REACCIONES EN SAP
OutputCase CaseType F1 F2
Frame Joint
Text Text Tonf Tonf
5 6 DEAD LinStatic -0.044 -0.0797
5 6 PERMANENTE LinStatic 0.0666 1.0692
5 6 LIVE LinStatic 0.0158 0.0996
5 6 SxE LinStatic 3.133 0.0408
5 6 SyE LinStatic -0.1134 0.014
9 11 DEAD LinStatic -0.0208 0.6696
9 11 PERMANENTE LinStatic -0.0288 -2.9445
9 11 LIVE LinStatic -0.0183 0.0408
9 11 SxE LinStatic 0.987 0.0401
9 11 SyE LinStatic -0.0205 -0.0072
13 16 DEAD LinStatic -0.4097 0.136
13 16 PERMANENTE LinStatic -0.3232 0.8765
13 16 LIVE LinStatic -0.1885 -0.0019
13 16 SxE LinStatic 0.7525 0.0627
13 16 SyE LinStatic -2.4147 0.0266
17 21 DEAD LinStatic -0.759 0.0154
17 21 PERMANENTE LinStatic -0.4591 0.6071
17 21 LIVE LinStatic -0.1607 0.0012
17 21 SxE LinStatic 5.8361 0.0606
17 21 SyE LinStatic 4.2809 0.0165
21 26 DEAD LinStatic -0.0269 0.0532
21 26 PERMANENTE LinStatic 0.0028 1.0779
21 26 LIVE LinStatic -0.0059 0.0249
21 26 SxE LinStatic 0.7435 -0.0652
21 26 SyE LinStatic 0.1139 -0.0173
25 31 DEAD LinStatic -0.0502 -0.0253
25 31 PERMANENTE LinStatic -0.0121 -2.9209
25 31 LIVE LinStatic 0.0016 -0.0121
25 31 SxE LinStatic 2.5586 -0.0647
25 31 SyE LinStatic 0.1138 -0.0173
33 41 DEAD LinStatic -0.1574 -0.0105
33 41 PERMANENTE LinStatic -0.4263 -1.1186
33 41 LIVE LinStatic -0.1613 -0.0072
33 41 SxE LinStatic 4.7027 0.0543
33 41 SyE LinStatic -0.0957 0.0067
37 46 DEAD LinStatic -0.0717 -0.0604
37 46 PERMANENTE LinStatic -0.2866 1.2185
37 46 LIVE LinStatic -0.11 -0.0545
37 46 SxE LinStatic 1.8431 0.0587
37 46 SyE LinStatic -0.0142 -1.0045
45 56 DEAD LinStatic -0.1054 0.0054
45 56 PERMANENTE LinStatic -0.1933 0.0287
45 56 LIVE LinStatic -0.073 0.005
45 56 SxE LinStatic 2.1875 -0.077
45 56 SyE LinStatic 0.035 -0.8672
49 61 DEAD LinStatic -0.0507 0.0218
49 61 PERMANENTE LinStatic -0.2576 0.1276
49 61 LIVE LinStatic -0.0817 0.033
49 61 SxE LinStatic 1.8305 -0.096
49 61 SyE LinStatic -0.0472 -1.0046
53 66 DEAD LinStatic -0.1947 -0.0418
53 66 PERMANENTE LinStatic -0.4302 -0.2602
53 66 LIVE LinStatic -0.1099 -0.0893
53 66 SxE LinStatic 4.1027 0.1116
53 66 SyE LinStatic 0.1119 -1.3774
57 112 DEAD LinStatic 0.2556 -0.0394
57 112 PERMANENTE LinStatic 0.2242 0.0155
57 112 LIVE LinStatic 0.1403 0.0116
57 112 SxE LinStatic -8.2835 -0.0745
57 112 SyE LinStatic -0.4561 -1.4139
61 76 DEAD LinStatic 0.0291 0.0036
61 76 PERMANENTE LinStatic 0.253 -0.0738
61 76 LIVE LinStatic 0.0783 -0.0232
61 76 SxE LinStatic 4.0123 0.0274
61 76 SyE LinStatic -0.036 -0.9826
65 81 DEAD LinStatic 0.0366 0.0004643
65 81 PERMANENTE LinStatic 0.2486 -0.0467
65 81 LIVE LinStatic 0.0891 -0.0109
65 81 SxE LinStatic 1.2353 0.0273
65 81 SyE LinStatic 4.883E-06 -1.6535
69 86 DEAD LinStatic 0.1597 0.8735
69 86 PERMANENTE LinStatic 0.3808 0.8221
69 86 LIVE LinStatic 0.1427 0.2355
69 86 SxE LinStatic 4.0619 1.043
69 86 SyE LinStatic -0.0145 -19.8136
73 91 DEAD LinStatic 1.0213 0.0821
73 91 PERMANENTE LinStatic 1.1533 0.1029
73 91 LIVE LinStatic 0.3182 0.0199
73 91 SxE LinStatic 0.7445 0.0365
73 91 SyE LinStatic -4.28 -1.3185
77 96 DEAD LinStatic 0.311 -0.0499
77 96 PERMANENTE LinStatic 0.5165 -0.0658
77 96 LIVE LinStatic 0.1438 -0.007
77 96 SxE LinStatic 0.3365 0.1242
77 96 SyE LinStatic 1.0243 -1.6985
81 101 DEAD LinStatic 0.1296 -0.5379
81 101 PERMANENTE LinStatic 0.3205 -0.7249
81 101 LIVE LinStatic 0.0626 -0.1504
81 101 SxE LinStatic 3.3315 -0.8992
81 101 SyE LinStatic 0.0703 -20.8551
Joints
F3 M1 M2 1
Tonf Tonf-m Tonf-m 11
-10.4962 -0.06332 -0.08049 16
-12.2085 -0.28211 0.1918 21
-3.2013 -0.08262 0.04035 26
14.2154 -0.29777 8.81091 31
3.7555 2.59357 -0.23761 41
-9.3036 -0.00656 -0.03439 46
-21.6855 0.04537 -0.02727 56
-5.3597 0.02347 -0.02352 61
8.0869 -0.06069 2.3326 66
1.4656 1.35494 -0.03525 76
-14.9702 0.0201 -0.46745 81
-19.0612 0.02554 -0.34187 86
-4.5101 0.00562 -0.20966 91
29.8799 -0.28405 5.94854 96
21.388 1.83833 -2.54409 101
-5.0879 -0.00369 -0.46956 112
-3.0716 -0.00682 -0.28493
-1.0779 -0.00321 -0.10127
41.9202 -0.05684 4.32868
32.2404 0.18815 2.99137
-9.7401 -0.03278 -0.04605
-16.7118 -0.14941 -0.01102
-4.2472 -0.0362 -0.01415
15.0891 -0.29491 1.93875
-18.0815 1.52406 0.17434
-10.8698 0.01892 -0.11677
-18.3987 0.24677 -0.13328
-3.4645 0.06628 -0.03997
16.5761 -0.10087 7.50877
-3.4534 2.63937 0.29638
-18.4361 -0.02426 -0.23132
-38.2622 -0.45063 -0.46239
-10.2457 -0.16367 -0.19494
2.581 -0.0872 10.90531
6.849 2.84731 -0.21612
-15.6225 0.00338 -0.10597
-48.244 0.24856 -0.36882
-14.1731 0.07612 -0.1465
0.7042 -0.05299 3.97402
-1.9425 1.64593 -0.0303
-16.5027 -0.01397 -0.15474
-17.4622 -0.02957 -0.26878
-6.3674 -0.00468 -0.10378
-33.9768 0.10326 4.37552
5.2793 1.48452 0.06304
-18.2995 -0.03599 -0.08268
-37.6208 -0.14635 -0.36938
-11.236 -0.04269 -0.11933
-4.3383 0.14328 3.86043
-9.1438 1.65234 -0.03323
-16.7849 0.04126 -0.30909
-27.2958 0.31442 -0.68983
-5.4492 0.12087 -0.18839
1.5344 -0.13465 9.56436
-6.2661 2.79651 0.29384
-0.1442 0.02888 0.06557
29.7894 0.01184 0.05753
9.4555 0.00408 0.03598
14.7558 0.19427 -2.12498
22.8823 -0.85428 -0.117
-16.6555 0.04764 0.01682
-30.107 0.08271 0.43987
-7.643 -0.00172 0.1235
-16.0792 0.2269 9.98142
2.441 2.50592 -0.13449
-12.9066 -0.00563 0.04323
-32.3912 0.09669 0.34785
-8.5757 0.03937 0.12173
-8.4945 0.03846 2.66849
1.3705 1.35234 -0.00748
-18.4401 -0.00359 0.17398
-26.1759 0.10177 0.51652
-5.7916 0.02791 0.18192
-13.347 0.10147 10.29321
10.5286 2.3691 -0.00775
-6.1982 0.00101 1.64809
-5.0622 -0.00691 1.36085
-1.2929 -0.00144 0.34636
-2.1348 0.01538 0.52217
64.3689 -0.31392 -17.31718
-3.4341 -0.00317 0.41461
-6.3388 -0.00619 0.71903
-1.7054 -0.00155 0.19153
-4.4567 0.01427 0.48645
-47.9972 0.0009 5.66151
-15.1384 -0.01728 0.12263
-21.3465 0.10191 0.30949
-4.4217 0.01705 0.04128
-17.0884 -0.0388 8.53771
-12.557 2.96841 0.23853
ZAPATA COMBINADA EJE 2 - 2
DATOS GENERALES
γ nat γ concreto γ comp γ relleno γ piso + f.p S/C
1.70 Tn/m3 2.40 Tn/m3 2.00 Tn/m3 2.10 Tn/m3 2.30 Tn/m3 0.20 Tn/m3
SECCIÓN
Cimentación Columna
C1 C2
0.60 m 0 cm
0 cm
JOINT COMBO P Mx My
C1 C2 C3
40 cm 0 cm 0 cm
40 cm 0 cm 0 cm
1.00 m
2.00 m
0.90 m
SI SI NO
0.60 m 1.20 m
0.20 m 0.00 m
0.80 m
2.00 m
COMBO 1: CM + CV
CM+CV P Mx My dx dy Predimensionamiento
C1 43.34 0.51 -8.74 0.20 0.45 σ Neto 0.69 Kg/cm2
C2 23.00 -0.78 -0.78 0.80 0.45 σ Neto. Sismo 0.89 Kg/cm2
C3 0.00 0.00 0.00 2.00 0.45 Área de la Zapta 9.66 m2
TOTAL 66.34 -0.27 -9.52 Largo 2.00 m
Ancho Aprox. 4.83 m
Ubicación R Ancho Final 0.90 m
Fuerza Resultante 66.34 Tn
∑ Momentos -9.80 Tn - m Cx 1.00 m
P * dx -27.07 Tn - m Ix 0.12 m4
P * dy -29.85 Tn - m Cy 0.45 m
Ubicación Rx 0.56 m Iy 0.60 m4
Ubicación Ry 0.60 m
Traslado de Carga al C.G q1 12.97 Kg/cm2
Fuerza Resultante 66.34 Tn q2 16.24 Kg/cm2
ex 0.44 m q3 -8.86 Kg/cm2
ey 0.15 m q4 -5.60 Kg/cm2
M. Traslado x 29.48 Tn - m No Cumple
M. Traslado y -9.80 Tn - m
COMBO 2: CM + CV + 0.8Sx
CM+CV+0.8 SX P Mx My dx dy Predimensionamiento
C1 149.98 -53.73 -1.17 0.20 0.45 σ Neto 0.69 Kg/cm2
C2 26.86 5.25 5.25 0.80 0.45 σ Neto. Sismo 0.89 Kg/cm2
C3 0.00 0.00 0.00 2.00 0.45 Área de la Zapta 19.80 m2
TOTAL 176.84 -48.48 4.08 Largo 2.00 m
Ancho Aprox. 9.90 m
Ubicación R Ancho Final 0.90 m
Fuerza Resultante 176.84 Tn
∑ Momentos -44.40 Tn - m Cx 1.00 m
P * dx -51.49 Tn - m Ix 0.12 m4
P * dy -79.58 Tn - m Cy 0.45 m
Ubicación Rx 0.54 m Iy 0.60 m4
Ubicación Ry 0.70 m
Traslado de Carga al C.G q1 32.41 Kg/cm2
Fuerza Resultante 176.84 Tn q2 47.21 Kg/cm2
ex 0.46 m q3 -27.56 Kg/cm2
ey 0.25 m q4 -12.76 Kg/cm2
M. Traslado x 80.96 Tn - m No Cumple
M. Traslado y -44.40 Tn - m
COMBO 3: CM + CV - 0.8Sx
CM+CV-0.8 SX P Mx My dx dy Predimensionamiento
C1 77.12 -35.98 -0.73 0.20 0.45 σ Neto 0.69 Kg/cm2
C2 19.14 6.95 6.95 0.80 0.45 σ Neto. Sismo 0.89 Kg/cm2
C3 0.00 0.00 0.00 2.00 0.45 Área de la Zapta 10.78 m2
TOTAL 96.26 -29.03 6.22 Largo 2.00 m
Ancho Aprox. 5.39 m
Ubicación R Ancho Final 0.90 m
Fuerza Resultante 96.26 Tn
∑ Momentos -22.81 Tn - m Cx 1.00 m
P * dx -30.73 Tn - m Ix 0.12 m4
P * dy -43.32 Tn - m Cy 0.45 m
Ubicación Rx 0.56 m Iy 0.60 m4
Ubicación Ry 0.69 m
Traslado de Carga al C.G q1 17.37 Kg/cm2
Fuerza Resultante 96.26 Tn q2 24.97 Kg/cm2
ex 0.44 m q3 -14.27 Kg/cm2
ey 0.24 m q4 -6.67 Kg/cm2
M. Traslado x 42.71 Tn - m No Cumple
M. Traslado y -22.81 Tn - m
COMBO 4: CM + CV + 0.8Sy
CM+CV+0.8 SY P Mx My dx dy Predimensionamiento
C1 149.98 -53.73 -1.17 0.20 0.45 σ Neto 0.69 Kg/cm2
C2 26.86 5.25 5.25 0.80 0.45 σ Neto. Sismo 0.89 Kg/cm2
C3 0.00 0.00 0.00 2.00 0.45 Área de la Zapta 19.80 m2
TOTAL 176.84 -48.48 4.08 Largo 2.00 m
Ancho Aprox. 9.90 m
Ubicación R Ancho Final 0.90 m
Fuerza Resultante 176.84 Tn
∑ Momentos -44.40 Tn - m Cx 1.00 m
P * dx -51.49 Tn - m Ix 0.12 m4
P * dy -79.58 Tn - m Cy 0.45 m
Ubicación Rx 0.54 m Iy 0.60 m4
Ubicación Ry 0.70 m
Traslado de Carga al C.G q1 32.41 Kg/cm2
Fuerza Resultante 176.84 Tn q2 47.21 Kg/cm2
ex 0.46 m q3 -27.56 Kg/cm2
ey 0.25 m q4 -12.76 Kg/cm2
M. Traslado x 80.96 Tn - m No Cumple
M. Traslado y -44.40 Tn - m
COMBO 5: CM + CV - 0.8Sy
CM+CV-0.8 SY P Mx My dx dy Predimensionamiento
C1 -12.84 11.52 1.88 0.20 0.45 σ Neto 0.69 Kg/cm2
C2 5.47 7.03 7.03 0.80 0.45 σ Neto. Sismo 0.89 Kg/cm2
C3 0.00 0.00 0.00 2.00 0.45 Área de la Zapta 0.82 m2
TOTAL -7.36 18.55 8.91 Largo 2.00 m
Ancho Aprox. 0.41 m
Ubicación R Ancho Final 0.90 m
Fuerza Resultante -7.36 Tn
∑ Momentos 27.46 Tn - m Cx 1.00 m
P * dx -1.81 Tn - m Ix 0.12 m4
P * dy 3.31 Tn - m Cy 0.45 m
Ubicación Rx 3.48 m Iy 0.60 m4
Ubicación Ry 4.18 m
q1 10.94 Kg/cm2
Traslado de Carga al C.G q2 1.79 Kg/cm2
Fuerza Resultante -7.36 Tn q3 -2.60 Kg/cm2
ex 2.48 m q4 -11.76 Kg/cm2
ey 3.73 m No Cumple
M. Traslado x 18.28 Tn - m
M. Traslado y 27.46 Tn - m
SI SI SI
0.53 m
0.53 m
0.26 m
0.26 m
0.53 m
0.53 m
0.26 m
8.- Verificación del Corte por Flexión
V actuante V Resistente
V actuante V Resistente
C1 Lateral
Verificación por Punzonado
Pu 149.98 Tn-m
qu 53.79 Tn/m2 V act. 135.73
αs 30 60.9
0.40 m d 0.52 m V res. 366.2
Po 1.20 m 95.9
0.40 m Ao 0.27 m2 φVnp 51.74
Bc 1.00 m No Cumple
C2 Centrada
Verificación por Punzonado
Pu 40.53 Tn-m
qu 53.79 Tn/m2 V act. 26.27
α 40 0.0
0.00 m d 0.52 m V res. #DIV/0!
Po 0.00 m 0.0
0.00 m Ao 0.27 m2 φVnp #DIV/0!
Bc #DIV/0! m #DIV/0!
C3 Lateral
Verificación por Punzonado
Pu 0.00 Tn-m
qu 53.79 Tn/m2 V act. 0.00
α 30 0.0
0.00 m d 0.52 m V res. #DIV/0!
Po 0.00 m 0.0
0.00 m Ao 0.00 m2 φVnp #DIV/0!
Bc #DIV/0! m #DIV/0!
C1 Esquina C2 Esquina
Pu 149.98 Tn-m Pu 40.53 Tn-m
B 0.40 m B 0.00 m
0.40 m L 0.40 m 0.00 m L 0.00 m
A1 0.16 m2 A1 0.00 m2
0.40 m A2 0.16 m2 0.00 m A2 0.00 m2
Pn 19.99 m2 Pn #DIV/0! m2
Necesita Dowells #DIV/0!
As Dowells 0.0344 As Dowells #DIV/0!
C3 Esquina
Pu 0.00 Tn-m
B 0.00 m
0.00 m L 0.00 m
A1 0.00 m2
0.00 m A2 0.00 m2
Pn #DIV/0! m2
#DIV/0!
As Dowells #DIV/0!
C1 C2 C3
P 61.21 Tn P 35.61 Tn P 0.00 Tn
Mx 12.53 Tn-m Mx -9.48 Tn-m Mx 0.00 Tn-m
0.60 m
53.79
53.79
q1 q2
0.20 m 0.20 m
0.80 m 1.200
2.00 m
2.20 m
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.20 53.79 9.68 61.21 70.89 0.97 12.53 0.00 -11.56
0.20 53.79 9.68 0.00 9.68 0.97 0.00 0.00 13.50
0.40 53.79 19.36 0.00 29.04 3.87 0.00 12.24 28.65
1.00 53.79 48.41 0.00 77.45 24.20 0.00 48.97 85.70
1.50 53.79 72.61 0.00 150.06 54.46 0.00 79.57 146.56
IZQUIERDA
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.20 53.79 9.68 0.00 9.68 0.97 0.00 0.00 0.97
0.20 53.79 9.68 0.00 9.68 0.97 0.00 0.00 0.97
0.40 53.79 19.36 0.00 29.04 3.87 0.00 0.00 3.87
DERECHA
400.00 400.00
271.08 300.00
300.00
200.00
200.00
100.00
100.00 70.89 9.68
38.73 0.00
9.68
0.00 5.00 4.50 4.00 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 -100.00
1336.05 Tn
590.57 Tn
9.68 Tn 9.68 Tn
+
-
0.00 Tn 0.00 Tn
-100.00 -100.00
-150.00 -150.00
-200.00 -200.00
605.09 Tn 0.00 Tn
219.52 Tn -11.56 Tn
-
+
13.50 Tn
605.09 Tn
888.12 Tn
ACERO MÍNIMO
Capas 1 Capa As mín req. 9.72 cm2
ρmin 0.0018 N° Varillas 5 varillas
Varilla asumida 5/8" Espaciamiento 18.35 cm
As Varilla 1.98 cm2 S 17.5 cm
φ de Varilla 1.59 cm 1 φ 5/8" @ 0.175m
TRAMO C1 - C2 TRAMO C2 - C3
ACERO (-) ACERO (-)
Mu 11.56 Tn-m Mu 5.78 Tn-m
Varilla asumida 5/8" Varilla asumida 5/8"
As Varilla 1.98 cm2 As Varilla 1.98 cm2
φ de Varilla 1.59 cm φ de Varilla 1.59 cm
As req 1.37 cm2 As req 0.69 cm2
Acero Mínimo Acero Mínimo
As req 9.72 cm2 As req 9.72 cm2
N° Varillas 5 varillas N° Varillas 5 varillas
Espaciamiento 18.35 cm Espaciamiento 18.35 cm
S 17.5 cm S 17.5 cm
1 φ 5/8" @ 0.175m 1 φ 5/8" @ 0.175m
TRANSVERSAL
Mu 21.78 Tn-m
Varilla asumida 5/8"
As Varilla 1.98 cm2
φ de Varilla 1.59 cm
As req 2.58 cm2
Acero Mínimo
As req 21.60 cm2
N° Varillas 11 varillas
Espaciamiento 7.34 cm
S 5 cm
1 φ 5/8" @ 0.05m
2
ZAPATA COMBINADA EJE 3 - 3
DATOS GENERALES
γ nat γ concreto γ comp γ relleno γ piso + f.p S/C
1.70 Tn/m3 2.40 Tn/m3 2.00 Tn/m3 2.10 Tn/m3 2.30 Tn/m3 0.20 Tn/m3
SECCIÓN
Cimentación Columna
C1 C2
0.80 m
JOINT COMBO P Mx My
C1 C2 C3
40 cm 35 cm 35 cm
40 cm 35 cm 0 cm
5.00 m
10.00 m
4.00 m
SI SI SI
3.70 m 6.30 m
0.20 m 0.00 m
3.70 m
10.00 m
COMBO 1: CM + CV
CM+CV P Mx My dx dy Predimensionamiento
C1 36.35 -0.06 0.09 0.20 2.00 σ Neto 0.67 Kg/cm2
C2 78.04 -0.33 -0.33 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 53.87 -0.13 -0.13 10.00 2.00 Área de la Zapta 25.00 m2
TOTAL 168.26 -0.52 -0.37 Largo 10.00 m
Ancho Aprox. 2.50 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 168.26 Tn
∑ Momentos -0.89 Tn - m Cx 5.00 m
P * dx -834.75 Tn - m Ix 53.33 m4
P * dy -336.52 Tn - m Cy 2.00 m
Ubicación Rx 4.97 m Iy 333.33 m4
Ubicación Ry 2.01 m
Traslado de Carga al C.G q1 0.44 Kg/cm2
Fuerza Resultante 168.26 Tn q2 0.44 Kg/cm2
ex 0.03 m q3 0.40 Kg/cm2
ey 0.01 m q4 0.40 Kg/cm2
M. Traslado x 5.66 Tn - m Cumple
M. Traslado y -0.89 Tn - m
COMBO 2: CM + CV + 0.8Sx
CM+CV+0.8 SX P Mx My dx dy Predimensionamiento
C1 42.82 -1.78 -0.01 0.20 2.00 σ Neto 0.67 Kg/cm2
C2 78.60 -2.56 -2.56 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 60.67 -2.65 -2.65 10.00 2.00 Área de la Zapta 20.81 m2
TOTAL 182.09 -6.99 -5.22 Largo 10.00 m
Ancho Aprox. 2.08 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 182.09 Tn
∑ Momentos -12.21 Tn - m Cx 5.00 m
P * dx -906.09 Tn - m Ix 53.33 m4
P * dy -364.18 Tn - m Cy 2.00 m
Ubicación Rx 5.04 m Iy 333.33 m4
Ubicación Ry 2.07 m
Traslado de Carga al C.G q1 0.41 Kg/cm2
Fuerza Resultante 182.09 Tn q2 0.44 Kg/cm2
ex 0.04 m q3 0.47 Kg/cm2
ey 0.07 m q4 0.50 Kg/cm2
M. Traslado x -7.84 Tn - m Cumple
M. Traslado y -12.21 Tn - m
COMBO 3: CM + CV - 0.8Sx
CM+CV-0.8 SX P Mx My dx dy Predimensionamiento
C1 6.91 -2.36 1.14 0.20 2.00 σ Neto 0.67 Kg/cm2
C2 77.48 3.80 3.80 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 47.08 1.62 1.62 10.00 2.00 Área de la Zapta 15.03 m2
TOTAL 131.47 3.06 6.57 Largo 10.00 m
Ancho Aprox. 1.50 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 131.47 Tn
∑ Momentos 9.63 Tn - m Cx 5.00 m
P * dx -758.82 Tn - m Ix 53.33 m4
P * dy -262.94 Tn - m Cy 2.00 m
Ubicación Rx 5.70 m Iy 333.33 m4
Ubicación Ry 1.93 m
Traslado de Carga al C.G q1 0.00 Kg/cm2
Fuerza Resultante 131.47 Tn q2 -0.03 Kg/cm2
ex 0.70 m q3 0.69 Kg/cm2
ey 0.07 m q4 0.66 Kg/cm2
M. Traslado x -91.85 Tn - m No Cumple
M. Traslado y 9.63 Tn - m
COMBO 4: CM + CV + 0.8Sy
CM+CV+0.8 SY P Mx My dx dy Predimensionamiento
C1 42.82 -1.78 -0.01 0.20 2.00 σ Neto 0.67 Kg/cm2
C2 78.60 -2.56 -2.56 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 60.67 -2.65 -2.65 10.00 2.00 Área de la Zapta 20.81 m2
TOTAL 182.09 -6.99 -5.22 Largo 10.00 m
Ancho Aprox. 2.08 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 182.09 Tn
∑ Momentos -12.21 Tn - m Cx 5.00 m
P * dx -906.09 Tn - m Ix 53.33 m4
P * dy -364.18 Tn - m Cy 2.00 m
Ubicación Rx 5.04 m Iy 333.33 m4
Ubicación Ry 2.07 m
Traslado de Carga al C.G q1 0.41 Kg/cm2
Fuerza Resultante 182.09 Tn q2 0.44 Kg/cm2
ex 0.04 m q3 0.47 Kg/cm2
ey 0.07 m q4 0.50 Kg/cm2
M. Traslado x -7.84 Tn - m Cumple
M. Traslado y -12.21 Tn - m
COMBO 5: CM + CV - 0.8Sy
CM+CV-0.8 SY P Mx My dx dy Predimensionamiento
C1 35.18 0.06 1.02 0.20 2.00 σ Neto 0.67 Kg/cm2
C2 76.49 0.60 0.60 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 52.78 -0.52 -0.52 10.00 2.00 Área de la Zapta 18.80 m2
TOTAL 164.44 0.14 1.10 Largo 10.00 m
Ancho Aprox. 1.88 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 164.44 Tn
∑ Momentos 1.24 Tn - m Cx 5.00 m
P * dx -817.80 Tn - m Ix 53.33 m4
P * dy -328.88 Tn - m Cy 2.00 m
Ubicación Rx 4.97 m Iy 333.33 m4
Ubicación Ry 1.99 m
q1 0.43 Kg/cm2
Traslado de Carga al C.G q2 0.43 Kg/cm2
Fuerza Resultante 164.44 Tn q3 0.39 Kg/cm2
ex 0.03 m q4 0.39 Kg/cm2
ey 0.01 m Cumple
M. Traslado x 5.63 Tn - m
M. Traslado y 1.24 Tn - m
SI SI SI
0.73 m
0.73 m
0.36 m
0.36 m
0.73 m
0.73 m
0.36 m
8.- Verificación del Corte por Flexión
V actuante V Resistente
V actuante V Resistente
C1 Lateral
Verificación por Punzonado
Pu 42.82 Tn-m
qu 6.10 Tn/m2 V act. 40.96
αs 30 113.1
0.40 m d 0.72 m V res. 872.9
Po 1.20 m 171.3
0.40 m Ao 0.31 m2 φVnp 96.12
Bc 1.00 m Cumple
C2 Centrada
Verificación por Punzonado
Pu 79.59 Tn-m
qu 6.10 Tn/m2 V act. 77.73
α 40 99.9
0.35 m d 0.72 m V res. 1149.3
Po 1.40 m 199.9
0.35 m Ao 0.31 m2 φVnp 84.96
Bc 1.00 m Cumple
C3 Lateral
Verificación por Punzonado
Pu 60.67 Tn-m
qu 6.10 Tn/m2 V act. 59.15
α 30 25.0
0.35 m d 0.72 m V res. 811.0
Po 0.35 m 50.0
0.00 m Ao 0.25 m2 φVnp 21.24
Bc #DIV/0! m No Cumple
10.- Verificación del Corte por Aplastamiento
C1 Esquina C2 Esquina
Pu 42.82 Tn-m Pu 79.59 Tn-m
B 0.40 m B 0.35 m
0.40 m L 0.40 m 0.35 m L 0.35 m
A1 0.16 m2 A1 0.12 m2
0.40 m A2 0.16 m2 0.35 m A2 0.12 m2
Pn 33.32 m2 Pn 25.51 m2
Necesita Dowells Necesita Dowells
As Dowells 0.0025 As Dowells 0.0143
C3 Esquina
Pu 60.67 Tn-m
B 0.35 m
0.35 m L 0.00 m
A1 0.00 m2
0.00 m A2 0.00 m2
Pn #DIV/0! m2
#DIV/0!
As Dowells #DIV/0!
C1 C2 C3
P -52.50 Tn P -113.51 Tn P -78.00 Tn
Mx -0.13 Tn-m Mx -0.91 Tn-m Mx 0.75 Tn-m
0.80 m
6.10
6.10
q1 q2
0.20 m 0.20 m
3.70 m 6.300
10.00 m
10.20 m
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.20 6.10 4.88 -52.50 -47.62 0.49 -0.13 0.00 0.61
0.20 6.10 4.88 0.00 4.88 0.49 0.00 0.00 0.36
0.40 6.10 9.76 0.00 14.64 1.95 0.00 -10.50 -8.67
1.00 6.10 24.40 0.00 39.04 12.20 0.00 -42.00 -29.92
1.50 6.10 36.60 0.00 75.64 27.45 0.00 -68.25 -40.92
IZQUIERDA
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.20 6.10 4.88 -78.00 -73.12 0.49 0.75 0.00 -0.27
0.20 6.10 4.88 0.00 4.88 0.49 0.00 0.00 0.49
0.40 6.10 9.76 0.00 14.64 1.95 0.00 -15.60 -13.65
DERECHA
673.44 Tn
516.67 Tn
4.88 Tn 4.88 Tn
+
-
-47.62 Tn -73.12 Tn
-69.38 Tn -108.59 Tn
-45.82 Tn -99.86 Tn
-
+
0.36 Tn
0.49 Tn
0.61 Tn
8.- Acero: Generalidades
ACERO MÍNIMO
Capas 1 Capa As mín req. 57.60 cm2
ρmin 0.0018 N° Varillas 30 varillas
Varilla asumida 5/8" Espaciamiento 13.22 cm
As Varilla 1.98 cm2 S 12.5 cm
φ de Varilla 1.59 cm 1 φ 5/8" @ 0.125m
TRAMO C1 - C2 TRAMO C2 - C3
ACERO (-) ACERO (-)
Mu 99.86 Tn-m Mu 104.22 Tn-m
Varilla asumida 5/8" Varilla asumida 5/8"
As Varilla 1.98 cm2 As Varilla 1.98 cm2
φ de Varilla 1.59 cm φ de Varilla 1.59 cm
As req 1.16 cm2 As req 1.21 cm2
Acero Mínimo Acero Mínimo
As req 57.60 cm2 As req 57.60 cm2
N° Varillas 30 varillas N° Varillas 30 varillas
Espaciamiento 13.22 cm Espaciamiento 13.22 cm
S 12.5 cm S 12.5 cm
1 φ 5/8" @ 0.125m 1 φ 5/8" @ 0.125m
TRANSVERSAL
Mu 203.17 Tn-m
Varilla asumida 5/8"
As Varilla 1.98 cm2
φ de Varilla 1.59 cm
As req 2.35 cm2
Acero Mínimo
As req 144.00 cm2
N° Varillas 73 varillas
Espaciamiento 5.33 cm
S 5 cm
1 φ 5/8" @ 0.05m
ZAPATA COMBINADA EJE 4 - 4
DATOS GENERALES
γ nat γ concreto γ comp γ relleno γ piso + f.p S/C
1.70 Tn/m3 2.40 Tn/m3 2.00 Tn/m3 2.10 Tn/m3 2.30 Tn/m3 0.20 Tn/m3
SECCIÓN
Cimentación Columna
C1 C2
0.80 m 30 cm
60 cm
JOINT COMBO P Mx My
C1 C2 C3
30 cm 35 cm 35 cm
35 cm 40 cm 60 cm
5.00 m
10.00 m
4.00 m
SI SI SI
3.70 m 6.30 m
0.18 m 0.30 m
3.70 m
9.70 m
COMBO 1: CM + CV
CM+CV P Mx My dx dy Predimensionamiento
C1 38.54 -0.05 1.02 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 39.10 -0.04 -0.04 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 12.55 0.01 0.01 9.70 2.00 Área de la Zapta 13.40 m2
TOTAL 90.20 -0.09 0.98 Largo 10.00 m
Ancho Aprox. 1.34 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 90.20 Tn
∑ Momentos 0.89 Tn - m Cx 5.00 m
P * dx -273.18 Tn - m Ix 53.33 m4
P * dy -180.39 Tn - m Cy 2.00 m
Ubicación Rx 3.02 m Iy 333.33 m4
Ubicación Ry 1.99 m
Traslado de Carga al C.G q1 0.90 Kg/cm2
Fuerza Resultante 90.20 Tn q2 0.89 Kg/cm2
ex 1.98 m q3 -0.44 Kg/cm2
ey 0.01 m q4 -0.45 Kg/cm2
M. Traslado x 178.69 Tn - m No Cumple
M. Traslado y 0.89 Tn - m
COMBO 2: CM + CV + 0.8Sx
CM+CV+0.8 SX P Mx My dx dy Predimensionamiento
C1 62.45 -3.74 0.18 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 50.91 1.54 1.54 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 14.26 -3.77 -3.77 9.70 2.00 Área de la Zapta 14.59 m2
TOTAL 127.61 -5.97 -2.06 Largo 10.00 m
Ancho Aprox. 1.46 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 127.61 Tn
∑ Momentos -8.03 Tn - m Cx 5.00 m
P * dx -337.61 Tn - m Ix 53.33 m4
P * dy -255.22 Tn - m Cy 2.00 m
Ubicación Rx 2.71 m Iy 333.33 m4
Ubicación Ry 2.06 m
Traslado de Carga al C.G q1 1.40 Kg/cm2
Fuerza Resultante 127.61 Tn q2 1.43 Kg/cm2
ex 2.29 m q3 -0.79 Kg/cm2
ey 0.06 m q4 -0.77 Kg/cm2
M. Traslado x 292.42 Tn - m No Cumple
M. Traslado y -8.03 Tn - m
COMBO 3: CM + CV - 0.8Sx
CM+CV-0.8 SX P Mx My dx dy Predimensionamiento
C1 12.77 -7.98 1.75 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 27.30 -1.86 -1.86 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 10.85 -2.94 -2.94 9.70 2.00 Área de la Zapta 5.82 m2
TOTAL 50.91 -12.78 -3.04 Largo 10.00 m
Ancho Aprox. 0.58 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 50.91 Tn
∑ Momentos -15.82 Tn - m Cx 5.00 m
P * dx -208.43 Tn - m Ix 53.33 m4
P * dy -101.82 Tn - m Cy 2.00 m
Ubicación Rx 4.40 m Iy 333.33 m4
Ubicación Ry 2.31 m
Traslado de Carga al C.G q1 0.22 Kg/cm2
Fuerza Resultante 50.91 Tn q2 0.26 Kg/cm2
ex 0.60 m q3 -0.01 Kg/cm2
ey 0.31 m q4 0.04 Kg/cm2
M. Traslado x 30.30 Tn - m No Cumple
M. Traslado y -15.82 Tn - m
COMBO 4: CM + CV + 0.8Sy
CM+CV+0.8 SY P Mx My dx dy Predimensionamiento
C1 62.45 -3.74 0.18 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 50.91 1.54 1.54 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 14.26 -3.77 -3.77 9.70 2.00 Área de la Zapta 14.59 m2
TOTAL 127.61 -5.97 -2.06 Largo 10.00 m
Ancho Aprox. 1.46 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 127.61 Tn
∑ Momentos -8.03 Tn - m Cx 5.00 m
P * dx -337.61 Tn - m Ix 53.33 m4
P * dy -255.22 Tn - m Cy 2.00 m
Ubicación Rx 2.71 m Iy 333.33 m4
Ubicación Ry 2.06 m
Traslado de Carga al C.G q1 1.40 Kg/cm2
Fuerza Resultante 127.61 Tn q2 1.43 Kg/cm2
ex 2.29 m q3 -0.79 Kg/cm2
ey 0.06 m q4 -0.77 Kg/cm2
M. Traslado x 292.42 Tn - m No Cumple
M. Traslado y -8.03 Tn - m
COMBO 5: CM + CV - 0.8Sy
CM+CV-0.8 SY P Mx My dx dy Predimensionamiento
C1 21.43 -1.02 1.42 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 20.79 -0.25 -0.25 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 -38.94 -17.21 -17.21 9.70 2.00 Área de la Zapta 0.38 m2
TOTAL 3.28 -18.48 -16.04 Largo 10.00 m
Ancho Aprox. 0.04 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 3.28 Tn
∑ Momentos -34.52 Tn - m Cx 5.00 m
P * dx 297.04 Tn - m Ix 53.33 m4
P * dy -6.57 Tn - m Cy 2.00 m
Ubicación Rx 79.94 m Iy 333.33 m4
Ubicación Ry 12.51 m
q1 -0.97 Kg/cm2
Traslado de Carga al C.G q2 -0.86 Kg/cm2
Fuerza Resultante 3.28 Tn q3 0.88 Kg/cm2
ex 74.94 m q4 0.98 Kg/cm2
ey 10.51 m No Cumple
M. Traslado x -246.10 Tn - m
M. Traslado y -34.52 Tn - m
SI SI SI
0.73 m
0.73 m
0.36 m
0.36 m
0.73 m
0.73 m
0.36 m
8.- Verificación del Corte por Flexión
V actuante V Resistente
V actuante V Resistente
C1 Lateral
Verificación por Punzonado
Pu 62.45 Tn-m
qu 0.39 Tn/m2 V act. 62.36
αs 30 94.2
0.30 m d 0.72 m V res. 858.3
Po 1.00 m 142.8
0.35 m Ao 0.21 m2 φVnp 80.10
Bc 1.17 m Cumple
C2 Centrada
Verificación por Punzonado
Pu 57.41 Tn-m
qu 0.39 Tn/m2 V act. 57.32
α 40 107.1
0.35 m d 0.72 m V res. 1156.5
Po 1.50 m 214.2
0.40 m Ao 0.21 m2 φVnp 91.02
Bc 1.14 m Cumple
C3 Lateral
Verificación por Punzonado
Pu 64.05 Tn-m
qu 0.39 Tn/m2 V act. 63.94
α 30 110.7
0.35 m d 0.72 m V res. 898.3
Po 1.55 m 221.3
0.60 m Ao 0.27 m2 φVnp 94.06
Bc 1.71 m Cumple
10.- Verificación del Corte por Aplastamiento
C1 Esquina C2 Esquina
Pu 62.45 Tn-m Pu 57.41 Tn-m
B 0.30 m B 0.35 m
0.30 m L 0.35 m 0.35 m L 0.40 m
A1 0.11 m2 A1 0.14 m2
0.35 m A2 0.11 m2 0.40 m A2 0.14 m2
Pn 21.87 m2 Pn 29.16 m2
Necesita Dowells Necesita Dowells
As Dowells 0.0107 As Dowells 0.0075
C3 Esquina
Pu 64.05 Tn-m
B 0.35 m
0.35 m L 0.60 m
A1 0.21 m2
0.60 m A2 0.21 m2
Pn 43.73 m2
Necesita Dowells
As Dowells 0.0054
C1 C2 C3
P -55.31 Tn P 57.58 Tn P -17.96 Tn
Mx -1.49 Tn-m Mx 0.23 Tn-m Mx 4.80 Tn-m
0.80 m
0.39
0.39
q1 q2
0.18 m 0.18 m
3.70 m 6.000
9.70 m
9.88 m
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.18 0.39 0.27 -55.31 -55.04 0.02 -1.49 0.00 1.51
0.18 0.39 0.27 0.00 0.27 0.02 0.00 0.00 -1.47
0.35 0.39 0.55 0.00 0.82 0.10 0.00 -9.68 -11.07
1.00 0.39 1.57 0.00 2.39 0.78 0.00 -45.63 -46.34
1.50 0.39 2.35 0.00 4.75 1.77 0.00 -73.29 -73.01
IZQUIERDA
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.18 0.39 0.27 -17.96 -17.69 0.02 4.80 0.00 -4.78
0.18 0.39 0.27 0.00 0.27 0.02 0.00 0.00 0.02
0.35 0.39 0.55 0.00 0.82 0.10 0.00 -3.14 -3.05
DERECHA
43.20 Tn
33.02 Tn
0.27 Tn 0.27 Tn
+
-
-55.04 Tn -17.69 Tn
50.00 50.00
-1.47 0.00
-4.78
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.00 4.50 4.00 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00
-50.11
-50.00 -67.05 -50.00
-99.29
-100.00 -100.00
-150.00 -150.00
-67.05 Tn
-99.29 Tn -185.95 Tn
-
+
-1.47 Tn
0.02 Tn
1.51 Tn -67.05 Tn
8.- Acero: Generalidades
ACERO MÍNIMO
Capas 1 Capa As mín req. 57.60 cm2
ρmin 0.0018 N° Varillas 30 varillas
Varilla asumida 5/8" Espaciamiento 13.22 cm
As Varilla 1.98 cm2 S 12.5 cm
φ de Varilla 1.59 cm 1 φ 5/8" @ 0.125m
TRAMO C1 - C2 TRAMO C2 - C3
ACERO (-) ACERO (-)
Mu 185.95 Tn-m Mu 126.50 Tn-m
Varilla asumida 5/8" Varilla asumida 5/8"
As Varilla 1.98 cm2 As Varilla 1.98 cm2
φ de Varilla 1.59 cm φ de Varilla 1.59 cm
As req 2.16 cm2 As req 1.47 cm2
Acero Mínimo Acero Mínimo
As req 57.60 cm2 As req 57.60 cm2
N° Varillas 30 varillas N° Varillas 30 varillas
Espaciamiento 13.22 cm Espaciamiento 13.22 cm
S 12.5 cm S 12.5 cm
1 φ 5/8" @ 0.125m 1 φ 5/8" @ 0.125m
TRANSVERSAL
Mu 13.43 Tn-m
Varilla asumida 5/8"
As Varilla 1.98 cm2
φ de Varilla 1.59 cm
As req 0.16 cm2
Acero Mínimo
As req 144.00 cm2
N° Varillas 73 varillas
Espaciamiento 5.33 cm
S 5 cm
1 φ 5/8" @ 0.05m
ZAPATA COMBINADA EJE 5 - 5
DATOS GENERALES
γ nat γ concreto γ comp γ relleno γ piso + f.p S/C
1.70 Tn/m3 2.40 Tn/m3 2.00 Tn/m3 2.10 Tn/m3 2.30 Tn/m3 0.20 Tn/m3
SECCIÓN
Cimentación Columna
C1 C2
0.80 m 30 cm
60 cm
JOINT COMBO P Mx My
C1 C2 C3
30 cm 35 cm 35 cm
35 cm 40 cm 60 cm
5.00 m
10.00 m
4.00 m
SI SI SI
3.70 m 6.30 m
0.18 m 0.30 m
3.70 m
9.70 m
COMBO 1: CM + CV
CM+CV P Mx My dx dy Predimensionamiento
C1 9.24 0.01 0.86 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 40.33 0.05 0.05 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 12.55 0.01 0.01 9.70 2.00 Área de la Zapta 9.23 m2
TOTAL 62.12 0.07 0.91 Largo 10.00 m
Ancho Aprox. 0.92 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 62.12 Tn
∑ Momentos 0.98 Tn - m Cx 5.00 m
P * dx -272.61 Tn - m Ix 53.33 m4
P * dy -124.25 Tn - m Cy 2.00 m
Ubicación Rx 4.37 m Iy 333.33 m4
Ubicación Ry 1.98 m
Traslado de Carga al C.G q1 0.30 Kg/cm2
Fuerza Resultante 62.12 Tn q2 0.30 Kg/cm2
ex 0.63 m q3 0.01 Kg/cm2
ey 0.02 m q4 0.01 Kg/cm2
M. Traslado x 38.98 Tn - m Cumple
M. Traslado y 0.98 Tn - m
COMBO 2: CM + CV + 0.8Sx
CM+CV+0.8 SX P Mx My dx dy Predimensionamiento
C1 42.77 -2.61 0.06 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 67.51 -2.97 -2.97 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 14.26 -3.77 -3.77 9.70 2.00 Área de la Zapta 14.24 m2
TOTAL 124.55 -9.35 -6.69 Largo 10.00 m
Ancho Aprox. 1.42 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 124.55 Tn
∑ Momentos -16.04 Tn - m Cx 5.00 m
P * dx -395.62 Tn - m Ix 53.33 m4
P * dy -249.10 Tn - m Cy 2.00 m
Ubicación Rx 3.31 m Iy 333.33 m4
Ubicación Ry 2.13 m
Traslado de Carga al C.G q1 1.08 Kg/cm2
Fuerza Resultante 124.55 Tn q2 1.13 Kg/cm2
ex 1.69 m q3 -0.50 Kg/cm2
ey 0.13 m q4 -0.46 Kg/cm2
M. Traslado x 211.08 Tn - m No Cumple
M. Traslado y -16.04 Tn - m
COMBO 3: CM + CV - 0.8Sx
CM+CV-0.8 SX P Mx My dx dy Predimensionamiento
C1 16.13 -1.94 0.21 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 13.15 4.03 4.03 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 10.85 -2.94 -2.94 9.70 2.00 Área de la Zapta 4.59 m2
TOTAL 40.12 -0.85 1.30 Largo 10.00 m
Ancho Aprox. 0.46 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 40.12 Tn
∑ Momentos 0.45 Tn - m Cx 5.00 m
P * dx -156.68 Tn - m Ix 53.33 m4
P * dy -80.25 Tn - m Cy 2.00 m
Ubicación Rx 3.89 m Iy 333.33 m4
Ubicación Ry 1.99 m
Traslado de Carga al C.G q1 0.27 Kg/cm2
Fuerza Resultante 40.12 Tn q2 0.27 Kg/cm2
ex 1.11 m q3 -0.07 Kg/cm2
ey 0.01 m q4 -0.07 Kg/cm2
M. Traslado x 44.39 Tn - m No Cumple
M. Traslado y 0.45 Tn - m
COMBO 4: CM + CV + 0.8Sy
CM+CV+0.8 SY P Mx My dx dy Predimensionamiento
C1 42.77 -2.61 0.06 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 67.51 -2.97 -2.97 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 14.26 -3.77 -3.77 9.70 2.00 Área de la Zapta 14.24 m2
TOTAL 124.55 -9.35 -6.69 Largo 10.00 m
Ancho Aprox. 1.42 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 124.55 Tn
∑ Momentos -16.04 Tn - m Cx 5.00 m
P * dx -395.62 Tn - m Ix 53.33 m4
P * dy -249.10 Tn - m Cy 2.00 m
Ubicación Rx 3.31 m Iy 333.33 m4
Ubicación Ry 2.13 m
Traslado de Carga al C.G q1 1.08 Kg/cm2
Fuerza Resultante 124.55 Tn q2 1.13 Kg/cm2
ex 1.69 m q3 -0.50 Kg/cm2
ey 0.13 m q4 -0.46 Kg/cm2
M. Traslado x 211.08 Tn - m No Cumple
M. Traslado y -16.04 Tn - m
COMBO 5: CM + CV - 0.8Sy
CM+CV-0.8 SY P Mx My dx dy Predimensionamiento
C1 -16.55 3.25 0.16 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 36.11 0.58 0.58 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 -38.94 -17.21 -17.21 9.70 2.00 Área de la Zapta 2.22 m2
TOTAL -19.39 -13.38 -16.47 Largo 10.00 m
Ancho Aprox. 0.22 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante -19.39 Tn
∑ Momentos -29.85 Tn - m Cx 5.00 m
P * dx 247.03 Tn - m Ix 53.33 m4
P * dy 38.78 Tn - m Cy 2.00 m
Ubicación Rx 11.20 m Iy 333.33 m4
Ubicación Ry 0.46 m
q1 0.36 Kg/cm2
Traslado de Carga al C.G q2 0.45 Kg/cm2
Fuerza Resultante -19.39 Tn q3 -0.54 Kg/cm2
ex 6.20 m q4 -0.45 Kg/cm2
ey 1.54 m No Cumple
M. Traslado x 120.24 Tn - m
M. Traslado y -29.85 Tn - m
SI SI SI
0.73 m
0.73 m
0.36 m
0.36 m
0.73 m
0.73 m
0.36 m
8.- Verificación del Corte por Flexión
V actuante V Resistente
V actuante V Resistente
C1 Lateral
Verificación por Punzonado
Pu 42.77 Tn-m
qu 2.24 Tn/m2 V act. 42.29
αs 30 94.2
0.30 m d 0.72 m V res. 858.3
Po 1.00 m 142.8
0.35 m Ao 0.21 m2 φVnp 80.10
Bc 1.17 m Cumple
C2 Centrada
Verificación por Punzonado
Pu 67.51 Tn-m
qu 2.24 Tn/m2 V act. 67.03
α 40 107.1
0.35 m d 0.72 m V res. 1156.5
Po 1.50 m 214.2
0.40 m Ao 0.21 m2 φVnp 91.02
Bc 1.14 m Cumple
C3 Lateral
Verificación por Punzonado
Pu 64.05 Tn-m
qu 2.24 Tn/m2 V act. 63.45
α 30 110.7
0.35 m d 0.72 m V res. 898.3
Po 1.55 m 221.3
0.60 m Ao 0.27 m2 φVnp 94.06
Bc 1.71 m Cumple
10.- Verificación del Corte por Aplastamiento
C1 Esquina C2 Esquina
Pu 42.77 Tn-m Pu 67.51 Tn-m
B 0.30 m B 0.35 m
0.30 m L 0.35 m 0.35 m L 0.40 m
A1 0.11 m2 A1 0.14 m2
0.35 m A2 0.11 m2 0.40 m A2 0.14 m2
Pn 21.87 m2 Pn 29.16 m2
Necesita Dowells Necesita Dowells
As Dowells 0.0055 As Dowells 0.0101
C3 Esquina
Pu 64.05 Tn-m
B 0.35 m
0.35 m L 0.60 m
A1 0.21 m2
0.60 m A2 0.21 m2
Pn 43.73 m2
Necesita Dowells
As Dowells 0.0054
C1 C2 C3
P -13.26 Tn P -58.38 Tn P -17.96 Tn
Mx -1.23 Tn-m Mx -0.77 Tn-m Mx 4.80 Tn-m
0.80 m
2.24
2.24
q1 q2
0.18 m 0.18 m
3.70 m 6.000
9.70 m
9.88 m
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.18 2.24 1.57 -13.26 -11.69 0.14 -1.23 0.00 1.37
0.18 2.24 1.57 0.00 1.57 0.14 0.00 0.00 -1.09
0.35 2.24 3.14 0.00 4.70 0.55 0.00 -2.32 -3.00
1.00 2.24 8.96 0.00 13.66 4.48 0.00 -10.94 -7.68
1.50 2.24 13.44 0.00 27.10 10.08 0.00 -17.56 -8.71
IZQUIERDA
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.18 2.24 1.57 -17.96 -16.39 0.14 4.80 0.00 -4.66
0.18 2.24 1.57 0.00 1.57 0.14 0.00 0.00 0.14
0.35 2.24 3.14 0.00 4.70 0.55 0.00 -3.14 -2.59
DERECHA
246.61 Tn
188.48 Tn
1.57 Tn 1.57 Tn
+
-
-11.69 Tn -16.39 Tn
-100.00 -100.00
-150.00 -150.00
-14.86 Tn
-7.50 Tn -28.16 Tn
-
+
-1.09 Tn
25.32 Tn
14.14 Tn 25.32 Tn
8.- Acero: Generalidades
ACERO MÍNIMO
Capas 1 Capa As mín req. 57.60 cm2
ρmin 0.0018 N° Varillas 30 varillas
Varilla asumida 5/8" Espaciamiento 13.22 cm
As Varilla 1.98 cm2 S 12.5 cm
φ de Varilla 1.59 cm 1 φ 5/8" @ 0.125m
TRAMO C1 - C2 TRAMO C2 - C3
ACERO (-) ACERO (-)
Mu 28.16 Tn-m Mu 21.51 Tn-m
Varilla asumida 5/8" Varilla asumida 5/8"
As Varilla 1.98 cm2 As Varilla 1.98 cm2
φ de Varilla 1.59 cm φ de Varilla 1.59 cm
As req 0.33 cm2 As req 0.25 cm2
Acero Mínimo Acero Mínimo
As req 57.60 cm2 As req 57.60 cm2
N° Varillas 30 varillas N° Varillas 30 varillas
Espaciamiento 13.22 cm Espaciamiento 13.22 cm
S 12.5 cm S 12.5 cm
1 φ 5/8" @ 0.125m 1 φ 5/8" @ 0.125m
TRANSVERSAL
Mu 76.66 Tn-m
Varilla asumida 5/8"
As Varilla 1.98 cm2
φ de Varilla 1.59 cm
As req 0.89 cm2
Acero Mínimo
As req 144.00 cm2
N° Varillas 73 varillas
Espaciamiento 5.33 cm
S 5 cm
1 φ 5/8" @ 0.05m
ZAPATA COMBINADA EJE 6 - 6
DATOS GENERALES
γ nat γ concreto γ comp γ relleno γ piso + f.p S/C
1.70 Tn/m3 2.40 Tn/m3 2.00 Tn/m3 2.10 Tn/m3 2.30 Tn/m3 0.20 Tn/m3
SECCIÓN
Cimentación Columna
C1 C2
0.80 m 30 cm
35 cm
JOINT COMBO P Mx My
C1 C2 C3
30 cm 35 cm 35 cm
35 cm 40 cm 35 cm
5.00 m
10.00 m
4.00 m
SI SI SI
3.70 m 6.30 m
0.18 m 0.18 m
3.70 m
9.83 m
COMBO 1: CM + CV
CM+CV P Mx My dx dy Predimensionamiento
C1 30.70 0.22 0.07 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 67.16 0.23 0.23 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 11.48 0.01 0.01 9.83 2.00 Área de la Zapta 16.25 m2
TOTAL 109.33 0.45 0.31 Largo 10.00 m
Ancho Aprox. 1.62 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 109.33 Tn
∑ Momentos 0.76 Tn - m Cx 5.00 m
P * dx -366.62 Tn - m Ix 53.33 m4
P * dy -218.67 Tn - m Cy 2.00 m
Ubicación Rx 3.35 m Iy 333.33 m4
Ubicación Ry 1.99 m
Traslado de Carga al C.G q1 0.95 Kg/cm2
Fuerza Resultante 109.33 Tn q2 0.95 Kg/cm2
ex 1.65 m q3 -0.40 Kg/cm2
ey 0.01 m q4 -0.41 Kg/cm2
M. Traslado x 180.81 Tn - m No Cumple
M. Traslado y 0.76 Tn - m
COMBO 2: CM + CV + 0.8Sx
CM+CV+0.8 SX P Mx My dx dy Predimensionamiento
C1 42.77 -1.48 0.45 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 70.63 -2.52 -2.52 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 15.04 -1.71 -1.71 9.83 2.00 Área de la Zapta 14.68 m2
TOTAL 128.44 -5.71 -3.78 Largo 10.00 m
Ancho Aprox. 1.47 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 128.44 Tn
∑ Momentos -9.49 Tn - m Cx 5.00 m
P * dx -416.61 Tn - m Ix 53.33 m4
P * dy -256.88 Tn - m Cy 2.00 m
Ubicación Rx 3.32 m Iy 333.33 m4
Ubicación Ry 2.07 m
Traslado de Carga al C.G q1 1.12 Kg/cm2
Fuerza Resultante 128.44 Tn q2 1.15 Kg/cm2
ex 1.68 m q3 -0.50 Kg/cm2
ey 0.07 m q4 -0.48 Kg/cm2
M. Traslado x 216.11 Tn - m No Cumple
M. Traslado y -9.49 Tn - m
COMBO 3: CM + CV - 0.8Sx
CM+CV-0.8 SX P Mx My dx dy Predimensionamiento
C1 0.62 -1.80 1.51 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 63.69 3.66 3.66 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 7.91 -0.94 -0.94 9.83 2.00 Área de la Zapta 8.25 m2
TOTAL 72.22 0.92 4.24 Largo 10.00 m
Ancho Aprox. 0.83 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 72.22 Tn
∑ Momentos 5.16 Tn - m Cx 5.00 m
P * dx -313.49 Tn - m Ix 53.33 m4
P * dy -144.45 Tn - m Cy 2.00 m
Ubicación Rx 4.27 m Iy 333.33 m4
Ubicación Ry 1.93 m
Traslado de Carga al C.G q1 0.39 Kg/cm2
Fuerza Resultante 72.22 Tn q2 0.37 Kg/cm2
ex 0.73 m q3 -0.01 Kg/cm2
ey 0.07 m q4 -0.03 Kg/cm2
M. Traslado x 52.78 Tn - m No Cumple
M. Traslado y 5.16 Tn - m
COMBO 4: CM + CV + 0.8Sy
CM+CV+0.8 SY P Mx My dx dy Predimensionamiento
C1 42.77 -1.48 0.45 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 70.63 -2.52 -2.52 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 15.04 -1.71 -1.71 9.83 2.00 Área de la Zapta 14.68 m2
TOTAL 128.44 -5.71 -3.78 Largo 10.00 m
Ancho Aprox. 1.47 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 128.44 Tn
∑ Momentos -9.49 Tn - m Cx 5.00 m
P * dx -416.61 Tn - m Ix 53.33 m4
P * dy -256.88 Tn - m Cy 2.00 m
Ubicación Rx 3.32 m Iy 333.33 m4
Ubicación Ry 2.07 m
Traslado de Carga al C.G q1 1.12 Kg/cm2
Fuerza Resultante 128.44 Tn q2 1.15 Kg/cm2
ex 1.68 m q3 -0.50 Kg/cm2
ey 0.07 m q4 -0.48 Kg/cm2
M. Traslado x 216.11 Tn - m No Cumple
M. Traslado y -9.49 Tn - m
COMBO 5: CM + CV - 0.8Sy
CM+CV-0.8 SY P Mx My dx dy Predimensionamiento
C1 16.23 0.21 1.44 0.18 2.00 σ Neto 0.67 Kg/cm2
C2 59.84 0.54 0.54 3.70 2.00 σ Neto. Sismo 0.87 Kg/cm2
C3 -26.92 3.20 3.20 9.83 2.00 Área de la Zapta 5.62 m2
TOTAL 49.16 3.96 5.19 Largo 10.00 m
Ancho Aprox. 0.56 m
Ubicación R Ancho Final 4.00 m
Fuerza Resultante 49.16 Tn
∑ Momentos 9.15 Tn - m Cx 5.00 m
P * dx 40.23 Tn - m Ix 53.33 m4
P * dy -98.31 Tn - m Cy 2.00 m
Ubicación Rx 1.00 m Iy 333.33 m4
Ubicación Ry 1.81 m
q1 0.87 Kg/cm2
Traslado de Carga al C.G q2 0.85 Kg/cm2
Fuerza Resultante 49.16 Tn q3 -0.60 Kg/cm2
ex 4.00 m q4 -0.63 Kg/cm2
ey 0.19 m No Cumple
M. Traslado x 196.40 Tn - m
M. Traslado y 9.15 Tn - m
SI SI SI
0.73 m
0.73 m
0.36 m
0.36 m
0.73 m
0.73 m
0.36 m
8.- Verificación del Corte por Flexión
V actuante V Resistente
V actuante V Resistente
C1 Lateral
Verificación por Punzonado
Pu 45.16 Tn-m
qu 3.96 Tn/m2 V act. 44.32
αs 30 94.2
0.30 m d 0.72 m V res. 858.3
Po 1.00 m 142.8
0.35 m Ao 0.21 m2 φVnp 80.10
Bc 1.17 m Cumple
C2 Centrada
Verificación por Punzonado
Pu 74.47 Tn-m
qu 3.96 Tn/m2 V act. 73.63
α 40 107.1
0.35 m d 0.72 m V res. 1156.5
Po 1.50 m 214.2
0.40 m Ao 0.21 m2 φVnp 91.02
Bc 1.14 m Cumple
C3 Lateral
Verificación por Punzonado
Pu 49.88 Tn-m
qu 3.96 Tn/m2 V act. 48.82
α 30 75.0
0.35 m d 0.72 m V res. 861.9
Po 1.05 m 149.9
0.35 m Ao 0.27 m2 φVnp 63.72
Bc 1.00 m Cumple
10.- Verificación del Corte por Aplastamiento
C1 Esquina C2 Esquina
Pu 45.16 Tn-m Pu 74.47 Tn-m
B 0.30 m B 0.35 m
0.30 m L 0.35 m 0.35 m L 0.40 m
A1 0.11 m2 A1 0.14 m2
0.35 m A2 0.11 m2 0.40 m A2 0.14 m2
Pn 21.87 m2 Pn 29.16 m2
Necesita Dowells Necesita Dowells
As Dowells 0.0062 As Dowells 0.0120
C3 Esquina
Pu 49.88 Tn-m
B 0.35 m
0.35 m L 0.35 m
A1 0.12 m2
0.35 m A2 0.12 m2
Pn 25.51 m2
Necesita Dowells
As Dowells 0.0064
C1 C2 C3
P -44.25 Tn P -97.39 Tn P -16.58 Tn
Mx -0.10 Tn-m Mx -0.84 Tn-m Mx 1.91 Tn-m
0.80 m
3.96
3.96
q1 q2
0.18 m 0.18 m
3.70 m 6.125
9.83 m
10.00 m
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.18 3.96 2.77 -44.25 -41.48 0.24 -0.10 0.00 0.35
0.18 3.96 2.77 0.00 2.77 0.24 0.00 0.00 0.14
0.35 3.96 5.54 0.00 8.31 0.97 0.00 -7.74 -6.88
1.00 3.96 15.82 0.00 24.13 7.91 0.00 -36.51 -28.70
1.50 3.96 23.73 0.00 47.86 17.80 0.00 -58.64 -40.94
IZQUIERDA
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.18 3.96 2.77 -16.58 -13.81 0.24 1.91 0.00 -1.67
0.18 3.96 2.77 0.00 2.77 0.24 0.00 0.00 0.24
0.35 3.96 5.54 0.00 8.31 0.97 0.00 -2.90 -1.93
DERECHA
435.51 Tn
333.85 Tn
2.77 Tn 2.77 Tn
+
-
-41.48 Tn -13.81 Tn
-100.00 -100.00
-150.00 -150.00
-5.77 Tn
-49.22 Tn -143.29 Tn
-
+
0.14 Tn
117.78 Tn
0.35 Tn 117.78 Tn
8.- Acero: Generalidades
ACERO MÍNIMO
Capas 1 Capa As mín req. 57.60 cm2
ρmin 0.0018 N° Varillas 30 varillas
Varilla asumida 5/8" Espaciamiento 13.22 cm
As Varilla 1.98 cm2 S 12.5 cm
φ de Varilla 1.59 cm 1 φ 5/8" @ 0.125m
TRAMO C1 - C2 TRAMO C2 - C3
ACERO (-) ACERO (-)
Mu 143.29 Tn-m Mu 74.53 Tn-m
Varilla asumida 5/8" Varilla asumida 5/8"
As Varilla 1.98 cm2 As Varilla 1.98 cm2
φ de Varilla 1.59 cm φ de Varilla 1.59 cm
As req 1.66 cm2 As req 0.86 cm2
Acero Mínimo Acero Mínimo
As req 57.60 cm2 As req 57.60 cm2
N° Varillas 30 varillas N° Varillas 30 varillas
Espaciamiento 13.22 cm Espaciamiento 13.22 cm
S 12.5 cm S 12.5 cm
1 φ 5/8" @ 0.125m 1 φ 5/8" @ 0.125m
TRANSVERSAL
Mu 135.38 Tn-m
Varilla asumida 5/8"
As Varilla 1.98 cm2
φ de Varilla 1.59 cm
As req 1.57 cm2
Acero Mínimo
As req 144.00 cm2
N° Varillas 73 varillas
Espaciamiento 5.33 cm
S 5 cm
1 φ 5/8" @ 0.05m
ZAPATA COMBINADA EJE 7 - 7
DATOS GENERALES
γ nat γ concreto γ comp γ relleno γ piso + f.p S/C
1.70 Tn/m3 2.40 Tn/m3 2.00 Tn/m3 2.10 Tn/m3 2.30 Tn/m3 0.20 Tn/m3
SECCIÓN
Cimentación Columna
C1 C2
0.80 m 35 cm
55 cm
JOINT COMBO P Mx My
C1 C2 C3
35 cm 35 cm 35 cm
55 cm 55 cm 55 cm
5.00 m
10.00 m
3.50 m
SI SI SI
3.70 m 6.30 m
0.28 m 0.28 m
3.70 m
9.73 m
COMBO 1: CM + CV
CM+CV P Mx My dx dy Predimensionamiento
C1 32.73 -0.33 0.29 0.28 1.75 σ Neto 0.67 Kg/cm2
C2 49.53 -0.48 -0.48 3.70 1.75 σ Neto. Sismo 0.87 Kg/cm2
C3 40.91 -0.10 -0.10 9.73 1.75 Área de la Zapta 18.30 m2
TOTAL 123.17 -0.91 -0.29 Largo 10.00 m
Ancho Aprox. 1.83 m
Ubicación R Ancho Final 3.50 m
Fuerza Resultante 123.17 Tn
∑ Momentos -1.20 Tn - m Cx 5.00 m
P * dx -590.08 Tn - m Ix 35.73 m4
P * dy -215.55 Tn - m Cy 1.75 m
Ubicación Rx 4.80 m Iy 291.67 m4
Ubicación Ry 1.76 m
Traslado de Carga al C.G q1 0.47 Kg/cm2
Fuerza Resultante 123.17 Tn q2 0.47 Kg/cm2
ex 0.20 m q3 0.23 Kg/cm2
ey 0.01 m q4 0.23 Kg/cm2
M. Traslado x 24.57 Tn - m Cumple
M. Traslado y -1.20 Tn - m
COMBO 2: CM + CV + 0.8Sx
CM+CV+0.8 SX P Mx My dx dy Predimensionamiento
C1 45.99 -5.72 -0.25 0.28 1.75 σ Neto 0.67 Kg/cm2
C2 50.76 -6.46 -6.46 3.70 1.75 σ Neto. Sismo 0.87 Kg/cm2
C3 54.58 -7.30 -7.30 9.73 1.75 Área de la Zapta 17.30 m2
TOTAL 151.33 -19.48 -14.02 Largo 10.00 m
Ancho Aprox. 1.73 m
Ubicación R Ancho Final 3.50 m
Fuerza Resultante 151.33 Tn
∑ Momentos -33.50 Tn - m Cx 5.00 m
P * dx -731.22 Tn - m Ix 35.73 m4
P * dy -264.83 Tn - m Cy 1.75 m
Ubicación Rx 5.05 m Iy 291.67 m4
Ubicación Ry 1.97 m
Traslado de Carga al C.G q1 0.34 Kg/cm2
Fuerza Resultante 151.33 Tn q2 0.45 Kg/cm2
ex 0.05 m q3 0.41 Kg/cm2
ey 0.22 m q4 0.53 Kg/cm2
M. Traslado x -8.08 Tn - m Cumple
M. Traslado y -33.50 Tn - m
COMBO 3: CM + CV - 0.8Sx
CM+CV-0.8 SX P Mx My dx dy Predimensionamiento
C1 13.81 -7.27 2.21 0.28 1.75 σ Neto 0.67 Kg/cm2
C2 48.30 8.84 8.84 3.70 1.75 σ Neto. Sismo 0.87 Kg/cm2
C3 27.24 6.36 6.36 9.73 1.75 Área de la Zapta 10.21 m2
TOTAL 89.35 7.92 17.41 Largo 10.00 m
Ancho Aprox. 1.02 m
Ubicación R Ancho Final 3.50 m
Fuerza Resultante 89.35 Tn
∑ Momentos 25.33 Tn - m Cx 5.00 m
P * dx -447.39 Tn - m Ix 35.73 m4
P * dy -156.37 Tn - m Cy 1.75 m
Ubicación Rx 4.72 m Iy 291.67 m4
Ubicación Ry 1.47 m
Traslado de Carga al C.G q1 0.42 Kg/cm2
Fuerza Resultante 89.35 Tn q2 0.33 Kg/cm2
ex 0.28 m q3 0.18 Kg/cm2
ey 0.28 m q4 0.09 Kg/cm2
M. Traslado x 24.70 Tn - m Cumple
M. Traslado y 25.33 Tn - m
COMBO 4: CM + CV + 0.8Sy
CM+CV+0.8 SY P Mx My dx dy Predimensionamiento
C1 45.99 -5.72 -0.25 0.28 1.75 σ Neto 0.67 Kg/cm2
C2 50.76 -6.46 -6.46 3.70 1.75 σ Neto. Sismo 0.87 Kg/cm2
C3 54.58 -7.30 -7.30 9.73 1.75 Área de la Zapta 17.30 m2
TOTAL 151.33 -19.48 -14.02 Largo 10.00 m
Ancho Aprox. 1.73 m
Ubicación R Ancho Final 3.50 m
Fuerza Resultante 151.33 Tn
∑ Momentos -33.50 Tn - m Cx 5.00 m
P * dx -731.22 Tn - m Ix 35.73 m4
P * dy -264.83 Tn - m Cy 1.75 m
Ubicación Rx 5.05 m Iy 291.67 m4
Ubicación Ry 1.97 m
Traslado de Carga al C.G q1 0.34 Kg/cm2
Fuerza Resultante 151.33 Tn q2 0.45 Kg/cm2
ex 0.05 m q3 0.41 Kg/cm2
ey 0.22 m q4 0.53 Kg/cm2
M. Traslado x -8.08 Tn - m Cumple
M. Traslado y -33.50 Tn - m
COMBO 5: CM + CV - 0.8Sy
CM+CV-0.8 SY P Mx My dx dy Predimensionamiento
C1 29.97 0.53 1.78 0.28 1.75 σ Neto 0.67 Kg/cm2
C2 44.52 1.42 1.42 3.70 1.75 σ Neto. Sismo 0.87 Kg/cm2
C3 30.86 -0.28 -0.28 9.73 1.75 Área de la Zapta 12.04 m2
TOTAL 105.35 1.67 2.92 Largo 10.00 m
Ancho Aprox. 1.20 m
Ubicación R Ancho Final 3.50 m
Fuerza Resultante 105.35 Tn
∑ Momentos 4.59 Tn - m Cx 5.00 m
P * dx -473.08 Tn - m Ix 35.73 m4
P * dy -184.36 Tn - m Cy 1.75 m
Ubicación Rx 4.45 m Iy 291.67 m4
Ubicación Ry 1.71 m
q1 0.59 Kg/cm2
Traslado de Carga al C.G q2 0.58 Kg/cm2
Fuerza Resultante 105.35 Tn q3 0.02 Kg/cm2
ex 0.55 m q4 0.01 Kg/cm2
ey 0.04 m Cumple
M. Traslado x 58.25 Tn - m
M. Traslado y 4.59 Tn - m
SI SI SI
0.73 m
0.73 m
0.36 m
0.36 m
0.73 m
0.73 m
0.36 m
8.- Verificación del Corte por Flexión
V actuante V Resistente
V actuante V Resistente
C1 Lateral
Verificación por Punzonado
Pu 45.99 Tn-m
qu 5.04 Tn/m2 V act. 44.38
αs 30 132.5
0.35 m d 0.72 m V res. 891.0
Po 1.45 m 207.0
0.55 m Ao 0.32 m2 φVnp 112.63
Bc 1.57 m Cumple
C2 Centrada
Verificación por Punzonado
Pu 54.54 Tn-m
qu 5.04 Tn/m2 V act. 52.93
α 40 128.5
0.35 m d 0.72 m V res. 1178.4
Po 1.80 m 257.0
0.55 m Ao 0.32 m2 φVnp 109.23
Bc 1.57 m Cumple
C3 Lateral
Verificación por Punzonado
Pu 54.58 Tn-m
qu 5.04 Tn/m2 V act. 52.97
α 30 103.5
0.35 m d 0.72 m V res. 891.0
Po 1.45 m 207.0
0.55 m Ao 0.32 m2 φVnp 87.99
Bc 1.57 m Cumple
10.- Verificación del Corte por Aplastamiento
C1 Esquina C2 Esquina
Pu 45.99 Tn-m Pu 54.54 Tn-m
B 0.35 m B 0.35 m
0.35 m L 0.55 m 0.35 m L 0.55 m
A1 0.19 m2 A1 0.19 m2
0.55 m A2 0.19 m2 0.55 m A2 0.19 m2
Pn 40.09 m2 Pn 40.09 m2
Necesita Dowells Necesita Dowells
As Dowells 0.0016 As Dowells 0.0038
C3 Esquina
Pu 54.58 Tn-m
B 0.35 m
0.35 m L 0.55 m
A1 0.19 m2
0.55 m A2 0.19 m2
Pn 40.09 m2
Necesita Dowells
As Dowells 0.0038
C1 C2 C3
P -46.87 Tn P -70.98 Tn P -58.60 Tn
Mx -0.42 Tn-m Mx -1.72 Tn-m Mx 0.68 Tn-m
0.80 m
5.04
5.04
q1 q2
0.28 m 0.28 m
3.70 m 6.025
9.73 m
10.00 m
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.28 5.04 4.85 -46.87 -42.01 0.67 -0.42 0.00 1.09
0.28 5.04 4.85 0.00 4.85 0.67 0.00 0.00 0.25
0.55 5.04 9.70 0.00 14.56 2.67 0.00 -12.89 -10.64
1.00 5.04 17.64 0.00 32.20 8.82 0.00 -33.98 -25.57
1.50 5.04 26.47 0.00 58.67 19.85 0.00 -57.41 -37.98
IZQUIERDA
D. al Borde qu V M
(m) (tn/m2) qu P Total qu M P*d Total
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.28 5.04 4.85 -58.60 -53.74 0.67 0.68 0.00 -0.01
0.28 5.04 4.85 0.00 4.85 0.67 0.00 0.00 0.67
0.55 5.04 9.70 0.00 14.56 2.67 0.00 -16.11 -13.45
DERECHA
490.94 Tn
373.61 Tn
4.85 Tn 4.85 Tn
+
-
-42.01 Tn -53.74 Tn
-56.32 Tn -80.90 Tn
-45.97 Tn -95.30 Tn
-
+
0.25 Tn
0.67 Tn
1.09 Tn
8.- Acero: Generalidades
ACERO MÍNIMO
Capas 1 Capa As mín req. 50.40 cm2
ρmin 0.0018 N° Varillas 26 varillas
Varilla asumida 5/8" Espaciamiento 13.34 cm
As Varilla 1.98 cm2 S 12.5 cm
φ de Varilla 1.59 cm 1 φ 5/8" @ 0.125m
TRAMO C1 - C2 TRAMO C2 - C3
ACERO (-) ACERO (-)
Mu 95.30 Tn-m Mu 88.10 Tn-m
Varilla asumida 5/8" Varilla asumida 5/8"
As Varilla 1.98 cm2 As Varilla 1.98 cm2
φ de Varilla 1.59 cm φ de Varilla 1.59 cm
As req 1.26 cm2 As req 1.17 cm2
Acero Mínimo Acero Mínimo
As req 50.40 cm2 As req 50.40 cm2
N° Varillas 26 varillas N° Varillas 26 varillas
Espaciamiento 13.34 cm Espaciamiento 13.34 cm
S 12.5 cm S 12.5 cm
1 φ 5/8" @ 0.125m 1 φ 5/8" @ 0.125m
TRANSVERSAL
Mu 125.05 Tn-m
Varilla asumida 5/8"
As Varilla 1.98 cm2
φ de Varilla 1.59 cm
As req 1.66 cm2
Acero Mínimo
As req 144.00 cm2
N° Varillas 73 varillas
Espaciamiento 4.63 cm
S 2.5 cm
1 φ 5/8" @ 0.025m