Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 20

Explosive Charging Table

Mass per Meter (kg)


Diameter (mm)
Inch 0.8
2.5 63.5 2.53
3 76.2 3.65
3.5 88.9 4.96
4 101.6 6.48
4.5 114.3 8.20

Bulk Explosives $/t Density Energy Factor Hole Diameters


ANFO 566.65 0.8 1 89
Fortan Ad 9 583.62 0.95 1.05 115
Fortan Ad 10 595.2 1 1.07 127
Fortan Ad 11 605.23 1.1 1.12 140
Fortan Ad 12 613.14 1.2 1.17 165
Fortan Ad 13 624.43 1.3 1.2 203
Fortis Ad 1.10 665.18 1.1 1 229
Fortis Ad 1.15 665.18 1.15 1.03 251
Fortis Ad 1.20 665.18 1.2 1.07 270
Fortis Ad 1.25 665.18 1.25 1.1
Fortis Ad H 1.10 652.64 1.1 1.03
Fortis Ad H 1.15 652.64 1.15 1.07
Fortis Ad H 1.20 652.64 1.2 1.1
Fortis Ad H 1.25 652.64 1.25 1.13
Fortis Ad S 1.10 674.48 1.1 0.97
Fortis Ad S 1.15 674.48 1.15 1
Fortis Ad S 1.20 674.48 1.2 1.04
Fortis Ad S 1.25 674.48 1.25 1.07

Cost/t Density
Stemming 26.00 1.80
Diameters $/m Drilling Cost Surface Det Accessories
89 3.21 $/bcm $/m Exel Connectadet 3.6m 3.99
102 3.38 Drill Ops Var 0.02 0.84 Exel Connectadet 4.9m 4.9
115 4.74 Drill Maint Var 0.17 6.21 Exel Connectadet 6.1m 5.36
127 4.77 Exel Connectadet 9m 6.56
140 5 Exel Connectadet 12m 8.27
165 5.29 Exel Connectadet 15m 10.05
203 5.32 Exel Connectadet 18m 11.86
229 5.37 Exel MSC $6.52
251 5.55 Connectaline $0.28
270 6.44 Exel Enduradet 9 $7.9
Exel Enduradet 12 $9.2
Exel Enduradet 15 $10.4
Exel Enduradet 18 $11.9
Exel Enduradet 24 $14.9
Exel Enduradet 30 $17.8
Exel Enduradet $19.8
Exel Enduradet $24.7
Exel Enduradet $35.5
Exel Enduradet $46.9

Stemming
Pentex H 150g $3.95
Pentex Stopeprime 400g $5.59
Pentex PPP 400g $6.54
$/hole
Surface Dets 6.56
Downhole delay $10.4
Booster $5.59
Stemming
Total Initiation Cost 22.54
Selo Group - Purwakarta
Drill and Blast Calculator

Shot No: 20201026.1

Shot Type Produksi


Shot Details
Jumlah Lubang 16
Diameters (Inch) 4.5
Burden (m) 4.5
Spacing (m) 5
Kedalaman Lubang (m) 9.00
Sub Drill (m) 0.5
Tinggi Stemming (m) 3,5
Jenis Explosive ANFO

Explosive Density 0.80 0.00


Charge (kg/m) 8.17 0.00
Charge Length (m) 5.00 0.00
Total Charge (kg) 40.85 0.00
Volume (bcm) 202.50 0.00
Drill Yield (bcm/m) 21.32 0.00

Powder Factor (kg/bcm) 0.20 0.00 0.00

Instructions/ Comments:

---------------------------------------------- -------------------------------------------
Juru Ledak Katek
Selo Group - Purwakarta
Drill and Blast Calculator

Shot No: 20201026.2

Shot Type Produksi


Shot Details
Jumlah Lubang 4
Diameters (Inch) 4.5
Burden (m) 4.5
Spacing (m) 5
Kedalaman Lubang (m) 10
Sub Drill (m) 0.5
Tinggi Stemming (m) 4
Jenis Explosive ANFO

Explosive Density 0.80


Charge (kg/m) 8.17
Charge Length (m) 6.00
Total Charge (kg) 49.02
Volume (bcm) 225.00
Drill Yield (bcm/m) 21.43

Powder Factor (kg/bcm) 0.22

Instructions/ Comments:

---------------------------------------------- -------------------------------------------
Juru Ledak Katek
Selo Group - Purwakarta
Drill and Blast Calculator

Shot No: 20201026.3

Shot Type Produksi


Shot Details
Jumlah Lubang
Diameters (Inch)
Burden (m)
Spacing (m)
Kedalaman Lubang (m)
Sub Drill (m)
Tinggi Stemming (m)
Jenis Explosive

Explosive Density 0.00 0.00


Charge (kg/m) 0.00 0.00
Charge Length (m) 0.00 0.00
Total Charge (kg) 0.00 0.00
Volume (bcm) 0.00 0.00
Drill Yield (bcm/m) 0.00 0.00

Powder Factor (kg/bcm) 0.00 0.00 0.00 0.00 0.00

Instructions/ Comments:

---------------------------------------------- -------------------------------------------
Juru Ledak Katek
PT. SELO AGUNG
Laporan Hasil Peledakan
Data Umum: 20201026.1 Cuaca: Cerah
Hari/Tanggal: Senin,26/10/2020 Material: Andesit
Lokasi: Level 433 025 SA I

Design Peledakan

Jumlah Lubang: 16

Burden (m): 4.5 Ukuran Lubang (inch): 4.5

Spacing(m): 5 Total Lubang: 18


Kedalaman Lubang
9 Volume Peledakan (bcm): 3,240
(m)
tidak termaksud subdrill Burden x Spacing x Kedalaman Lubang x Jumlah Lobang

Subdrill (m)
0.5 0.5 Volume Hasil Pickup / Survey = 4,163
Pemakaian Bahan Peledak

MANFO (kg): 725 Powder Factor (kg/bcm) 0.22

Powergel (kg): 6 (MANFO (kg) + Powergel (kg))/Volume Peledakan (bcm)

In Hole Detonator
(pcs): 16

Pemakaian Delay
Non Electric Non Electronic
Nomor Delay (ms) Pcs Nomor Delay Pcs
17 7 1
25 2 2
67 6 3
4
5
6
Electric 7
Nomor Delay (ms) Pcs 8
4 1 9
10

CATATAN

Hasil Peledakan: Bagus / Sedang / Jelek KOMENTAR


Asap Kuning: Sedikit/Sedang/Banyak
Misfire:

Juru Ledak Kepala Teknik


………………………………. ……………………………….
PT. SELO AGUNG
Laporan Hasil Peledakan
Data Umum: 20201026.2 Cuaca: Cerah
Hari/Tanggal: senin,26/10/2020 Material: Andesit
Lokasi: Level 433-025 SA I

Design Peledakan

Jumlah Lubang: 4

Burden (m): 4.5 Ukuran Lubang (inch): 4.5

Spacing(m): 5 Total Lubang: 4


Kedalaman Lubang
10 Volume Peledakan (bcm): 900.0
(m)
tidak termaksud subdrill Burden x Spacing x Kedalaman Lubang x Jumlah Lobang

Subdrill (m)
0.5 0.5 Volume Hasil Pickup / Survey = 4,588
Pemakaian Bahan Peledak

MANFO (kg): 175 Powder Factor (kg/bcm) 0.19

Powergel (kg): 2 (MANFO (kg) + Powergel (kg))/Volume Peledakan (bcm)

In Hole Detonator
(pcs): 4

Pemakaian Delay
Non Electric Non Electronic
Nomor Delay (ms) Pcs Nomor Delay Pcs
25 1 1
109 2 2
3
4
5
6
Electric 7
Nomor Delay (ms) Pcs 8
5 1 9
10

CATATAN

Hasil Peledakan: Bagus / Sedang / Jelek KOMENTAR


Asap Kuning: Sedikit/Sedang/Banyak
Misfire:

Juru Ledak Kepala Teknik


………………………………. ……………………………….
Ket 1 2

Jlh Lubang 5 10

Burden 4 4

Spacing 5 5.5

Kedalaman 10.00 11

Subdril 0.5 0.5

Diameter
4.5 4.5
Lubang

875
PT. SELO AGUNG
Laporan Hasil Peledakan
Data Umum: Cuaca:
Hari/Tanggal: Material:
Lokasi:

Design Peledakan

Jumlah Lubang:

Burden (m): Ukuran Lubang (inch):

Spacing(m): Total Lubang:


Kedalaman Lubang
Volume Peledakan (bcm):
(m)
tidak termaksud subdrill Burden x Spacing x Kedalaman Lubang x Jumlah Lobang

Subdrill (m) Volume Hasil Pickup / Survey =


Pemakaian Bahan Peledak

MANFO (kg): Powder Factor (kg/bcm)

Powergel (kg): (MANFO (kg) + Powergel (kg))/Volume Peledakan (bcm)

In Hole Detonator
(pcs):

Pemakaian Delay
Non Electric Non Electronic
Nomor Delay (ms) Pcs Nomor Delay Pcs
17 1
25 2
67 3
4
5
6
Electric 7
Nomor Delay (ms) Pcs 8
9
10

CATATAN

Hasil Peledakan: Bagus / Sedang / Jelek KOMENTAR


Asap Kuning: Sedikit/Sedang/Banyak
Misfire:

Juru Ledak Kepala Teknik


………………………………. ……………………………….
Jangan dihapus : tidak

Ket 1 2

Jlh Lubang

Burden

Spacing

Kedalaman

Subdril

Diameter
Lubang
Design Timing Peledakan
Pattern :
O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O O

O O O O O O O O O O O O O O O O

---------------------------------------------- -------------------------------------------
Juru Ledak Katek
Selo Group - Purwakarta
Drill and Blast Calculator

Shot No:

Shot Type Produksi


Shot Details
Jumlah Lubang 27
Diameters (Inch) 4.5
Burden (m) 3
Spacing (m) 4.5
Kedalaman Lubang (m) 7.5
Sub Drill (m) 0.5
Tinggi Stemming (m) 3
Jenis Explosive ANFO

Rumus dari P.Hamond Aktual di lapangan

Explosive Density 0.80 0.00 0.00 0.00


Charge (kg/m) 8.20 0.00 0.00 0.00
Charge Length (m) 5.00 0.00 0.00 0.00
Total Charge (kg) 41.02 0.00 0.00 0.00
Volume (bcm) 101.25 0.00 0.00 0.00
Drill Yield (bcm/m) 12.66 0.00 0.00 0.00

Powder Factor (kg/bcm) 0.41 0.00 0.00 0.00 0.00


PT. SELO AGUNG
Laporan Hasil Peledakan
Data Umum: Cuaca:
Hari/Tanggal: Material:
Lokasi:

Design Peledakan

Jumlah Lubang:

Burden (m): Ukuran Lubang (inch):

Spacing(m): Total Lubang:


Kedalaman Lubang
Volume Peledakan (bcm):
(m)
tidak termaksud subdrill Burden x Spacing x Kedalaman Lubang x Jumlah Lobang

Subdrill (m) Volume Hasil Pickup / Survey =


Pemakaian Bahan Peledak

MANFO (kg): Powder Factor (kg/bcm)

Powergel (kg): (MANFO (kg) + Powergel (kg))/Volume Peledakan (bcm)

In Hole Detonator
(pcs):

Pemakaian Delay
Non Electric Non Electronic
Nomor Delay (ms) Pcs Nomor Delay Pcs
17 1
25 2
67 3
4
5
6
Electric 7
Nomor Delay (ms) Pcs 8
9
10

CATATAN

Hasil Peledakan: Bagus / Sedang / Jelek KOMENTAR


Asap Kuning: Sedikit/Sedang/Banyak
Misfire:

Juru Ledak Kepala Teknik


………………………………. ……………………………….
PT. SELO AGUNG
STONE QUARRY INDUSTRY
LAPORAN INTERNAL PELEDAKAN
I. DATA UMUM
Nomor Laporan : 20201026.1 dan 20201026.2 Cuaca : Cerah
Hari/Tanggal : Senin,26/10/2020 Mulai Pengisian : 10.00 WIB
Lokasi (& GPS) : Level 433 025 SA I Saat Peledakan : 11.30 WIB
Material : Andesit Alat Drilling :

II. GEOMETRI & VOLUME PELEDAKAN III. SKETSA PELEDAKAN

Tinggi Jenjang yang tertulis di bawah ini adalah yang sudah dikurangi dengan Subdrill
Subdrill = 0.5 M SF = 1.4
(D) Diameter (H) Tinggi (N) Jumlah LCM = BCM x
Jumlah Baris (B) Burden x (S) Spacing x x = BCM =
Lubang Bor Jenjang Lubang SF
BARIS INCIH METER METER METER LUBANG M3

4.5 4.5 5 9 27 = 5,468 BCM = 7,656 LCM


4.5 4.5 5 9 8 = 1,620 BCM = 2,268 LCM
4.5 4 5 7.5 23 = 3,450 BCM = 4,830 LCM
= - BCM = - LCM
x x x = - BCM = - LCM

Setelah x MR
(MR) MINING RECOVERY = 60% ->> 6,323 BCM = 8,852 LCM

IV. PEMAKAIAN BAHAN PELEDAK


Ammonium Nitrate (ANFO) : 900 KG
Dynamite (POWERGEL) : 8 KG TOTAL ANFO + POWERGEL = 908 KG
Electric Detonator (DETO) : 2 PCS

No. 0 : PCS
No. 1 : PCS In Hold 12 M : 58 PCS Non Electric
No. 2 : 2 PCS TLD 17 MS : 12 PCS
No. 3 : PCS TLD 25 MS : 4 PCS
No. 4 : PCS TLD 42 MS : - PCS
No. 5 : PCS TLD 67 MS : 6 PCS
No. 6 : PCS TLD 109 MS : - PCS
No. 7 : PCS : PCS
No. 8 : PCS : PCS
No. 9 : PCS : PCS
No. 10 : PCS

V. POWDER FACTORY (PF) = (TOTAL ANFO + POWELGEL)/(TOTAL BCM) = 0.086 KG/M3


VI. CATATAN
Diajukan Oleh; Disetujui Oleh;
Juru Ledak Kepala Teknik Tambang

Revisi 05/X/2019

You might also like