N/m3) Sand (2.00mm- Silt (0.075mm- Clay (less than Classification
2mm 0.425mm 0.075mm LL, % PL, % PI, %
0.075mm), % 0.002mm), % 0.002), %

Lot-2 Point-1,
1 Chancho - 17.98 99.3 97.5 95.2 4.8 40.2 55.0 53 34 19 MH 50

Chancho
2 0.7-1.50 18.60 89.6 87.3 85.7 14.3 35.2 50.5 80 36 44 CH 130

Chancho @ 2.7m
3 1.50-2.70 16.99 88.3 85.2 83.9 16.1 35.2 48.7 85 38 47 CH 150

Remarks:

Reported by: Checked by: Approved by :